PRIME-SUB_FORM_for_Contractors_rev._01.15.2025_(lock_before_publishing).xls
XLS spreadsheet 38 KB Posted
- Attached to
- Southwest Storage and Repump Facility
- Solicitation number
- 26-B-50IF
- Issued by
- Volusia County, Florida
About this file
This is a Prime/Subcontractor Form for Volusia County, Florida, designed for bidders responding to Invitation to Bid No. 25-B-##XX for Contract No. C-2014 related to the Southwest Storage and Repump Facility project. The project involves construction of a two-million-gallon potable water storage tank, a high-service pump station, and a combined electrical/IT/chemical storage building, along with associated civil site development, concrete foundations, mechanical systems, electrical and instrumentation installations. Bidders must identify all proposed subcontractors and the specific dollar values and percentages of work each entity will perform. The anticipated subcontractor disciplines required include underground utilities, electrical work, instrumentation, site work, and ground storage tank installation, with additional subcontractors added as needed. The County reserves the right to seek clarification on subcontractors but will not allow changes to total base bid pricing, and any subcontractor changes during project completion require prior written approval from the County Project Manager.
The form requires bidders to complete designated green-shaded cells with dollar values for both the prime contractor and all subcontractors, with all other cells automatically calculating percentages of work performed. The total bid price, inclusive of any performance or payment bonds, must match the amount listed on the Bid Price Sheet, and the percentages must total 100 percent. Failure to complete and return this form may result in a non-responsive bid. The form will also be used to determine local preference eligibility in accordance with Section 2.8, D of the solicitation. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and the County Project Manager must provide approval for any modifications to the subcontractor team.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Contract No. C-2014 | ITB No. 25-B-##XX | ||||
| PRIME/SUBCONTRACTOR FORM | |||||
| FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID | |||||
| Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing. | |||||
| TOTAL BID | $ - 0 | This number should match the Total Bid Price |
(inclusive of performance/payment bond, if applicable) as listed on Bid Form/Exhibit ?/Attachment ? - Bid Price Sheet
| PRIME CONTRACTOR | Company name and complete address | Dollar Value performed by Prime Contractor | % of Work performed by Contractor |
| $ - 0 | 0.00% | ||
| List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation. | |||
| Anticipated Subcontractor Disciplines required for this project. | Company name and complete address | Dollar Value performed by Subcontractor(s) | % of Work performed by Subcontractor |
| Underground utilities | $ - 0 | 0.00% | |
| Electrical | $ - 0 | 0.00% | |
| Instrumentation | $ - 0 | 0.00% | |
| Site Work | $ - 0 | 0.00% | |
| Ground Storage Tank | $ - 0 | 0.00% | |
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| $ - 0 | 0.00% | ||
| Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100% | $ - 0 | 0% |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .