This document contains two attachments related to notifications for fire sprinkler impairments and restorations during construction projects at Veterans Affairs medical facilities. Attachment 1a details the process for notifying relevant parties when fire sprinklers must be taken offline due to construction work. This includes identifying the project, facility, contractor, nature of impairment, protective measures, timeline, and points of contact. Attachment 1b similarly outlines notifications required when fire sprinklers are restored. A second document provides details of a federal contract opportunity to replace the cardiac cath lab at the James A. Haley VA Medical Center in Tampa, Florida, with a project number of 673-CSI-127, to be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 8.

View the file

Other files

File Type Posted
36C24822R0173 0002.docx DOCX document
10A unit.pdf PDF
Final Report - James A. Haley VA Hospital - Fan Array AHU 10A _ 10B - 20211412.pdf PDF
Azurion_7_C20_Standard_Reference_Drawings.pdf PDF
10B unit.pdf PDF
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION Cath Lab 1.pdf PDF
Azurion Specification 7 F-C20 (incl. FlexArm) _ Philips IGT.pdf PDF
Building 1 AHERA Report_Appendix C.pdf PDF
36C24822R0173 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
013323 Shop Drawings Spec 673-CSI-1127 Replace Cardiac Cath Lab 1.docx DOCX document
014219 Reference Standards 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf PDF
36C24822R0173_1.pdf PDF
VA 01 00 00 General Requirements - Attachment 2 (1).pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Installation Specs - Azurion 7 C20 FlexArm - 4300mm SRD.pdf PDF
Price Matrix.xlsx XLSX spreadsheet
EMR.pdf PDF
Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
VA 01 00 00 General Requirements - Appendix B.pdf PDF
013526 Safety Requirements 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachments 1a & 1b

Fire Sprinkler Work

Notifications

SECTION 01 00 00

GENERAL REQUIREMENTS

ATTACHMENT #1 - A

NOTIFICATION OF IMPAIRED FIRE SPRINKLER BY CONTRACTOR PERSONNEL

PROJECT No. & TITLE:

NAME OF FACILITY:

NOTIFIED BY:

TITLE:

COMPANY:

NATURE OF IMPAIRMENT:

PRECAUTIONS TO BE TAKEN:

CLOSED VALVE #: BLDG. #: ROOM #:

CONTROLLING:

START DATE: Su M T W Th F Sa @ TIME:

END DATE: Su M T W Th F Sa @ TIME:

JUSTIFICATION:

COR CONTACTED: DATE/TIME

EXT: or CELL:

SAFETY OFFICER CONTACTED (EXT. 7292)

EGCC OPERATOR/CEP CONTACTED (EXT. 7080)

FIRE DEPARTMENT CONTACTED (813- 971-3636)

VISN SAFETY MANAGER( )

Section 01 00 00, Revised May 2015 General Requirements – Attachment #1 - A Page 1

SECTION 01 00 00

GENERAL REQUIREMENTS

ATTACHMENT #1 - B

NOTIFICATION OF RESTORED FIRE SPRINKLER BY CONTRACTOR PERSONNEL

PROJECT No. & TITLE:

NAME OF FACILITY:

NOTIFIED BY:

TITLE:

COMPANY:

NATURE OF IMPAIRMENT:

FULL PROTECTION RESTORED, EXCEPT:

OPENED VALVE #: BLDG. #: ROOM #:

CONTROLLING:

DATE: Su M T W Th F Sa @ TIME:

REASON FOR PARTIAL RESTORATION:

COR CONTACTED: DATE/TIME

EXT: or CELL:

SAFETY OFFICER CONTACTED (EXT. 7292)

EGCC OPERATOR/CEP CONTACTED (EXT. 7080)

FIRE DEPARTMENT CONTACTED (813- 971-3636)

VISN SAFETY MANAGER( )

Section 01 00 00, Revised May 2015 General Requirements – Attachment #1 - B Page 1

DATETIMESAFETY OFFICER CONTACTED EXT 7598:
DATETIMEEGCC OPERATORCEP CONTACTED EXT 7080:
DATETIMEFIRE DEPARTMENT CONTACTED 8139713636:
DATETIMERSFPE CONTACTED:
DATETIMESAFETY OFFICER CONTACTED EXT 7598_2:
DATETIMEEGCC OPERATORCEP CONTACTED EXT 7080_2:
DATETIMEFIRE DEPARTMENT CONTACTED 8139713636_2:
DATETIMERSFPE CONTACTED_2:
Contract Information:
DATETIMECOTR CONTACTED:
DATETIMECOTR CONTACTED_2:
End Time - #1A:
Group18: Off
Group19: Off
Project # and Title - #1A:
Name of Facility - #1A:
Notified By - #1A:
Title - #1A:
Company - #1A:
Nature of Impairment - #1A:
Closed Valve - #1A:
BLDG # - #1A:
Room # - #1A:
Controlling - #1A:
Justification - #1A:
COTR Name - #1A:
COTR Phone Ext - #1A:
COTR Cell # - #1A:
RSFPE # - #1A:
Precautions Taken - #1A:
Precautions Taken - #1B:
Justification - #1B:
Start Time - #1A:
Start Time - #1B:
Group20: Off
Reset:
Print: