VA IRM Plum Dwgs 2020-04-13.pdf

PDF 1 MB Posted

Attached to
Y1DA--Increase IRM Physical Security Project 541-19-102
Solicitation number
36C25020B0001
Issued by

About this file

This package includes construction documents for the Increase IRM Physical Security Project 541-19-102 solicited by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

The documents detail plumbing and fire protection plans and notes for renovations to portions of the third floor at the VAMC Wade Park facility. Phase one plans show demolition and new work for sanitary piping replacements, addition of a sheet metal enclosure and leak detection system for overhead piping, installation of domestic water and sprinkler lines. Phase two plans cover further demolition and installation of domestic water, sprinkler and sanitary piping. Specifications include replacement of all overhead sanitary piping with new cast iron, routing of new piping as high as possible, addition of sheet metal gutters and leak alarms.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2" V

3" SAN

1 1/2" V

FD-B

CO

3" SAN DN TO SAN

FROM SINK. FIELD

VERIFY EXACT

ROUTING.

74490

L.D. HENDRIX, JR

GN

SS

AI ON EL

T

F EGE

P R O R

SI NR E I

E E R

D

E

ATS

ET O

OI

HOF

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED W ITHOUT THE EXPRESSED W RITTEN

CONSENT OF PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2018.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Revisions: Date

FULLY SPRINKLERED

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440)546-9696

FAX: (440)546-9699

BID ISSUE 4/13/20

Increase IRM Physical

Security

541-19-102

DMLLDH

PLUMBING LEGEND AND

GENERAL NOTES

P0.1 4/13/20

ABBREVIATIONS:

CALL OUTS:

SYMBOLS:

DEMOLITION SYMBOLS:

PLUMBING PIPING:

DOMESTIC HOT W ATER RETURN

DOMESTIC HOT W ATER SUPPLY

DOMESTIC COLD W ATER SUPPLY

SANITARY W ASTE

PLUMBING VENT

SAN

PIPE DOW N

PIPE RISE UP

PIPE CAP

FLOOR DRAIN

NATURAL GAS

FIRE SUPPRESSION PIPING

VENT THROUGH ROOFVTR

F

G

HW R

HW

CW

V

AD ACCESS DOOR

ELECTRICAL CONTRACTOR

GENERAL TRADES CONTRACTOR

TEMPERATURE CONTROL CONTRACTOR

HVAC CONTRACTOR

FIRE SUPPRESSION CONTRACTOR

PLUMBING CONTRACTOR

EC

GC

FC

PC

TC

HC

REFERENCE TO CODED NOTE

ABOVE FINISHED FLOORAFF

ROOF OPENINGRO

RD

FD

ROOF DRAIN

FLOOR DRAIN

STRAINER

ISOLATION VALVE

REDUCER

UNION

CHECK VALVE

EXISTING TO REMAIN

EXISTING TO BE REMOVED

X

XR

EXISTING TO BE RELOCATEDXRL

EQUIPMENT OR FIXTURE MARK

BRANCH PIPE CONNECTION

NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOW N IN THESE CONSTRUCTION DOCUMENTS. IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF W ORK, FOR DETAILED SCOPE OF W ORK PLEASE REFER TO THE SUBSEQUENT DRAW INGS.

EQUIPMENT

TYPE

UNIT NUMBER

A. LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTW ORK AND EQUIPMENT IS PRESUMED FROM EXISTING DRAW INGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS W HICH W ILL NOT PERMIT THE W ORK TO BE

PERFORMED AS INDICATED ON THESE DRAW INGS.

B. COORDINATE ALL SHUT-DOW NS OF EXISTING MECHANICAL SYSTEMS W ITH VA A MINIMUM OF

SEVEN W ORKING DAYS IN ADVANCE.

C. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW W ALL MOUNTED DEVICES W ITH VA

AND ARCHITECT.

D. PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO

INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER.

E. NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAW INGS

FOR LOCATION OF PANELS.

F. PROVIDE ISOLATION VALVES ON ALL BRANCH PIPING AND ON ALL SUPPLIES TO INDIVIDUAL FIXTURES AND EQUIPMENT. PROVIDE ISOLATION VALVES ON ALL W ATER MAIN BRANCHES IN CORRIDORS AND

W HERE INDICATED ON DRAW INGS.

G. DEMOLITION OF PLUMBING FIXTURES SHALL INCLUDE ASSOCIATED VALVES, PIPING, INSULATION, CARRIERS, ETC. BACK TO ACTIVE MAINS AND CAPPED. INCLUDE REMOVAL AND REPLACEMENT OF CEILINGS AND CUTTING AND PATCHING OF W ALLS AND FLOORS. FILL AND PATCH ALL OPENINGS

CREATED BY THE REMOVAL OF FIXTURES AND PIPING TO MATCH SURROUNDING SURFACES.

H. W HERE W ORK IS SHOW N ABOVE EXISTING CEILINGS THE CONTRACTOR SHALL REMOVE AND REPLACE

EXISTING CEILINGS AS REQUIRED TO PERFORM ALL W ORK DESCRIBED.

I. W HERE CEILING SPACE IS TO BE USED AS A RETURN AIR PLENUM, PIPE SHALL NOT BE PVC PLASTIC AND

ALL W IRING SHALL BE INSTALLED IN CONDUIT OR SHALL BE PLENUM RATED.

PLUMBING AND FIRE PROTECTION LEGEND

PLUMBING GENERAL NOTES

X

XX-XX

LIGHT HAZARD OCCUPANCY

ORDINARY HAZARD GROUP 1 OCCUPANCY

ORDINARY HAZARD GROUP 2 OCCUPANCY

L

OH1

OH2

DEMOLISH TO POINT

CONNECT TO EXISTING

COORDINATE ALL SHUT-DOW NS OF EXISTING SYSTEMS W ITH VA A MINIMUM OF SEVEN W ORKING

DAYS IN ADVANCE.

PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW W ALL MOUNTED DEVICES W ITH

OW NER AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE

LOCATION OF CEILING MOUNTED DEVICES.

PROVIDE SERVICE CLEARANCE FOR ALL EQUIPMENT. REFER TO INSTRUCTIONS FROM THE

EQUIPMENT MANUFACTURER.

NEW PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL DRAW INGS

FOR LOCATION OF PANELS.

THE CONTRACTOR SHALL PROVIDE DETAILED DESIGN OF THE SPRINKLER SYSTEM. REFER TO

SPECIFICATIONS.

UNLESS OTHERW ISE NOTED NEW SPRINKLERS SHALL BE AS FOLLOW S:

F.1. AREAS W ITH CEILING: SEMI-RECESSED TYPE W ITH CHROME PLATED ESCUTCHEONS.

F.2. EXPOSDE STRUCTURE: UPRIGHT OR PENDENT TYPE.

THE FIRE PROTECTION SYSTEM IS PERFORMANCE SPECIFIED. ALL SPRINKLER PIPE SIZES SHALL BE

DETERMINED BY FIRE PROTECTION CONTRACTOR, BASED ON HYDRAULIC CALCULATIONS.

PROVIDE SUPPLEMENTAL DRAINS AS NECESSARY TO PROVIDE 100% SYSTEM DRAINAGE TO

PROJECT AREAS. LOCATE DRAINS ABOVE ACCESSIBLE CEILINGS.

REFER TO ARCHITECTURAL PLANS FOR EXACT PHASING REQUIREMENTS.

REFER TO SPECIFICATIONS FOR FIRE SUPPRESSION HAZARD OCCUPANCY CLASSIFICATIONS.

SPRINKLER PIPING SHALL BE A MINIMUM OF ONE INCH.

UNLESS OTHERW ISE STATED ON DRAW INGS OR IN SPECIFICATIONS, ALL SPRINKLER HEADS SHALL

BE QUICK RESPONSE.

ALL HEADS SHALL BE UL LISTED AND FM APPROVED.

ALL SPRINKLER HEADS LOCATED IN CEILING TILES SHALL BE CENTERED.

CONTRACTOR SHALL REMOVE AND REPLACE CEILING TILES AND GRID AS REQUIRED TO COMPLETE DEMOLITION AND NEW W ORK IN AREAS OUTSIDE RENOVATION PROJECT. CONTRACTOR SHALL BE

RESPONSIBLE FOR REPLACING ANY TILES OR GRID DAMAGED DUE TO THIS W ORK.

PROVIDE PROTECTIVE CAGE FOR SPRINKLER HEADS MOUNTED BELOW 7'-6" AFF.

FIRE PROTECTION GENERAL NOTES

A.

B.

C.

D.

E.

F

G.

H.

I.

J.

K.

L.

M.

N.

O.

P.

THIS PROJECT CONSISTS OF MULTIPLE TRADES OF W ORK PERFORMED W ITHIN AN EXISTING

BUILDING, ALL OF W HICH ALLOW S VERY LITTLE PERMISSABLE RANGE OF VARIATION. THE

CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION W ITH THE COORDINATION AND

INSTALLATION OF THE MULTITUDE OF NEW SYSTEMS W HILE ALSO ACCOMMODATING ANY

EXISTING SYSTEMS TO REMAIN.

THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED W ITH

THIS PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE

OF CONSTRUCTION.

THE COORDINATION DRAW INGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS!

THIS CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN

ORDER TO ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.

IF CONFLICTS ARE IDENTIFIED DURING DEVELOPMENT OF COORDINATION PLANS, THE

CONTRACTOR SHALL NOTIFY THE VA COR. ARCHITECT, AND/OR ENGINEER OF ANY CONDITIONS

W HICH W ILL NOT PERMIT THE W ORK TO BE PERFORMED AS INDICATED ON THE PROJECT PLANS.

A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE

CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOW N CONFLICTS

HAVE BEEN ADDRESSED.

PROJECT COORDINATION NOTES

A.

B.

C.

D.

E.

PLUMBING FIXTURE CONNECTION SCHEDULE

MARK FIXTURE

CW

BRANCH PIPE SIZE

HW W ASTE VENT

FD-B - - 3" 1-1/2"FLOOR DRAIN

NOTES:

1. ALL PIPE SIZES ARE AS SCHEDULED, UNLESS INDICATED OTHERW ISE

ON PLANS.

PENETRATION OF FIRE/SMOKE BARRIERS

PIPE/DUCT

TYPICAL METHOD OF SECURING

HANGER RODS IN CONCRETE

SLABS AND BEAMS.

NOTE:

1. APPLICABLE TO PENETRATIONS

OF ALL FIRE RATED MEMBRANES,

IN ACCORDANCE W ITH NFPA 101.

REFER TO SPECIFICATIONS

SECTION FOR FIRE STOPPING

SYSTEMS.

INSULATED

PIPE OR

DUCT

FLOOR

FIRESTOP MATERIAL

3/4" [19mm]

APPROVED FIRESTOP

INSULATION W ITH

VAPOR BARRIER

PIPE SLEEVE

W HERE SPECIFIED

1/4" [6mm]Ø

ANCHOR ROD FOR

NEW CONSTRUCTION

W ELD

FLOOR OR DECK PENETRATION

PARTITION OR CHASE PENETRATION

6"

[152mm]

6"

[152mm]

MASONRY

PARTITIO

N

PARTITION SUPPORT

FIRESTOP

MATERIAL

6"

[152mm]

6" [152mm]

3/4" [19mm] APPROVED

FIRESTOP INSULATION

W ITH VAPOR BARRIER

DRYW ALL PARTITION

INSULATED

PIPE OR

DUCT

STEEL EXPANSION SHIELD FOR

EXISTING CONSTRUCTION AND

INSERTS FOR NEW CONTRUCTION.

THIS TYPE SHALL BE USED ONLY IN

SLABS OR BEAMS OF 4" (100MM) MIN

DEPTH

3/8" (10 MM) MIN DIA EXPANSION

BOLTS FOR EXISTING

CONTRUCTION AND INSERTS FOR

NEW CONTRUCTION

CONCRETE

FLOOR SLAB

CLIP

ANGL

E

NUTS & W ASHERS

3/8" (10 MM) MIN DIA

HANGER RODS

TURNBUCKLE

3/8" (10 MM) MIN

DIA HANGER RODS

3/8" (10 MM) MIN DIA INSERTS

NEW CONTRUCTION ONLY

TYPICAL PIPE HANGERSVENT THROUGH ROOF DETAIL

NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.

MAXIMUM PIPE/TUBING SUPPORT SPACING

TUBING 5 FT

NOM. SIZE

PIPE

THRU (20)

6 8 10

(32)(25) (40)

(65)

(50)

(75)

ADJUSTABLE CLEVIS HANGER

TYPE 43 - SEE SPECIFICATIONS

SADDLE

W ELD

1312 14 16

(125)(100)

(150)

(200)

TO 1000 LB. (453 KG) UNIFORM LOAD

TRAPEZE HANGER FOR UP

PROVIDE INSULATION SHIELD

SIDE VIEW

1 5/8" (43 MM) 12 GAGE1" (25 MM) MAX.

STRENGTH INSULATION

PROVIDE HIGH COMPRESSIVE

TYPE 1 - SEE SPECIFICATIONS

ADJUSTABLE CLEVIS HANGER

HANGER ROD

UNDER INSULATION SHIELD

AT HANGER

INSULATION SHIELD

TEMPERATURE PIPE)

REQUIRED FOR LOW

BARRIER TYPE IS

INSULATION (VAPOR

SPACING ON

36" (900 MM) MAX.

BAND

(9 PCF MIN. DENSITY)

HANGER RODS W ITH

(8" (200 MM) MIN.)

CHANNEL OR 2"x2"x1/4"

(50x50x8 MM) ANGLE

864 532 2 1/21 1/21 1 1/4IN.

(MM)

(M)

FT.

FT.

(M)

(5.8)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)

(4.9)(4.1)(3.7) (4.0)(3.0)(2.4)(1.8)5 FT

THRU 3/4

(2.1) (2.1)

(2.1)

(2.7)

(2.4)

1/2" (15 MM) DIA.

EACH CHANNEL

AND INSERT FOR ALL PIPING

INSULATION

ROOFING

VENT (SEE PLANS

FOR SIZES,

MINIMUM 3-INCHES)

FLASH VENT W ITH 6 LB.

LEAD CAP AND BASE.

ROLL CAP 1" INTO TOP

OF VENT. BASE TO BE

2'-0" SQUARE

TRAP PRIMER DETAIL

NOTES:

1. ALL FLOOR DRAINS SHALL BE

PROVIDED W ITH A TRAP PRIMER.

FLOOR DRAIN

TRAP PRIMER VALVE

ISOLATION VALVE

COLD W ATER MAIN

FLOOR

1/2" CONTINUOUS

SOFT

COPPER TUBING,

(TYPICAL) NO JOINTS

DOMESTIC W ATER BACKFLOW PREVENTER DETAIL

THREADED DRAIN VALVE W ITH CAP

1"

CW

REDUCED PRESSURE BACKFLOW ASSEMBLY

W ITH

STRAINER AND DRAIN CUP. TO EQUIPMENT

ROUTE INDIRECT

W ASTE THROUGH

FLOOR TO 5TH

FLOOR

NOT TO SCALE

SANITARY ISOMETRIC 1

NOT TO SCALE NOT TO SCALE

NOT TO SCALENOT TO SCALE

NOT TO SCALE NOT TO SCALE

UP

36 37

H

L

L1

L2

L3

39 42414038

M

36a

Z3

3 TYP.

3 TYP.

2TYP.

2"Ø

4"Ø

3"Ø 2"Ø

4"Ø

2"Ø

3"Ø

4"Ø

CO

CO

XR - 2"

XR - 4"

XR - 4"

XR - 4"

XR - 3"

XR - 4"

X - 4"

X - 4"

X - 4" F

XR - 3/4"

XR - 3/4"

X-CU

X-CU

X-CU

BATTERY

3A-135A

MCOR-1

3A135B-1

FMS-1

3A135-1

Tele Health

3A137

L.C.

3A132

Corridor

3A100E

MCR-1

3A133-1

Passage

3AC312

HAC

3AC311

2 Bedroom

3A131

74490

L.D. HENDRIX, JR

GN

SS

AI ON EL

T

F EGE

P R O R

SI NR E I

E E R

D

E

ATS

ET O

OI

HOF

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED W ITHOUT THE EXPRESSED W RITTEN

CONSENT OF PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2018.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Revisions: Date

FULLY SPRINKLERED

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440)546-9696

FAX: (440)546-9699

BID ISSUE 4/13/20

Increase IRM Physical

Security

541-19-102

DMLLDH

PARTIAL THIRD FLOOR

PLUMBING AND FIRE

PROTECTION DEMOLITION PLAN

- PHASE 1

P1.1 4/13/20

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL THIRD FLOOR PLUMBING AND FIRE

PROTECTION DEMOLITION PLAN - PHASE 1 1

# CODED NOTES:

1 REMOVE EXISTING EYEW ASH STATION AND ASSOCIATED MIXING VALVE COMPLETELY. REMOVE

W ATER, DRAIN, AND VENT PIPING BACK TO MAINS AND CAP.

REMOVE EXISTING SANITARY PIPING AND RE-INSTALL NEW CAST IRON BELL & SPIGOT PIPING, SAME

SIZE. COORDINATE SHUTDOW N OF PLUMBING FIXTURES ABOVE W ITH VA COR.

REPLACE EXISTING SHEETMETAL GUTTER SYSTEM IN ITS ENTIRETY W ITH A NEW SHEETMETAL GUTTER SYSTEM. GUTTER SYSTEM SHALL ENCLOSE ALL SANITARY PIPING ABOVE PROJECT SCOPE AREA. SEAL UP TO DECK W ATERTIGHT. SLOPE IN DIRECTION OF FLOW . PROVIDE LEAK DETECTION W ITH AUDIBLE

ALARM. ALARM TO BAS. PROVIDE ACCESS PANEL AT EACH CLEANOUT.

EXISTING PRE-ACTION SPRINKLER CABINET TO REMAIN.

EXISTING PRE-ACTION SPRINKLER PIPING SERVICE TO OIT ROOM SHALL REMAIN UNDER PHASE 1.

DEMOLISH UNIT COLD W ATER HUMIDIFIER LINE AND CONDENSATE DRAIN PIPE BACK TO MAINS AND

CAP.

EXACT CONDITIONS MAY NOT BE ILLUSTRATED ON THIS DRAW ING. FIELD VERIFY ALL EXISTING ABOVE-

CEILING PIPING.

ALL ABOVE-CEILING SANITARY PIPING IN THE PROJECT SCOPE AREA SHALL BE REPLACED W ITH NEW CAST IRON BELL & SPIGOT PIPING. REPLACEMENT PIPING SHALL BE SAME AS CURRENT SIZE.

INSTALL NEW SANITARY PIPING AS HIGH AS POSSIBLE.

NEW SANITARY PIPING CAN BE RE-ROUTED DIFFERENTLY, IF IT ALLOW S FOR A REDUCTION IN OVERALL

PIPE LENGTH AND ALLOW S FOR INSTALLATION AT A HIGHER ELEVATION.

ALL OVERHEAD PIPING SHALL BE PROVIDED A NEW SHEET METAL GUTTER SYSTEM. GUTTER SHALL PROTECT FROM LEAKAGE DOW N INTO ROOM. GUTTERS SHALL EXTEND UP TO DECK AND BE SEALED AT

ALL SEAMS W ATERTIGHT.

PROVIDE ACCESS PANEL AT EACH CLEANOUT.

GUTTERS SHALL BE PROVIDED LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO BAS.

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

N

H

L

L1

L2

L3

39 42414038

M

36a

Z3

X-CU

X-CU

X-CU

2 TYP.

3 TYP.

3TYP.

XR - 3"

X - 3/4" CW

XR - 2"

XR - 4"

XR - 2"

XR - 3"

XR - 4"

XR - 3"

XR-F

CAP

FMS-2

3A135-2

MCOR-2

3A135B-2

74490

L.D. HENDRIX, JR

GN

SS

AI ON EL

T

F EGE

P R O R

SI NR E I

E E R

D

E

ATS

ET O

OI

HOF

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED W ITHOUT THE EXPRESSED W RITTEN

CONSENT OF PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2018.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Revisions: Date

FULLY SPRINKLERED

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440)546-9696

FAX: (440)546-9699

BID ISSUE 4/13/20

Increase IRM Physical

Security

541-19-102

DMLLDH

PARTIAL THIRD FLOOR

PLUMBING AND FIRE

PROTECTION DEMOLITION PLAN

- PHASE 2

P1.3 4/13/20

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL THIRD FLOOR PLUMBING AND FIRE

PROTECTION DEMOLITION PLAN - PHASE 2 1

# CODED NOTES:

1 REMOVE ABANDONED 2-INCH VENT LINE TO POINT INDICATED AND CAP.

REMOVE EXISTING SANITARY PIPING AND RE-INSTALL NEW CAST IRON BELL & SPIGOT PIPING, SAME

SIZE. COORDINATE SHUTDOW N OF PLUMBING FIXTURES ABOVE W ITH VA COR.

REPLACE EXISTING SHEETMETAL GUTTER SYSTEM IN ITS ENTIRETY W ITH A NEW SHEETMETAL GUTTER SYSTEM. GUTTER SYSTEM SHALL ENCLOSE ALL PIPING ABOVE PROJECT SCOPE AREA. SEAL UP TO DECK W ATERTIGHT. SLOPE IN DIRECTION OF FLOW . PROVIDE LEAK DETECTION W ITH AUDIBLE ALARM.

ALARM TO BAS. PROVIDE ACCESS PANEL AT EACH CLEANOUT.

EXISTING PRE-ACTION SPRINKLER CABINET TO REMAIN.

REMOVE ALL EXISTING PRE-ACTION SPRINKLER PIPING AND HEADS SERVING EXISTING OIT ROOM.

REMOVE BACK TO POINT INDICATED. REFER TO NEW PLAN FOR RECONNECTION.

EXACT CONDITIONS MAY NOT BE ILLUSTRATED ON THIS DRAW ING. FIELD VERIFY ALL EXISTING ABOVE-

CEILING PIPING.

ALL ABOVE-CEILING SANITARY PIPING IN THE PROJECT SCOPE AREA SHALL BE REPLACED W ITH NEW CAST IRON BELL & SPIGOT PIPING. REPLACEMENT PIPING SHALL BE SAME AS CURRENT SIZE.

INSTALL NEW SANITARY PIPING AS HIGH AS POSSIBLE.

NEW SANITARY PIPING CAN BE RE-ROUTED DIFFERENTLY, IF IT ALLOW S FOR A REDUCTION IN OVERALL

PIPE LENGTH AND ALLOW S FOR INSTALLATION AT A HIGHER ELEVATION.

ALL OVERHEAD SANITARY PIPING SHALL BE PROVIDED A NEW SHEET METAL GUTTER SYSTEM. GUTTER SHALL PROTECT FROM LEAKAGE DOW N INTO ROOM. GUTTERS SHALL EXTEND UP TO DECK AND BE

SEALED AT ALL SEAMS W ATERTIGHT.

PROVIDE ACCESS PANEL AT EACH CLEANOUT.

GUTTERS SHALL BE PROVIDED LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO BAS.

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

N

H

L

L1

L2

L3

39 42414038

M

36a

Z3

CRAC-3

CRAC-4

2 TYP.

2 TYP.

1TYP.

2"Ø

4"Ø

3"Ø 2"Ø

4"Ø

2"Ø

3"Ø

4"Ø

CO

CO

4" SAN

2" SAN

4" SAN

4" SAN

4" SAN

L

L

L

1" CW

1" CW

1" CW

3/4" CW

1/2" CW

1/2" CW

F

2" VTR

FD-B

F

HAC

3AC311

Passage

3AC312

2 Bedroom

3A131

BATTERY

3A-135A

MCOR-1

3A135B-1

FMS-1

3A135-1

MCR-1

3A133-1

X-CU

X-CU

X-CU

Corridor

3A100E

Tele Health

3A137

REW ORK EXISTING SPRINKLER SYSTEM IN

OUTLINED AREA IN ORDER TO MAINTAIN

SPRINKLER COVERAGE UNTIL PHASE 2. PROVIDE

ADDITIONAL HEADS, W HERE NECESSARY.

PROOVIDE NEW W ET-PIPE SPRINKLER LINE FROM

INDICATED POINT TO OUTLINED AREA. PROVIDE

ALL NEW MAIN AND BRANCH PIPING AND ALL NEW

HEADS.

OUTLINED AREA SHALL BE SPRINKLERED BY PRE-

ACTION SYSTEM. CONNECT TO PRE-ACTION MAIN

AT CABINET. PROVIDE ALL NEW MAIN AND

BRANCH PIPING AND ALL NEW HEADS. LABEL

PIPING FOR PRE-ACTION.

EE

J

3" SAN

CO

1-1/2" V UP

FD-B ABOVE

3" SAN DN TO SAN

FROM MOP BASIN.

FIELD VERIFY EXACT

ROUTING.

CO

X-MB

74490

L.D. HENDRIX, JR

GN

SS

AI ON EL

T

F EGE

P R O R

SI NR E I

E E R

D

E

ATS

ET O

OI

HOF

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED W ITHOUT THE EXPRESSED W RITTEN

CONSENT OF PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2018.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Revisions: Date

FULLY SPRINKLERED

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440)546-9696

FAX: (440)546-9699

BID ISSUE 4/13/20

Increase IRM Physical

Security

541-19-102

DMLLDH

PARTIAL THIRD FLOOR

PLUMBING AND FIRE

PROTECTION PLAN - PHASE 1

P2.1 4/13/20

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL THIRD FLOOR PLUMBING AND FIRE

PROTECTION PLAN - PHASE 1 2

# CODED NOTES:

1 REMOVE EXISTING SANITARY PIPING AND RE-INSTALL NEW CAST IRON BELL & SPIGOT PIPING, SAME SIZE.

COORDINATE SHUTDOW N OF PLUMBING FIXTURES ABOVE W ITH VA COR.

PROVIDE NEW SHEET METAL GUTTER SYSTEM. GUTTER SYSTEM SHALL ENCLOSE ALL PIPING ABOVE PROJECT SCOPE AREA. SEAL UP TO DECK W ATERTIGHT. SLOPE IN DIRECTION OF FLOW . PROVIDE LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO BAS. PROVIDE ACCESS PANEL AT EACH CLEANOUT.

ROUTE 1" APPROXIMATELY 20 LF AND CONNECT TO LOCAL CW MAIN. FIELD VERIFY ROUTE.

PROVIDE NEW BACKFLOW PREVENTER. MOUNT UP HIGH IN HOUSEKEEPING CLOSET. PIPE DRAIN DOW N

TO MOP SINK.

1" CW CAPPED FOR PHASE 2.

PIPE 1/2'" CW TO CRAC UNIT HUMIDIFIER.

1/2" CW DN TO FD TRAP PRIMER.

1-1/2"V TO FD.

SPRINKLER BRANCH FROM W ET-PIPE MAIN TO SERVE OUTLINED AREA. SIZE PER NFPA.

PRE-ACTION SPRINKLER BRANCHED FROM CABINET. SIZE PER NFPA.

EXACT CONDITIONS MAY NOT BE ILLUSTRATED ON THIS DRAW ING. FIELD VERIFY ALL EXISTING ABOVE-

CEILING PIPING.

ALL ABOVE-CEILING SANITARY PIPING IN THE PROJECT SCOPE AREA SHALL BE REPLACED W ITH NEW CAST IRON BELL & SPIGOT PIPING. REPLACEMENT PIPING SHALL BE SAME AS CURRENT SIZE.

INSTALL NEW SANITARY PIPING AS HIGH AS POSSIBLE.

NEW SANITARY PIPING CAN BE RE-ROUTED DIFFERENTLY, IF IT ALLOW S FOR A REDUCTION IN OVERALL

PIPE LENGTH AND ALLOW S FOR INSTALLATION AT A HIGHER ELEVATION.

ALL OVERHEAD PIPING SHALL BE PROVIDED A NEW SHEET METAL GUTTER SYSTEM. GUTTER SHALL PROTECT FROM LEAKAGE DOW N INTO ROOM. GUTTERS SHALL EXTEND UP TO DECK AND BE SEALED AT

ALL SEAMS W ATERTIGHT.

PROVIDE ACCESS PANEL AT EACH CLEANOUT.

GUTTERS SHALL BE PROVIDED LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO BAS.

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

SPRINKLER LEGEND

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL SECOND FLOOR PLUMBING AND FIRE

PROTECTION PLAN - PHASE 1 3NN

H

L

L1

L2

L3

39 42414038

M

36a

Z3

CRAC-3

CRAC-4

CRAC-2

CRAC-1

CO

CO

2" SAN

X - 3/4" CW

2" SAN

4" SAN 4" SAN

3" SAN

4" SAN

4" SAN

4" SAN

2" SAN

2" SAN

1 TYP.

2 TYP.2TYP.

1" CW

MCR-2

3A133-2

MCOR-2

3A135B-2

FMS-2

3A135-2

OUTLINED AREA SHALL BE SPRINKLERED BY PRE-ACTION SYSTEM. CONNECT

TO PRE-ACTION MAIN AT CABINET. PROVIDE ALL NEW MAIN AND BRANCH

PIPING AND ALL NEW HEADS. LABEL PIPING FOR PRE-ACTION.

74490

L.D. HENDRIX, JR

GN

SS

AI ON EL

T

F EGE

P R O R

SI NR E I

E E R

D

E

ATS

ET O

OI

HOF

DESIGN AND CONSTRUCTION DOCUMENTS AS

INSTRUMENTS OF SERVICE ARE GIVEN IN

CONFIDENCE AND REMAIN THE PROPERTY OF

PERSPECTUS ARCHITECTURE. THE USE OF THIS

DESIGN AND THESE CONSTRUCTION

DOCUMENTS

FOR PURPOSES OTHER THAN THE SPECIFIC

PROJECT NAMED HEREIN IS STRICTLY

PROHIBITED W ITHOUT THE EXPRESSED W RITTEN

CONSENT OF PERSPECTUS ARCHITECTURE.

COPYRIGHT C 2018.

13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833

CONSULTANTS: ARCHITECT:

Drawing Title

Approved: Project Director Location

Project Title

Date Checked Drawn

Drawing Number

Building Number

Project Number

Office of

Facilities

Management

Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t

VA FORM 08-6231, OCT 1978

1 2 3 4 5 6 7 8 9 10

A

1 2 3 4 5 6 7 8 9 10

B

C

D

E

F

A

B

C

D

E

F

VAMC - WADE PARK

Revisions: Date

FULLY SPRINKLERED

FREDRICK, FREDRICK & HELLER

ENGINEERS, INC.

672 EAST ROYALTON ROAD

BROADVIEW HTS., OHIO 44147

TEL. (440)546-9696

FAX: (440)546-9699

BID ISSUE 4/13/20

Increase IRM Physical

Security

541-19-102

DMLLDH

PARTIAL THIRD FLOOR

PLUMBING AND FIRE

PROTECTION PLAN - PHASE 2

P2.3 4/13/20

0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'

1/4" = 1'-0"

PARTIAL THIRD FLOOR PLUMBING AND FIRE

PROTECTION PLAN - PHASE 2 1N

# CODED NOTES:

1 REMOVE EXISTING SANITARY PIPING AND RE-INSTALL NEW CAST IRON BELL & SPIGOT PIPING, SAME SIZE.

COORDINATE SHUTDOW N OF PLUMBING FIXTURES ABOVE W ITH VA COR.

PROVIDE NEW SHEET METAL GUTTER SYSTEM. GUTTER SYSTEM SHALL ENCLOSE ALL SANITARY PIPING ABOVE PROJECT SCOPE AREA. SEAL UP TO DECK W ATERTIGHT. SLOPE IN DIRECTION OF FLOW . PROVIDE LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO DECK. PROVIDE ACCESS PANEL AT EACH CLEANOUT.

PIPE 3/4" CW TO CRAC UNIT HUMIDIFIER.

EXTEND NEW SPRINKLER PIPING FROM PRE-ACTION SYSTEM TO SERVE OUTLINED ARE. SIZE PER NFPA.

1" CW DOW N TO BELOW RAISED FLOOR. ROUTE TO CRAC HUMIDIFIERS.

EXACT CONDITIONS MAY NOT BE ILLUSTRATED ON THIS DRAW ING. FIELD VERIFY ALL EXISTING ABOVE-

CEILING PIPING.

ALL ABOVE-CEILING SANITARY PIPING IN THE PROJECT SCOPE AREA SHALL BE REPLACED W ITH NEW CAST IRON BELL & SPIGOT PIPING. REPLACEMENT PIPING SHALL BE SAME AS CURRENT SIZE.

INSTALL NEW SANITARY PIPING AS HIGH AS POSSIBLE.

NEW SANITARY PIPING CAN BE RE-ROUTED DIFFERENTLY, IF IT ALLOW S FOR A REDUCTION IN OVERALL

PIPE LENGTH AND ALLOW S FOR INSTALLATION AT A HIGHER ELEVATION.

ALL OVERHEAD PIPING SHALL BE PROVIDED A NEW SHEET METAL GUTTER SYSTEM. GUTTER SHALL PROTECT FROM LEAKAGE DOW N INTO ROOM. GUTTERS SHALL EXTEND UP TO DECK AND BE SEALED AT

ALL SEAMS W ATERTIGHT.

PROVIDE ACCESS PANEL AT EACH CLEANOUT.

GUTTERS SHALL BE PROVIDED LEAK DETECTION W ITH AUDIBLE ALARM. ALARM TO BAS.

GENERAL NOTES:

A.

B.

C.

D.

E.

F.

G.

SPRINKLER LEGEND

P0.1 - PLUMBING LEGEND AND GENERAL NOTES
18077 FFH CF R18_ifowler
P0.1 - PLUMBING LEGEND AND GENERAL NOTES
P1.1 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION DEMOLITION PLAN - PHASE 1
18077 FFH CF R18_ifowler
P1.1 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION DEMOLITION PLAN - PHASE 1
P1.3 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION DEMOLITION PLAN - PHASE 2
18077 FFH CF R18_ifowler
P1.3 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION DEMOLITION PLAN - PHASE 2
P2.1 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - PHASE 1
18077 FFH CF R18_ifowler
P2.1 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - PHASE 1
P2.3 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - PHASE 2
18077 FFH CF R18_ifowler
P2.3 - PARTIAL THIRD FLOOR PLUMBING AND FIRE PROTECTION PLAN - PHASE 2