Final Report - James A. Haley VA Hospital - Fan Array AHU 10A _ 10B - 20211412.pdf

PDF 1 MB Posted

Attached to
Z2DZ--FY22: NRM Tier 2 (PROJ: 673-CSI-127) DB Replace Cardiac Cath Lab 1
Solicitation number
36C24822R0173
Issued by

About this file

This document contains a final report for testing, adjusting and balancing of HVAC systems at the James A. Haley VA Hospital in Tampa, Florida. The report provides test results for two air handling units, AHU-10A and AHU-10B, which serve the third floor roof area. Actual air flows for both units were within 1% of design values. Static pressure profiles and duct traverse data are included for the supply, return and outdoor air systems. Instrument calibration records and an equipment list are also provided. The report was certified by Southern Independent Testing Agency on August 24, 2022.

The related federal contract opportunity is a solicitation to replace the Cardiac Cath Lab 1 at the James A. Haley VA Medical Center in Tampa, Florida, under project number 673-CSI-127. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration VISN 8. The opportunity type is listed as a solicitation. No other details are provided regarding response dates, award dates, pricing or terms, set-asides, or incumbent contractors.

View the file

Other files

File Type Posted
36C24822R0173 0002.docx DOCX document
10A unit.pdf PDF
Azurion_7_C20_Standard_Reference_Drawings.pdf PDF
10B unit.pdf PDF
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION Cath Lab 1.pdf PDF
Azurion Specification 7 F-C20 (incl. FlexArm) _ Philips IGT.pdf PDF
Building 1 AHERA Report_Appendix C.pdf PDF
36C24822R0173 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 1a and 1b.pdf PDF
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
013323 Shop Drawings Spec 673-CSI-1127 Replace Cardiac Cath Lab 1.docx DOCX document
014219 Reference Standards 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf PDF
36C24822R0173_1.pdf PDF
VA 01 00 00 General Requirements - Attachment 2 (1).pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Installation Specs - Azurion 7 C20 FlexArm - 4300mm SRD.pdf PDF
Price Matrix.xlsx XLSX spreadsheet
EMR.pdf PDF
Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
VA 01 00 00 General Requirements - Appendix B.pdf PDF
013526 Safety Requirements 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

140A Whitaker Road, Lutz, Florida 33549

James A. Haley VA Hospital

Fan Array AHU 10A & 10B

~ Final Report ~

August 24, 2022

PROJECT

ADDRESS

CITY, STATE

CERTIFICATION NO. DATE

ARCHITECT

ADDRESS

ENGINEER

ADDRESS

GENERAL CONTRACTOR

ADDRESS

MECHANICAL CONTRACTOR

ADDRESS

20211412

Albert Architecture

3221 Tulane Avenue

August 24, 2022

James A. Haley VA Hospital

Fan Array AHU10A & 10B

1300 Bruce B. Downs Blvd.

Tampa, FL 33612

New Orleans, LA 70119

Orlando, FL 32803

Pinellas Park, FL 33781-3141

Superior Mechanical Services, Inc.

6482 Park Blvd.

Blue Cord Design & Construction

835 Bennett Road, Suite 100

CERTIFIED

TEST, ADJUST AND BALANCE

FINAL REPORT

SOUTHERN INDEPENDENT

TESTING AGENCY, INC.

Testing & Adjusting of Building Environmental Systems 140A Whitaker Road Lutz, FL 33549 (813) 949-1999 Fax (813) 949-5084 www.sita-tab.com

NATIONALLY CERTIFIED

Project # 20211412

ITEM

AABC CERTIFICATION.……………………………...…………………………………………………..

INSTRUMENT LIST.…...………………………………...……………………………………………….

PROJECT SUMMARY.………………………………..……………………………………………………

AIR MOVING EQUIPMENT TEST SHEET………………..…………………………...……..……

EXHAUST / SUPPLY FAN DATA SHEET……………………….………………………………...……

STATIC PRESSURE PROFILE SHEET………………...…………………..……………………………

DUCT / PIPE TRAVERSE SHEET…………………...………………………………………….…… 4 - 6

Insert

A

TABLE OF CONTENTS

PAGE

Insert

James A. Haley VA Hospital

Fan Array AHU10A & 10B

TEST AND BALANCE REPORT

TEST & BALANCE ENGINEER

[ SEAL ] [ SIGNATURE ]

TBE REGISTRATION NUMBER DATE OF CERTIFICATION

03-09-36 August 24, 2022

SUBMITTED AND CERTIFIED BY THIS AABC AGENCY

SITA - SOUTHERN INDEPENDENT TESTING AGENCY, INC.

140A Whitaker Road, Lutz, FL 33549

PROJECT / CERTIFICATION NUMBER

BRIAN C. KAUPP 20211412

THE DATA CONTAINED WITHIN THIS REPORT IS TRUTHFUL AND REFLECTS THE OPTIMUM

PERFORMANCE CAPABILTIIES OF THE INSTALLED SYSTEMS.

James A. Haley VA Hospital

Fan Array AHU10A & 10B

1300 Bruce B. Downs Blvd.

Tampa, FL 33612

The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the AABC procedural standards for testing, adjusting and balancing of environmental systems and per the project specifications.

Any variances from design quantities, which exceed AABC tolerances, are noted in the test report project summary.

ASSOCIATED AIR

BALANCE COUNCIL

CERTIFICATION

Micah Brian Kaupp

[ Signature ]

Tampa, FL 33612

James A. Haley VA Hospital

Fan Array AHU10A & 10B

1300 Bruce B. Downs Blvd.

August 24, 2022

We, SITA - Southern Independent Testing Agency, Inc.

140A Whitaker Road, Lutz, Florida 33549, subcontractor for

Testing, Adjusting and Balancing of HVAC Systems on the above referenced project, do hereby guarantee that all testing, adjusting and balancing performed by SITA, Inc., is in accordance with the Contract, Drawings, and Specifications and authorized alterations and additions thereto.

Should any defect develop within one (1) year from the date of completion, after acceptance of the Work by the Owners, due to improper workmanship, will upon written notice, be made good by

SITA - Southern Independent Testing Agency, Inc.

without expense to the Owners.

Date of Completion

SUBCONTRACTOR ONE (1) YEAR WARRANTY

DATE: JOB # 20211412

PROJECT NAME: James A. Haley VA Hospital - Fan Array AHU 10A & 10B TAB TECH: K. Wyatt

MFG. MODEL # SERIAL # RANGE

CALIBRATE

DATE

CALIBRATION

DUE DATE

ALNOR EBT-731 EBT731743018 25 TO 2500 FPM 3/23/22 3/23/23

ALNOR EBT-731 EBT731743018 ±15 IN. H2O 3/23/22 3/23/23

HUMIDITY / TEMPERATURE PROBE ALNOR 800220 P22110063 - 14º TO 140º F 3/10/22 3/10/23

ROTATING VANE ANEMOMETER ALNOR RVA801 A02944 0 TO 3000 FPM 6/1/22 6/1/23

AMP / VOLT METER FLUKE 323 40581190WS 0 TO 400 AMP 10/29/21 10/29/22

TACHOMETER EXTECH RPM10 365582 0 - 10,000 RPM 10/30/21 10/30/22

TSI / ALNOR HM 670 70633344 0 - 250 IN. H2O 11/23/21 11/23/22

PITOT TUBE - 12" DWYER 160-12 -- -- N / A N / A

PITOT TUBE - 24" DWYER 160-24 -- -- N / A N / A

PITOT TUBE - 36" DWYER 160-36 -- -- N / A N / A

PITOT TUBE - 60" DWYER 160-60 -- -- N / A N / A

ABBREVIATION LIST

DIGITAL HYDRONIC MANOMETER

08/15/22

INSTRUMENT

EBT BALOMETER

EBT MICROMANOMETER

AHU = AIR HANDLING UNIT Hp = HORSEPOWER

BCU = BLOWER COIL UNIT HPU = HEAT PUMP UNIT

BTU = BRITISH THERMAL UNIT LWT = LEAVING WATER TEMPERATURE

CAV = CONSTANT AIR VOLUME MUA = MAKE-UP AIR

CFM = CUBIC FEET PER MINUTE MVD = MOTORIZED VOLUME DAMPER

CRU = COMPUTER ROOM UNIT N / A = NOT APPLICABLE - NO ACCESS

DH = DUCT HEATER N / O = NOT OPERATING

DP = DIFFERENTIAL PRESSURE N / S = NOT SPECIFIED

EDH = ELECTRIC DUCT HEATER NTS = NO TEST SITE

EF = EXHAUST FAN PIU = POWERED INDUCTION UNITS

ERU = ENERGY RECOVERY UNIT PTU = POWER TERMINAL UNITS

ERV = ENERGY RECOVERY VENTILATOR RTU = ROOF TOP UNITS

EWT = ENTERING WATER TEMPERATURE SP = STATIC PRESSURE

FCU = FAN COIL UNIT VAV = VARIABLE AIR VOLUME

FPBU = FAN POWERED BOX UNITS VD = VOLUME DAMPER (MANUAL)

FPM = FEET PER MINUTE VFD = VARIABLE FREQUENCY DRIVE

GPM = GALLONS PER MINUTE VSC = VARIABLE SPEED CONTROLLER

INSTRUMENT LIST

A

Fan Array AHU 10A & 10B

Final Report Project Summary

JOB #20211412

August 24, 2022

This project summary and comments reflects the equipment operation and capacity status as of the date indicated on the following performance data forms.

1. AIR HANDLING UNITS

1.1 The following equipment has been tested with the summary of test results is indicated in the following table.

AHU #

Design

CFM

Actual

CFM

% Of

Design

Design

OSA

Actual

OSA

% Of

Design

AHU-10A 52000 51283 99% - 10140 -

AHU-10A (RETURN FAN) - 50083 - - - -

AHU-10B 52000 52479 101% - 11508 -

AHU-10B (RETURN FAN) - 50387 - - - -

1.2 The units were tested in two different scenarios.

1.3 The first test was with each unit operating by independently.

1.4 The second test was with units operating at the same time in normal operation.

1.5 Actual information on air moving equipment sheets were obtained when units were operating independently.

Testing, Adjusting & Balancing (TAB) of Building Environmental Systems 140A Whitaker Road Lutz, FL 33549 (813) 949-1999 Fax (813) 949-5084 www.sita-tab.com

Fan Array AHU 10A & 10B

PROJECT SUMMARY

Job #20211412

August 24, 2022

B

1.6 All existing motorized dampers in units are either seized up, broke or not controlling.

DATE: PAGE # 1

TAB TECH: KW

SETTING/CAL. - -

SETTING/CAL. - -

ACT. ACT.

MOTOR MANUFACTURER

MOTOR H.P. │ B.H.P.

PHASE │ FRAME

VOLTAGE 477 479 479 478

AMPS │ 72.2 72.2 63.3 35.2

HEATER ELEMENT SIZE

MOTOR SHEAVE & BORE x bl x BORE 5/7/8 x 5-7/8 bl x BORE

FAN SHEAVE & BORE x bl x BORE 12-3/4 x 12-3/4 bl x BORE

BELT(S) / CENTER-TO-CENTER

QTY. QTY.

REMARKS:

1.9 -- -

-.88

AHU-10A (RETURN FAN)

3RD FLOOR ROOF

MODEL NUMBER

ACTUAL

5008351283TOTAL CFM OF FAN

YORK

ACTUALDESIGN

52000 -

YORK

RETURN AIR CFM

SYSTEM

EQUIPMENT LOCATION

AREA SERVED

SERIAL NUMBER

3RD FLOOR ROOF

BALDOR

2-1/8

1.15

ROTATION │ MOTOR RPM

72.3 35.2

VARIABLE

CORRECTED AMPS

TOTAL CFM OF OUTLETS

82%

3 184T

49 36.5

DISCHARGE STATIC PRESSURE

BALDOR (X12)

ACTUAL

STATIC PRESSURE (TOTAL / EXT.)

INLET STATIC PRESSURE

OUTSIDE AIR CFM

BALDOR

DESIGN

SHEAVE │ BELT MFG.

SYSTEM STATIC PRESSURE

FAN RPM

- SETPOINT - - SETPOINT -

FINAL Hz │ SERVICE FACTOR

SPEED: VARIABLE or LO, MED, HI

99.5% 92% 89.5% 92%

184T

6.5

MOTOR EFFIC. │ POWER FACTOR

FIXED

James A. Haley VA Hospital - Fan Array AHU 10A & 10B

VARIABLE

1.15

VARIABLE

38972

1.15

6.5 71.3

ACTUAL

+1.02 -

VARIABLE

BALDOR (X12)

- 3460

FIXED

7/17/22; 7/24/22; 8/15/22 20211412

DESIGN

JOB #

PROJECT NAME:

EQUIPMENT MANUFACTURER

AHU-10A

DESIGN

1.15

7.4 -

ADJ.

2-7/8

ADJ.

93%

3461 - 1770

324 T

324 T

66.0

82% 93%

-2.21

3.23

11111

- 1770

SEE STATIC

PROFILE

SHEET

FILTERS:

DIRECT DRIVE 5 @ B84 29-3/8

SIZE TYPE SIZE TYPE

30 24 X 24 X 6 MERV-14

20 24 X 24 X 2 MERV-8

10 24 X 24 X 2 MERV-8

BROWNING HIGH POWER

AIR MOVING EQUIPMENT

TEST SHEET

DATE: PAGE # 2

TAB TECH: KW

SETTING/CAL. - -

SETTING/CAL. - -

ACT. ACT.

MOTOR MANUFACTURER

MOTOR H.P. │ B.H.P.

PHASE │ FRAME

VOLTAGE 478 479 479 478

AMPS │ 86.5 72.2 28.1 28.2

HEATER ELEMENT SIZE

MOTOR SHEAVE & BORE x bl x BORE 5/7/8 x 5-7/8 bl x BORE

FAN SHEAVE & BORE x bl x BORE 12-3/4 x 12-3/4 bl x BORE

BELT(S) / CENTER-TO-CENTER

QTY. QTY.

REMARKS:

3.38 -- 5.5

-2.37

AHU-10B (RETURN FAN)

3RD FLOOR ROOF

MODEL NUMBER

ACTUAL

5038752479TOTAL CFM OF FAN

YORK

ACTUALDESIGN

52000 -

YORK

RETURN AIR CFM

SYSTEM

EQUIPMENT LOCATION

AREA SERVED

SERIAL NUMBER

3RD FLOOR ROOF

BALDOR

2-1/8

1.15

ROTATION │ MOTOR RPM

86.8 28.2

VARIABLE

CORRECTED AMPS

TOTAL CFM OF OUTLETS

82%

3 184T

49 29.2

DISCHARGE STATIC PRESSURE

BALDOR (X12)

ACTUAL

STATIC PRESSURE (TOTAL / EXT.)

INLET STATIC PRESSURE

OUTSIDE AIR CFM

BALDOR

DESIGN

23.8

SHEAVE │ BELT MFG.

SYSTEM STATIC PRESSURE

FAN RPM

- SETPOINT - - SETPOINT -

FINAL Hz │ SERVICE FACTOR

SPEED: VARIABLE or LO, MED, HI

89.5% 92% 89.5% 92%

184T

6.5

MOTOR EFFIC. │ POWER FACTOR

FIXED

James A. Haley VA Hospital - Fan Array AHU 10A & 10B

VARIABLE

1.15

VARIABLE

38379

1.15

6.5 71.3

ACTUAL

+1.01 -

VARIABLE

BALDOR (X12)

- 3460

FIXED

7/24/22; 7/29/22 20211412

DESIGN

JOB #

PROJECT NAME:

EQUIPMENT MANUFACTURER

AHU-10B

DESIGN

1.15

88.8 90.3

ADJ.

2-7/8

ADJ.

93%

38879

3461 - 1770

324 T

324 T

82% 93%

+2.46

3.47

11508

- 1770

SEE STATIC

PROFILE

SHEET

FILTERS:

DIRECT DRIVE 5 @ B84 29-3/8

SIZE TYPE SIZE TYPE

30 24 X 24 X 6 MERV-14

20 24 X 24 X 2 MERV-8

10 24 X 24 X 2 MERV-8

BROWNING HIGH POWER

AIR MOVING EQUIPMENT

TEST SHEET

DATE: 7/24/22; 7/29/22 JOB # 20221412 PAGE # 3

James A. Haley VA Hospital - Fan Array AHU 10A & 10B TAB TECH: KW

UNIT A B C D E F G H I

AHU-10A +1.02 +2.46 -2.21 -1.99 -1.03 -.88 -2.18 -1.77

AHU-10B +1.01 - -2.99 -2.96 -2.14 -.97 -2.37 1.85

AHU-10A +3.69 +4.81 1.11 -1.09 -54 -.04 -1.74 -1.77 (1)

AHU-10B +3.87 - -1.39 -1.36 -1.01 -.34 -1.97 -1.53 (1)

REMARKS: (1) Both units operating at the same time in normal operation.

PROJECT NAME:

STATIC PRESSURE PROFILE

TEST SHEET

SUPPLY RETURN

FANS FAN

RETURN

SUPPLY

H W

C O

IL

C H

W C

O

IL

F

IL

T E

R S

O S

A /R

E T

U R

N

IN

T

A K

E

IN

T A

K E

O S

A /R

E T

U R

NA B C D E F G H

DATE: 7/24/22; 7/29/22 JOB # PAGE # 4

PROJECT NAME: TAB TECH: KW

SYSTEM

ZONE / UNIT #

DUCT

SIZE

AREA

SQ. FT

CORR.

FACT

REQ'D

FPM

ACTUAL

FPM

REQ'D

CFM

ACTUAL

CFM

STATIC

PRESS

INSTRUMENT

USED

AHU-10A

SUPPLY 56 17.0 - - 2688 52000 51283 1.02 AF

RETURN 56 17.0 - - 2420 - 41143 .004 AF

OSA 104 X 74 53.4 .95/50.7 - 200 - 10140 - VEL

OSA

TOP INTAKE 63 X 35 15.3 .95/14.5 - 33 - 478 - VEL

MIDDLE INTAKE 63 X 35 15.3 .95/14.5 - 34 - 493 - VEL

AHU-10B

SUPPLY 56 17.0 - - 3087 52000 52479 1.01 AF

RETURN 56 17.0 - - 2287 - 38879 1.85 AF

OSA 104 X 74 53.4 .95/50.7 - 227 - 11508 - VEL

OSA

TOP INTAKE 63 X 35 15.3 .95/14.5 - 0 - 0 - VEL

MIDDLE INTAKE 63 X 35 15.3 .95/14.5 - 0 - 0 - VEL

REMARKS:

INSTRUMENT USED: ANEM = 4" VANE ANEMOMETER; PT = PITOT TUBE; H = HOOD; VEL = VELGRID/MATRIX

20211412

James A. Haley VA Hospital - Fan Array AHU 10A & 10B

DUCT / PIPE TRAVERSE SHEET

DATE: 8/15/22 JOB # PAGE # 5

SYSTEM

ZONE / UNIT #

DUCT

SIZE

AREA

SQ. FT

CORR.

FACT

REQ'D

FPM

ACTUAL

FPM

REQ'D

CFM

ACTUAL

CFM

STATIC

PRESS

INSTRUMENT

USED

BOTH UNITS OPERATING TOGETHER IN NORMAL OPERATION

AHU-10A

SUPPLY 56 17.0 - 3058 1807 52000 30719 3.69 AF

RETURN 56 17.0 - - 1323 - 22491 1.77 AF

OSA 104 X 47 53.4 .95/50.7 - 170 - 9083 - VEL

OSA

TOP INTAKE 63 X 35 15.3 .95/14.5 - 21 - 304 - VEL

MIDDLE INTAKE 63 X 35 15.3 .95/14.5 - 22 - 319 - VEL

REMARKS:

INSTRUMENT USED: ANEM = 4" VANE ANEMOMETER; PT = PITOT TUBE; H = HOOD; VEL = VELGRID/MATRIX

20211412

DATE: 8/15/22 JOB # PAGE # 6

SYSTEM

ZONE / UNIT #

DUCT

SIZE

AREA

SQ. FT

CORR.

FACT

REQ'D

FPM

ACTUAL

FPM

REQ'D

CFM

ACTUAL

CFM

STATIC

PRESS

INSTRUMENT

USED

BOTH UNITS OPERATING TOGETHER IN NORMAL OPERATION

AHU-10B

SUPPLY 56 17.0 - 3058 2400 52000 40813 +3.87 AF

RETURN 56 17.0 - - 1852 - 31491 1.53 AF

OSA 104 X 47 53.4 .95/50.7 - 183 - 9321 1.53 VEL

OSA

TOP INTAKE 63 X 35 15.3 .95/14.5 - 0 - 0 - VEL

MIDDLE INTAKE 63 X 35 15.3 .95/14.5 - 0 - 0 - VEL

REMARKS:

INSTRUMENT USED: ANEM = 4" VANE ANEMOMETER; PT = PITOT TUBE; H = HOOD; VEL = VELGRID/MATRIX

20211412

2022-08-24T16:26:29-0400
Brian C. Kaupp
2022-08-24T16:26:40-0400
Brian C. Kaupp