This package includes mechanical construction documents and specifications for the Increase IRM Physical Security Project 541-19-102 solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10. The project scope involves renovations and upgrades to HVAC systems on various floors of an existing VA medical center building. Work will be conducted in phases to maintain operations. Demolition and installation plans show ductwork, piping, and equipment changes. Specifications provide details for materials, connections, controls, and schedules.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
MECHANICAL LEGEND AND
GENERAL NOTES
M0.1 4/13/20
A. LOCATIONS AND ROUTING OF EXISTING PIPING, DUCTW ORK AND EQUIPMENT IS PRESUMED FROM EXISTING DRAW INGS. MECHANICAL CONTRACTOR SHALL FIELD VERIFY ALL PRIOR TO COMMENCEMENT OF CONSTRUCTION. NOTIFY ENGINEER OF ANY CONDITIONS W HICH W ILL NOT PERMIT THE W ORK TO BE
PERFORMED AS INDICATED ON THESE DRAW INGS.
B. COORDINATE ALL SHUT-DOW NS OF EXISTING MECHANICAL SYSTEMS W ITH VA A MINIMUM OF
SEVEN W ORKING DAYS IN ADVANCE.
C. PRIOR TO INSTALLATION, VERIFY PRECISE LOCATION OF NEW W ALL MOUNTED DEVICES W ITH VA AND ARCHITECT. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN FOR PRECISE LOCATION OF CEILING MOUNTED DEVICES. COORDINATE ROOF MOUNTED EQUIPMENT W ITH ARCHITECT PRIOR TO
INSTALLATION.
D. PROVIDE ADEQUATE SERVICE CLEARANCE FOR ALL MECHANICAL EQUIPMENT. REFER TO
INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER. MAINTAIN A MINIMUM OF 18 INCH CLEARANCE
AT CONTROLS FOR VARIABLE AIR VOLUME TERMINALS ABOVE CEILINGS.
E. NEW DUCTS OR PIPING SHALL NOT BE ROUTED ABOVE ELECTRICAL PANELS. REFER TO ELECTRICAL
DRAW INGS FOR LOCATION OF PANELS.
F. CONTRACTOR SHALL INSTALL MANUAL BALANCING DAMPERS ON ALL SUPPLY, RETURN, AND EXHAUST DUCTW ORK BRANCHES SERVING DIFFUSERS OR GRILLES. DAMPERS SHALL BE INSTALLED IN AN
ACCESSIBLE LOCATION AS CLOSE TO MAIN AS POSSIBLE.
G. REFER TO TERMINAL CONNECTIONS SCHEDULE FOR SIZE OF DUCT CONNECTIONS TO TERMINAL UNITS.
H. UNLESS NOTED OTHERW ISE, BRANCH DUCTS TO DIFFUSERS SHALL BE THE SAME SIZE AS THE NECK OF
THE DIFFUSER.
I. ALL REFRIGERANT PIPING SHALL BE SIZED, SLOPED, TRAPPED, ROUTED AND CHARGED IN STRICT ACCORDANCE W ITH W RITTEN INSTRUCTIONS FROM THE EQUIPMENT MANUFACTURER. SIZING AND
ROUTING SHOW N ON THE DRAW INGS IS FOR BIDDING PURPOSES ONLY.
J. IN GENERAL, REFRIGERANT SYSTEMS SHALL BE THOROUGHLY EVACUATED, AND REFRIGERANT
CHARGE SHALL BE DETERMINED BY W EIGHT.
K. NO TEMPERATURE SENSING CONTROL DEVICES SHALL BE LOCATED OVER HEAT PRODUCING DEVICES.
L. INSTALL ALL EQUIPMENT TO BE DEAD LEVEL.
M. EXTREMELY TIGHT CLEARANCES OCCUR IN THE EXISTING BUILDING. CONTRACTOR SHALL PREPARE SHEET METAL SHOP DRAW INGS FOR APPROVAL PRIOR TO FABRICATING SHEET METAL. COORDINATE
W ITH ALL OTHER TRADES.
N. MECHANICAL DRAW INGS ARE DIAGRAMMATICAL W HERE DUCT SIZE SHOW N IS IN CONFLICT W ITH
STRUCTURE OR OTHER BUILDING SYSTEM, CONTRACTOR MAY MODIFY DUCT SIZE AND PROVIDE
EQUIVALENT FREE AREA DUCT.
O. W HERE CEILING SPACE IS TO BE USED AS A RETURN AIR PLENUM, PIPE SHALL NOT BE PVC PLASTIC AND
ALL W IRING SHALL BE INSTALLED IN CONDUIT OR SHALL BE PLENUM RATED.
SYMBOLS:
HVAC CONTROLS:
ABBREVIATIONS:
CALL OUTS: HVAC PIPING:
DEMOLITION SYMBOLS:
MANUAL BALANCING DAMPER ON DUCT
ROUND DUCT SIZE
AD ACCESS DOOR
12"Ø
RECTANGULAR DUCT SIZE24x18
ELECTRICAL CONTRACTOR
GENERAL TRADES CONTRACTOR
TEMPERATURE CONTROL CONTRACTOR
HVAC CONTRACTOR
FIRE SUPPRESSION CONTRACTOR
PLUMBING CONTRACTOR
CONNECT TO EXISTING
EC
GC
FC
PC
TCC
HC
CTE
REFERENCE TO CODED NOTE
TO
SUPPLY AIR DUCT
TO BE MOUNTED OVER ACCESSIBLE CEILING
SUPPLY AIR DIFFUSER
SHADING INDICATES TO PROVIDE QUADRANT BLANK-OFF
IN NECK OF DIFFUSER. TO BE FURNISHED W ITH DIFFUSER.
x'-x" INDICATES BOTTOM OF DUCT DIMENSION ABOVE FINISHED FLOOR
ABOVE FINISHED FLOOR
EXHAUST AIR
RETURN AIR
SUPPLY AIR
AFF
EA
RA
SA
ROOF OPENINGRO
TEMPERATURE CONTROL PANELTCP
HEATING HOT WATER SUPPLY
HEATING HOT W ATER RETURN
PCW S
HHW S
HHW R
PCW R PROCESS CHILLED W ATER RETURN
PROCESS CHILLED W ATER SUPPLY
SECTION / DETAIL / ELEVATION MARK
DETAIL NO.
PRESSURE GAUGE
HUMIDITY SENSOR
MOTOR OPERATED DAMPER
H
MOD
STRAINER
FLEXIBLE PIPE CONNECTOR
THERMOMETER IN PIPE W ELL
BALANCING VALVE
ISOLATION VALVE
REDUCER
UNION
CHECK VALVE
3-W AY CONTROL VALVE
GAUGE PORT (PETE'S PLUG)
DRAIN VALVE W ITH HOSE FITTING
2-W AY CONTROL VALVE
MAV
RETURN AIR DUCT
EXHAUST AIR DUCT
CD CONDENSATE PIPING
EXISTING TO REMAIN
EXISTING TO BE REMOVED
X
XR
EXISTING TO BE RELOCATEDXRL
EQUIPMENT OR FIXTURE MARK
AIR DISTRIBUTION DEVICE
BRANCH PIPE CONNECTION
DRAW ING
FIRE DAMPER IN DUCTFDD
INDICATES DIRECTION OF AIRFLOW
LIMIT OF DEMOLITIONLOD
THERMOSTATT
NOTE: THIS LEGEND IS INTENDED TO AID IN THE UNDERSTANDING OF SHORTHAND, SYMBOLS AND ABBREVIATIONS SHOW N IN THESE CONSTRUCTION DOCUMENTS. IT IS NOT THE INTENTION TO DESCRIBE THE PROJECT SCOPE OF W ORK, FOR DETAILED SCOPE OF W ORK PLEASE REFER TO THE SUBSEQUENT DRAW INGS.
TYPE
CONNECTION SIZE AT
DEVICE
EQUIPMENT
TYPE
UNIT NUMBER
MANUAL AIR VENT
LOCAL DRAIN, VALVED W ITH 3/4" THREADED CONNECTOR
OPENING IN TOP OF DUCT. SHALL BE A MINIMUM 1.5 TIMES
GREATER THAN THE CROSS-SECTIONAL AREA OF DUCT.
H4-1
MECHANICAL GENERAL NOTES
MECHANICAL LEGEND
XX-XX
X
X X
XXX
PROJECT COORDINATION NOTES
A.
B.
C.
D.
E.
THE PROJECT CONSISTS OF MULTIPLE TRADES OF W ORK PERFORMED W ITHIN AN EXISTING BUILDING, ALL OF W HICH ALLOW S VERY LITTLE PERMISSIBLE RANGE OF VARIATION. THE CONTRACTOR SHALL TAKE CAREFUL CONSIDERATION W ITH THE COORDINATION AND INSTALLATION OF THE MULTITUDE OF
NEW SYSTEMS W HILE ALSO ACCOMMODATING ANY EXISTING SYSTEMS TO REMAIN.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING ALL TRADES ASSOCIATED W ITH THIS
PROJECT AND ISSUING COORDINATION PLANS PRIOR TO COMMENCEMENT OF EACH PHASE OF
CONSTRUCTION.
THE COORDINATION DRAW INGS SHALL ILLUSTRATE ALL SYSTEMS IN PLACE. NO EXCEPTIONS! THE CONTRACTOR SHALL SHOW ALL NECESSARY OFFSETS, TRANSITIONS, ETC. AS REQUIRED IN ORDER TO
ACCOMMODATE CONDITIONS IDENTIFIED IN THE FIELD.
IF CONFLICTS ARE IDENTIFIED DURING THE DEVELOPMENT OF COORDINATION PLANS. THE
CONTRACTOR SHALL NOTIFY THE VA COR, ARCHITECT, AND/OR ENGINEER OF ANY CONDITIONS W HICH
W ILL NOT PERMIT TO BE PERFORMED AS INDICATED ON THE PROJECT PLANS.
A COMPLETED SET OF COORDINATION PLANS ISSUED FOR REVIEW SHALL CONFIRM THAT THE
CONTRACTOR FULLY UNDERSTANDS THE PROJECT CONSTRAINTS AND ALL KNOW N CONFLICTS HAVE
BEEN ADDRESSED.
DEMOLISH TO POINT
CONNECT TO POINT
UP
T
T
H
36 37
H
L
L1
L2
L3
39 42414038
M
36a
Z3
XR-AC
X-AC
X-AC
X-ACCAP
CAP
XR-EF
CAP
CAP
X - 32 x 14 RA
X - 24 x 10 SA
X-VAV
X-CU
X-CU
X-CU
CAP
XR
XR
XR
XR
CAP
XR
MCR-1
3A133-1
2 Bedroom
3A131
Corridor
3A100E
L.C.
3A130
Tele Health
3A137
FMS-1
3A135-1
MCOR-1
3A135B-1
BATTERY
3A-135A
XR
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR
DUCTWORK DEMOLITION PLAN -
PHASE 1
M1.1 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR DUCTW ORK DEMOLITION
PLAN - PHASE 1 1
# CODED NOTES:
1 REMOVE VAV BOX AND ASSOCIATED DUCTW ORK, CONTROLS, ETC.
REMOVE EXISTING EXHAUST FAN AND ALL ASSOCIATED DUCTW ORK, CONTROLS, POW ER, ETC.
COMPLETELY.
REMOVE EXHAUST DUCTW ORK TO LOUVER. CAP BACK OF LOUVER W ITH INSULATED PANEL AND SEAL
W EATHERTIGHT.
INFILL PENETRATION. INFILL SHALL MATCH W ALL RATING.
CAP OPEN RETURN DUCT ABOVE CEILING.
REMOVE EXISTING LIEBERT AC UNIT COMPLETELY. REMOVE ALL ASSOCIATED POW ER, CONTROLS, ETC.
REMOVE ALL ASSOCIATED DUCTW ORK AND PIPING IN PHASE 2.
GENERAL NOTES:
ALL EXISTING DUCTW ORK, PIPING, ETC. FOUND ABANDONED OR UNUSED ABOVE CEILING SHALL BE
REMOVED COMPLETELY. ACTIVE SYSTEMS SHALL BE CAPPED BACK AT MAINS.
FIELD VERIFY ALL EXISTING SYSTEMS.
A.
B.
N
T
T
H
36 37
H
L
L1
L2
L3
39 42414038
M
36a
Z3
XR-AC
X-AC
X-AC
X-AC
X-VAV
X-
PERIMETER
HEATING
HOT W ATER
X-CU
X-CU
X-CU
EXISTING PIPING
ROUTED OVERHEAD
EXISTING PIPING
ROUTED BELOW
RAISED FLOOR (TYP.)
BATTERY
3A-135A
MCOR-1
3A135B-1
FMS-1
3A135-1
Tele Health
3A137
L.C.
3A132
EMS
3A134
L.C.
3A130
EMS
3A128
Corridor
3A100E
2 Bedroom
3A131
MCR-1
3A133-1
EXISTING PIPING
ROUTED BELOW
RAISED FLOOR (TYP.)
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR HVAC
PIPING DEMOLITION PLAN -
PHASE 1
M1.2 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION
PLAN - PHASE 1 1
# CODED NOTES:
1 REMOVE VAV BOX AND ASSOCIATED PIPING, CONTROLS, ETC.
REMOVE EXISTING HUMIDISTAT COMPLETELY.
REMOVE EXISTING THERMOSTAT COMPLETELY.
REMOVE EXISTING PERIMETER HEATING PIPING AND REPLACE W ITH NEW PIPING (SAME SIZE) AND INSULATION. INSTALL NEW PIPING AS MUCH AS POSSIBLE IN ORDER TO MINIMIZE SHUTDOW N OF PERIMETER HEAT TO FOURTH FLOOR EAST. FIELD VERIFY LOCATION OF ISOLATION VALVES. INSTALL NEW PIPING AS HIGH AS POSSIBLE IN ORDER TO PERMIT INSTALLATION OF NEW DUCTW ORK. ROUTING OF NEW PIPING CAN VARY AT CONTRACTOR'S DISCRETION, HOW EVER SHALL BE COORDINATED W ITH
ALL EXISTING AND NEW SYSTEMS IN THIS PROJECT. COORDINATE SHUTDOW N W ITH VA COR.
PROVIDE NEW SHUTOFF VALVES IN EXISTING PIPING.
PROVIDE NEW SHEETMETAL GUTTER SYSTEM FOR REINSTALLED PERIMETER HEATING PIPING. GUTTER SYSTEM SHALL ENCLOSE ALL PIPING ABOVE PROJECT SCOPE AREA. SEAL W ATERTIGHT. PROVIDE LEAK
DETECTION W ITH AUDIBLE ALARM AND ALARM TO BAS.
REMOVE EXISTING LIEBERT AC UNIT COMPLETELY. REMOVE ALL ASSOCIATED POW ER, CONTROLS, ETC.
REMOVE ALL ASSOCIATED DUCTW ORK AND PIPING IN PHASE 2.
GENERAL NOTES:
ALL EXISTING DUCTW ORK, PIPING, ETC. FOUND ABANDONED OR UNUSED ABOVE CEILING SHALL BE
REMOVED COMPLETELY. ACTIVE SYSTEMS SHALL BE CAPPED BACK AT MAINS.
FIELD VERIFY ALL EXISTING SYSTEMS.
A.
B.
36 37
H
L
L1
L2
L3
39 42414038
M
36a
Z3
XR-AC
XR-AC
XR-AC
X - 32 x 14 RA
X - 24 x 10 SA
XR-CU
XR-CU
XR-CU
XR - 32 x 14
X - 14"ø RA
MCOR-2
3A135B-2
MCR-2
3A133-2
FMS-2
3A135-2
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR
DUCTWORK DEMOLITION PLAN -
PHASE 2
M1.3 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR DUCTW ORK DEMOLITION
PLAN - PHASE 2 1
# CODED NOTES:
1 PATCH W ALL AT PENETRATION. INFILL SHALL MATCH W ALL RATING.
REMOVE VAV BOX AND ASSOCIATED DUCTW ORK, CONTROLS, ETC.
REMOVE EXISTING LIEBERT AC UNIT COMPLETELY. REMOVE ALL ASSOCIATED POW ER, DUCTW ORK, CONTROLS, PIPING, ETC.
REMOVE EXISTING CONDENSING UNIT (ASSOCIATED W ITH LIEBERT AC) COMPLETELY. REMOVE ALL
ASSOCIATED POW ER, CONTROLS, PIPING, ROOF CURBS, ETC.
EXISTING LIEBERT UNIT (AND ASSOCIATED CONDENSING UNIT) SHALL BE REMOVED UPON INSTALLATION AND ACTIVATION OF NEW CRAC UNITS IN OIT ROOM. EXISTING UNIT SHALL REMAIN ACTIVE DURING
PHASE 2 IN ORDER TO MAINTAIN CONDITIONING OF SPACE.
REMOVE ALL REMAINING ASSOCIATED POW ER, DUCTW ORK, CONTROLS, PIPING, ETC FROM LIEBERT AC
UNIT REMOVED DURING PHASE 1 DEMOLITION.
GENERAL NOTES:
ALL EXISTING DUCTW ORK, PIPING, ETC. FOUND ABANDONED OR UNUSED ABOVE CEILING SHALL BE
REMOVED COMPLETELY. ACTIVE SYSTEMS SHALL BE CAPPED BACK AT MAINS.
FIELD VERIFY ALL EXISTING SYSTEMS.
A.
B.
H
L
L1
L2
L3
39 42414038
M
36a
Z3
X-PERIMETER
HEATING HOT
W ATER
X - 3/4" HHW S
X - 3/4" HHW R
XR-PIPE
BELOW
FLOOR
XR-PIPE
BELOW
FLOOR
XR-PIPE
BELOW
FLOOR
XR-PIPE
BELOW
FLOOR
/2
H H
W S
/2
H H
W R
X
/4
P C
W R
X
/4
P C
W S
X
/4
R L
X
/4
R S
X-PIPE
BELOW
FLOOR
CU-4
CU-3
MCOR-2
3A135B-2
FMS-2
3A135-2
MCR-2
3A133-2
XR-PIPE
BELOW
FLOOR
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR HVAC
PIPING DEMOLITION PLAN -
PHASE 2
M1.4 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION
PLAN - PHASE 2 1
# CODED NOTES:
1 REMOVE EXISTING LIEBERT AC UNIT COMPLETELY. REMOVE ALL ASSOCIATED POW ER, DUCTW ORK, CONTROLS, PIPING, ETC.
REMOVE EXISTING CONDENSING UNIT (ASSOCIATED W ITH LIEBERT AC) COMPLETELY. REMOVE ALL
ASSOCIATED POW ER, CONTROLS, PIPING, ROOF CURBS, ETC.
PROVIDE NEW SHEETMETAL GUTTER SYSTEM FOR REINSTALLED PERIMETER HEATING PIPING. GUTTER SYSTEM SHALL ENCLOSE ALL PIPING ABOVE PROJECT SCOPE AREA. SEAL W ATERTIGHT. PROVIDE LEAK
DETECTION W ITH AUDIBLE ALARM AND ALARM TO BAS.
REMOVE EXISTING PERIMETER HEATING PIPING AND REPLACE W ITH NEW PIPING (SAME SIZE) AND INSULATION. INSTALL NEW PIPING AS MUCH AS POSSIBLE IN ORDER TO MINIMIZE SHUTDOW N OF PERIMETER HEAT TO FOURTH FLOOR EAST. FIELD VERIFY LOCATION OF ISOLATION VALVES. INSTALL NEW PIPING AS HIGH AS POSSIBLE IN ORDER TO PERMIT INSTALLATION OF NEW DUCTW ORK. ROUTING OF NEW PIPING CAN VARY AT CONTRACTOR'S DISCRETION, HOW EVER SHALL BE COORDINATED W ITH
ALL EXISTING AND NEW SYSTEMS IN THIS PROJECT. COORDINATE SHUTDOW N W ITH VA COR.
PROVIDE NEW SHUTOFF VALVES IN EXISTING PIPING.
EXISTING LIEBERT UNIT (AND ASSOCIATED CONDENSING UNIT) SHALL BE REMOVED UPON INSTALLATION AND ACTIVATION OF NEW CRAC UNITS IN OIT ROOM. EXISTING UNIT SHALL REMAIN ACTIVE DURING
PHASE 2 IN ORDER TO MAINTAIN CONDITIONING OF SPACE.
REMOVE ALL REMAINING ASSOCIATED POW ER, DUCTW ORK, CONTROLS, PIPING, ETC FROM LIEBERT AC
UNIT REMOVED DURING PHASE 1 DEMOLITION.
GENERAL NOTES:
ALL EXISTING DUCTW ORK, PIPING, ETC. FOUND ABANDONED OR UNUSED ABOVE CEILING SHALL BE
REMOVED COMPLETELY. ACTIVE SYSTEMS SHALL BE CAPPED BACK AT MAINS.
FIELD VERIFY ALL EXISTING SYSTEMS.
A.
B.
N
H
L
L1
L2
L3
39 42414038
M
36a
Z3
X-AC
X-AC
X-AC
X - 32 x 14 RA
X - 24 x 10 SA
X-VAV
X-CU
X-CU
X-CU
CAP
8"ø
S1 110
22 x 22
R2 0
TYP. OF 10
VAV - 1
"ø
S A
10 x 6 SA
16 x 10 SA
10 x 6
S2 210
CRAC-3
CRAC-4
NA
10"ø SA
10 x 6
S2 210
18 x 14
T1 0
10"ø
S1 300
10"ø
S1 300 x
NA
T
CU-4
CU-3
R2 700
14"Ø 14"ø RA
2 Bedroom
3A131
Corridor
3A100E
Tele Health
3A137
Corridor
3A-134
BATTERY
3A-135A
FMS-1
3A135-1
MCOR-1
3A135B-1
MCR-1
3A133-1
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR
DUCTWORK PLAN - PHASE 1
M2.1 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR DUCTW ORK PLAN - PHASE
1 1
# CODED NOTES:
1 PROVIDE TOP RETURN PLENUM. HEIGHT SHALL BE FROM TOP OF UNIT TO CEILING. MANUFACTURER'S
PLENUM SYSTEM SHALL BE USED. CUSTOM CUT AS NECESSARY.
PROVIDE TRANSFER GRILLE "T1" ON BOTH SIDES OF W ALL.2
H
L
L1
L2
L3
39 42414038
M
36a
Z3
X-AC
X-AC
X-AC
X-VAV
X-PERIMETER
HEATING HOT
W ATER
X - 3/4" HHW S
X - 3/4" HHW R
X-CU
X-CU
X-CU
CO
CO
1" CD
3/4" HHW S
3/4" HHW R
VAV - 1
1 1/4" CD
1 1/4" CD
1" CD
1" CD
CRAC-4
CRAC-3
2 5
11 TYP.
/2
H H
W R
/2
H H
W S
CU-4
CU-3
MCOR-1
3A135B-1
FMS-1
3A135-1
Tele Health
3A137
BATTERY
3A-135A
BATTERY
3A-135A
MCR-1
3A133-1
Corridor
3A100E
L.C.
3A130
EMS
3A128
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR HVAC
PIPING PLAN - PHASE 1
M2.2 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR HVAC PIPING PLAN -
PHASE 1 1
# CODED NOTES:
1 INSTALL UNIT ON FLOOR. PLACE IN CONTAINMENT PAN W ITH LEAK DETECTION.
PIPE 1-1/4" PCW S/R THROUGH W ALL AT FLOOR LEVEL. CAP FOR EXTENSION UNDER PHASE 2.
RACK 1-1/4" CD TO W ALL AND SPILL TO MOP SINK W ITH AIR GAP.
1" CD DOW N TO UNIT CONDENSATE PUMP.
RS/RL TIGHT TO W ALL DOW N TO CRAC UNIT.
1-1/4" PCW S/R DOW N TO CRAC-4.
RS/RL ROUTED UP ALONG CEILING IN THIS ROOM TO PERMIT PASSAGE UNDERNEATH. RS/RL SHALL DROP ALONG NORTH W ALL AND BE ROUTED NORTH BELOW EXISTING RAISED FLOOR. OVERHEAD PIPING
IN THIS AREA SHALL BE REINSTALLED IN PHASE 2 BELOW NEW RAISED FLOOR.
1-1/4" PCW S/R AND RS/RL SHALL BE RACKED TO W ALL AND PENETRATE W ALL AT FLOOR LEVEL.
1-1/4" PCW S/R AND RS/RL PIPING ROUTED ABOVE CEILING IN FMS ROOM. PROVIDE SHEETMETAL GUTTER SYSTEM FOR PIPING. SEAL W ATERTIGHT. PROVIDE LEAK DETECTION W ITH AUDIBLE ALARM AND ALARM
TO BAS.
RS/RL PIPING ROUTED BELOW RAISED FLOOR. FIELD VERIFY EXACT ROUTING.
PROVIDE ROOF PIPE CURBS EVERY 4'-0" O.C. AND AT EACH CHANGE IN DIRECTION. FLASH TO ROOF.
MOUNT CU ON NEW EQUIPMENT CURBS. FLASH CURBS TO ROOF.
H
L
L1
L2
L3
39 42414038
M
36a
Z3
X - 32 x 14 RA
X - 24 x 10 SA
50 x 12 SA
CRAC-1 CRAC-2
50 x 12 SA x x
(TYP.)
1 TYP.
22 x 10
S3 600
12"ø
S3 600
(TYP.) 1 TYP.
CU-4
CU-3
CU-2
CU-1
X - 14"ø RA
MCR-2
3A133-2
FMS-2
3A135-2
MCOR-2
3A135B-2
22 x 10
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR
DUCTWORK PLAN - PHASE 2
M2.3 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR DUCTW ORK PLAN - PHASE
2 1N
# CODED NOTES:
1 MOUNT DUCTW ORK AS HIGH AS POSSIBLE (MIN. 7'-4" ABOVE RAISED FLOOR). COORDINATE FINAL
PLACEMENTS OF SUPPLY GRILLES W ITH ROOM LAYOUT.
DUCT TOP SUPPLY DISCHARGE FULL SIZE UP TO SUPPLY DUCT MAIN. PROVIDE TRANSITION AT
CONNECTION TO SUPPLY DUCT MAIN (CONICAL OR OTHER).
CONDENSING UNITS #1 AND #2 INSTALLATION TO BE COORDINATED W ITH THE REMOVALE OF EXISTING LIEBERT UNITS. REFER TO SEQUENCING OF EXISTING LIEBERT UNIT DURING PHASE 2 CONSTRUCTION, DW G M1.4.
H
L
L1
L2
L3
39 42414038
M
36a
Z3
X-PERIMETER HEATING HOT W ATER
X - 3/4" HHW S
X - 3/4" HHW R
CO
CO
CO
CO
CRAC-2CRAC-1
PCW S/R DN
TO CRAC-3
CHW S/R DN
TO CRAC-4
3" PCW S
3" PCW R
2" PCW R
2" PCW S
3"Ø PCW S/R DN
7 TYP.
2-1/2" PCW S/R ROUTED
BELOW RAISED FLOOR.
/2
P C
W S
/2
P C
W R
CU-2
CU-1
CU-4
CU-3
MCOR-2
3A135B-2
FMS-2
3A135-2
MCR-2
3A133-2
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL THIRD FLOOR HVAC
PIPING PLAN - PHASE 2
M2.4 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL THIRD FLOOR HVAC PIPING PLAN -
PHASE 2 1
# CODED NOTES:
1 2" PCW S/R TO SERVE CRAC UNIT.
RACK 1-1/4" CD TO W ALL AND SPILL TO MOP SINK W ITH AIR GAP.
PROVIDE NEW LEAK DETECTION THROUGHOUT RAISED FLOOR AREA. ALARM TO TRIDIUM BAS
SUPERVISOR.
MOUNT NEW UNIT ON RAISED FLOOR. PLACE IN CONTAINMENT PAN W ITH LEAK DETECTION.
1-1/4" CD DOW N TO UNIT CONDENSATE PUMP.
RS/RL PIPING ROUTED BELOW RAISED FLOOR. FIELD VERIFY EXACT ROUTING.
PROVIDE ROOF PIPE CURBS EVERY 4'-0" O.C. AND AT EACH CHANGE IN DIRECTION. FLASH TO ROOF.
MOUNT CU ON NEW EQUIPMENT CURBS. FLASH CURBS TO ROOF.
RACK 3" PCW S/R ALONG W ALL. PENETRATE AT FLOOR LEVEL IN ORDER TO ROUTE PIPING BELOW OIT
ROOM RAISED FLOOR.
L
3" PCW S/R DN
3" PCW S/R UP
3" PCW R
3" PCW S
Corridor
BAC284
P.E.
BB401
Director Motion Study Lab
C14
Corridor
BB300B
Elevator Lobby
B-AC325
L
M
M
L m
3" PCW R
3" PCW S
3" PCW S/R UP
X - 6" PCW S
X - 6" PCW R
X - 6" PCW R
X - 6" PCW S
3" PCW R
3" PCW S
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL FIRST FLOOR,
BASEMENT AND SUB-BASEMENT
HVAC PIPING PLANS
M2.5 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL BASEMENT HVAC PIPING PLAN 2
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SUB-BASEMENT HVAC PIPING PLAN 1N N
GENERAL NOTES:
PROCESS CHILLED W ATER PIPING INSTALLATION SHALL BEGIN DURING PHASE 1. PIPNG SHALL BE IN
PLACE AND PREPARED FOR COMPLETION DURING PHASE 2.
CONTRACTOR SHALL FIELD VERIFY ROUTE. SCHEDULE W ORK IN OCCUPIED AREAS DURING OFF-HOURS.
COORDINATE W ITH COR.
SUB-BASEMENT CLEARANCE HEIGHT IS APPROXIMATELY 4'-0".
A.
B.
C.
L
3"Ø PCW S/R
UP/DN
HAC
2A198
Elevator Lobby 2A197
Waiting 2B310
Storage 2B150
L
3" PCW S/R DN
3" PCW S/R UP
3" PCW R
3" PCW S
PCAS Waiting 1A218
PCAS Photo ID 1A219D
Reception 1A219A
Storage 1B101
ACP Eligility 1A219E
74490
L.D. HENDRIX, JR
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
PARTIAL FIRST AND SECOND
FLOOR HVAC PIPING PLANS
M2.6 4/13/20
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL SECOND FLOOR HVAC PIPING PLAN -
PHASE 1 2
0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'0' 2' 4' 8' 16'
1/4" = 1'-0"
PARTIAL FIRST FLOOR HVAC PIPING PLAN -
PHASE 1 1
GENERAL NOTES:
PROCESS CHILLED W ATER PIPING INSTALLATION SHALL BEGIN DURING PHASE 1. PIPNG SHALL BE IN
PLACE AND PREPARED FOR COMPLETION DURING PHASE 2.
CONTRACTOR SHALL FIELD VERIFY ROUTE. SCHEDULE W ORK IN OCCUPIED AREAS DURING OFF-HOURS.
COORDINATE W ITH COR.
A.
B.
NN
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
MECHANICAL DETAILS
M3.1 4/13/20
TYPICAL PIPE HANGERS
TYPICAL METHOD OF SECURING
HANGER RODS IN CONCRETE
SLABS AND BEAMS.
VAV AND DUCT-MOUNTED REHEAT COILS
TYPICAL COIL PIPING CONNECTIONS
TYPICAL ROOF SUPPORT DETAIL
SUPPORT/ANCHOR FOR PIPE RISERS DETAIL
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
TUBING 5 FT
NOM. SIZE
PIPE
THRU (20)
6 8 10
(32)(25) (40)
(65)
(50)
(75)
ADJUSTABLE CLEVIS HANGER
TYPE 43 - SEE SPECIFICATIONS
SADDLE
W ELD
1312 14 16
(125)(100)
(150)
(200)
TO 1000 LB. (453 KG) UNIFORM LOAD
TRAPEZE HANGER FOR UP
PROVIDE INSULATION SHIELD
SIDE VIEW
1 5/8" (43 MM) 12 GAGE1" (25 MM) MAX.
STRENGTH INSULATION
PROVIDE HIGH COMPRESSIVE
TYPE 1 - SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER
HANGER ROD
UNDER INSULATION SHIELD
AT HANGER
INSULATION SHIELD
TEMPERATURE PIPE)
REQUIRED FOR LOW
BARRIER TYPE IS
INSULATION (VAPOR
SPACING ON
36" (900 MM) MAX.
BAND
(9 PCF MIN. DENSITY)
HANGER RODS W ITH
(8" (200 MM) MIN.)
CHANNEL OR 2"x2"x1/4"
(50x50x8 MM) ANGLE
864 532 2 1/21 1/21 1 1/4IN.
(MM)
(M)
FT.
FT.
(M)
(5.8)(5.2)(4.1) (4.9)(3.7)(3.0) (3.4)(2.7)(2.1)
(4.9)(4.1)(3.7) (4.0)(3.0)(2.4)(1.8)5 FT
THRU 3/4
(2.1) (2.1)
(2.1)
(2.7)
(2.4)
1/2" (15 MM) DIA.
EACH CHANNEL
AND INSERT FOR ALL PIPING
STEEL EXPANSION SHIELD FOR
THIS TYPE SHALL BE USED ONLY
INSERTS FOR NEW CONSTRUCTION
FOR EXISTING CONSTRUCTION AND
3/8" (10 MM) MIN DIA EXPANSION BOLTS
NUTS & W ASHERS
HANGER RODS
3/8" (10 MM) MIN DIA
FLOOR SLAB
CLIP
ANGLE
HANGER RODS
3/8" (10 MM) MIN DIA
TURNBUCKLE
NEW CONSTRUCTION ONLY.
3/8" (10 MM) MIN DIA INSERTS
IN SLABS OR BEAMS OF
INSERTS FOR NEW CONSTRICTION
EXISTING CONSTRUCTION AND
4" (100 MM) MIN DEPTH
CONCRETE
NOT TO SCALE
BOLT
2-W AY VALVE
W ATER SUPPLY
UNIONS OR SOLDER
CONNECTION (TYP.)
SCREW HEAD VENT
W ATER RETURN
REDUCER, IF REQUIRED
TEST PLUG (TYP.)
COIL
RISER
CLAMP
PLAN
ELEVATION
RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.
PIPE SLEEVE
W HERE
SPECIFIED
RISER
RISER
CLAMP
PIPE SLEEVE
W HERE SPECIFIED
PIPE
FIRE-STOPPING
MATERIAL
FLOOR
SLAB
BOLT
(TYPICAL)
INSULATION
PROVIDE ANCHORS ONLY
W HERE SHOW N ON
DRAW INGS.
EXTEND SLEEVE ABOVE
FLOOR W HERE SPECIFIED.
NOTES:
1.
2.
NEW MEMBRANE
FLASHING
METAL CURB
EXISTING ROOFING AND
INSULATION
EXISTING METAL
ROOF DECK
ALUMINUM FLASHING
NAIL FLASHING 8" O.C. THROUGH
ROOF MEMBRANE FLASHING &
COVER HEADS W ITH SILICONE
SEALANT
NEW RIGID INSULATION
NEW ROOF INSULATION
EXISTING ROOFING AND
INSULATION
W OOD BLOCKING
SEAL NEW MEMBRANE FLASHING
TO EXISTING EPDM ROOF
MEMBRANE.
BY ROOFING
SUBCONTRACTOR.
MECHANICAL CONTRACTOR TO FURNISH
PREFABRICATED METAL CURB W ITH W OOD BLOCKING
AND ALUMINUM FLASHING. PATE MODEL ES-2B OR
OTHER AS APPROVED.
NOTE:
VAV TERMINAL DETAIL
VOLUME DAMPER DETAIL
DUCTW ORK RADIUS ELBOW S
W ITH EQUIPMENT MOUNTED IN DUCT
TYPICAL DUCTW ORK TRANSITION
AVAILABLE.
OR LEFT SIDE) BASED ON SPACE
DETERMINE CONTROL PANEL LOCATION (RIGHT
MAINTAIN ADEQUATE SERVICE
ACCESS TO CONTROLS. T.C.C. SHALL
MINIMUM OF (1) 90° CHANGE
OF DIRECTION BETW EEN EACH
DIFFUSER AND VAV TERMINAL
(TYPICAL)
DIFFUSER PER PLAN
UNLESS OTHERW ISE
BE SAME SIZE AS
DIFFUSER NECK.
NOTED, BRANCH DUCTS
TO DIFFUSERS SHALL
VAV
TERMINAL
FLEX DUCT
INSTALL MANUAL BALANCING
DAMPER FOR EACH DIFFUSER
W ITHIN DUCT AS FAR FROM
DIFFUSER AS POSSIBLE. ALL
MANUAL BALANCING DAMPERS
SHALL HAVE 2" INSULATION
STAND-OFF AND LOCKING
QUADRANT. NOTE: W HERE VAV
TERMINAL SERVES ONLY ONE
DIFFUSER MANUAL BALANCING
DAMPER IS NOT REQUIRED.
PROVIDE MINIMUM OF FOUR
STRAIGHT DUCT DIAMETERS TO
INLET OF VAV BOX. NO FLEX SHALL
BE USED TO INLET OF VAV BOX.
R
RVANE
VANE
M A
X
M A X.
TYPICAL DUCTW ORK TRANSITION W ITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
TYPICAL DUCTW ORK TRANSITION
PLAN OR SIDE VIEW
AIR
FLOW
AIR
FLOW
E Q
U
IP
M E
N T
M A
X
M A
X
°2
M A X.
M A
X
0°
NOTE:
UNLESS OTHERW ISE INDICATED ON PLANS, MAXIMUM ANGLES SHOW N SHALL APPLY.
1/6W
/3
W
1/2W
WW
SHORT RADIUS ELBOW
W ITH TW O VANES
SHORT RADIUS ELBOW
W ITH ONE VANE
STANDARD RADIUS ELBOW
R SHALL
EQUAL OR
BE
GREATER
THAN
1/6W .
/3
W
2/3W
R
W
R SHALL
EQUAL OR
BE
GREATER
THAN
1/3W .
R SHALL
EQUAL OR
BE
GREATER
THAN W .
THE INTERIOR SURFACE OF ALL RADIUS ELBOW S SHALL BE MADE ROUND.
ALL STANDARD RADIUS ELBOW S SHOW N ON FLOOR PLANS MAY BE MADE SHORT RADIUS
ELBOW S. ALL SHORT RADIUS ELBOW S SHALL HAVE VANES. VANES SHALL BE
CONSTRUCTED, SUPPORTED AND FASTENED AS RECOMMENDED BY SMACNA.
NOTE:
1.
2.
SECTIONSIDE ELEVATION
STIFFEN BLADE
AS REQUIRED
DUCT
1/2" [15mm] ROUND
ROD PIN
2" INSULATION
STAND-OFF
HANDLE W ITH
LOCKING
QUADRANT
INSIDE END BEARING
OUTSIDE END BEARING
1/8" [6mm]
CLEARANCE
ALL AROUND
DAMPER BLADE
INSULATION
DELETE INSULATION STAND-OFF ON DUCTW ORK W ITHOUT EXTERIOR INSULATION.
DETAIL SHOW S SINGLE BLADE DAMPER. DAMPER INSTALLATION SHALL BE SIMILAR FOR
MULTI-BLADE DAMPERS & ROUND DAMPERS.
NOTE:
1.
2.
NOTES:
1. DETAIL APPLIES TO TERMINAL VAV BOX INSTALLATION. VAV BOXES ARE
1. PROVIDE 12"x12" DUCT
ACCESS PANEL DOW NSTREAM OF
REHEAT COIL.
DUCTW ORK SQUARE VANED ELBOW S
W 1
W
ALL VANED ELBOW S SHALL BE CONSTRUCTED AND INSTALLED AS DETAILED BY SMACNA.
W HEN W 1 DOES NOT EQUAL W 2, VANE SHALL BE SINGLE VANE TYPE REGARDLESS OF W
DIMENSION.
ALL SINGLE VANES SHALL HAVE A 2" [50mm] RADIUS, 1 1/2" [40mm] MAXIMUM SPACE
BETW EEN VANES AND A 3/4" [20mm] TRAILING EDGE.
W HEN W EQUALS W 2 AND W 1 IS GREATER THAN 20" [500mm] VANES SHALL BE DOUBLE VANE
TYPE.
NOTE:
1.
2.
3.
4.
TEMPERATURE CONTROLS NOTES:
A.
B.
C.
D.
E.
PROVIDE BUILDING CONTROLS NETW ORK INTERFACE CARD FOR EACH AIR CONDITIONING UNIT. EACH
UNIT SHALL BE INTEGRATED INTO TRIDIUM.
RELAY ALL SETPOINTS AND ALARMS TO TRIDIUM SUPERVISOR.
RELAY ALL LEAK DETECTION ALARMS TO TRIDIUM SUPERVISOR. LEAK DETECTION SHALL BE PROVIDED
FOR:
1. UNDER FLOOR
2. CRAC-1
3. CRAC-2
4. CRAC-3
5. CRAC-4
6. OVERHEAD PIPING ENCLOSURES/GUTTERS. (REFERENCE PLUMBING AND HVAC PIPING PLANS)
CRAC UNITS SHALL INCLUDE UNITARY CONTROLLERS. UNIT-TO-UNIT CONTROLS SHALL BE PROVIDED
BETW EEN CRAC-1 AND CRAC-2, AND CRAC-3 AND CRAC-4.
CRAC-1 AND CRAC-2 SHALL BE PROVIDED MOTORIZED BACKDRAFT DAMPERS ON SUPPLY OUTLET.
DAMPER SHALL OPEN W HEN "ON" AND CLOSE W HEN "OFF".
H O
T W
A T
E R
R E
H E
A T
DUCT TEMPERATURE
SENSOR
TEMPERATURE CONTROL
VALVE
UNITARY
CONTROLLER
E
LOW VOLTAGE W IRING BY T.C.C.
XFORMER
AIR FLOW SENSOR
ROOM
THERMOSTAT
SUPPLY AIR DUCT
COMMUNICATION
BUS TO OTHER
CONTROLLERS
T
T
TYPICAL VAV TERMINAL
W ITH REHEAT
OPERATION:
VAV BOX SHALL MAINTAIN CONSTANT AIR FLOW .
REHEAT COIL SHALL OPERATE TO MAINTAIN ROOM TEMPERATURE SETPOINT.
VAV BOX SEQUENCE OF OPERATION
A.
B.
NTS
HVAC TEMPERATURE CONTROLS
NOT TO SCALE
NOT TO SCALE NOT TO SCALE NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALENOT TO SCALE
GN
SS
AI ON EL
T
F EGE
P R O R
SI NR E I
E E R
D
E
ATS
ET O
OI
HOF
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION
DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED W ITHOUT THE EXPRESSED W RITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2018.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of
Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
BID ISSUE 4/13/20
Increase IRM Physical
Security
541-19-102
DMLLDH
MECHANICAL SCHEDULES
M3.2 4/13/20
NOTES:
NOTES:
VAV TERMINAL NOTES:
(GPM)
COIL FLOW
(MBH)
CAPACITY
MIN.
(CFM)
MAX.
(CFM)
AIRFLOW AIRFLOW
VAV-1
MARK
DROP (FT.)
W ATER PRES.
RISE (°F)
AIR TEMP.
HOT W ATER HEATING COIL PERFORMANCETERMINAL
(NOTE 2)
TYPE
ROW S
NUMBER OF
SIZE
BRANCH PIPE
INLET
TERMINAL TYPE
TERMINAL
C
NECK SIZE (IN)
SUPPLY DUCT
(IN)
MAX AIRFLOW
(CFM)
AIR PRESSURE
DROP (IN W .G.)
TERMINAL
RADIATED NOISE
(NC)
DISCHARGE
TERMINAL
CONN. SIZE (IN)
DISCHARGE DUCT
(IN)
36.81130 3/4"130 1.03.7C1130
HEATING
(CFM)
AIRFLOW
VAV TERMINALS
VARIABLE AIR VOLUME TERMINALS : CONNECTION SCHEDULE
AIR DISTRIBUTION DEVICE (DIFFUSERS, REGISTERS AND GRILLES)
120012"Ø10"Ø 22x1214x12.5281.0"
MARK TYPE
S1
(INCHES)
FACE SIZE
24x24
COLORSTYLE
ALUMINUMW HITE
MATERIAL
- 1
NOTESFACTORY
DAMPER
(INCHES)
NECK SIZE
SEE TAGSUPPLY
DIFFUSER
R1 RETURN
W HITE -
GRILLE
24x24 EGG CRATE
LAY-IN
NONE 1ALUMINUM
R2 24x24 W HITE - 1SEE TAG ALUMINUM
PERFORATED FACE
LAY IN
RETURN
GRILLE
PLAQUE FACE
LAY-IN
T1
S2 SUPPLY
DIFFUSER
TRANSFER
GRILLE
SINGLE DEFLECTION
SIDEW ALL
DOUBLE DEFLECTION
SURFACE
W HITE
W HITE
10x6
18x14
ALUMINUM -
-ALUMINUM
12x8
20x16
1. REFER TO SPECIFICATIONS FOR ADDITIONAL INFORMATION.
1. PROVIDE DUCT SIZES AS INDICATED OR EQUIVALENT FREE AREA AS INDICATED ON PLANS.
2. CONTRACTOR SHALL PROVIDE ALL TRANSITIONS/OFFSETS AS NECESSARY.
1. TERMINALS SHALL BE CAPABLE OF OPERATING W ITH A MINIMUM INLET PRESSURE OF 0.5 IN. W .G. PROVIDE W ITH SCREW ACCESS
(UN-HINGED) W HERE TERMINALS ARE INSTALLED IN THE BEAM/JOIST SPACE.
2. REFER TO "VARIABLE AIR VOLUME TERMINALS: CONNECTION SCHEDULE" FOR TERMINAL SIZE, DUCT CONNECTIONS AND DUCT SIZES.
VAV-X
X X-X
S3 SUPPLY
DIFFUSER
DOUBLE DEFLECTION
SURFACE
W HITE22x10 ALUMINUM - 124x12
PRECISION COOLING UNITS
MARK (INDOOR UNIT)
FAN
DIRECT EXPANSION COOLING COIL
ENTERING AIR DRY BULB (°F)
ENTERING AIR W ET BULB (°F)
AIRFLOW (CFM)
FAN MOTOR (HORSEPOW ER)
EXTERNAL STATIC PRESSURE (IN. W .G.)
TOTAL CAPACITY (MBH)
SENSIBLE CAPACITY (MBH)
ACCESSORIES
SINGLE POINT POW ER
INTERNAL ELECTRIC REHEAT
STEAM GENERATING ELECTRIC HUMIDIFIER
MAX. OVERCURRENT PROTECTION (AMPS)
W IRE SIZE (AMPS)
ELECTRICAL (INDOOR UNIT ONLY)
VOLTS - PHASE - HZ
OPERATING W EIGHT (LBS)
COMPONENT
MERV 8 AIR FILTER
ELECTRIC REHEAT
CAPACITY (MBH)
SIZE (KW )
INFRARED HUMIDIFIER
CAPACITY (LB/HR)
SIZE (KW )
AC-CONDENSATE PUMP W IRED TO UNIT - FIELD INSTALLED
SPRING VIBRATION ISOLATORS
NON-FUSED DISCONNECT SW ITCH
RETURN AIR SMOKE DETECTOR
BACNET INTERFACE CARD
REMOTE TEMPERATURE/HUMIDITY SENSORS
CRAC 1 & CRAC 2
0.6
7.5
128.9
114.3
75.0
61.1
85.3
15.0
11.0
3.1
460-3-60
50.0
1800.0
YES
YES
49.9
YES
YES
YES
YES
DX/CHW FAN COIL
YES
YES
YES
YES
FULL LOAD (AMPS) 41.6
INDOOR UNIT (LBS)
COMPONENT CONDENSING UNIT
OPERATING W EIGHT
500.0OUTDOOR UNIT (LBS)
MAX. OVERCURRENT PROTECTION (AMPS)
W IRE SIZE (AMPS)
ELECTRICAL (OUTDOOR UNIT ONLY)
VOLTS - PHASE - HZ 460-3-60
3.3
FULL LOAD (AMPS) 2.8
COLOR TOUCHSCREEN DISPLAY YES
SOUND JACKET OVER COMPRESSOR YES
NUMBER OF STAGES 2
15.0
CHILLED W ATER COOLING COIL
ENTERING AIR DRY BULB (°F)
ENTERING AIR W ET BULB (°F)
TOTAL CAPACITY (MBH)
SENSIBLE CAPACITY (MBH)
120.0
114.0
75.0
61.1
FLOW RATE (GPM) 31.0
PRESSURE DROP (FT) 15.0
2-W AY MOD. CONTROL VALVE YES
CRAC-X
CU-X
CRAC 3 & CRAC 4
0.2
4.2
61.0
54.1
75.0
61.1
40.9
12.0
7.7
3.1
460-3-60
40.0
900.0
YES
YES
35.6
YES
YES
YES
YES
DX/CHW FAN COIL
YES
YES
YES
YES
29.3
CONDENSING UNIT
300.0
460-3-60
1.8
1.4
YES
YES
15.0
71.4
61.9
75.0
61.1
18.4
10.0
YES
| M0.1 - MECHANICAL LEGEND AND GENERAL NOTES |
| 18077 FFH CF R18_ifowler |
| M0.1 - MECHANICAL LEGEND AND GENERAL NOTES |
| M1.1 - PARTIAL THIRD FLOOR DUCTWORK DEMOLITION PLAN - PHASE 1 |
| 18077 FFH CF R18_ifowler |
| M1.1 - PARTIAL THIRD FLOOR DUCTWORK DEMOLITION PLAN - PHASE 1 |
| M1.2 - PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 1 |
| 18077 FFH CF R18_ifowler |
| M1.2 - PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 1 |
| M1.3 - PARTIAL THIRD FLOOR DUCTWORK DEMOLITION PLAN - PHASE 2 |
| 18077 FFH CF R18_ifowler |
| M1.3 - PARTIAL THIRD FLOOR DUCTWORK DEMOLITION PLAN - PHASE 2 |
| M1.4 - PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 2 |
| 18077 FFH CF R18_ifowler |
| M1.4 - PARTIAL THIRD FLOOR HVAC PIPING DEMOLITION PLAN - PHASE 2 |
| M2.1 - PARTIAL THIRD FLOOR DUCTWORK PLAN - PHASE 1 |
| 18077 FFH CF R18_ifowler |
| M2.1 - PARTIAL THIRD FLOOR DUCTWORK PLAN - PHASE 1 |
| M2.2 - PARTIAL THIRD FLOOR HVAC PIPING PLAN - PHASE 1 |
| 18077 FFH CF R18_ifowler |
| M2.2 - PARTIAL THIRD FLOOR HVAC PIPING PLAN - PHASE 1 |
| M2.3 - PARTIAL THIRD FLOOR DUCTWORK PLAN - PHASE 2 |
| 18077 FFH CF R18_ifowler |
| M2.3 - PARTIAL THIRD FLOOR DUCTWORK PLAN - PHASE 2 |
| M2.4 - PARTIAL THIRD FLOOR HVAC PIPING PLAN - PHASE 2 |
| 18077 FFH CF R18_ifowler |
| M2.4 - PARTIAL THIRD FLOOR HVAC PIPING PLAN - PHASE 2 |
| M2.5 - PARTIAL FIRST FLOOR, BASEMENT AND SUB-BASEMENT HVAC PIPING PLANS |
| 18077 FFH CF R18_ifowler |
| M2.5 - PARTIAL FIRST FLOOR, BASEMENT AND SUB-BASEMENT HVAC PIPING PLANS |
| M2.6 - PARTIAL FIRST AND SECOND FLOOR HVAC PIPING PLANS |
| 18077 FFH CF R18_ifowler |
| M2.6 - PARTIAL FIRST AND SECOND FLOOR HVAC PIPING PLANS |
| M3.1 - MECHANICAL DETAILS |
| 18077 FFH CF R18_ifowler |
| M3.1 - MECHANICAL DETAILS |
| M3.2 - MECHANICAL SCHEDULES |
| 18077 FFH CF R18_ifowler |
| M3.2 - MECHANICAL SCHEDULES |
File details come from the government source that posted it. Updated .