VAMC Butler Replace CLC Nurse Call System - Construction Bid Drawings.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24425R0073
About this file
These are construction bid drawings for the VA Medical Center in Butler, Pennsylvania, detailing a comprehensive nurse call system replacement project. The drawings cover multiple buildings (Buildings 20-25) including CLC (Community Living Center), Freedom Hall, Independence House, Liberty House, Inspiration House, and Serenity House. The technical documents specify electrical and communications infrastructure modifications, including installing new nurse call terminal cabinets, patient room communication devices, staff stations, pull cords, and interconnected systems across six separate buildings. The drawings provide detailed floor plans, electrical layouts, mounting specifications, and system connection diagrams for a full replacement of the existing nurse call infrastructure, with careful attention to mounting heights, conduit pathways, and integration with existing electrical systems.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED
Department of Veterans Affairs Medical Center
ABOVE GROUP, INC.
PRIME/ELECTRICAL
305 EAST DRIVE, SUITE H
MELBOURNE, FL 32904
321.345.9026 P
305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
JOHN POE ARCHITECTS
ARCHITECTURAL/ICRA
3131 NEWMARK DRIVE, SUITE 200
DAYTON, OHIO 45342
937.461.3290 P
STANTON ENGINEERING
SERVICES, LLC
LIFE SAFETY
10280 OLD COLUMBIA ROAD, SUITE 275,
COLUMBIA, MD 21046
410.290.9301 P
A u to d e s k D o c s /0
V A
M C
B u tl e r R e p la c e
C L C
N u rs e C a ll/
V A
M C
B u tl e r C
L C
N u rs e C a ll
R
E .r v t
/1
/2
:0
:5
A
M
GI001
COVER SHEET VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 BNJ WWS
CONTRACT DOCUMENTS
VAMC Butler Replace CLC Nurse Call
325 New Castle Road Butler, PA 16001 PROJECT #: 529-22-102
SHEET LIST
SHEET NUMBER SHEET NAME
GENERAL
GI001 COVER SHEET
GI002 CAMPUS MAP
ARCHITECTURAL
A-100-A B2 BASEMENT PLAN
A-100-B B2 FIRST FLOOR PLAN
A-100-C B2 SECOND FLOOR PLAN
A-101-A B20 AREA A FIRST FLOOR PLAN
A-101-B B20 AREA B FIRST FLOOR PLAN
A-101-C B20 AREA C FIRST FLOOR PLAN
A-102 B21 FIRST FLOOR PLAN
A-103 B22 FIRST & SECOND FLOOR PLANS
A-104 B23 FIRST & SECOND FLOOR PLANS
A-105 B24 FIRST & SECOND FLOOR PLANS
A-106 B25 FIRST FLOOR PLAN
ELECTRICAL
E-001 ELECTRICAL LEGENDS & SYMBOLS
ED100-A B2 BASEMENT ELECTRICAL PLAN - DEMO
ED100-B B2 FIRST FLOOR ELECTRICAL PLAN - DEMO
ED100-C B2 SECOND FLOOR ELECTRICAL PLAN - DEMO
ED101-A B20 AREA A FIRST FLOOR ELECTRICAL PLAN - DEMO
ED101-B B20 AREA B FIRST FLOOR ELECTRICAL PLAN - DEMO
ED101-C B20 AREA C FIRST FLOOR ELECTRICAL PLAN - DEMO
ED102 B21 FIRST FLOOR ELECTRICAL PLAN - DEMO
ED103 B22 FIRST & SECOND FLOOR ELECTRICAL PLANS - DEMO
ED104 B23 FIRST & SECOND FLOOR ELECTRICAL PLANS - DEMO
ED105 B24 FIRST & SECOND FLOOR ELECTRICAL PLANS - DEMO
ED106 B25 FIRST FLOOR ELECTRICAL PLAN - DEMO
E-100-A B2 BASEMENT ELECTRICAL PLAN - NEW
E-100-B B2 FIRST FLOOR ELECTRICAL PLAN - NEW
E-100-C B2 SECOND FLOOR ELECTRICAL PLAN - NEW
E-101-A B20 AREA A FIRST FLOOR ELECTRICAL PLAN - NEW
E-101-B B20 AREA B FIRST FLOOR ELECTRICAL PLAN - NEW
E-101-C B20 AREA C FIRST FLOOR ELECTRICAL PLAN - NEW
E-102 B21 FIRST FLOOR ELECTRICAL PLAN - NEW
E-103 B22 FIRST & SECOND FLOOR ELECTRICAL PLANS - NEW
E-104 B23 FIRST & SECOND FLOOR ELECTRICAL PLANS - NEW
E-105 B24 FIRST & SECOND FLOOR ELECTRICAL PLANS - NEW
E-106 B25 FIRST FLOOR ELECTRICAL PLAN - NEW
E-501 ELECTRICAL DETAILS
E-601 NURSE CALL DIAGRAM
E-602 PANEL SCHEDULES & INTERCOM DIAGRAM
PROJECT LOCATION
© Google Maps
Revisions Date
MAIN BUILDING
NEW CASTLE ROAD
24AREA OF WORK
CLC
AREA OF WORK
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
A u to d e s k D o c s /0
V A
M C
B u tl e r R e p la c e
C L C
N u rs e C a ll/
V A
M C
B u tl e r C
L C
N u rs e C a ll
R
E .r v t
/1
/2
:0
:5
A
M
GI002
CAMPUS MAP VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 BNJ WWS
CONTRACT DOCUMENTS
N.T.S.
CAMPUS MAP
N
B012
B001
B024
B002
B023
B003
B005
B006
B013
B007
B010 B009 B008
B011
B
B019
B020
B021
B022
B018
B015
B016
B017
B
B002A
B004
B014A
EXIST.
CUST./RISER
SUPPLY
STORAGE
SUBSISTENCE
STORAGE
TRAY
ASSEMBLY
COOK'S
OFFICE
DIETARY
OFFICE
EXIST.
MECH.
EXIST.
MECHANICAL
EXIST.
CORRIDOR
EXIST.
ELEVATOR
CART
STAGING
EXIST.
MECHANICAL
EXIST.
ELECTRICAL
DISH
WASH
EXIST.
TOILET
EXIST.
STAIR
B
E X
IS
T
S
E R
V
IC
E T
U N
N E
L
KITCHEN
PREP.
FREEZER
COOLER
CART
COOLER
DOCK
STAGING
CONTAMINATED
WASTE
TRASH
COLLECTION
CAN
WASH
N E
W S
E R
V
IC
E T
U N
N E
L
ELEC
ELEC
CLO
9.28
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:0
A M
A-100-A
B2 BASEMENT PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD JW
CONTRACT DOCUMENTS
Scale: 1/8" = 1'-0"1
B2 BASEMENT PLAN
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
KEYNOTES
0 4' 8' 16' 24'
1/8" = 1'-0"N
9.28 Gypsum board ceiling.
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
113112111110109108
100A 100B
119 118 117 116 600 115
102 100C101
127 400 126 125 124 123 122 500
114A
CHAPLAIN
OFFICE
#1
EXAM
ROOM
#2
EXAM
ROOM
#1
CLEAN
LINEN
SOLID
LINEN
OFFICE
UNASSIGNED
MULTIUSE
ELECT.
ICRA
CART
VENDING
AREA
I.T.
EXIST.
ELEVATOR
EXIST.
LOBBY
EXIST.
CORRIDOR
CHAPEL
EXIST.
VESTIBULE
SEATING
AREA
POLICE/
SECURITY
WOMEN'S
RESTROOM
MEN'S
RESTROOM PSYCHOLOGIST
EXIST.
STAIR
C CHAPLAIN
OFFICE
#2
EXIST.
MECH.
CHASE
EXIST.
OFFICE
EXIST.
VESTIBULE
EXIST. NURSING
CLC
SUPPORT
EXIST.
TOILET
EXIST.
ADHC
OFFICE
EXIST.
STAIR
A
EXIST.
ADHC/
KT OFFICE
EXIST.
RESTROOM
EXIST.
NURSE
EXIST.
STORAGE JANITOR
EXIST.
STAIR
B
EXIST.
MECH.
CHASE
EXIST.
CORRIDOR
EUCHARISTIC
9.289.28 9.289.28
9.28 9.28
9.28 9.28 9.28 9.28 9.28
9.28
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:0
A M
A-100-B
B2 FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD JW
CONTRACT DOCUMENTS
0 4' 8' 16' 24'
1/8" = 1'-0"N
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
9.28 Gypsum board ceiling.
KEYNOTES
Scale: 1/8" = 1'-0"1
B2 FIRST FLOOR PLAN
D W
212211210209
207 -206205204203202201
400 228 227 226 225
- 222 221 220 219 218 217 600
EXIST.
CORRIDOR
H.A.C.
WHEELCHAIR
REPAIR
EMS
KITCHEN/
BREAK
BIOMED
EMS
EQUIPMENT
EMS
OFFICE
KITCHEN
SUPERVISOR
EQUIPMENT
WASH
EMS/SEWING
UNIFORM
FIRE ALARM
SECURITY
EXIST.
ELEVATORPYXISSPS
SPS
WASH
DOWNNURSENURSENURSE
NURSE
EXIST.
TOILET
EXIST.
STAIR
A OFFICE
OXYGEN
STORAGE
RESPIRATORY
THERAPY
NURSE
STORAGE
EXIST.
MECH.
CHASE
EXIST.
STAIR
B
EXIST.
MECH.
CHASE
EXIST.
VESTIBULE
MIT
CART
STORAGE
FOOD
SERVICE
DIRECTOR
FOOD
SERV.
ADM.
ASSIT.
PORTABLE
XRAY
STOR.
EXIST.
MEN
R.R.
EXIST.
WOMEN
R.R.
EXIST.
STAIR
C
EAST
ATTIC
9.28
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-100-C
B2 SECOND FLOOR VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD JW
CONTRACT DOCUMENTS
Scale: 1/8" = 1'-0"1
B2 SECOND FLOOR
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
KEYNOTES
9.28 Gypsum board ceiling.
0 4' 8' 16' 24'
1/8" = 1'-0"N
127B
123E
123A
123C
127E
123D
123F
203A
220 220
123B
104103
127A
126A
127C
127D
201A
202A
223A 222A
221A
211A
210A
209A208A
207A
209208
203B
206A
MECH / ELEC
CLEAN
SPA
STAFF
CONFERENCE
CLERICAL
RECEPTION
WAIT
TELECOM
EQUIP.
STOR.
BLDG.
STOR.
NURSE
MGR.
VEST.
MULTI-PURPOSE
STOR
JAN. CL.
FIRE ALARM &
NURSE CALL
WARMING
KITCHEN
FAMILY
DINING
NURSE
MED. /
TREAT.
LIVING DINING
CORR.
ELEC.
ATRIUMCORR.
ELEC.
PUBLIC TLT.PUBLIC TLT.
STAFF TLT.
SPA TLT.
STOR
CONSULT /
FILES
PAT. RM.
TLT.
PAT. RM.
TLT.
TLT. TLT.
TLT.
TLT.
TLT.
TLT.TLT.
TLT.
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.
PAT. RM.PAT. RM.
PAT. RM.
CORR.
CORR.
CORR.
JAN. CL.
STAFF TLT.
STORAGE
SOILED
ATTIC
ACCESS
217A
219A 218A
216A215A
217216215
TLT.
TLT. TLT.
TLT.TLT.
PAT. RM.
PAT. RM.
PAT. RM.PAT. RM.PAT. RM.
CORR.
MATCHLINE - REFER TO PLAN 1/A-101-B FOR CONTINUATION
9.28 9.28
9.28
9.28
9.28
9.28
9.28 9.28
9.289.289.28
9.28
9.28
9.28 9.289.28 9.28
9.28
9.28
9.28
9.28
9.28 9.28
9.289.28
9.28
9.28
9.28
9.28
9.28 9.28
9.28 9.28 9.28
9.28
9.28 9.28
9.28
9.28
9.28
9.28
9.28
1.11
1.11
1.12
1.12
1.12
1.10
1.10
1.12
SAC
AREA A
AREA B
AREA C
200 WING
300 WING
W
IN
G
400 WING500 WING
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-101-A
B20 AREA A FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
0 4' 8' 16' 24'
1/8" = 1'-0"
N
1/8" = 1'-0"
B20/CLC AREA A FIRST FLOOR PLAN
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
N.T.S.
KEY PLAN - AREA A
N.T.S.
PHASING PLAN
1.10 Seal existing door per ICRA requirments on construction side.
1.11 Contractor access.
1.12 Phase boundary.
9.28 Gypsum board ceiling.
KEYNOTES
100N
321B
304304
100N
301 302
323 322
316 315
301A 302A
303A
323A 322A
317A
316A 315A
314A
313A
321A
318A
CORRIDOR
WARMING
KITCHEN
FAMILY
DINING
NURSE
MED. /
TREAT.
ELEC.
DININGLIVING
CORR.
PAT. RM. PAT. RM.
PAT. RM.
PAT. RM. PAT. RM.
CORR.
CORR.
PAT. RM.
PAT. RM. PAT. RM.
PAT. RM.
PAT. RM.
CORR.
TLT. TLT.
TLT.
TLT. TLT.
TLT.
TLT. TLT.
TLT.
TLT.
STAFF TLT.
STORAGE
SOILED
ATTIC
ACCESS
JAN. CL.
305A 306A
307A308A309A
307308309
117120
119 118
106A
116A 117A
100A
100B
100N
116B
116B
TLT. TLT.
TLT.TLT.TLT.
PAT. RM.
PAT. RM.
PAT. RM.PAT. RM.PAT. RM.
CORR.
MULTIPURPOSE
GAME ROOMMECH / ELEC
ELEC STORAGE
STORAGE
TLT
STUDY
THERAPY
STORAGE
STORAGE
SEATING
AREA
CORR.
SEATING
AREA
CORR.
ATTIC
ACCESS
STORAGE
MATCHLINE - REFER TO PLAN A-101-A FOR CONTINUATION
MATCHLINE - REFER TO PLAN 1/A-101-C FOR CONTINUATION
NCS
9.289.289.289.289.28
9.28 9.28
9.28
9.289.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28 9.28
9.28
9.28
9.28
9.28
9.28 9.289.28
9.28 9.28 9.28 9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
1.10
1.12
1.11
1.11
1.12
1.12
1.10
1.12
AREA A
AREA B
AREA C
200 WING
300 WING
W
IN
G
400 WING500 WING
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-101-B
B20 AREA B FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
0 4' 8' 16' 24'
1/8" = 1'-0"
N
1/8" = 1'-0"
B20/CLC AREA B FIRST FLOOR PLAN
N.T.S.
KEY PLAN - AREA B
N.T.S.
PHASING PLAN
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
1.10 Seal existing door per ICRA requirments on construction side.
1.11 Contractor access.
1.12 Phase boundary.
9.28 Gypsum board ceiling.
401A
E125
403A
E125.1
425A
424A
423A
423B
419A
418A
416A
415A
414A
409A
408A
410A
407A
406A
405A402
524A
523A
503A
519A
519B
518A
517A
516A
514A
513A
512A
511A
510A
509A
508A
507A
502A
501A
417A
BARIATRIC
TOILET
BARIATRIC
PAT. ROOM
PAT. ROOM
PAT. ROOM
CORR.
TOILET
TOILET
BARIATRIC
TOILET
BARIATRIC
PAT. ROOM
PAT. ROOM
TOILET
NURSE
STAFF
TLT.
JAN. CL.
STORAGE
SOILED
MED./TREAT.
PAT. ROOM
TOILET
PAT. ROOM
TOILET
TOILET
PAT. ROOM
PAT. ROOM
TOILET
PAT. ROOM
TOILET
ELEC.
WARMING
KITCHEN
FAMILY
DINING
PAT. ROOM
PAT. ROOM
PAT. ROOM
TOILET
TOILET
TOILET
PAT. ROOM
TOILET
TOILET
PAT. ROOM
DINING
LIVING
CORR.
CORR.
SUN
ROOM
ATTIC
ACCESS
PAT. ROOM
TOILET
PAT. ROOM
TOILET
PAT. ROOM
TOILET
ELEC.
SOILED RM.
JAN. CL
STORAGE
NURSE
MED/TREAT
STAFF
TLT.
PAT. ROOM
TOILET
BARIATRIC
TOILET
BARIATRIC
PAT. ROOM
BARIATRIC
PAT. ROOM
BARIATRIC
TOILET
ATTIC
ACCESS
TOILET
PAT. ROOM
TOILET
PAT. ROOM
DINING
SUN
ROOM
LIVING
PAT. ROOM
PAT. ROOM
TOILET
TOILET
PAT. ROOM
PAT. ROOM
PAT. ROOM
TOILET
TOILET
TOILET
FAMILY
DINING
WARMING
KITCHEN
PAT. ROOM
TOILET
PAT. ROOM
TOILET
CORR.
CORR.
CORR.
ATRIUM
ATTIC
ACCESS
107A
108A
108E
108D
108C
108B
100C
112A
DATA
VISITOR
BEDROOM
SPA
TOILET
TOILET
CLEAN SUPPLY
CLERICAL
STAFF
BREAK
CONSULT
OFFICE
CONFERENCE
SPD
EQUIPMENT
STORAGE
FAMILY
LAUNDRY
CORR.
CORR.
SEATING
AREA
PRIVATE
TOILET
MATCHLINE - REFER TO PLAN 1/A101-B FOR CONTINUATION
NCS
NCS
9.28 9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
1.11
1.11
1.10
1.10
1.12
1.10
1.12
1.12
1.12
1.12
1.12
1.12
1.11
1.11
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28 9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
9.28
404A
1.15
1.15
AREA A
AREA B
AREA C
200 WING
300 WING
W
IN
G
400 WING500 WING
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-101-C
B20 AREA C FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
1/8" = 1'-0"
B20/CLC AREA C FIRST FLOOR PLAN
0 4' 8' 16' 24'
1/8" = 1'-0" N
N.T.S.
KEY PLAN - AREA C
N.T.S.
PHASING PLAN
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. At hatched area contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
1.10 Seal existing door per ICRA requirments on construction side.
1.11 Contractor access.
1.12 Phase boundary.
1.15 Maintain clear emergency egress throughout construction.
9.28 Gypsum board ceiling.
VITREO
US CHINA
C_URINALSBARDO
N
K-4915
100 142
142B
142A
100W
140W
137W 139W
128W
129W
138W
136W
135W
134W
133W
132W
131W
130W
100W
124123
122121
116E
116D116A
116BA
116B
116C
115114A
D-144
113E
113D 113C 112 D-152
113B
113A
106107109
VESTIBULE
LOBBY CLERICAL
STORAGE
DIRECTOR'S
OFFICE
STAFF
CORRIDOR
GROUP
THERAPY
PROG. COORD.
OFFICE
STOR.
GROUP
THERAPY
GROUP
THERAPY
STUDENT
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR.
VESTIBULE
CORRIDOR
GROUP
THERAPY
WOMEN
DINING
WARMING
KITCHEN
CORRIDOR
PHONEPHONE
PHONE
STOR.
CUST. COORD.
OFFICE
TLT.
TLT.
ART
OCC. THER.
KITCHENSTOR.
RESOURCE
LIBRARY
COMP.
REC. THER.
OFFICE
RECREATION
SPD
STOR.STOR.
PHYS. THER.
CORRIDOR
DOCK
LINEN
HOLD
DATA SWITCHGEAR
MECHANICAL
EQUIPMENT P/FP
ELEC.
STOR.
VENDING
SPECIMEN
TOILET
MEN
DOM. ASSIST.
MEDS.
NURSEEXAM
NURSE
PRACTITIONER
JAN. CL.
9.28
9.28 9.28
9.28
9.28 9.28 9.28
9.28
9.28
9.28
9.28
9.28
9.289.28
9.28
9.28
9.28
9.289.28
9.28
9.28
9.28
9.28
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-102
B21 FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
0 4' 8' 16' 24'
1/8" = 1'-0" N
1/8" = 1'-0"
B21/FREEDOM HALL FIRST FLOOR PLAN
GENERAL NOTES:
1. All ceilings acoustic ceiling tile unless otherwise noted.
2. Contractor to access one room at a time. Where work is required in corridor install temporary plastic barrier at boundries per ICRA requirements.
9.28 Gypsum board ceiling.
B1-10
B1-12
B1-11
B1-13
B1-14
B1-15B1-16
B2-10
B2-12
B2-11
B2-13
B2-14
B2-15B2-16
B3-10
B3-12
B3-11
B3-13
B3-14
B3-15
FOYER
GREAT ROOM
COATS
KITCHEN
LAUNDRYMECH.
FOYER
GREAT ROOM
COATS
STOR.
KITCHEN
LAUNDRYMECH.
FOYER
GREAT ROOM
COATS
LAUNDRY/
STOR.
KITCHEN
MECH.
B1-23
B1-20
B1-21
B1-22
B1-24B1-25
B1-26 B1-27
B2-23
B2-20
B2-22
B2-24B2-25
B2-26 B2-27
B3-23
B3-20
B3-22
B3-24B3-25
B3-26 B3-27
B2-21 B3-21
BEDROOM
HALL
LINEN
BEDROOM
BATHBATH
BEDROOM BEDROOM
BEDROOM
HALL
BEDROOM
BATHBATH
BEDROOM BEDROOM
BEDROOM
HALL
BEDROOM
BATHBATH
BEDROOM BEDROOM
LINEN LINEN
1.121.12
IT
1.121.12
1.12 1.12
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-103
B22 FIRST & SECOND FLOOR
PLANS
VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
GENERAL NOTES:
1. All ceilings gypsum board unless otherwise noted
2. Contractor to access one apartment at a time
0 4' 8' 12' 16'
3/16" = 1'-0"
N
3/16" = 1'-0"
B22/INDEPENDENCE HOUSE FIRST FLOOR PLANS
3/16" = 1'-0"
B22/INDEPENDENCE HOUSE SECOND FLOOR PLANS
KEYNOTES
1.12 Phase boundary.
A-100
A-102
A1-04 A1-05
A1-11
A1-10
A1-09
A2-11
A2-10
A2-09
A1-08 A1-07
A1-06
A2-06
A2-07 A2-08
A-101
A2-05
A2-04
A1-02
A1-03
A1-01
A2-01 A2-02
A2-03
A2-12
STAIR
ELEC.
GREAT ROOM KITCHEN
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
P/FP
KITCHEN
GREAT ROOM
COATS
LAUNDRY
STOR.
STOR. COATS
LAUNDRY
STOR.
A-200
A3-04
A3-05
A3-11
A3-10
A3-09
A4-11
A4-10
A4-09
A3-08
A3-07
A3-06 A4-06
A4-07
A4-08
A-201 A4-05 A4-04
A3-02
A3-03
A3-01
A4-01
A4-02
A4-03
A4-12
STAIR
GREAT ROOM
KITCHEN
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM BEDROOM
BATH
BEDROOM
P/FP
KITCHEN GREAT ROOM
COATS
LAUNDRY
STOR.
STOR.
COATS
LAUNDRY
ELEC.
1.12
1.12
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-104
B23 FIRST & SECOND FLOOR
PLANS
VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
0 4' 8' 12' 16'
3/16" = 1'-0"
N
3/16" = 1'-0"1
B23/LIBERTY HOUSE FIRST FLOOR PLANS
3/16" = 1'-0"
B23/LIBERTY HOUSE SECOND FLOOR PLANS
GENERAL NOTES:
1. All ceilings gypsum board unless otherwise noted
2. Contractor to access one apartment at a time
KEYNOTES
1.12 Phase boundary.1.12 Phase boundary.
A1-04 A1-05
A1-11
A1-10
A1-09
A2-11
A2-10
A2-09
A1-08 A1-07
A1-06
A2-06
A2-07 A2-08
A-101
A2-05
A2-04
A1-02
A1-03
A1-01
A2-01 A2-02
A2-03
A2-12
STAIR
ELEC.
GREAT ROOM KITCHEN
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
P/FP
KITCHEN
GREAT ROOM
COATS
LAUNDRY
STOR.
STOR. COATS
LAUNDRY
STOR.
A-200
A3-04
A3-05
A3-11
A3-10
A3-09
A4-11
A4-10
A4-09
A3-08
A3-07
A3-06 A4-06
A4-07
A4-08
A-201 A4-05 A4-04
A3-02
A3-03
A3-01
A4-01
A4-02
A4-03
A4-12
STAIR
GREAT ROOM
KITCHEN
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM
BEDROOM
BATH
BEDROOM BEDROOM
BATH
BEDROOM
P/FP
KITCHEN GREAT ROOM
COATS
LAUNDRY
STOR.
STOR.
COATS
LAUNDRY
ELEC.
