This solicitation is for an Increase IRM Physical Security Project at a Department of Veterans Affairs medical center. The solicitation seeks construction services including demolition, new walls, doors, flooring, ceilings and electrical and mechanical work. The project scope involves renovations to rooms on the third floor including the main computer room, medical records office, and telehealth areas. Construction will occur in two phases to minimize disruptions. The total project duration is estimated at 331 days from notice to proceed. Submissions are due by a specified date. The awarded firm will be expected to comply with all relevant construction standards and codes.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT DURATION
Third Floor Main IRM Rooms 3A133, 3A135 and 3A135B
Duration in Days from Notice Calendar Days of Award
Preconstruction Activities 90 Days 1 - 90 On-Site Construction (NTP)
Phase 1 120 Days 91 - 211 Phase 2 120 Days 212 - 331
Total Project duration is 331 days from Notice of Award.
Telecom Rooms - Sub-Basement, Basement, Floors 1 thru 6 and CARES Tower
Duration in Days from Notice Calendar days of Award
Preconstruction Activities 90 Days 1 - 90 On-Site Construction (NTP) 240 Days 91 - 331
Total Project duration is 331 days from Notice of Award.
PHASING GENERAL NOTES
1. The work shall be accomplished in two phases.
2. Contractor to coordinate all work with the entire set of documents.
3. Contractor to cooperate with the Owner's occupancy of the IRM
Rooms / facility and shall execute the work as to intefere as little as possible with the normal functioning of the IRM Rooms / Medical Center. See also Specification 01 00 00
4. Maintain positive pressure in Main Computer Room during construction.
5. Contractor to protect equipment during construction.
6. Main Computer Room (MCR)- Temporary enclosure by Value
Facility Services.
7. IDF Equipment rack - drape visqueen over rack during construction.
8. All shutdowns in this area are covered under major shutdowns.
DEDUCT ALTERNATE SUMMARY
Deduct Alternate No. 1 Delete all work associated with Telecom Closet doors in CARES Tower
Deduct Alternate No. 2 Delete all work associated with Telecom Rooms on the 6th, 5th, 4th & 3rd floors
Deduct Alternate No. 3 Delete all work associated with Telecom Rooms in Basement
Deduct Alternate No. 4 Delete all work associated with Telecom Rooms on 2nd & 1st floors
EAST BLVD.
E.
S
T.
EA
ST
B
LV
D
MAGNOLIA DR.
HA
ZE
L
DR
E. 108 ST.
MT. SINAI DR.
MARTIN LUTHER KING DR.
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
Drawing Title
Approved: Division Chief
Location
Project Title Date
Checked Drawn DRAWING NO.Building Number
Project No.
Office of Facilities
Management
Dwg. of on e ei gh th in ch o ne fo ot on e qu ar te r i nc h on e fo ot th re e ei gh th s in ch o ne fo ot on e ha lf in ch o ne fo ot th re e qu ar te rs in ch o ne fo ot on e in ch o ne fo ot on e an d on e ha lf in ch es o ne fo ot th re e in ch es o ne fo ot
VA FORM 08-6231, OCT 1978 1
2 3 4 5 6 7 8 9
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A B
C D
E F
6"
6"
6"
6"
FACILITY MANAGER
DATE
SHOP FOREMAN 138
APPROVALS
CHIEF Planning and Construction
DATE
CHIEF, Occupational Health & Safety
APPROVALS
DIRECTOR 00
DATE
ASSOCIATE DIRECTOR 00A (B)
APPROVALS
Approved: Service Director
CHIEF, IRMCHIEF, ENGINEERING 138
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER - WADE PARK
10701 EAST BLVD. CLEVELAND, OH. 44106
PROJECT NO.
DRAWING INDEX
U.S. GOVERNMENT PRINTING OFFICE: 1983-400-285
ARCH JOB NO.:
FULLY SPRINKLERED
SITE PLAN
Scale = None
True North
Fredrick, Fredrick & Heller Engineers, Inc.
Mechanical & Electrical Engineers 672 East Royalton Road Broadview Heights, Ohio 44147
Plan North
Perspectus Architecture LLC Architect 13212 Shaker Square Cleveland, Ohio 44120
Increase IRM Physical Security
541-19-102
DRTH
Cover Sheet
X.1
541-19-102
BID ISSUE
APRIL 13, 2020
APRIL 13, 2020
Increase IRM Physical Security
18-145
10701 EAST BLVD. CLEVELAND, OHIO
ELECTRICAL
E0.1 Electrical Legend and General Notes E0.2 Lighting Fixture Schedule and Appearance Guide E1.1 Sub Basement Electrical Key Plan E1.2 Basement Electrical Key Plan E1.3 First Floor Electrical Key Plan E1.4 Second Floor Electrical Key Plan E1.5 Third Floor Electrical Key Plan E1.6 Fourth Floor Electrical Key Plan E1.7 Fifth Floor Electrical Key Plan E1.8 Sixth Floor Electrical Key Plan E2.1 Partial Third Floor Lighting and Fire Alarm Demolition
Plan - Phase 1 E2.2 Partial Third Floor Power and Security Demolition
Plan - Phase 1 E2.3 Partial Third Floor Lighting and Fire Alarm Demolition
Plan - Phase 2 E2.4 Partial Third Floor Power and Security Demolition
Plan - Phase 2 E3.1 Partial Third Floor Lighting and Fire Alarm Plan -
Phase 1 E3.2 Partial Third Floor Power and Security Plan - Phase 1 E3.3 Partial Third Floor Lighting and Fire Alarm Plan -
Phase 2 E3.4 Partial Third Floor Power and Security Plan - Phase 2 E3.5 Partial Third Floor Main Computer Room Final Layout
Plan E4.1 Enlarged Telecom Room Plans E4.2 Enlarged Telecom Room Plans E4.3 Enlarged Telecom Room Plans E4.4 Enlarged Telecom Room Plans E4.5 Enlarged Telecom Room Plans E4.6 Enlarged Telecom Room Plans E5.1 Power Distribution One-Line Diagram Legend E5.2 Power Distribution One-Line Diagram E5.3 Panelboard Schedules E5.4 Emergency Power Off (EPO) System Diagram and
Notes E7.1 Access Control Details E7.2 Electrical Details E7.3 Electrical Details
TECHNOLOGY
T0.1 Technology Legend and General Notes T2.1 Partial Third Floor Technology Demolition Plan -
Phase 1 T2.2 Partial Third Floor Technology Demolition Plan -
Phase 2 T3.1 Partial Third Floor Technology Plan - Phase 1 T3.2 Partial Third Floor Technology Plan - Phase 2 T4.1 Technology Grounding Details T4.2 Technology Rack Details
GENERAL
X.1 Cover Sheet
ARCHITECTURAL
A0.1 Reference Information & Door Schedule A0.2 Partial Third Floor Life Safety Plan A1.0 Overall Sub-Basement Floor Plan A1.1 Overall Basement Floor Plan A1.2 Overall First Floor Plan A1.3 Overall Second Floor Plan A1.4 Overall Third Floor Plan A1.5 Overall Fourth Floor Plan A1.6 Overall Fifth Floor Plan A1.7 Overall Sixth Floor Plan A2.1 Third Floor Phase 1 Plans A2.2 Third Floor Phase 2 Plans A3.1 MISC Details & Finish Schedule
MECHANICAL
M0.1 Mechanical Legend and General Notes M1.1 Partial Third Floor Ductwork Demolition Plan - Phase 1 M1.2 Partial Third Floor HVAC Piping Demolition Plan - Phase 1 M1.3 Partial Third Floor Ductwork Demolition Plan - Phase 2 M1.4 Partial Third Floor HVAC Piping Demolition Plan - Phase 2 M2.1 Partial Third Floor Ductwork Plan - Phase 1 M2.2 Partial Third Floor HVAC Piping Plan - Phase 1 M2.3 Partial Third Floor Ductwork Plan - Phase 2 M2.4 Partial Third Floor HVAC Piping Plan - Phase 2 M2.5 Partial First Floor, Basement and Sub-Basement HVAC
Piping Plans M2.6 Partial First and Second Floor HVAC Piping Plans M3.1 Mechanical Details M3.2 Mechanical Schedules
PLUMBING
P0.1 Plumbing Legend and General Notes P1.1 Partial Third Floor Plumbing and Fire Protection Demolition
Plan - Phase 1 P1.3 Partial Third Floor Plumbing and Fire Protection Demolition
Plan - Phase 2 P2.1 Partial Third Floor Plumbing and Fire Protection Plan -
Phase 1 P2.3 Partial Third Floor Plumbing and Fire Protection Plan -
Phase 2
SYMBOLS
Building, wall and detail section mark
Interior/exterior elevation reference
Enlarged plan or detail reference
Column reference grids
Revision reference number
Wall type
Window type
New level line, control point, or datum
New door
Indicates drawing sheet on which plan/detail is shown.
Indicates detail number
Indicates drawing sheet on which elevation is shown
Indicates elevation number
Indicates drawing sheet on which section is shown
Indicates section number
Door number46
XX
A
A2-1
A2-1
A2-1
A
Crown typeXX
Wall finish
A
New Existing
XX
anchor bolt above air conditioning acoustic(al) acoustical ceiling tile adjacent above finish floor alternate aluminum anodized approximate architect(ural) automatic
AB
ABV
A/C
ACOUS
ACT
ADJ
AFF
ALT
ALUM
ANOD
APPROX
ARCH
AUTO
board between building block(ing) bulkhead beam bottom bridging bearing brick basement built-up roofing
BD
BETW
BLDG
BLK
BLKHD
BM
BOT
BRDG
BRG
BRK
BSMT
BUR
CFM
CG
CI
CJ
CLG
CL
CLR
CLL
CNTR
CMU
CO
COL
CONC
CONN
CONST
CONT
COORD
CORR
CS
CTR
CL
cubic feet per minute corner guard cast iron control joint ceiling closet clear contract limit line counter concrete masonry unit cased opening/clean out column concrete connection construction continuous coordinate corridor course center
D
DBL
DEG
DEMO
DIA
DIM
DISP
DN
DR
DS
DET
DWG
DWR
DW
depth double degrees demolition diameter dimension dispenser down door down spout detail drawing drawer drywall each electrical contractor exterior insulation and finish system expansion joint electric elevator/elevation emergency equal equipment exposed structure existing to remain each way electric water cooler exhaust existing expansion exposed exterior
EA
EC
EIFS
EJ
ELEC
ELEV
EMERG
EQ
EQUIP
ES
ETR
EW
EWC
EXH
EXIST
EXP
EXP'D
EXT
fire alarm face brick fan coil unit face to face floor drain foundation fire extinguisher fire extinguisher cabinet fire hose cabinet finish floor fluorescent fire resistant
FA
FB
FCU
F/F
FD
FDN
FE
FEC
FHC
FIN
FLR
FLUOR
FR
GA
GALV
GC
GL
GR
GYP BD
gauge galvanized general contractor glass grade gypsum board
H
HB
HC
HDBD
HDCPD
HDWR
HDWD
HM
HORIZ
HPDL
HR
HT
HTG
HTR
HVAC
HW
HWH
high hose bibb hollow core hardboard handicapped hardware hardwood hollow metal horizontal high pressure decorative laminate hour height heating heater heating, ventilation air conditioning hot water hot water heater
ID
IN
INCL
INSUL
INT
inside diameter inch include (inclusive) insulation interior janitor joist
JAN
JST
knock down knock out
KD
KO
L
LAM
LAV
LB
LF
LIM
LT
LTG
LVR
length (long) laminate(d) lavatory pound linear feet (foot) limited light lighting louver
MARB
MAS
MAT
MAX
MECH
MEMB
MFR
MH
MIN
marble masonry material maximum mechanical membrane manufacturer manhole minimum not applicable not in contract number nominal not to scale
N/A
NIC
NO
NOM
NTS
overall on center on center above finish floor outside diameter overhead door opposite hand overflow roof drain out to out opening opposite optional
OA
OC
OCAFF
OD
OHDR
OPH
OVRD
O/O
OP'G
OPP
OPT
PLBG
PMLD
PNL
PLYWD
POL
PP
PR
PREFIN
PREFAB
PROJ
PSC
PSF
PSI
PT
PTD
PTN
PVC
PVMT
plumbing premoulded panel plywood polished push plate pair prefinished prefabricated projection pre-stress concrete pounds per square foot pounds per square inch point painted partition polyvinylchloride pavementQTY quantity
R
RA
RAD
RAG
RD
REC
REF
REG
REINF
riser return air radius return air grille roof drain receptacle refrigerator register reinforcement solid core schedule smoke detector saddle section sheet similar stand pipe specifications speaker sprinkler single ply roofing square square inch square yard stainless steel/ slop sink standard steel storage structure(al) suspended systems
SC
SCHED
SD
SDL
SECT
SHT
SIM
SP
SPEC
SPKR
SPKLR
SPR
SQ
SQ IN
SY
SS
STD
STL
STOR
STRUC
SUCP
SYS
T T/G or T&G
TG
TD
TEL
TEMP
TEMP'D
TERR
THK
THLD
TOC
TOS
TOD
TOM
TOJ
TOP
TOW
TYP
thread tongue and groove tempered glass trench drain telephose temporary tempered terrazzo thick threshold top of concrete (top of curb) top of steel top of deck top of masonry top of joist top of parapet top of wall typicalundercut underground unfinished unlimited unless noted otherwise urinal
UC
UG
UNFIN
UNLIM
UNO
UR
VERT
VEST
VIF
vertical vestibule verify in field
W W/ W/O W/W
WC
WD
WH
WIN
WG
WT
WWF
width with without wall to wall water closet wood water heater window wire glass weight welded wire fabric
YD yard
ABBREVIATIONS
C/C
CAB'T
CAD
CB
CEM
CL or center to center cabinet cadmium catch basin cement center line fire-retardant treated fire-retardant treated wood feet footing furring fire valve cabinet
FRT
FRTWD
FT
FTG
FURR
FVC
MISC
MO
MTD
MTG
MTL
MULL
miscellaneous masonry opening mounted mounting metal mullion
PBD
PCF
PERIM
PG BD
PL
PLAS
PLAM
particle board pounds per cubic foot perimeter peg board plate plastic plastic laminate
REINF
REQ'D
RES
RET
REV
RM
RO
RVS
reinforcement (reinforcing) required resilient return revised (revision) room rough opening reverse
A
See specifications for sealant type.
All joints 1" wide or more are to be laid up in beads and tooled to profile indicated.
All joints are to be primed before bond breaking rod is installed.
Install bond breaking rod with roller to proper depth. No sharp tools permitted.
1.
2.
3.
4.
Notes:
B C
Wall material varies
07 92 00 - Bond breaker rod
07 92 00 - Sealant
Joint Schedule Dimensions
A B C 3/8" 1/8" 1/4"
1/2" 1/8" 3/8"
5/8" 1/8"
3/4" 1/8"
7/8" 1/8"
1" 1/8"
3/8"
3/8"
3/8"
3/8"
UNO
6"
Partition assembly
Door frame
TYP of all frames that occur at room corner locations, UNO
5/8" Type X GYP BD MTL studs
Control joint, both sides
MAX
1/2"
5/8" Type X GYP BD
TYP of all control joints located in rated wall assemblies
MAX
1/2"
MAX
1/2"
1 13/16"
I. General Notes
1. Do not scale drawings. Contractor(s) are to verify site dimensions and conditions prior to work.
2. Construction shall be in accordance with the requirements of the applicable codes including accessibility standards and the requirements of “Americans with Disabilities Act.”
3. Contractor(s) shall visit the site and correlate the requirements of the documents with the existing conditions.
4. Drawings are diagrammatic and since existing conditions, including areas above accessible ceilings may affect new work, the contractor shall coordinate and alter new work to properly fit the existing conditions. The work shall be performed at no extra cost. The contractor shall verify all conditions and dimensions at the job site prior to the start of construction. If discrepancies are found, the architect shall be notified for clarification before commencing with the work.
5. Details not shown are similar in character to those shown. When specific dimensions, details, or design intent cannot be determined, consult the architect before proceeding with the work.
6. Some masonry and lumber dimensions shown on the drawings are nominal dimensions. Contractor(s) shall coordinate actual dimensions with the job conditions.
Report all discrepancies to the architect.
7. Existing conditions shown on this drawing are not guaranteed to be complete. The contractor(s) shall field verify all existing conditions, dimensions, and materials required for the contracted work. Report all discrepancies to the architect prior to fabrication and erection.
8. The term ‘patch to match’ or ‘cutting and patching’ denotes that repair work is necessary to construct a floor, base, wainscot, wall or ceiling to match its adjacent surface, texture, material, finish and color of adjacent existing surfaces.
9. If materials suspected of containing hazardous materials are encountered, DO NOT DISTURB; immediately notify the owner.
10. Where existing partitions or services have been removed, or new services penetrate existing surfaces, the openings shall be patched to match the existing surface finish, texture, and sheen. Provide firestopping at rated walls, see Life Safety Plans for locations.
11. Where new openings occur in structural bearing wall, contractor is responsible for temporary supports and/or shoring as required for installation of lintels.
12. Where existing doorways are to be filled in, contractor is responsible for field verifying wall widths.
13. The General Contractor is responsible for installation of all access doors, access panels and frames, including, but not limited to those specific in the construction documents and furnished by other contractors. General contractor should attempt to locate devices requiring access above ACT, in order to limit the quantity of access doors; coordinate locations of devices with the Reflected Ceiling Plans. All access doors and panel locations to be coordinated and approved by the architect prior to installation. The general contractor is responsible for painting all access panels and access doors. General contractor is responsible for coordinating all paint colors with the architect prior to commencing with the work.
II. Fire Resistance Rating
1. Fire rating indicated on a wall shall mean the entire length and height of wall to be fire rated.
2. All piping, ducts, cabinets, etc. that penetrate walls shall be installed in a manner that wil preserve the fire resistance rating of that wall.
3. Preserve all fire resistant ratings of existing wall unless otherwise noted.
III. Dimensioning
1. Interior partitions are dimensioned to face of gypsum board exclusive of finish material, such as ceramic tile or wood paneling. The contractor shall coordinate finish dimensions with finish schedule when critical to the installation of millwork or equipment.
fo r w al l t yp e
Se e pl an s
09 29 00 - GYP BD.
See plan for wall type
09 22 16 - DBL studs back to back
07 21 13 - Acoustical INSUL
08 11 13 - Hollow Metal rame
2"5/8"
07 21 13 - Acoustical INSUL
07 92 00 - Sealant (typical all sides)
1/ 2"
1/ 2"
/1 6"
/1 6" for wall type See plans
09 22 16 - MTL studs
09 29 00 - Acoustical
INSUL
08 11 13 - HM frame2" 5/
8"
07 21 13 - Acoustical INSUL
07 92 00 - Sealant (typical all sides)
09 29 00 - GYP BD.
See plan for wall type
1/2" 1/2"
1 15/16" 1 15/16"
EXIST CMU wall; Patch to match where impacted by demolition.
08 11 13 - Frame anchor may occur, replace where REQD
08 11 13 - Hollow Metal frame, grout solid
5/8" 2"
Se e pl an
5/
8" o r 1
5/ 8"
1"
/1
6"
7/ 8"
07 92 00 - Sealant (typical all sides)
/1 6"
08 11 13 - Hollow Metal frame
VI
F
2" o r 4
5/ 8" 1"
1 15/16" 1 15/16"
5 7/8"
07 92 00 - Sealant (TYP)
See Plan 7 5/8" or 11 5/8"
EXIST CMU wall; Patch to match where impacted by demolition.
Type B
Metal Stud Partition;
Extend GYP BD from top of concrete floor to underside of opening.
AB
Extend GYP BD to underside of STRUC above
09 22 16 - Deflection track
09 29 00 - (1) layer of 5/8" fire resistant GYP BD EA side 07 21 13 - 3 1/2" sound attenuation blanket 09 22 16 - 6" MTL studs @
16" OC
07 92 00 - Sealant
09 22 16 - Deflection track
09 29 00 - (1) layer of 5/8" fire resistant GYP BD this side
09 22 16 - 3 5/8" MTL studs
@ 16" OC
07 92 00 - Sealant
7 1/4"4 1/4"
Type A
Metal Stud Partition
A1 Type A1
Sames as Type 'A' above, except provide 3 5/8" metal studs in lieu of 6" metal studs.
Same as Type 'A' above except (1) layer of Type 'X' 5/8" gypsum board each side and fire caulk both sides of deflection track. (1) hour fire rated assembly, per UL Design U423.
A2 Type A2Type B1
Metal Stud Partition;
Same as Type B, except add 09 29 00 - 3 1/2" sound attenuation blanket.
B1
Extend GYP BD to underside of opening
C
Extend GYP BD to underside of STRUC above
09 29 00 - (1) layer of 5/8" fire resistant GYP BD
Type C
Mesh Security Patch
09 22 36 - Security barrier mesh
Existing wall to remain
(VIF)
Existing INSUL to remain
(VIF)
D
Extend GYP BD to underside of opening
09 22 16 - Deflection track
09 29 00 - (2) layer of 5/8" fire resistant GYP BD EA side
09 22 16 - 3 5/8" MTL studs
@ 16" OC
07 92 00 - Sealant
6 1/8"
Type D
Metal Stud Partition 2 Hour rating
UL #425
Hollow MTL
Type F1
Swing Door Hollow MTL
Type
Swing Door Hollow MTL
Type D2D1
Back to back boxes NOT permitted Stagger Boxes
07 92 00 - silicone acoustical sealant, TYP both sides
Gypsum board - see wall types for quantity of layers
07 92 00 - silicone acoustical sealant, TYP both sides
M
AX3/
8"
M
AX1/
2"
EXIST Precast CONC wall
08 11 13 - Hollow Metal frame
07 92 00 - Sealant (TYP)
09 22 16 - MTL studs
2" 5/
8"
EXIST GYP BD
1 15/16" 1 15/16"
5 7/8"
1/2"
See plan 1'-4 1/4" +/- 08 11 13 - Hollow Metal frame
5/8" 2"
/1 6"
/1 6"
7/
8"
07 92 00 - Sealant (typical all sides)
09 22 16 - MTL studs
EXIST GYP BD
Se e pl an
1' -4
/4
EXIST Precast CONC wall
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Reference Information & Door Schedule
A0.1 4/13/20
TYP Sealant Detail
TYP Frame Location
Fire Resistant Control Joint
Jamb Detail J1Head Detail H1
Jamb Detail J2Head Detail H2
WALL PARTITION TYPESDOOR FRAME TYPESDOOR TYPES
TYP Electrical / Junction Box
TYP Acoustical Partition
DOOR SCHEDULE
NUMBER
DOOR FRAME
NOTES
OPENING SIZE
PAIR TYPE LABEL TYPE MATERIAL JAMB HEADWIDTH HEIGHT
1A114 0" 0" ETR ETR 1
1A181 0" 0" ETR ETR 1
1AC262 0" 0" ETR ETR 1
1B100 0" 0" ETR ETR 1
1B468 0" 0" ETR ETR 1
1B496 0" 0" ETR ETR 1
1C300D 0" 0" ETR ETR 1
1C519 3' - 0" 7' - 0" D1 ETR 1
1D211 7' - 0" 0" ETR ETR 1
1E257 0" 0" ETR ETR 1
1E334 0" 0" ETR ETR 1
1E491 0" 0" ETR ETR 1
1F515 0" 0" ETR ETR 1
1FLVC1 0" 0" ETR ETR 1
2A103 0" 0" ETR ETR 1
2A158 0" 0" ETR ETR 1
2A186 0" 0" ETR ETR 1
2B149 0" 0" ETR ETR 1
2C134A 3' - 0" 7' - 0" D1 20 MIN F1 HM J1 H1 1
2C134B 3' - 0" 7' - 0" D1 90 MIN F1 HM J2 H2 1
2C363 0" 0" ETR ETR 1
2E331 0" 0" ETR ETR 1
2FLVC1 0" 0" ETR ETR 1
3A101A 0" 0" ETR ETR 1
3A101B 3' - 0" 7' - 0" D1 90 MIN F1 HM J2 H2 1
3A133A 5' - 0" 7' - 0" Yes D2 20 MIN F1 HM J1 H1
3A133B 0" 0" ETR ETR
3A135 0" 0" ETR ETR
3A135BA 3' - 0" 7' - 0" D1 F1 HM J1 H1
3A135BB 3' - 0" 7' - 0" D1 F1 HM J3 H3
3A135C 0" 0" ETR ETR
3AC267 0" 0" ETR ETR 1
3AC322 0" 0" ETR ETR 1
3B129 0" 0" ETR ETR 1
3B162C 0" 0" ETR ETR 1
3FLVC1 0" 0" ETR ETR 1
4A101A 0" 0" ETR ETR 1
4A101B 3' - 0" 7' - 0" D1 90 MIN F1 HM J2 H2 1
4AC231 0" 0" ETR ETR 1
4AC352 0" 0" ETR ETR 1
4B145 0" 0" ETR ETR 1
4FLVC1 0" 0" ETR ETR 1
5A100A 0" 0" ETR ETR 1
5A100B 3' - 0" 7' - 0" D1 90 MIN F1 HM J2 H2 1
5B156 0" 0" ETR ETR 1
5FLVC1 0" 0" ETR ETR 1
6A100A 0" 0" ETR ETR 1
6A100B 3' - 0" 7' - 0" D1 90 MIN F1 J2 H2 1
6B119 0" 0" ETR ETR 1
6FLVC1 0" 0" ETR ETR 1
AFLVC1 0" 0" ETR ETR 1
BA149 0" 0" ETR ETR 1
BA151A 0" 0" ETR ETR 1
BAC308 0" 0" ETR ETR 1
BB379 0" 0" ETR ETR 1
BB471 0" 0" ETR ETR 1
BC505 3' - 0" 7' - 0" D1 ETR 1
BD421 0" 0" ETR ETR 1
BF101 6' - 0" 7' - 0" Yes D2 F1 HM J1 H1 1
BF312 0" 0" ETR ETR 1
BF515 3' - 0" 7' - 0" D1 F1 HM J3 H3 1
BFLVC1 0" 0" ETR ETR 1
K122A 5' - 0" 0" Yes ETR ETR 1 K223 5' - 0" 7' - 0" Yes D2 FI HM J1 H1 1
Head Detail H3 Jamb Detail J3
DOOR SCHEDULE NOTES
- Coordinate new door and frame finish with specification 08 11 13 - Hollow Metal Doors and Frames
- See specification 08 71 11 - Door Hardware for door hardware set types
- Contractor to verify existing door and frame sizes where new doors and frames are scheduled to be provided.
1. See Overall Plans for Deduct Alternates.
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
ETRETR
Code Information Healthcare Occupancies Design Code 2018 NFPA 101 Life Safety Code Occupancy Separations 2 hours between Healthcare and Ambulatory Care (Table 6.1.14.4.1 & 6.1.14.4.3) 2 hours between Healthcare and Business
2 hours between Healthcare and Industrial Fire Suppression (18.3.5.1) Fully Sprinklered Construction Type (Table 18.1.6.1) Type II (222)
Greater than 4 stories permitted Fire Ratings (Table A.8.2.1.2)
Exterior Bearing Walls 2 hours 1 hour supporting roof only
Interior Bearing Walls 2 hours 1 hour supporting roof only
Columns/Beams/Girders 2 hours 1 hour supporting roof only
Floor-Ceiling Assemblies 2 hours Roof-Ceiling Assemblies 1 hour Interior Non-Bearing Walls 0 hours Exterior Non-Bearing Walls 0 hours
Exit Enclosures/Passageways (7.1.3.2.1.3) 1 hour for less than 4 stories 2 hours for 4 stories or more 1 hour for existing if building is fully sprinklered
Shaft Enclosures (8.6.5) 2 hours for 4 stories or more 1 hour for less than 4 stories
Communicating Spaces (18.3.1.5) Not permitted Atriums (18.1.3.2, 18.3.1, 8.6.7) 1 hour with exceptions Convenience Openings (18.3.1, 8.6.9) Permitted Exit Access Corridors (18.3.6.2) 0 hour smoke partitions Corridor Width (18.2.3.4) 96" minimum
44" minimum in non-inpatient areas Dead End Corridors (Table 18.2.5.2) 30' maximum Smoke Compartments (18.3.7.1.3.a) 22,500 sf maximum Smoke Barriers (18.3.7.3) 1 hour Suite
Non-sleeping (18.2.5.7.3.2 A&B) 12,500 sf maximum, 15,000 sf with smoke detection Sleeping (18.2.5.7.2.3 C) 7,500 sf maximum, 10,000 sf with direct supervision and smoke detection Sleeping means of egress (18.2.5.7.2.2 B) 2 over 1000 sf Non-sleeping means of egress (18.2.5.7.3.1 B) 2 over 2500 sf Walls (18.2.5.7.1.2 & 18.3.6.2) 0 hour smoke partitions
Hazardous Area Protection (18.3.2.1) Boiler and fuel-fired heater rooms 1 hour Central/bulk laundries larger than 100 sf 1 hour Paint shops less than severe hazard 1 hour Physical plant maintenance shops 1 hour Soiled linen rooms exceeding 64 gal 1 hour Trash rooms exceeding 64 gal 1 hour Storage rooms larger than 50 sf (18.3.2.1.3.2) Storage rooms larger than 100 sf 0 hour smoke partitions Labs with non-severe hazard materials (18.3.2.1.3.2) 0 hour smoke partitions Labs with severe hazard materials (18.3.2.2) NFPA 45
Travel Distances Room remote point to exit (18.2.6.2.1) 200' maximum Sleeping room remote point to exit access 50' maximum door (18.2.6.2.3) Sleeping suite remote point to exit access 100' maximum door (18.2.5.7.2.4 A) Sleeping suite remote point to exit (18.2.5.7.2.4 B) 200' maximum Non-sleeping suite remote point to exit 100' maximum access door (18.2.5.7.3.3 A) Non-sleeping suite remote point to exit 200' maximum (18.2.5.7.3.3 B) Room remote point to smoke barrier (18.3.7.1.5) 200' maximum Common path of travel (19.2.5.3) Not limited Common path of travel (18.2.5.3) 100' maximum
1 hour
UP
UP
UP
UP
UP
3A126
EMS
3A128
EMS
3A134
L.C.
3A130
L.C.
3A132
3A124 3A108B
3A108A
MCR
3A133
FMS
3A135
MCOR
3A135B
Tele Health 3A1373A1393A1413A1433A145
2 Bedroom 3A1313A129
3A127
3A125
3A123
3A110
3A114
3A116
3A121
3A119
3A117
3A1153A113
3A118 3A120 3A122
3A108
3A147
P R O J E C T S C O P E
P R O J E C T S C O P E
CONSTRUCTION STAGING AREA
Replace existing door with temporary door and construction hardware.
A
HE
EX
EX
144'-0" TRAVEL DISTANCE
192'-0" TRAVEL DISTANCE
LIFE SAFETY LEGEND
2 HR Fire Barrier
2 HR Smoke Barrier
1 HR Fire Barrier
1 HR Smoke Barrier
0 HR Smoke Partition
Fire Extinguisher
Exit Sign
Exit
Horizontal Exit
Hazardous Room
Suite
LIFE SAFETY GENERAL NOTES
1. See Cover Sheet for applicable code information.
2. Contractor shall preserve all fire resistant ratings of existing walls, UNO
3. See plans for location of rated walls. When rated walls are encountered during the course of construction, contractor shall maintain indicated ratings by firestopping or patching with materials or shall perform other work necessary which will maintain indicated ratings.
4. The fire rating indicated on a wall shall mean the entire length and height of wall.
5. All rated walls within Project Scope Area shall be stenciled with wall rating. Refer to Specification 09 91 00.
6. Existing smoke compartments will not be impacted by this project.
EX
HE
SUITES
LETTER NAME AREA TYPE EXIT ACCESS
DOORS
A IRM 2,870SF Non-Patient Care 3
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Partial Third Floor Life Safety Plan
A0.2 4/13/20
Scale
4' 8' 16' 1/8" = 1'-0"
PARTIAL THIRD FLOOR LIFE SAFETY PLAN1 THIS DRAWING SHALL BE PRINTED IN FULL COLOR FOR CLARITY
BLACK AND WHITE FACSIMILES ARE NOT CONSIDERED PART OF
THE CONSTRUCTION DOCUMENT SET.
UP
AFLVC1
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Sub-Basement Floor Plan
A1.0 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL SUB-BASEMENT FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room AFLVC1; Existing doors and hardware to remain;
Delete new access controls.
16' 32' 64'
DN
DN
DN
DN
BF312
BD421
BB471
BB379
BC505
BA149
BA151A
BAC308
BF515
BF101
BFLVC1
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Basement Floor Plan
A1.1 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL BASEMENT FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Rooms BF101 and BFLVC1; Existing doors and hardware to remain; Delete new access controls.
DEDUCT ALTERNATE NO. 3
Revise the Scope of Work as follows:
1. Telecom Rooms BA149, BA151A, BA308, BB379, BB471, BD421 and BF312; Existing doors and hardware to remain; Delete new access controls.
2. Telecom Rooms BC505 and BC515; Existing doors, door frames and hardware to remain, in lieu of new; Delete new access controls.
DN
DN
DN
DN
DN
1B496
1B100
1E491
1AC262
1A181
1A114
1C519
1C300D
1E2571E334
K122A
1F515
1FLVC1
1D211
1B468
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall First Floor Plan
A1.2 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL FIRST FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room 1FLVC1; Existing doors and hardware to remain;
Delete new access controls.
DEDUCT ALTERNATE NO. 4
Revise the Scope of Work as follows:
1. Telecom Rooms 1A114, 1A181, 1AC262, 1B100, 1B468, 1B496, 1C300D,1C519, 1D211, 1E257, 1E334, 1E491, 1F515 and K122A;
Existing doors and hardware to remain; Delete new access controls.
2FLVC1
K223
2E331
2C134A
2B149
2C363
2A186
2A158
2A103
2C134B
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Second Floor Plan
A1.3 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL SECOND FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room 2FLVC1; Existing doors and hardware to remain; Delete new access controls.
DEDUCT ALTERNATE NO. 4
Revise the Scope of Work as follows:
1. Telecom Rooms 2A103, 2A158, 2A186, 2B149, 2C363, 2E331 and K223;
Existing doors and hardware to remain; Delete new access controls.
2. Telecom Rooms 2C134A and 2C134B; Existing doors, door frames and hardware to remain, in lieu of new; Delete new access controls.
16' 32' 64'16' 32' 64'
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
See A2.1 and A2.2 for Scope of Work and Phasing information.
3FLVC1
3B129
3B162C
3A101A
3AC322
3AC267
3A101B
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Third Floor Plan
A1.4 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL THIRD FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room 3FLVC1; Existing doors and hardware to remain;
Delete new access controls.
DEDUCT ALTERNATE NO. 2
Revise the Scope of Work as follows:
1. Telecom Rooms 3A101A, 3A101B, 3AC267, 3AC322, 3B129 and 3B162C; Existing doors and hardware to remain; Delete new access controls.
UP
UP
UP
UP
UP
UP
UP
UP
UPUP
4AC231
4AC352
4A101A
4B145
4FLVC1
4A101B
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Fourth Floor Plan
A1.5 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL FOURTH FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room 4FLVC1; Existing doors and hardware to remain; Delete new access controls.
DEDUCT ALTERNATE NO. 2
Revise the Scope of Work as follows:
1. Telecom Rooms 4B145, 4A101A, 4AC352 and 4AC231; Existing doors and hardware to remain; Delete new access controls.
2. Telecom Room 4A101B; Existing door, door frame and hardware to remain, in lieu of new; Delete new access controls.
UP
UP
UP
5FLVC1
5B156
5A100A
5A100B
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Fifth Floor Plan
A1.6 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL FIFTH FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Rooms 5FLVC1; Existing doors and hardware to remain;
Delete new access controls.
DEDUCT ALTERNATE NO. 2
Revise the Scope of Work as follows:
1. Telecom Rooms 5A100A and 5B156; Existing doors and hardware to remain; Delete new access controls.
2. Telecom Room 5A100B; Existing door, door frame and hardware to
UP
UP
UP
UP
6FLVC1
6B119
6A100A
6A100B
PROJECT SCOPE
FLOOR PLAN LEGEND
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Overall Sixth Floor Plan
A1.7 4/13/20
Scale
4' 8' 16' 1/32" = 1'-0"
OVERALL SIXTH FLOOR PLAN1
DEDUCT ALTERNATE NO. 1
Revise the Scope of Work as follows:
1. Telecom Room 6FLVC1; Existing doors and hardware to remain; Delete new access controls.
DEDUCT ALTERNATE NO. 2
Revise the Scope of Work as follows:
1. Telecom Rooms 6A100A and 6B119; Existing doors and hardware to remain; Delete new access controls.
2. Telecom Room 6A100B; Existing door, door frame and hardware to
UP UP
36 37
H
J
K
L
P
39 42
P R O J E C T S C O P E
P R O J E C T S C O P E
MCR
3A133
3A135C
MCOR
3A135B
FMS
3A135
3A135A
Closet
3A135BA
2 Bedroom 3A131
EMS
3A128
L.C.
3A130
EMS
3A134 L.C.
3A132
Toilet/ Shower 3A137A
Tele Health 3A137
3A135BB
AA1
3A133A
A1A1
EQ 5'-0" EQ 5'-1"
A1
3A135BA
3A135
3A133B
3A135C
Passage
3AC312
Corridor 3A100E
Stand Up Workstation
(NIC)
EX UPS
Align
Align
36 37
H
J
K
L
P
39 42
P R O J E C T S C O P E
P R O J E C T S C O P E
Passage
3AC312
3' -0
5 7
5 7
EX UPS
36 37
H
J
K
L
P
39 42
P R O J E C T S C O P E
P R O J E C T S C O P E
8' - 6" 8' - 6"
Passage
3AC312
MCR
3A133
3A135C
3A135A 3A135A
MCOR
3A135B
FMS
3A135
DEMOLITION PLAN LEGEND
Existing construction to remain
Construction to be demolished
# Number represents coded demolition note
Existing construction to remain
New construction
FLOOR PLAN LEGEND
# Number represents coded floor plan note
Toilet/ Shower 3A137A
Tele Health 3A137
EMS
3A134 L.C.
3A132
EMS
3A128
L.C.
3A130
FMS
3A135
MCOR
3A135B
3A135A
MCR
3A133
3A135C
2 Bedroom 3A131
Closet
3A135BA
Corridor 3A100E
REFLECTED CEILING PLAN LEGEND
GWB-1; 5/8" Gypsum Board
ACT-1; 2'-0" x 2'-0" Acoustical Ceiling Tiles
2'-0" x 2'-0" Light fixture
4'-0" Suspended light fixture
Supply grille / diffuser
Return grille / register
Number represents coded reflected ceiling plan note
R E G
I STERED ARCH
I T E C T
WILLIAM
CURTISS
AYARS
ST
AT
E OF OHIO
William Curtiss Ayars, License #7259 Expiration Date 12/31/2021
DESIGN AND CONSTRUCTION DOCUMENTS AS
INSTRUMENTS OF SERVICE ARE GIVEN IN
CONFIDENCE AND REMAIN THE PROPERTY OF
PERSPECTUS ARCHITECTURE. THE USE OF THIS
DESIGN AND THESE CONSTRUCTION DOCUMENTS
FOR PURPOSES OTHER THAN THE SPECIFIC
PROJECT NAMED HEREIN IS STRICTLY
PROHIBITED WITHOUT THE EXPRESSED WRITTEN
CONSENT OF PERSPECTUS ARCHITECTURE.
COPYRIGHT C 2020.
13212 Shaker Square Suite 204 Cleveland, Ohio 44120 P. 216.752.1800 F. 216.752.3833
CONSULTANTS: ARCHITECT:
Drawing Title
Approved: Project Director Location
Project Title
Date Checked Drawn
Drawing Number
Building Number
Project Number
Office of Facilities
Management
Dwg. of o n e e ig h th in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e in c h o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t th re e in c h e s o n e fo o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 7 8 9 10
A
1 2 3 4 5 6 7 8 9 10
B
C
D
E
F
A
B
C
D
E
F
VAMC - WADE PARK
Revisions: Date
FULLY SPRINKLERED
BID ISSUE 4/13/20
FREDRICK, FREDRICK & HELLER
ENGINEERS, INC.
672 EAST ROYALTON ROAD
BROADVIEW HTS., OHIO 44147
TEL. (440)546-9696
FAX: (440)546-9699
Increase IRM Physical Security
541-19-102
DRTH
Third Floor Phase 1 Plans
A2.1 4/13/20
Scale
4' 8' 16' 1/8" = 1'-0"
THIRD FLOOR PLAN - PHASE 12
Scale
4' 8' 16' 1/8" = 1'-0"
THIRD FLOOR DEMOLITION PLAN - PHASE 11
Scale
4' 8' 16' 1/8" = 1'-0"
THIRD FLOOR REFLECTED CEILING PLAN - PHASE 13
DEMOLITION CODED NOTES
1 Remove interior partition from floor to underside of structure above. Prepare all adjacent surfaces to receive new construction and scheduled finish. Existing walls shown to be removed shall be demolished complete. This includes the removal of reinforcement, soffits, doors, windows, frames and overhead bracing. COORD with MECH and ELEC for disconnection and removal of EXIST utilities and devices located within areas scheduled to be demolished.
2 Remove portion of existing wall from floor to 7'-0"H. Patch edges of opening and adjacent surfaces to match.
3 Remove existing door, frame, anchors, thresholds, and hardware as indicated. Patch and repair wall and floor to match existing. Owner shall have the right to salvage any and all doors and hardware. Contractor shall verify doors for salvage or relocation prior to commencing demolition.
4 Remove existing ceiling system, supports, ties, and related equpiment within room.
Coordinate with electrical work on removal and/ or relocation of lights, conduit, ties, supports, and related wiring. Coordinate with mechanical on removal of diffusers, grills and related ductwork and equipment. Contractor shall verify fixtures for salvage or relocation prior to commencing demolition.Protect existing equipment from dust and damage.
5 Remove existing lighting and all ceiling mounted fixtures within limits of construction unless noted otherwise, including fixture, housing, and all associated wiring and conduit. See MEP drawings for additional information.
6 Remove plumbing fixtures. Cap all plumbing lines not required by new construction.
Coordinate with plumbing plans for additional information. Remove all accessories associated with plumbing fixture.
7 Remove EXIST floor finish and base from entire room to top of structural slab or subfloor as REQ’D for new construction. Patch and level EXIST floor to receive new finish as scheduled. Level per new floor finish MANUF recommendations. Patch EXIST walls as REQ’D to receive new finish as scheduled.
8 Remove existing base from entire room; Patch existing walls as REQD to receive scheduled base.
9 Remove EXIST condensing units and associated rails and/or roof curbs. Patch to match existing roofing
10 Remove existing window unit, including associated trim and hardware. Prepare remaining opening for new construction.
11 Contractor shall remove and dispose of existing desks, shelving and cabinets. (All of which may not be shown on the DEMO Plan)
12 Contractor shall remove and dispose of existing fencing system in it's entirety; Patch floor to accept scheduled floor finish.
13 Contractor shall remove and salvage existing fencing system as REQD for scheduled flooring installation; Replace after new flooring installation has been completed.
GENERAL DEMOLITION NOTES
A Refer to specifications section 02 41 00 - Demolition for additional requirements and information.
B Project Scope line is indicated for general intent only. Additional demolition will be REQ'D outside of this line. Architectural demolition drawings are for schematic purposes. Contractor shall COORD all demolition with the entire set of contract documents for full scope of demolition work REQ'D for the project.
C EXIST conditions shown on these drawings are not guaranteed to be complete. The contractor shall verify all EXIST conditions, dimensions, and materials REQ'D for the contracted work. Report all discrepencies to architect prior to fabrication, erection, and/or installation.
D COORD all new penetrations and/or openings with other associated trades.
E The Owner may select and tag items for demolition to be salvaged. The contractor shall remove selected items and deliver to the Owner's requested…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .