This document contains a contractor work plan and peer review request form along with information for a federal contract opportunity to replace the Cardiac Cath Lab 1 at the James A. Haley VA Medical Center in Tampa, Florida. The contractor work plan form requests details on the duration, location, description of work, tools and equipment needed, personal protective equipment, names of employees, work procedures before, during and after, and notifications to the COR and general contractor. The peer review form requires signatures from various facility staff approving the work. The federal contract opportunity is solicitation number 36C24822R0173 to replace the cardiac cath lab as project number 673-CSI-127 through the Department of Veterans Affairs Veterans Health Administration VISN 8. No response date or award date is included.

View the file

Other files

File Type Posted
36C24822R0173 0002.docx DOCX document
10A unit.pdf PDF
Final Report - James A. Haley VA Hospital - Fan Array AHU 10A _ 10B - 20211412.pdf PDF
Azurion_7_C20_Standard_Reference_Drawings.pdf PDF
10B unit.pdf PDF
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION Cath Lab 1.pdf PDF
Azurion Specification 7 F-C20 (incl. FlexArm) _ Philips IGT.pdf PDF
Building 1 AHERA Report_Appendix C.pdf PDF
36C24822R0173 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 1a and 1b.pdf PDF
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
013323 Shop Drawings Spec 673-CSI-1127 Replace Cardiac Cath Lab 1.docx DOCX document
014219 Reference Standards 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
36C24822R0173_1.pdf PDF
VA 01 00 00 General Requirements - Attachment 2 (1).pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Installation Specs - Azurion 7 C20 FlexArm - 4300mm SRD.pdf PDF
Price Matrix.xlsx XLSX spreadsheet
EMR.pdf PDF
Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
VA 01 00 00 General Requirements - Appendix B.pdf PDF
013526 Safety Requirements 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachments 5a & 5b

Contractor Work Plan & Peer Review

SECTION 01 00 00

GENERAL REQUIREMENTS

ATTACHMENT #5 - A

CONTRACTOR WORK PLAN / PEER REVIEW REQUEST

PROJECT No. & TITLE:

START DATE: Su M T W Th F Sa @ TIME:

END DATE: Su M T W Th F Sa @ TIME:

ESTIMATED DURATION OF WORK: HOURS

LOCATION OF WORK:

DESCRIPTION OF WORK:

TOOLS & EQUIPMENT TO PERFORM WORK:

PERSONNAL PROTECTIVE EQUIPMENT FOR WORK:

NAME(S) OF EMPLOYEE(S) PERFORMING WORK:

SUPERVISOR / WORK LEADER NAME (PRINTED):

SUPERVISOR / WORK LEADER SIGNATURE:

DATE:

Section 01 00 00, General Requirements – Attachment #5 - A

Revised March 2018

DATE:

DATE:

PROCEEDURE(S):

All maintenance and repair work must have a written procedure prepared by the maintenance person performing the task.

BEFORE:

DURING:

AFTER:

Section 01 00 00, General Requirements – Attachment #5 - A

Revised Mar 2018

DATE AND TIME COR NOTIFIED:

GENERAL CONTRACTOR’S NOTIFYING PERSON:

NOTIFYING PERSON’S SIGNATURE:

GENERAL CONTRACTOR COMPANY:

PHONE NUMBER(S) –

OFFICE:

CELL:

Section 01 00 00, General Requirements – Attachment #5 - A

Revised March 2018

SECTION 01 00 00

GENERAL REQUIREMENTS

PEER REVIEW #5 – B

PROJECT No. & TITLE:

Name Signature Title / Service Date

*COR / FMS

*Elec Supv / FMS

*AC Supv / FMS

*Plumb Supv / FMS

*CEP / FMS

*M&O Supv / FMS

*Projects Supv / FMS

*Safety / FMS

*BioMed / FMS

*Chief / FMS

*Infect Ctrl / MED

* - Designates signature required.

Check all that apply:

Notification of Live Electrical Work Mitigation Plan

Enclosed Space Permit Contingency Plan

Burn Permit (Hot Work) Utility Shutdown required?

Safety Review (ILSM) Coordination Meeting Required?

Infection Controls Review (ICRA) Utility Shutdown / Closure Notice

Above Ceiling Permit Utility Shutdown & Start Up Procedures

Drawings Enclosed Shutdown Checklist and Flow Chart

Section 01 00 00, General Requirements – Attachment #5 - B

Revised March 2018

*Logistics

*SPD/SPS

*AFGE

*NNU

*POLICE

Power Plant

VHATAMHaleM Sticky Note Accepted set by VHATAMHaleM

DateCOTR FMS:
DateElec Supv FMS:
DateAC Supv FMS:
DatePlumb Supv FMS:
DateControls FMS:
DateMO Supv FMS:
DateProjects Supv FMS:
DateSafety FMS:
DateBioMed FMS:
DateChief FMS:
DateInfect Ctrl MED:
NameRow12:
DateRow12:
NameRow13:
DateRow13:
NameRow14:
DateRow14:
NameRow15:
DateRow15:
NameRow16:
DateRow16:
NameRow17:
DateRow17:
Contract Information:
Group25: Off
Group26: Off
Duration - #5A:
Description of Work - #5A:
Tools and Equipment - #5A:
Personal Protective Equipment - #5A:
Employee Names - #5A:
Procedure - #5A:
Before Work - #5A:
During Work - #5A:
Location of Work - #5A:
After Work - #5A:
Supvr Sig Date - #5A:
Contractor Notifier Name - #5A:
Supervisor or Work Leader Name - #5A:
GC Company Name - #5A:
COTR Notified Date - #5A:
Notifier Office Phone - #5A:
Notifier Cell Phone - #5A:
Project # and Title - #5A:
NameCOTR FMS:
NameElec Supv FMS:
NameAC Supv FMS:
NamePlumb Supv FMS:
NameControls FMS:
NameMO Supv FMS:
NameProjects Supv FMS:
NameSafety FMS:
NameBioMed FMS:
NameChief FMS:
NameImfect Ctrl MED:
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Reset - #5A:
Print - #5A:
Start Time - #5A:
End Time - #5A:
End Date - #5A:
Start Date - #5A:

File details come from the government source that posted it. Updated .