1.12
1.12
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:1
A M
A-105
B24 FIRST & SECOND FLOOR
PLANS
VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023
CONTRACT DOCUMENTS
0 4' 8' 12' 16'
3/16" = 1'-0"
N
3/16" = 1'-0"1
B24/INSPIRATION HOUSE FIRST FLOOR PLANS
3/16" = 1'-0"
B24/INSPIRATION HOUSE SECOND FLOOR PLANS
GENERAL NOTES:
1. All ceilings gypsum board unless otherwise noted
2. Contractor to access one apartment at a time
KEYNOTES
1.12 Phase boundary.
MD SM
C1-01
C1-02
C1-03C1-04
C1-06
C1-05 C1-07
C1-08C1-09C1-10
C1-11
C1-12
C1-13 C2-01
C2-02
C2-03C2-04
C2-06
C2-05
C2-07
C2-08C2-09C2-10
C2-11
C2-12
C2-13 C3-01
C3-02
C3-03C3-04
C3-06
C3-05
C3-07
C3-08C3-09C3-10
C3-11
C3-12
C3-13
GREAT ROOM
COATS
KITCHENSTOR.
LAUNDRY
HALL MECH.
BEDROOMBATHBEDROOM
BEDROOM
BATH
BEDROOM GREAT ROOM
COATS
KITCHENSTOR.
LAUNDRY
HALL
MECH.
BEDROOMBATHBEDROOM
BEDROOM
BATH
BEDROOM GREAT ROOM
COATS
KITCHENSTOR.
LAUNDRY
HALL
P/FP
BEDROOMBATHBEDROOM
BEDROOM
BATH
BEDROOM
1.121.12
1.121.12
0-HR Smoke Partition - [OBC 710] / NFPA 101-8.4
1/2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
1-HR Smoke Barrier - [OBC 709] / NFPA 101-8.5
1-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
2-HR Fire Barrier - [OBC 706] / NFPA 101-8.3
CODE LEGEND
MICHAEL
J.
DUKE
1516455
IO
HO
FOET
A T
S
R E G I S
E T
R
ED RA
C H
TI
E C T
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10 www.abovegroupinc.com COA/CA Lic. No. 31120
FULLY SPRINKLERED305 East Dr., Suite H, Melbourne, Florida 32904
PH: 321.345.9026
C U s e rs \j w a it e
\D o c u m e n ts \2
V A
M C
B u tl e r C
L C
N u rs e C a ll
R jw a it e
J S
Z
.r v t
/9
/2
:1
:2
A M
A-106
B25 FIRST FLOOR PLAN VAMC Butler Replace CLC Nurse Call
BUTLER, PA
529-22-102
06/13/2023 MD SM
CONTRACT DOCUMENTS
0 4' 8' 12' 16'
3/16" = 1'-0"
N
3/16" = 1'-0"
B25/SERENITY HOUSE FIRST FLOOR PLAN
GENERAL NOTES:
1. All ceilings gypsum board unless otherwise noted
2. Contractor to access one apartment at a time
KEYNOTES
1.12 Phase boundary.
1PH SINGLE-PHASE
3PH THREE-PHASE
4W FOUR-WIRE
A/E ARCHITECT/ENGINEER
AF AMPERE FRAME OR AMP FUSE
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIC AMPERE INTERRUPTING CAPACITY
ALT ALTERNATE
AMP AMPERE
ASC AMPS SHORT CIRCUIT
AT AMPERE TRIP
ATS AUTOMATIC TRANSFER SWITCH
AUTO AUTOMATIC
AV AUDIO VISUAL
BLDG BUILDING
C CONDUIT
CAT CATALOG
CATV COMMUNITY ANTENNA TELEVISION
CCTV CLOSED CIRCUIT TELEVISION
cd CANDELA
CD CONSTRUCTION DOCUMENTS
CKT CIRCUIT
CLG CEILING
COAX COAX CABLE
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUE
COORD COORDINATE
CRI COLOR RENDERING INDEX
CT CURRENT TRANSFORMER
CU COPPER
DB DECIBEL OR DIRECT BURIAL
DC DIRECT CURRENT
DEG C DEGREES CELSIUS
DEG F DEGREES FAHRENHEIT
DEMO DEMOLITION
DISC DISCONNECT
DN DOWN
DPDT DOUBLE POLE, DOUBLE THROW
DPST DOUBLE POLE, SINGLE THROW
DS DISCONNECT SWITCH
DWG DRAWING
ELEC ELECTRIC OR ELECTRICAL
ELEV ELEVATOR
EMT ELECTRICAL METALLIC TUBING
ENCL ENCLOSURE
EPO EMERGENCY POWER OFF
ESMT EASEMENT
EWC ELECTRIC WATER COOLER
EWH ELECTRIC WATER HEATER
ETR EXISTING TO REMAIN
ELECTRICAL ABBREVIATIONS
FA FIRE ALARM
FAAP FIRE ALARM ANNUNCIATOR PANEL
FACP FIRE ALARM CONTROL PANEL
FC FOOTCANDLE
FLA FULL LOAD AMPS
FP FIRE PROTECTION
FT FEET OR FOOT
GND GROUND
G OR GFCI GROUND FAULT CIRCUIT INTERRUPTER
GTB GROUND TERMINAL BOX
HOA HAND-OFF-AUTOMATIC
HP HORSEPOWER
HZ HERTZ
IESNA ILLUMINATION ENGINEERING SOCIETY OF NORTH AMERICA
IMC INTERMEDIATE METAL CONDUIT
IR INFRARED
IWH INSTANTANEOUS WATER HEATER
J-BOX JUNCTION BOX
kV KILOVOLT kVA KILOVOLT AMPERE kVAH KILOVOLT AMPERE PER HOUR kVAR KILOVOLT AMPERE REACTIVE kW KILOWATT kWH KILOWATT HOUR
LED LIGHT EMITTING DIODE
LF LINEAR FEET (FOOT)
LM LUMEN
LP LIGHT POLE
LRA LOCKED ROTOR AMPS
LTG LIGHTING
LV LOW VOLTAGE
MAX MAXIMUM
MC METAL-CLAD
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MCC MOTOR CONTROL CENTER
MDP MAIN DISTRIBUTION PANEL
MECH MECHANICAL
MH MANHOLE
MIN MINIMUM
MOCP MAXIMUM OVERCURRENT PROTECTION
MLO MAIN LUGS ONLY
MTD MOUNTED
MTG MOUNTING
MTS MANUAL TRANSFER SWITCH
MV MEDIUM VOLTAGE
MVA MEGAVOLT-AMPERE
MW MEGAWATT MICROWAVE
NC NORMALLY CLOSED
NEC NATIONAL ELECTRICAL CODE
NEMA NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION
NEUT OR N NEUTRAL
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NL NIGHT LIGHT
NO NORMALLY OPEN
NS NO SCALE
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OL OVERLOAD
P POLE
PA PUBLIC ADDRESS
PCB POLYCHLORINATED BIPHENYL
PH PHASE
PNL PANEL
POD POWER OPERATED DAMPER
PVC POLYVINYL CHLORIDE (PLASTIC)
PWR POWER
RCP REFLECTED CEILING PLAN
RGS RIGID GALVANIZED STEEL
RM ROOM
RMS ROOT MEAN SQUARE
REQD REQUIRED
SCC SHORT CIRCUIT CAPACITY
SD SMOKE DETECTOR
SF SQUARE FOOT (FEET)
SI INTERNATIONAL SYSTEM OF UNITS
SPEC SPECIFICATION
SPST SINGLE POLE, SINGLE THROW
SW SWITCH
SWBD SWITCHBOARD
SWGR SWITCHGEAR
TEL TELEPHONE
TP TWISTED PAIR
TPS TWISTED PAIR SHIELDED
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
TYP TYPICAL
UGND UNDERGROUND
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
UPS UNINTERRUPTIBLE POWER SUPPLY
V VOLT
VA VOLT AMPERE
VAR VOLT AMPERE REACTIVE
VFD VARIABLE FREQUENCY DRIVE
VOLT VOLTAGE
W WATT
WH WATER HEATER
WP WEATHERPROOF
XFER TRANSFER
XFMR TRANSFORMER
ABBR. DESCRIPTION ABBR. DESCRIPTION ABBR. DESCRIPTION
AWG AMERICAN WIRE GAUGE
KCMIL ONE-THOUSAND CIRCULAR MILS
NA NOT APPLICABLE
HD HEAT DETECTOR
NEW (HEAVY, SOLID LINE)
EXISTING TO REMAIN (LIGHT, SOLID LINE)
EXISTING TO BE REMOVED (HEAVY, DASHED LINE)
ELECTRICAL & SYSTEMS SYMBOLS
SYMBOL DESCRIPTION DESCRIPTIONSYMBOL
37-PIN CONNECTOR FOR PATIENT BED CONTROLS (NURSE CALL/CODE
BLUE/TV/LIGHTS/PHONE
N
2 NURSE CALL CORRIDOR DOME LIGHT WITH SOUNDER - CEILING MOUNTED:
2 = NURSE'S CALL DOME LIGHT (SUFFIX INDICATES NUMBER OF LAMP).
Z = AUXILIARY INTERSECTIONAL DOME LIGHT.
NURSE CALL STATION:
D = DUTY STATION. MTD 5'-0" AFF UNLESS OTHERWISE NOTED.
TC = PULL CORD MTD 50" AFF FOR SHOWER LOCATION, MTD 4'-6" AFF FOR TUB
LOCATION, & MTD 4'-0" AFF FOR TOILET LOCATION.
T = DUAL HEIGHT PUSH BUTTONS. (2) PUSH BUTTONS STACKED VERTICALLY (1) AT
3'-0" AFF AND (1) AT 1'-6" AFF.
WP = WEATHER PROOF
C = PULL CORD MTD 4'-6" AFF.
P = PATIENT BED STATION
PS = PULL STATION MTD AT 3'-6" AFF.
S = AUDIO VISUAL WALL STATION (STAFF) MTD 5'-0" AFF UNLESS OTHERWISE
NOTED.
E = EMERGENCY CALL STATION
NURSE CALL TERMINAL CABINET.
NURSE'S CALL MASTER STATION MTD ON NURSE'S COUNTER TOP,
UNLESS OTHERWISE NOTED.
NCS
NCT
N D
N
2 NURSE CALL CORRIDOR DOME LIGHT WITH SOUNDER - WALL MOUNTED:
2 = NURSE'S CALL DOME LIGHT (SUFFIX INDICATES NUMBER OF LAMP) MTD 6"
ABOVE DOOR.
Z = AUXILIARY INTERSECTIONAL DOME LIGHT.
SUGGESTED PHASING SEQUENCE OF WORK FOR
CLC BUILDING 20 AND CLC SUPPORT BUILDING 2
1. DEMOLISH EXISTING DEVICES AND INSTALL NEW SYSTEM AND DEVICES INTO CLC BUILDING 20, 400 WING. COMPLETE TESTING AND CHECK OUT
PRIOR TO COMMENCING NEXT PHASE.
2. RELOCATE BUILDING 20, 500 WING PATIENTS AND STAFF TO 400 WING.
3. DEMOLISH EXISTING DEVICES AND INSTALL NEW SYSTEM AND DEVICES INTO CLC BUILDING 20, 500 WING. COMPLETE TESTING AND CHECK OUT
PRIOR TO COMMENCING NEXT PHASE.
4. RETURN BUILDING 20 PATIENTS AND STAFF CURRENTLY OCCUPYING 400 WING BACK TO 500 WING AND RELOCATE BUILDING 20, 300 WING
PATIENTS AND STAFF TO 400 WING.
5. DEMOLISH EXISTING DEVICES AND INSTALL NEW SYSTEM AND DEVICES INTO CLC BUILDING 20, 300 WING. COMPLETE TESTING AND CHECK OUT
PRIOR TO COMMENCING NEXT PHASE.
6. RETURN BUILDING 20 PATIENTS AND STAFF CURRENTLY OCCUPYING 400 WING BACK TO 300 WING AND RELOCATE BUILDING 20, 200 WING
PATIENTS AND STAFF TO 400 WING.
7. DEMOLISH EXISTING DEVICES AND INSTALL NEW SYSTEM AND DEVICES INTO CLC BUILDING 20, 200 WING. COMPLETE TESTING AND CHECK OUT
PRIOR TO COMMENCING NEXT PHASE.
8. RETURN BUILDING 20 PATIENTS AND STAFF CURRENTLY OCCUPYING 400 WING BACK TO 200 WING.
9. INSTALL NEW DEVICES ADJACENT TO EXISTING DEVICES IN CLC BUILDING 20, 100 WING. COMPLETE TESTING AND CHECK OUT PRIOR TO COMMENCING NEXT PHASE. ADDITIONAL 100 WING PHASING REQUIREMENTS TO BE REVIEWED DURING UPCOMING SITE VISIT WITH END USERS
AND INCLUDED WITH FUTURE SUBMISSION.
10. DEMOLISH EXISTING DEVICES IN CLC BUILDING 20, 100 WING.
11. DEMOLISH EXISTING EQUIPMENT AND DEVICES IN BUILDING 2 AND INSTALL NEW EQUIPMENT AND DEVICES IN BUILDING 2. COMPLETE TESTING
AND CHECK OUT.
WP
APPLICABLE CODES
1. NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL CODE (NEC), NFPA 70 - 2023
b. NATIONAL FIRE ALARM CODE, NFPA 72 - 2022
c. LIFE SAFETY CODE, NFPA 101 – 2021
d. HEALTH CARE FACILITIES CODE, NFPA 99 - 2021
2. AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI), INCLUDING (BUT NOT LIMITED TO):
a. NATIONAL ELECTRICAL SAFETY CODE, ANSI C2
3. OCCUPATIONAL SAFETY AND HEALTH ACT (OSHA)
4. FACILITY GUIDELINES INSTITUTE (FGI):
a. GUIDELINES FOR DESIGN AND CONSTRUCTION OF HOSPITALS AND OUTPATIENT FACILITIES
5. FEDERAL COMMUNICATION COMMISSION (FCC)
6. NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION (NEMA)
7. INSULATED CABLE ENGINEERS ASSOCIATION (ICEA)
8. INSTITUTE OF ELECTRICAL AND ELECTRONICS ENGINEERS (IEEE)
9. NATIONAL ELECTRICAL TESTING ASSOCIATION (NETA)
10. AMERICAN SOCIETY OF TESTING AND MATERIALS (ASTM)
11. ILLUMINATION ENGINEERING SOCIETY (IES)
12. ANTI-FRICTION BEARING MANUFACTURERS ASSOCIATION (AFBMA)
13. BUILDING OFFICIALS AND CODE ADMINISTRATORS INTERNATIONAL, INC. (BOCA)
14. INTERNATIONAL CODE COUNCIL (ICC):
a. INTERNATIONAL BUILDING CODE (IBC)
15. UNIFORM BUILDING CODE (UBC)
16. COMBINED ANSI/ASHRAE/IES STANDARD 90.1 – “ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE
RESIDENTIAL BUILDINGS”
17. NATIONAL ELECTRICAL CONTRACTORS ASSOCIATION INSTALLATION STANDARDS (NECA)
18. AMERICANS WITH DISABILITIES ACT (ADA)
19. APPLICABLE STATE AND LOCAL CODES, AMENDMENTS, REGULATIONS, AND PRACTICES.
20. APPLICABLE REGULATORY REQUIREMENTS AND ADVISORY PRACTICES OF APPROPRIATE
a. AUTHORITIES HAVING JURISDICTION (AHJs).
21. APPLICABLE STANDARDS, REGULATIONS, AND PRACTICES OF THE VA.
STRUCTURED CABLING SYSTEM (SCS):
THE SCS CONTRACTOR (SCSC) SHALL PROVIDE ALL BACKBONE AND HORIZONTAL CABLING,
COMPONENTS AND TERMINATIONS AS REQUIRED FOR A COMPLETE AND OPERATIONAL CABLING
SYSTEM PER INDUSTRY BEST PRACTICES AS PRESCRIBED BY BICSI AND NEC.
THE SCSC SHALL BE RESPONSIBLE FOR COORDINATION WITH THE ELECTRICAL CONTRACTOR (EC) FOR SPECIFIC LOCATIONS OF ALL TELECOMMUNICATIONS SYSTEM DEVICES, INCLUDING ANCILLARY
SYSTEM COMPONENTS AND ASSOCIATED CONDUITS PROVIDED BY THE EC.
THE ELECTRICAL CONTRACTOR (EC) SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL
ROUGH-IN COMPONENTS ASSOCIATED WITH THE TELECOMMUNICATIONS SYSTEM COMPONENTS
AS NOTED ON THE DRAWINGS AND SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, CONDUIT AND BACK-BOXES. THE EC SHALL COORDINATE ALL REQUIREMENTS WITH THE SCS CONTRACTOR.
FIRESTOPPING:
THE EC SHALL BE RESPONSIBLE FOR FIRE-STOPPING SLEEVE ASSEMBLIES TO OBTAIN A UL RATING.
THE SCSC SHALL BE RESPONSIBLE FOR FIRE-STOPPING INSIDE THE SLEEVES AFTER CABLE
INSTALLATION IS COMPLETE.
CONDUIT:
THE EC SHALL BE RESPONSIBLE TO PROVIDE AND INSTALL ALL BACKBONE AND HORIZONTAL CABLING
PATHWAYS. THIS SHALL INCLUDE ALL INTERIOR CONDUITS, PATHWAY COMPONENTS SUCH AS
JUNCTION BOXES, PULL BOXES, WALL/CEILING PENETRATIONS AND CONDUIT SLEEVES, WHETHER SHOWN ON THE DRAWINGS OR AS REQUIRED TO PENETRATE FULL-HEIGHT PARTITIONS AS SHOWN ON THE DRAWINGS. THE EC SHALL PROVIDE AND INSTALL ALL BUSHINGS ON TELECOMMUNICATIONS
CONDUITS PRIOR TO INSTALLATION OF CABLING.
NURSE CALL SYSTEM:
THE EC SHALL BE RESPONSIBLE FOR PROVIDING AND INSTALLING ALL CONDUIT AND BACK-BOXES
ASSOCIATED WITH THE NURSE CALL SYSTEM AND ALL ASSOCIATED DEVICES.
THE SCSC SHALL BE RESPONSIBLE FOR INSTALLATION OF ALL STRUCTURED CABLING TO ALL NURSE
CALL DEVICES AND CABINETS.
COORDINATION NOTES:
SUGGESTED PHASING SEQUENCE OF WORK
FOR DOMICILIARY BUILDINGS 21, 22, 23, 24, 25
1. BUILDING 21 - INSTALL NEW AIPHONE MASTER STATION, REPLACE EXISTING AMPLIFIER, REPLACE THE EXISTING SPEAKERS AND INSTALL NEW
SPEAKERS. INSTALL NEW EQUIPMENT IN NEW TELECOMMUNICATIONS EQUIPMENT CABINET IN DOMICILIARY ASSISTANCE ROOM 103.
COMPLETE TESTING AND CHECK OUT PRIOR TO COMMENCING NEXT PHASE. EXISTING AIPHONE MASTER STATION TO BE MAINTAINED UNTIL
PHASE 6 BELOW.
2. BUILDING 22 - ALL WORK TO BE COMPLETED ONE APARTMENT AT A TIME. RELOCATE BUILDING 22 RESIDENTS. DEMOLISH EXISTING INTERCOM CALL STATIONS AND INSTALL NEW INTERCOM CALL STATIONS INTO BUILDING 22. COMPLETE TESTING AND CHECK OUT PRIOR TO
COMMENCING NEXT PHASE.
3. BUILDING 23 - ALL WORK TO BE COMPLETED ONE APARTMENT AT A TIME. RELOCATE BUILDING 23 RESIDENTS. DEMOLISH EXISTING INTERCOM CALL STATIONS AND INSTALL NEW INTERCOM CALL STATIONS INTO BUILDING 23. COMPLETE TESTING AND CHECK OUT PRIOR TO
COMMENCING NEXT PHASE.
4. BUILDING 24 - ALL WORK TO BE COMPLETED ONE APARTMENT AT A TIME. RELOCATE BUILDING 24 RESIDENTS. DEMOLISH EXISTING INTERCOM CALL STATIONS AND INSTALL NEW INTERCOM CALL STATIONS INTO BUILDING 24. COMPLETE TESTING AND CHECK OUT PRIOR TO
COMMENCING NEXT PHASE.
5. BUILDING 25 - ALL WORK TO BE COMPLETED ONE APARTMENT AT A TIME. RELOCATE BUILDING 25 RESIDENTS. DEMOLISH EXISTING INTERCOM CALL STATIONS AND INSTALL NEW INTERCOM CALL STATIONS INTO BUILDING 25. COMPLETE TESTING AND CHECK OUT PRIOR TO
COMMENCING NEXT PHASE.
6. BUILDING 21 - DEMOLISH EXISTING AIPHONE MASTER STATION.
DC DOMELESS CONTROLLER
INTERCOM MASTER STATION MTD ON NURSE'S COUNTER TOP,
UNLESS OTHERWISE NOTED.
ICS
INTERCOM CALL STATION - AUDIO ONLY.
2-BUTTON: CALL AND EMERGENCY CALL
I
S CEILING MOUNTED PUBLIC ADDRESS SYSTEM SPEAKER
JUNCTION BOXJ
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, SURFACE MOUNTED
BRANCH CIRCUIT PANELBOARD, UNDER 250 VOLTS, FLUSH MOUNTED
WALL MOUNTED JUNCTION BOXJ
RECEPTACLE, SPECIAL PURPOSE, SEE CODED NOTES ON FLOOR PLANS
FOR NEMA CONFIGURATION AND WIRING REQUIREMENTS
ELECTRICAL DEMOLITION NOTES
D1. THE FACILITY WILL REMAIN OCCUPIED DURING RENOVATIONS.
D2. DEVICES AND EQUIPMENT SHOWN IN DASHED LINE TYPE ARE EXISTING TO BE DEMOLISHED; DEVICES AND EQUIPMENT SHOWN IN LIGHT
SOLID LINE TYPE ARE EXISTING TO REMAIN, UNLESS OTHERWISE NOTED.
D3. EXISTING EQUIPMENT, DEVICES SHOWN ARE BASED ON FIELD SURVEYS AND RECORD DRAWINGS PROVIDED BY THE OWNER, AND IS NOT
NECESSARILY ALL INCLUSIVE IN EVERY AREA AS FAR AS EXISTING ELECTRICAL EQUIPMENT, LIGHT FIXTURES AND DEVICES. EXISTING CIRCUITING SHOWN IS BASED ON RECORD DRAWINGS AND THE SURVEYED PANEL DIRECTORIES, WHERE THEY WERE AVAILABLE. THE ACTUAL CONDITIONS MAY VARY. ALL EXISTING CONDITIONS MUST BE VERIFIED PRIOR TO BID. THE CONDITIONS SHOWN ARE INTENDED TO SHOW THE LOCATIONS OF EXISTING DEVICES, LIGHT FIXTURES AND EQUIPMENT, WHERE SHOWN ON THE PLAN DRAWINGS, AND IN NO WAY RELIEVES THE CONTRACTOR FROM PROVIDING ANY AND ALL COORDINATION NECESSARY TO COMPLETE THE NEW WORK. FIELD
CONDITIONS SHALL GOVERN.
D4. WHERE EXISTING DEVICES ARE INDICATED TO REMAIN OR RELOCATED, LOCATED WITHIN THE SCOPE OF THIS PROJECT AND EXISTING CIRCUITING INFORMATION IS UNAVAILABLE, CONTRACTOR IS TO PROVIDE CIRCUIT TRACING TO IDENTIFY PANEL AND CIRCUIT DEVICES ARE CONNECTED TO AND PROVIDE THAT INFORMATION TO A/E PRIOR TO ROUTING CONDUITS AND WIRING FOR NEW DEVICES AND
EQUIPMENT WITHIN THE SCOPE OF THIS PROJECT.
D5. PRIOR TO DEMOLITION, FIELD VERIFY CONDUIT AND WIRING WHICH SERVES AREAS OUTSIDE THE SCOPE OF WORK AND PASSES
THROUGH THE AREA OF WORK. MAINTAIN CONTINUITY OF SYSTEMS.
D6. WHERE EXISTING DEVICES ARE TO REMAIN, CONTRACTOR MUST EXTEND EXISTING CIRCUITING WHERE NECESSARY TO MAINTAIN
CONTINUITY OF CIRCUIT.
D7. COORDINATE WITH THE OWNER FOR DISPOSITION OF ELECTRICAL ITEMS TO BE DEMOLISHED. OWNER SHALL HAVE THE OPTION TO RETAIN REUSABLE ITEMS SUCH AS COVERPLATES, RECEPTACLES, LIGHT FIXTURES, PANELBOARDS, TRANSFORMERS, ETC. NOT BEING USED IN THE FINISHED WORK. COORDINATE WITH THE OWNER PRIOR TO START OF DEMOLITION. PROPERLY AND LEGALLY DISPOSE OF
ALL EQUIPMENT AND MATERIALS BEING REMOVED.
D8. ALL AREAS OUTSIDE THE SCOPE OF CONSTRUCTION ARE TO REMAIN ENERGIZED. COORDINATE PHASING WITH CONSTRUCTION
MANAGER AND OWNER PRIOR TO DEMOLITION WHICH MAY RESULT IN INTERRUPTION OF POWER.
D9. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING ALL OPENINGS IN EXISTING CONSTRUCTION AFTER REMOVAL OF EQUIPMENT AND ELECTRICAL DEVICES, UNLESS OTHERWISE NOTED ON ARCHITECTURAL PLANS. REPAIRS ARE TO BE DONE TO LOGICAL EDGES OF SURFACES AFFECTED AND SHALL MATCH IMMEDIATE ADJACENT AREAS IN CONSTRUCTION, MATERIAL, FIRE RATING, FINISH AND COLOR.
D10. FIELD VERIFY ALL EXISTING CONDITIONS AND DIMENSIONS PRIOR TO COMMENCEMENT OF WORK AND OBTAIN CLARIFICATIONS FROM
ARCHITECT/ENGINEER IF NECESSARY.
D11. COORDINATE SERVICE INTERRUPTION WITH CONSTRUCTION MANAGER, OWNER, LANDLORD, AND UTILITY COMPANY, WHERE APPLICABLE, AND DO NOT INTERRUPT POWER WITHOUT WRITTEN PERMISSION. PROVIDE A MINIMUM OF ONE WEEK'S WRITTEN
NOTIFICATION WHEN POWER IS DESIRED TO BE INTERRUPTED.
D12. EXERCISE EXTREME CAUTION WHEN REMOVING/ RELOCATING WIRING AND EQUIPMENT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THAT OTHER WIRING DEVICES, EQUIPMENT AND LIGHT FIXTURES THAT MAY BE CONNECTED TO THE SAME CIRCUIT REMAIN
OPERATIONAL AND ACTIVE.
D13. INFORMATION INDICATED IN THE DEMOLITION PORTION OF THE CONTRACT DRAWINGS IS DIAGRAMMATIC IN NATURE. FIELD VERIFY ELECTRICAL CIRCUIT HOMERUNS TO ALL ELECTRICAL ITEMS SCHEDULED TO BE DEMOLISHED AND PERFORM THE WORK AS INTENDED
AND DEPICTED ON THE DRAWINGS.
D14. STORE ITEMS INDICATED TO BE RETURNED TO THE OWNER IN A DRY, CLEAN AND PROTECTED AREA. NOTIFY OWNER WHEN ITEMS ARE
READY TO BE REMOVED.
D15. SCHEDULE ALL POWER INTERRUPTION WITH OWNER FOR EXACT DATE, TIME AND DURATION. PROVIDE A MINIMUM OF 7 DAYS NOTICE PRIOR TO DISCONNECTING ANY POWER TO ANY PORTION OF THE BUILDING, AND MAKE ARRANGEMENTS TO MAINTAIN POWER TO ALL CRITICAL EQUIPMENT AS NEEDED AND REQUESTED BY THE OWNER PRIOR TO COMMENCEMENT OF WORK.
D16. THE DEMOLITION PLAN IS NOT INCLUSIVE OF ALL ELECTRICAL DEVICES WITHIN THE PROJECT AREA. IT IS INTENDED TO PROVIDE A GENERAL KNOWLEDGE OF THE EXISTING CONDITIONS WITHIN THE PROJECT AREA. ANY DISCREPANCIES OR CONDITIONS NOT SHOWN ON THE PLAN SHALL BE BROUGHT TO THE ATTENTION OF THE A/E. THE CONTRACTOR IS RESPONSIBLE FOR ALL REQUIRED ELECTRICAL
DEMOLITION WHETHER INDICATED ON THE PLANS OR NOT.
D17. ALL CONDUITS SERVING OTHER SPACES THAT RUN THROUGH THE PROJECT AREA SHALL REMAIN ACTIVE DURING CONSTRUCTION SO AS NOT TO CAUSE DISRUPTION TO THESE OTHER SPACES. ENSURE THAT ALL CONDUITS, NEW OR EXISTING WITHIN THE PROJECT AREA ARE PROPERLY SUPPORTED IN ACCORDANCE WITH THE NEC. ANY EXISTING CONDUIT IS INSTALLED BELOW THE HEIGHT OF THE
NEW CEILING SHALL BE RELOCATED TO ABOVE THE NEW CEILING HEIGHT.
D18. REMOVE ALL ABANDONED WIRING AND CONDUIT THAT IS WITHIN THE PROJECT AREA PRIOR TO THE END OF CONSTRUCTION.
D19. UPDATE PANELBOARD DIRECTORIES WHICH ARE MODIFIED BY THIS PROJECT.
D20. REPAIR DISTURBED AREAS TO MATCH EXISTING CONDITIONS.
GENERAL:
1. THE DRAWINGS AND APPLICABLE SPECIFICATIONS SHALL BE CONSIDERED SUPPLEMENTARY, ONE TO THE OTHER AND ARE CONSIDERED THE "CONTRACT DOCUMENTS". ALL WORKMANSHIP, METHODS AND/OR MATERIALS DESCRIBED OR IMPLIED BY ONE AND NOT DESCRIBED OR IMPLIED BY THE OTHER SHALL BE PROVIDED, FURNISHED OR PERFORMED AS IF IT HAD APPEARED IN BOTH SECTIONS. THE TERM "CONTRACT DOCUMENTS" DESCRIBED HEREIN IS NOT LIMITED SOLELY TO THE ELECTRICAL PORTION OF THE DRAWINGS AND SPECIFICATIONS, BUT ENCOMPASSES THE DRAWINGS AND
SPECIFICATIONS OF ALL DIVISIONS AS A WHOLE.
2. PROVIDE AN OPERATING AND MAINTENANCE MANUAL TO OWNER PRIOR TO THE FINAL ACCEPTANCE. THE MANUAL SHALL INCLUDE, AS A MINIMUM, (1) SUBMITTAL DATA STATING EQUIPMENT RATING AND SELECTED OPTIONS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. ALSO PROVIDE TWO OPERATIONS AND MAINTENANCE MANUALS FOR EACH PIECE OF EQUIPMENT REQUIRING MAINTENANCE. REQUIRED ROUTINE MAINTENANCE ACTIONS AND METHOD OF OPERATION FOR EQUIPMENT SHALL BE CLEARLY IDENTIFIED, AND THE NAME, PHONE NUMBER AND ADDRESS OF AT LEAST
ONE QUALIFIED SERVICE AGENCY.
3. INCLUDE ALL COSTS FOR EXCAVATION, SAW CUTTING, DIRECTIONAL BORING, CORE DRILLING, BACKFILLING, SURFACE RESTORATION, REPAIR OF FINISHES, ETC. THAT IS REQUIRED IN ORDER TO MEET THE
PROJECT REQUIREMENTS.
4. INCLUDE IN BID THE TRANSPORT AND DISPOSAL OR RECYCLING OF ALL WASTE MATERIALS GENERATED BY THIS PROJECT IN ACCORDANCE WITH ALL LOCAL, STATE AND FEDERAL RULES, REGULATIONS AND GUIDELINES APPLICABLE. COMPLY FULLY WITH PENNSYLVANIA STATUTES REGARDING MERCURY-CONTAINING DEVICES, AND WITH ALL DEP AND EPA APPLICABLE GUIDELINES AT THE TIME OF
DISPOSAL. PROVIDE OWNER WITH WRITTEN CERTIFICATION OF ACCEPTED DISPOSAL.
5. DRAWINGS ARE DIAGRAMMATIC AND INDICATE GENERAL ARRANGEMENT OF SYSTEMS. PROVIDE COMPONENTS INDICATED ON RISER DIAGRAMS WHETHER OR NOT INDICATED ON PLANS AND VICE VERSA.
6. ROUTING OF CONDUIT IS DIAGRAMMATIC AND NOT INTENDED TO SHOW REQUIRED OFFSETS AND DETAILS. COORDINATE EXACT ROUTING WITH FIELD CONDITIONS.
7. REFER TO ARCHITECTURAL DRAWINGS FOR RELATED INFORMATION AND ADDITIONAL INSTALLATION REQUIREMENTS TO BE PERFORMED AS PART OF THE WORK.
8. WHERE A DISCREPANCY OR CONFLICT IS FOUND BETWEEN ONE DRAWING AND ANOTHER, OR BETWEEN A DRAWING AND APPLICABLE SPECIFICATIONS, NOTIFY THE ARCHITECT/ENGINEER AND THE VA
IMMEDIATELY IN WRITTEN FORM. IN GENERAL, THE MOST STRINGENT REQUIREMENT SHALL GOVERN UNLESS THE DISCREPANCY CONFLICTS WITH APPLICABLE CODES OR OWNER'S DESIGN STANDARDS, WHEREIN THE CODE OR OWNER'S DESIGN STANDARDS SHALL GOVERN.
9. COORDINATE ALL PROJECT SCHEDULING AND PHASING REQUIREMENTS WITH ARCHITECT/ENGINEER AND OWNER PRIOR TO SUBMITTING BID PRICE. THIS PROJECT MAY REQUIRE PHASING SEQUENCES AND POTENTIAL PREMIUM TIME WORK AND ALL COSTS FOR SUCH SHALL BE INCLUDED IN THE BID PRICE. PROVIDE ADEQUATE WORK FORCE AND EQUIPMENT, AND INCLUDE PREMIUM TIME AS MAY BE REQUIRED IN ORDER TO ADHERE TO THE PROJECT SCHEDULE. ADDITIONALLY, ENSURE THAT LONG LEAD ITEMS DO NOT IMPACT THE PROJECT'S SCHEDULE OR PHASING.
10. CONDUCT WORK OPERATIONS AND DEBRIS REMOVAL IN A MANNER THAT ENSURES MINIMUM INTERFERENCE WITH NORMAL BUSINESS OPERATIONS, TRAFFIC, PARKING, ETC. ONGOING IN ADJACENT OCCUPIED SPACES OR FACILITIES. PROVIDE ALL THAT IS REQUIRED TO EFFECTIVELY PROTECT SURROUNDING OCCUPANTS, EQUIPMENT, FINISHES, FURNITURE, ETC. FROM DAMAGE OR EXCESSIVE NOISE THROUGHOUT THE DURATION OF THIS PROJECT. CONTRACTOR IS RESPONSIBLE FOR ANY LOSSES OR DAMAGE. ANY DAMAGE RESULTING FROM THE FAILURE TO ADHERE TO THIS REQUIREMENT.
RESTORE DAMAGED ELEMENTS TO ORIGINAL CONDITION BY THE CONTRACTOR TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER, AT NO ADDITIONAL COSTS. REPORT OF ANY SUCH OCCURRENCE TO THE ARCHITECT/ENGINEER AND OWNER IMMEDIATELY AND AWAIT WRITTEN DIRECTION PRIOR TO PROCEEDING WITH REPAIRS.
11. COORDINATE THE LOCATION OF ALL DEVICES AND BOXES WITH WINDOWS, MIRRORS, MILLWORK, CABINETS, GLASS CURTAIN WALLS, AND GLASS WALLS PRIOR TO INSTALLATION OF CONDUITS OR BOXES. REVIEW ALL CONTRACT DRAWINGS TO ASCERTAIN ANY CONFLICTS PRIOR TO BIDDING. OBTAIN CLARIFICATION FROM A/E PRIOR TO BID. CONTRACTOR SHALL NOT BE ENTITLED TO ADDITIONAL COMPENSATION FOR WORK REQUIRED TO RELOCATE OUTLET BOXES OR RACEWAYS FOR COORDINATION WITH OTHER TRADE'S WORK.
12. UNLESS NOTED AS EXISTING, ALL ELECTRICAL INDICATED ON THE CONTRACT DOCUMENTS SHALL BE NEW, SHALL BE U.L. LISTED, AND SHALL BEAR A U.L. LABEL. WHERE NO U.L. LABEL OR LISTING IS AVAILABLE, THE MATERIAL SHALL BE LISTED WITH AN APPROVED, NATIONALLY RECOGNIZED ELECTRICAL TESTING AGENCY.
13. PROVIDE EXPERIENCED, QUALIFIED AND RESPONSIBLE SUPERVISION FOR ALL WORK REQUIRED BY THE CONTRACT DOCUMENTS. ALL ELECTRICAL EQUIPMENT SHALL BE INSTALLED IN A NEAT AND
WORKMANLIKE MANNER, TO THE SATISFACTION OF THE ARCHITECT/ENGINEER AND OWNER.
14. THE ELECTRICAL PORTION OF THE CONTRACT DOCUMENTS ARE COORDINATED WITH THE DESIGN BASIS EQUIPMENT SPECIFIED BY DIVISION 26 AND OTHER DIVISIONS. WHERE THE CONTRACTOR ELECTS TO SUBSTITUTE A PRODUCT IN LIEU OF PROVIDING THE DESIGN BASIS, AND SAID SUBSTITUTION IS ACCEPTED BY THE A/E AND OWNER, THE CONTRACTOR SHALL MAKE ALL CORRECTIONS TO THE ELECTRICAL SYSTEM NECESSARY IN ORDER TO ENSURE A COMPLETE AND OPERATIONAL INSTALLATION OF THE EQUIPMENT AT NO ADDITIONAL COSTS. WHERE THE CONTRACTOR'S DESIGN SUBSTITUTION RESULTS IN THE NEED FOR THE ENGINEER TO REVISE THE CONTRACT DOCUMENTS, THE ENGINEER RESERVES THE RIGHT TO REQUEST COMPENSATION FROM THE CONTRACTOR FOR SAID
SERVICES.
15. PRODUCTS SHALL BE OF MATERIALS THAT ARE SUITABLE FOR THE ENVIRONMENT IN WHICH THEY ARE TO BE INSTALLED.
16. NURSE CALL SYSTEM MUST BE UL 1069 LISTED.
17. WORKING CLEARANCES AROUND ELECTRICAL EQUIPMENT SHALL BE MAINTAINED IN COMPLIANCE WITH THE NATIONAL ELECTRICAL CODE ARTICLE 110, COORDINATE EQUIPMENT INSTALLATION TO
MAINTAIN REQUIRED CLEARANCES.
18. IF AN OUTLET BOX IS REQUIRED TO BE LOCATED IN AN ASSEMBLY OR PARTITION RATED AS "FIRE/SMOKE" OR "SMOKE" OR IDENTIFIED AS EITHER "FIRE/SMOKE" OR "SMOKE", THEN ALL OF THE FOLLOWING
CONDITIONS SHALL BE MET:
a. THE OUTLET BOX SHALL BE METALLIC.
b. THE OUTLET BOX OPENINGS SHALL OCCUR ONLY ON ONE SIDE OF THE FRAMING SPACE.
c. THE OUTLET BOX OPENINGS SHALL NOT EXCEED 16 SQUARE INCHES.
d. ALL CLEARANCES BETWEEN THE OUTLET BOX AND THE WALL BOARD MATERIAL SHALL BE COMPLETELY SEALED WITH APPROVED MATERIALS IN ACCORDANCE WITH THE APPLICABLE CODES AND
STANDARDS FOR THE PROJECT.
e. PROVIDE A SUPPLEMENTAL BARRIER AROUND OUTLETS LARGER THAN 16 INCHES SO THAT THE ORIGINAL RATING OF THE PENETRATION IS MAINTAINED.
f. THE TOTAL AGGREGATE SURFACE AREA OF THE OUTLET BOX SHALL NOT EXCEED 100 SQUARE INCHES PER 100 SQUARE FEET.
g. THE OUTLET BOX SHALL BE SEPARATED FROM OPENINGS ON THE OPPOSITE SIDE OF THE RATED PARTITION BY A MINIMUM HORIZONTAL DISTANCE OF 24 INCHES.
h. THE OUTLET BOX SHALL BE SECURELY FASTENED TO A PARTITION FRAMING MEMBER BY MEANS OF AN APPROVED ATTACHMENT METHOD.
i. OPENINGS CUT INTO THE WALL BOARD MATERIAL SHALL NOT EXCEED 1/8 INCH BETWEEN THE EDGES OF THE OUTLET BOX AND THE EDGES OF THE OPENING.
19. LOCATIONS OF EQUIPMENT SHOWN ON THE DRAWINGS ARE APPROXIMATE, COORDINATE EXACT EQUIPMENT LOCATION AND CONNECTION REQUIREMENTS WITH THE APPROPRIATE TRADE PRIOR TO
INSTALLATION.
20. FOR EXACT LOCATION OF CEILING MOUNTED EQUIPMENT COORDINATE WITH EXISTING CEILING MOUNTED DEVICES. LOCATIONS OF EQUIPMENT NOT INCLUDED ON THE REFLECTED CEILING PLAN SHALL BE COORDINATED WITH THOSE ITEMS SHOWN. COORDINATION OF CEILING MOUNTED EQUIPMENT SHALL BE PRIOR TO ANY ROUGH-IN.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .