VC_Southest_Storage_and_Re-Pump_Facility_Bid_Form.xlsx

XLSX spreadsheet 16 KB Posted

Attached to
Southwest Storage and Repump Facility
Solicitation number
26-B-50IF
Issued by
Volusia County, Florida

About this file

This is a bid tab form for Volusia County's Southwest Storage and Re-Pump Facility (SWSRF) project in Florida. The project encompasses construction of a new two-million-gallon potable water storage tank, high service pump station, and combined electrical/IT/chemical storage building, along with associated civil site development, concrete foundations, mechanical systems, electrical and instrumentation installations. The bid form details line items across fifteen major work categories, including mobilization and demobilization, site work, ground storage tank installation, yard piping systems, chemical feed systems, high service pumps, a sanitary sump pump station, operations building construction, and electrical and instrumentation work. Site work quantities include tree removal (116 each), clearing and grubbing (2.5 acres), excavation of unsuitable material (4,200 cubic yards), importing fill (18,200 cubic yards), sod installation (624 square yards), and seed application (8,665 square yards). Major structural components include a 2.0 MG ground storage tank, three high service pump and motor units, chlorine and ammonia chemical storage and feed systems, and a 3,100 square foot operations building with HVAC systems.

The bid form includes a construction allowance provision with a specified amount of $1,362,500 and requires bidders to complete unit pricing and total pricing columns for all line items. The form references a use directive related to the construction allowance, and includes a provision for a base bid subtotal with an allowance that feeds into a total bid calculation, though the final bid total field displays a calculation error. The project encompasses comprehensive water infrastructure improvements designed to enhance system capacity and operational reliability for Volusia County's Southwest Service Area in support of long-term potable water service needs.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Tab

Volusia County
Southwest Storage & Re-Pump Facility (SWSRF)
BID TAB FORM
ItemDescriptionUNITQTYUnit PriceTotal Price
1Mobilization, Bonds, Insurance, and General Conditions
1.1Mobilization, Bonds, Insurance, and General ConditionsLS1
2Demobilization, Record Drawings and Closeout
2.1Demobilization, Record Drawings and CloseoutLS1
3Pre-Construction Video
3.1Pre-Construction VideoLS1
4Site Work
4.1Erosion & Sedimentation Control (including silt fence)LS1
4.2Tree RemovalEA116
4.3Clearing and GrubbingAC2.5
4.4Excavation and Removal of Unsuitable MaterialCY4200
4.5Importing FillCY18200
4.6Proofrolling SiteAC2.5
4.7DewateringLS1
4.8GradingLS1
4.9SodSY624
4.10SeedSY8665
4.11Stormwater Piping System and StructuresLS1
4.12Stormwater PondLS1
4.13Concrete Pads for Above Ground Assemblies and Generator and TransformerCY46
4.14Concrete Driveway (6" thick)CY279
4.15Asphalt DrivewaySY275
4.16FencingLF1490
4.17Roll GateLS1
52.0 MG Ground Storage Tank (GST)
5.1Furnish & Install New GST (2,000,000 gal)LS1
5.2Furnish & Install 16" GST Fill Piping up to the Valve (including the Valve and couplings)LS1
5.3Furnish & Install 24" GST Discharge Piping up to the Valve (including the Valve and couplings)LS1
5.4Furnish & Install 8" GST Drain Piping (including the Valve)LS1
5.5Install Safety Ladder and Safety Rails Around the Roof HatchLS1
5.6Apply Interior CoatingLS1
5.7Furnish & Install GST In-Tank Pax MixerLS1
6Yard Piping
6.1Furnish & Install 16" DIP Supply and GST Fill Line including Fittings and 16" Gate ValveLS1
6.2Furnish & Install 24" DIP GST Discharge Piping including FittingsLS1
6.3Furnish & Install 24" DIP HSP Header and Discharge Piping including FittingsLS1
6.4Furnish & Install 24"/16" DIP Finished Water Discharge Piping including FittingsLS1
6.5Furnish & Install 16" DIP GST By-Pass Piping including Fittings and 16" Gate ValveLS1
6.6Furnish & Install 16" DIP SWSRF By-Pass Piping including Fittings and 16" Gate ValveLS1
6.7Furnish & Install Fire Hydrant with associated Piping and ValveEA1
6.8Furnish & Install 2" Potable Water Service Meter Assembly and Service to the FacilitiesLS1
6.9Connect SWSRF to the Potable Water Distribution SystemEA2
7Aboveground Check Valve Assembly
7.1Furnish & Install 16" DIP Check Valve Assembly on SWSRF By-Pass LineLS1
8Aboveground Solenoid Controlled Back Pressure Sustaining Valve and Flow Meter Assembly
8.1Furnish & Install 16" DIP Solenoid Controlled Back Pressure Sustaining Valve and Flow Meter Assembly on Supply LineLS1
9Aboveground Chemical Injection Assembly
9.1Furnish & Install 24" DIP Chemical Injection Assembly with Static Mixer and Injection Quills (Chlorine & Ammonia)LS1
10Aboveground Finished Water Flow Meter Assembly
10.1Furnish & Install 24" DIP Finished Water Flow Meter AssemblyLS1
11Chlorine & Ammonia Chemical Feed System & Storage
11.1Furnish & Install Single Wall Chlorine Storage Tank (500 gal)EA1
11.2Furnish & Install Single Wall Ammonia Storage Tank (100 gal)EA1
11.3Furnish & Install Chlorine Chemical Feed SkidEA1
11.4Furnish & Install Ammonia Chemical Feed SkidEA1
11.5Furnish & Install Water Quality AnalyzersLS1
11.6Furnish & Install Chemical Yard PipingLS1
11.7Furnish & Install Water Quality Sampling Yard PipingLS1
11.8Furnish & Install Safety Shower and EyewashEA1
11.9Furnish & Install Hose Bib AssemblyEA3
12High Service Pumps
12.1Furnish & Install HSP Piping AssemblyEA3
12.2Furnish & Install High Service Pumps & MotorsEA3
12.3Furnish & Install Adjustable Pipe SupportEA6
12.4Form & Pour Three (3) Concrete Pads for HSPsCY8
13Sanitary Sump Pump Station and 2-inch Force Main
13.1Sanitary Sump PumpLS1
13.22-inch Force MainLF260
14Operations Building
14.1Furnish & Install Operations Building (62 x 50 SF)SF3100
14.2Furnish & Install HVAC for Operations Building - Electrical & I&C and IT RoomsLS1
14.3Furnish & Install Louvres Exhaust Fan for HSP RoomLS1
15Electrical & I/C SCADA
15.1Furnish & Install Electrical & I&C , GST, HSP, & Chemical Feed SystemsLS1
15.2Furnish & Install Electrical & IT RoomLS1
15.3Furnish & Install 250 kW GeneratorLS1
15.4Grounding & Lightening ProtectionLS1
15.5Furnish & Install Exterior and Interior LightingLS1
15.6Furnish & Install FPL Power Feed & TransformerLS1
15.7Furnish & Install Security SystemLS1
Base Bid Subtotal Construction
Allowance Use Directive$1,362,500
Base plus Allowance Bid TotalERROR:#REF!

File details come from the government source that posted it. Updated .