This document set includes installation specifications and minimum site preparation requirements for a Philips Azurion 7 C20 FlexArm medical imaging system. Key details include:

The specifications provide guidance for installing the Azurion 7 C20 FlexArm system, which has a 4,300mm maximum reach. Minimum site preparation requirements specify that walls, floors, ceilings and lighting must be completed. Electrical work must also be finished, including a dedicated circuit breaker and disconnect for the Azurion system. Only equipment included in the Azurion certification or with a compatibility statement can be connected to the medical imaging system's grounding domain.

View the file

Other files

File Type Posted
36C24822R0173 0002.docx DOCX document
10A unit.pdf PDF
Final Report - James A. Haley VA Hospital - Fan Array AHU 10A _ 10B - 20211412.pdf PDF
Azurion_7_C20_Standard_Reference_Drawings.pdf PDF
10B unit.pdf PDF
INSTRUCTIONS TO OFFERORS AND EVALUATION INFORMATION Cath Lab 1.pdf PDF
Azurion Specification 7 F-C20 (incl. FlexArm) _ Philips IGT.pdf PDF
Building 1 AHERA Report_Appendix C.pdf PDF
36C24822R0173 0001.docx DOCX document
VA 01 00 00 General Requirements - Attachment 1a and 1b.pdf PDF
VA 01 00 00 General Requirements - Attachment 2.pdf PDF
013323 Shop Drawings Spec 673-CSI-1127 Replace Cardiac Cath Lab 1.docx DOCX document
014219 Reference Standards 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
VA 01 00 00 General Requirements - Attachment 6.pdf PDF
VA 01 00 00 General Requirements - Attachment 5a and 5b.pdf PDF
36C24822R0173_1.pdf PDF
VA 01 00 00 General Requirements - Attachment 2 (1).pdf PDF
VA 01 00 00 General Requirements - Appendix A.pdf PDF
Price Matrix.xlsx XLSX spreadsheet
EMR.pdf PDF
Past Performance Questionnaire.pdf PDF
VA 01 00 00 General Requirements - Attachment 4.pdf PDF
VA 01 00 00 General Requirements - Appendix C.pdf PDF
VA 01 00 00 General Requirements - Appendix B.pdf PDF
013526 Safety Requirements 673-CSI-127 Replace Cardiac Cath Lab 1.docx DOCX document
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

N

C

F L

E X

A R

M

M

M

D a t e

D r a w n

Q u o t e

O r d e r

A z u r i o n

C

F l e x A r m m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

I

T

H

S

P

A C

K A

G E

R O

V I D

D

U S

T O

M E

R

C

O N

V E

N I E

N C

E

A

O

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a d e f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j k h i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n i w o l o p a r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

B y

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Healthcare www.healthcare.philips.com

Table of Contents

Revision History

Note for Architects and/or Contractors: If revisions are listed, these drawings must be thoroughly reviewed so that all changes can be incorporated into your project

Rev. Date

Revision Descriptions By

Transport Details ------------------------------------ AD1

Equipment Details -------------------------- AD2 - AD5

Equipment Plan ---------------------------------------- A1

Equipment Legend ------------------------------------ AL

General Notes ----------------------------------------- AN

Section A - Equipment Plan

Check List -------------------------------------------- CHK

Remote Service Network ----------------------- N1-N2

Electrical Details ---------------------------- ED1 - ED4

Raceway & Conduit Information ------------- E2 - E4

Electrical Plan ------------------------------------------- E1

Electrical Legend -------------------------------------- EL

Electrical Notes ---------------------------------------- EN

Section E - Electrical Plan

Support Details ------------------------------ SD1 - SD3

Support Plan - Ceiling -------------------------------- S2

Support Plan - Floor & Wall ------------------------- S1

Support Legend ---------------------------------------- SL

Support Notes ------------------------------------------ SN

Section S - Support Plan

All information in this drawing should be considered provisional and subject to change.

Ceiling Movement and Safety Zones ------------- S3

AN

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Minimum Site Preparation Requirements

A smooth efficient installation is vital to Philips and their customers. Understanding what the minimum site preparation requirements are will help achieve this goal. The following list clearly defines the requirements which must be fulfilled before the installation can begin.

1. Walls to be painted or covered, baseboards installed, floors to be tiled and/or covered, ceiling shall have grid tiles and luminaires installed and operational.

2. Doors and windows, especially radiation protection barriers, installed and finished with locksets operational.

3. All electrical convenience outlets, raceways, wireways, auxiliary fittings, knockouts, cable connectors, terminal and power distribution blocks, cable openings, chase nipples, junction boxes and pull boxes installed and operational.

4. A private supply mains branch circuit with overcurrent protective circuit breaker and manual operable circuit disconnect means shall be present and operational. Definition of "Private supply" means an end-leave of the hospital distribution system after the last overcurrent protective disconnect means from which all equipment included in the Azurion ground domain is powered.

Note that only equipment included in the Azurion certification and equipment with which the

Azurion has a compatibility statement are allowed to be inside the Azurion ground domain. All other electrical equipment is not allowed to have a functional connection to the Azurion system and shall have no direct galvanic connection to prevent ground loops. 3rd party equipment that does not have a function connection with the Azurion system, but that is intended to be used inside the same patient area as the Azurion System shall be grounded to the PCB inside the

ERB with a ground bonding of <= 200 mOhm for plugable equipment.

5. 120V convenience outlets operational.

6. All support structure correctly installed. All channels, pipes, beams and/or other supporting devices should be level, parallel, and free of lateral or longitudinal movements.

7. All contractor supplied cables pulled and terminated.

8. A dust-free environment in and around the procedure room.

9. All HVAC (heating, ventilating and air conditioning) installed and operational as per specifications.

10. Architectural features such as computer floor, wood floor, casework, bulkheads, installed and finished. When technical cabinets are installed in a closet with doors, it is suggested that the customer install a temperature alarm in the event of an air conditional failure.

11. All plumbing installed and finished.

12. Philips does not install or connect developing tanks, automatic processors or associated equipment, built in illuminators, cassette pass boxes, loading benches and cabinets, lead protective screens, panels or lead glass window and frame. This is to be done by the customer/contractor.

13. Clear door openings for moving equipment into the building must be 42" (1067mm) W x 82"

(2083mm) H min. 48" (1219mm) W x 82" (2083mm) H rec., Or larger contingent on an 8'-0"

(2438mm) corridor width.

14. Countertop is 30" (765mm) for seated height and 36" (915mm) for standing height.

Note

Once Philips has moved equipment into the suite and started the installation, the contractor shall schedule his work around the Philips installation team on site. It is suggested that a telephone be provided in the room to receive telephone calls. This would alleviate facility staff from answering calls for Philips personnel.

Remote Service Diagnostics

Medical imaging equipment to be installed by Philips Medical is equipped with a service diagnostic feature which allows for remote and on site service diagnostics. To establish this feature, a RJ45 type ethernet 10/100/1000 Mbit network connector must be installed as shown on plan. Access to customer's network via their remote access server is needed for Remote

Service Network (RSN) connectivity. All cost with this feature are the responsibility of the customer.

(16.0)

HVAC Requirement for General Equipment Locations

*Average heat emission during clinical use

Data applicable for basic system:

Large monitor + 4 x small monitor in Monitor Ceiling Suspension

1 workstation + 2 x small monitor in Control Room

Add 1706 BTU/hr for additional large monitor

Add 273 BTU/hr for additional small monitor

Add 1024 BTU/hr for additional workstation

See AL sheet for additional heat load in case of UPS

Equipment's designed airflow is from front/side to back. Please design the air handling in the rack cabinet equipment area accordingly.

Heating, ventilation, and air conditioning requirements must maintain temperature at 72 degrees +/- 5 degrees Fahrenheit as well as a non-condensing relative humidity at 20-80% with

10% maximum variation. These temperature and humidity levels must be maintained in all (3) rooms (equipment, examination and control rooms).

(19.0)

General Specifications

1. Responsibility

The customer shall be solely responsible, at its expense for preparation of site, including any required structural alterations. The site preparation shall be in accordance with plans and specifications provided by Philips. Compliance with all safety electrical and building codes relevant to the equipment and its installation is the sole responsibility of customer.

The customer shall advise Philips of conditions at or near the site which could adversely affect the installation work and shall ensure that such conditions are corrected and that the site is fully prepared and available to Philips before the installation work is due to begin. The customer shall provide all necessary plumbing, carpentry work, or raceway

(conduits, wireways, auxiliary gutters, etc.) required to attach and install products ready for use.

2. Permits

Customer shall obtain all permits and licenses required by federal, state/provincial or local authorities in connection with the construction, installation and operation of the products and related rules, regulations, shall bear any expense in obtaining same or in complying with any ordinances and statutes.

3. Radiation Protection

The customer or his contractor, at his own expense, shall obtain the service of a licensed radiation physicist to specify radiation protection. (X-Ray Tube output 125 KVp max.)

4. Asbestos and Other Toxic Substances

Philips assumes no hazardous waste (i.e., PCB's in existing transformers) exists at the site. If any hazardous material is found, it shall be the sole responsibility of the customer to properly remove and dispose of this material at its expense. Any delays caused in the project for this special handling shall result in Philips time period for completion being extended by like period of time. Philips assumes that no asbestos material is involved in this project in any ceilings, walls or floors. If any asbestos material is found anywhere on the site, it shall be the customer's sole responsibility to properly remove and/or make safe this condition, at the customer's sole expense.

5. Labor

In the event local labor conditions make it impossible or undesirable to use Philips' regular employees for such installation and connection, such work shall be performed by laborers supplied by the customer, or by an independent contractor chosen by the customer at the customer's expense, and in such case, Philips agrees to furnish adequate engineering supervision for proper completion of the installation.

6. Schedule

The general contractor should provide Philips with a schedule of work to assist in the coordination of delivery of Philips supplied products which are to be installed by the contractor and delivery of the primary equipment.

7. Extended Installation or Turnkey Work by Philips

Any room preparation requirements for Philips equipment indicated on these drawings is the responsibility of the customer. If an extended installation or turnkey contract exists between Philips and the customer for room preparation work required by the equipment represented on these drawings, some of the responsibilities of the customer as depicted in these drawings may be assumed by Philips. In the event of a conflict between the work described in the turnkey contract workscope and these drawings, the turnkey contract workscope shall govern.

8. Infection Control and Interim Life Safety Measures

Compliance with all Infection Control and Interim Life Safety Measures shall be the sole responsibility of the customer. The customer shall provide all means and methods necessary for compliance with Infection Control (IC) and Interim Life Safety Measures

(ILSM) in connection with the construction and installation/operation of the products shown herein and shall bear any expenses related to same.

(16.0)

Electrical Requirements

Mains 40E Cabinet

Maximum Rated Power: 100kW

Supply Configuration: 3 phase, equally sized insulated power conductors and an insulated equipment grounding conductor. Insulated grounding conductor shall have the same or larger size than line conductors. Line wires shall be no smaller than 6 AWG, 90 degrees Celsius or higher temperature rating. The conductor size is dependant on the upstream circuit breaker rating:

Minimum 4 AWG for 80A circuit breaker rating.

Nominal Line Voltage: 480 VAC, 60 Hz

Branch Power

Requirement: 100 kVA (System only; verify UPS power requirements)

Circuit Breaker: 3 phase, Type D 80A with long-time delay and shunt trip

(19.0)

Remote Control of Room Lighting

The control of customer lighting must incorporate an electrical isolation system such as demonstrated on Sheet ED3. Lighting scheme is the responsibility of the customer.

(12.0)

Operation

Temperature 59°F (15°C) to 86°F (30°C)

Temperature gradient Max. 1°F / Minute (0.5°C / Minute)

Humidity (non-condensing)

Humidity shall be stable within 10%

20% to 80%

Exam Room *6483 BTU/hr

Equipment Room

*8189 BTU/hr

Control Room *1706 BTU/hr

AL

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Weight

(lbs)

Heat Load

(BTU/hr)

Detail Sheet

Equipment Designation

Description

Equipment Legend

Optional

Future

Existing

Furnished by Philips and installed by contractor

Installed by customer/contractor

Furnished by customer/contractor and installed by customer/contractor

G

D

C

B

Furnished and installed by PhilipsA

F

E

A SP C-Arc Stand 2755 2047 AD2

A ME Certeray iX Generator Cabinet 320 2971 AD3

A MR Peripheral 40E Cabinet 441 2049 AD3

A MA Mains 40E Cabinet 826 5464 AD3

A DB Documentation Box - Mounted on Wheels

(Final location to be coordinated with customer and/or local Philips Service)

176 0 AD4

A ATY Exam Room Auxiliary Box 7 1.7 AD4

G IH Interventional Hardware 73 2424 AD5

G MB Image 40E Cabinet 441 1877 AD3

G VB1 Video Connection Box 11 34 AD4

G VB8 Video Connection Box 11 34 AD4

Items not on Philips Quote/Order

A CY Control Room Connection Box 102 567 AD3

G TV 58" LCD Monitor Suspension 563 1020 AD4

A MSA Angio Diagnost 7 999 205 AD2

6'-0" 26'-0"

26'-0"

ATY

C l e a

T a b l e

R e c o m m e n d e d

M i n i m u m

Equipment closet doors to be hung from ceiling mounted track, no floor tracks allowed

MA

MR

MB

ME

Customer's Physio

(PHY)

Coordinate final location with customer

IH VB1VB2 CY

Exact location to be coordinated by Customer and local Philips service.

DB

VB8VB3 VB4 VB5 VB6 VB7

16'-6"

AD7 Table Floor Plate ℄

MSA

SP

Ceiling Inlet

A1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

* Counters and cabinetry shown to be supplied and installed by contractor.

General Notes

* Architect to coordinate with end users/technicians to determine final placement of control desk components prior to installation in order to avoid rework.

Architect to coordinate with Philips Project Manager to reflect final placement on

Philips drawings.

Source Location

Displayed

VB1

Physio

Control FlexVision

VB2 IH Control FlexVision

VB3

VB4

VB5

VB6

VB7

VB8

Equipment Layout

1/4" = 1'-0"

Required Unistrut Height: 9' - 6

" / -0 (2900mm, +10mm / -0)

Unistrut height measured from finished floor to bottom of Unistrut.

AD1

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Detail - FlexArm Ceiling (C-ARM) Transport Details

(19.0)

Transport Possibilities

Crate Pallet Kick Wheels Wide Kick Wheels Small

Height 77.95" (1980mm) 76.22" (1936mm) 69.02" (1753mm) 77.76" (1975mm)

Weight 2050 lbs (930 kg) 1940 lbs (880 kg) 2061 lbs (935 kg) 1764 lbs (800 kg)

3'-7

[1100mm]

3 8 m m

3'-7

[1100mm] m m

5'-4

[1649mm] m m

3'-1

[960mm]

1 2 m

AD2

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

120°

3'-11

" 1'-11

7 8

5'-6

Floor Plate ℄

Ceiling

Inlet

3 8

3 8

2'-6

16'-4

" 11

Table Pivot is optional. This allows the table to rotate -90, +180 degrees about center of table base.

Front

(Not site specific)

(19.0)

MSA

Angio Diagnost 7

Weight Heat Dissipation

999 lbs 205 BTU/hr

Minimum to avoid C-Arm collision with floor

Side

(Not site specific)

Top

(Not site specific)

3 4

7 8

5°

1'-3

5'-4

90°

5 8

1'-11

5'-10

15'-10

Optional Table

Pivot ℄ (-90, +180 degrees)

Front

(Not site specific)

(19.0)

SP

FlexArm Stand

Weight Heat Dissipation

2755 lbs 2047 BTU/hr

Indicates equipment movement

1 4

5 8

3'-11

"3'-11

15'-0

3'-6

4'-7

Right

(Not site specific)

1'-9

14'-1

1'-9

5 8

5'-10

6'-10

Cable Duct

4'-3

AD3

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and

1 meter high (1 meter = 39.37")

CRC Cover

CRC Extension

Top m m

Side

1'-8

[520mm]

[276mm]

[160mm]

CRC Cover

1'-9

[550mm]

(19.0)

MA

Mains 40E Cabinet

Weight Heat Dissipation

826 lbs 5464 BTU/hr

Top m m

Side

1'-8

[520mm]

[175mm]

1'-9

[550mm]

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 65 dB(A) @ 1 meter in front of the rack and

1 meter high (1 meter = 39.37")

CRC Cover

CRC Cover

(19.0)

MR

Peripheral 40E Cabinet

Weight Heat Dissipation

441 lbs 2049 BTU/hr

Top m m

Side

1'-8

[520mm]

[175mm]

1'-9

[550mm]

Front

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 48 dB(A) @ 1 meter in front of the rack and

1 meter high (1 meter = 39.37")

CRC Cover

CRC Cover

(19.0)

MB

Image 40E Cabinet

Weight Heat Dissipation

441 lbs 1877 BTU/hr

Top m m

Side

1'-8

[520mm]

[175mm]

1'-9

[550mm]

The CRC Cover must be attached to the back box.

Acoustic noise level: <= 55 dB(A) @ 1 meter in front of the rack and

1 meter high (1 meter = 39.37")

Front

CRC Cover

CRC Cover

(19.0)

ME

Certeray iX Generator 40E Cabinet

Weight Heat Dissipation

320 lbs 2971 BTU/hr

Control Module

Review Module

Front Side

Top

Front Side

Top

Touch Screen Module

(Optional)

DVD Writer

(Optional)

1'-0"

[304mm] m m

[160mm] m m

Front Side

Top

LCD Monitor

5 8 m m

1'-10

[564mm]

1 2 m m

Front Side

Top

Keyboard / Mouse

3 8 m m m m

1'-7

[490mm]

[60mm]

3 8 m m

Front Side

Top

Connection Box

(See SD3 for mounting options)

5 8 m m

2'-7

[800mm] m m m m

1 2 m m

(19.0)

CY

Control Room Connection Box

(All Components)

Weight Heat Dissipation

102 lbs 567 BTU/hr

Front Side

Top

1'-5

[442mm]

1'-5

[442mm] m m

Front Side

Top

1 4 m m

9"

[228mm]

1 2 m

AD4

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Front

Top

Side m m

[195mm]

1 4 m m

(19.0)

ATY

Auxiliary Box

Weight Heat Dissipation

7 lbs 1.7 BTU/hr

Front

Top

Side

1'-9

[550mm] m m m m

1'-1

[335mm]

(19.0)

DB

Documentation Box

Weight Heat Dissipation

176 lbs 0 BTU/hr m m

Front

Top

Side

(19.0)

VB1

VB8

Video Connection Box

Weight Heat Dissipation

11 lbs 34 BTU/hr

[242mm]

[240mm] m m

Front

Top

Side

360°

7'-7

[2321mm] m m

12'-9

[3900mm]

5'-2

[1587mm]

9'-5

[2895mm]

11'-6

[3510mm]

7 8 m m

5 8 m m

For swing labs, 2700mm long ceiling rails are delivered. Maximum longitudinal column travel = 2100mm.

Weight shown is total weight including monitors, suspension, cabling, and options.

Bearing Forces:

(Tension) Tmax = 661 lbs/support

(Shear) Vmax = 150 lbs/support

(19.0)

TV

58" LCD Monitor Suspension

Weight Heat Dissipation

563 lbs 1020 BTU/hr

AD5

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Weight shown is for all components.

Front Side

Top

Front Side

Top

19" (480mm) Flat Panel Monitor

Multiswitch

Front Side

Top

Front Side

Top

CPU

Keyboard / Mouse m m

1'-4

[425mm]

7 8 m m m m

1'-1

[336mm]

3 8 m m

1'-5

[434mm] m m m m m m

1'-6"

[457mm]

[66mm]

1 2 m m m m

(19.0)

IH

Interventional Hardware

Weight Heat Dissipation

73 lbs 2424 BTU/hr

SN

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Equipment Support Information

1. General

The customer shall be solely responsible, at its expense, for preparation of the site, including any required structural alterations. The site preparation shall be in accordance with this plan and specifications, the architectural/construction drawings and in compliance with all safety and building codes. The customer shall be solely responsible for obtaining all construction permits from jurisdictional authority.

2. Equipment Anchorage

Philips provides, with this plan and specifications, information relative to equipment size, weight, shape, anchoring hole locations and forces which may be exerted on anchoring fasteners. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of equipment anchoring to floors, wall and/or ceiling of the building. Any anchorage test required by local authority shall be the customer's responsibility. Stud type anchor bolts should not be specified as they hinder equipment removal for service. Consult with Philips service prior to specifying anchor methods. Philips equipment must be electrically isolated from anchorage.

3. Floor Loading and Surface

Philips provides, with this plan and specifications, information relative to size, weight and shape of floor mounted equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings confirmation of the structural adequacy of the floor upon which the equipment will be placed. Any load test required by local authority, shall be the customer's responsibility.

The floor surface upon which Philips equipment is to be placed/anchored shall be flat and level to within

" (2mm) over a length of 39" (1m).

4. Ceiling Support Apparatus

a. Philips provides, with this plan and specifications, information relative to size, weight and shape of ceiling supported equipment. The customer shall be solely responsible, through the engineer of record for the building, to provide on the architectural/construction drawings, information regarding the approved method of structural support apparatus, fasteners and anchorage to which Philips will attach equipment.

Any anchorage and/or load test required by local authority shall be the customer's responsibility. Philips equipment must be electrically isolated from anchorage.

b. Contractor to clearly mark Philips equipment longitudinal centerline on bottom of each structural support.

c. The structural support apparatus surface to which Philips equipment is to be attached, shall have horizontal equipment attachment surfaces parallel, square and level to within .236" (6mm) per entire span.

d. Any drilling and/or tapping of holes required to attach Philips equipment to the structural support apparatus shall be the responsibility of the customer.

e. Fasteners/anchors (i.e., bolts, spring nuts, lock and flat washers) and strip closures shall be provided by the customer.

5. Lighting

Luminaires shall be placed in such a position that they are not obscured by equipment or its movement, nor shall they interfere with Philips ceiling rails and equipment movement or otherwise adversely affect the equipment. Such luminaire locations shall be the sole responsibility of the customer.

6. Ceiling Obstructions

There shall be no obstructions that project below the finished ceiling in the area covered by ceiling suspended equipment travel.

7. Seismic Anchorage (For Seismic Zones Only)

All seismic anchorage hardware, including brackets, backing plates, bolts, etc., shall be supplied and installed by the customer/contractor unless otherwise specified within the support legend on this sheet. Installation of electronic cabinets to meet seismic anchorage requirements must be accomplished using flush mounted expansion type anchor/bolt systems to facilitate the removal of a cabinet for maintenance. Do not use threaded rod/adhesive anchor systems. Consult with Philips regarding any anchor system issues. Philips equipment must be electrically isolated from anchorage.

8. Floor Obstructions/ Floor Coverings

There shall be no obstructions on the floor (sliding door tracks, etc.) in front of the Philips technical cabinets. Floor must be clear to allow cabinets to be pulled away from the wall for service.

Contractor to verify with Philips the preferred floor covering installation method.

9. Safety Factors

Ceiling loads as mentioned in the PRD are worst case loads and excluding safety factors. Proper safety factors need to be applied by Design

Professional/Engineer of Record.

10. Stiffness Requirements of Ceiling

Horizontal Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in

Vertical Stiffness: preferred 10,000,000 Newton/meter - 57.1 klb/in, minimal 6,000,000 Newton/meter - 34.2 klb/in

Rotation Stiffness: minimal 20,000,000 Newtonmeter/Rad - 177,014 (klb in)/Rad

FlexArm: Max allowed deflection of ceiling structure is 2.1mm (FlexArm weight is 1250 kg and ceiling stiffness is 6,000,000 Newton/meter.

(19.0)

Center frequency [Hz]

1 1.25 1.6 2 2.5 3.15 4 5 6.3 8

Terts band value [μm/s]

(RMS)

50.8 50.8 50.8 50.8 63.5 80.01 101.6 127 160 203.2

Center frequency [Hz]

10 12.5 16 20 25 31.5 40 50 63 80

Terts band value [μm/s]

(RMS)

254 317.5 406.4 406.4 406.4 406.4 406.4 406.4 406.4 406.4

Center frequency [Hz]

100 125 160 200

Terts band value [μm/s]

(RMS)

406.4 406.4 406.4 406.4

Equipment Support Information

11. Requirements for External Vibration

The maximum allowed external vibration level of floors and ceilings, to which the equipment is mounted that will not adversely affect the image quality, is specified in terms of RMS velocity levels in 1/3-octave or terts bands, as follows:

Terts Band Specification for External Vibrations

A graphical representation of this specification is given below:

Terts Band Specification for External Vibrations

Terts band spectra shall be calculated on the basis of time traces with a duration of 10 minutes (600 seconds), taken at representative locations and during representative times during working days.

SL

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Floor & Wall Support Legend

Item Number

Description

Detail Sheet

Optional

Future

Existing

Furnished by Philips and installed/anchored by contractor

Installed/anchored by customer/contractor

Furnished and installed by customer/contractor and installed/anchored by customer/contractor

G

D

C

B

Furnished and installed/anchored by Philips (exceptions may exist, see Note 2)A

F

E

See S1 for Floor & Wall Support Layout

Ceiling Support Legend

Item Number

Description

Detail Sheet

Optional

Future

Existing

Furnished by Philips and installed by contractor

Installed by customer/contractor

Furnished by customer/contractor and installed by customer/contractor

G

D

C

B

Furnished and installed by PhilipsA

F

E

See S2 for Ceiling Support Layout

Notes:

1. Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor.

2. Anchors for items that are installed/anchored by Philips shall be provided by

Philips. If customer's engineering documents specify anchors other than those listed in this document, the anchors shall be provided by customer/contractor and installed by Philips.

3. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.

A CD Philips Cable Duct SD1

B UNI Unistrut (P1000/P1001, P5500/P5501, or equivalent in meeting Philips ceiling requirements, geometry of channel and geometry of fixing block) - Bottom of

Unistrut 0" to 1/4" (6mm) Below Finished Ceiling

SD1

B CY Support in wall for Control Room Connection Box (CY) SD3

A CY Anchors in wall for Control Room Connection Box (CY) SD3

D MSA AD7 Universal Floor Plate SD1

A SP 2 - Philips FlexArm Rails SD1

A TV 2 - Philips Monitor Equipment Rails SD1 e a

T a b l e

Level of floor ±

" (2mm) per 39" (1m) within this area.

6'-11"

CY

16'-6"

AD7 Table Floor Plate ℄

MSA

Level of floor ±

" (2mm) per 39" (1m) within this area.

13'-2

3'-6"

S1

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Refer to Floor/Wall Support Legend -

Sheet SL

Floor & Wall Support Layout

1/4" = 1'-0"

Required Unistrut Height: 9' - 6 e a

T a b l e

16'-6"

AD7 Table Floor Plate ℄

UNI

Typ.

SP

SP

CD

1'-2

2'-1" 2'-1" 1'-11" 1'-9" 1'-9" 1'-9"

11"

1'-1"

" 4

S2

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Refer to Ceiling Support Legend -

Sheet SL

System Ceiling Rails: Overhang max 5

" (150mm), distance between struts max

2'-3" 685mm) .

General Notes

* Ceiling inlet cable duct must be supported by 2 struts.

Normal cable duct (open): Overhang min 2" (50mm), max 11

" (300mm).

Hybrid cable duct (closed): Overhang min 9

" (250mm), max 1'-7

" (500mm) on the side where the strip rolls up and min 6

" (165mm), max 1'-4

" (415mm) at the other side.

Ceiling Support Layout

1/4" = 1'-0"

Required Unistrut Height: 9' - 6 e a

T a b l e

16'-6"

AD7 Table Floor Plate ℄

Motorized

Movement Line

Safety Zone

S3

THIS SHEET IS PART OF THE DOCUMENT SET LISTED ON SHEET C1 AND SHOULD NOT BE SEPARATED.

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Refer to Ceiling Support Legend -

Sheet SL

Ceiling Movement and

Safety Zones

1/4" = 1'-0"

Required Unistrut Height: 9' - 6

SD1

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

MSA SP

SP CD UNI

(19.0)

Detail - Clip Rail Cross-Section

(Not to scale)

Cover

Clip

Self-locking

Bolt, M10x40

Clip Rail

Fixing Block

[72mm]

4"

[101mm]

[151mm]

[159mm] m m

Detail - Philips Fixing Block for Philips Ceiling Rails (Clip Rails)

(Not to scale)

P1000/P1001/P5500/P5501

Unistrut (or equal)*

See S2

Sheet

See S2

Sheet

General Requirements:

1. Philips does not specify the overhead equipment support structure. Unistrut may or may not be used. If Unistrut are used, it is up to Unistrut and the structural engineer for the project to determine which of its products are appropriate for each project.

2. *P1000/P1001/P5500/P5501 Unistrut or equivalent is specified. An equivalent may be used as long as it meets Philips ceiling requirements, geometry of channel, and geometry of fixing block to be installed inside unistrut.

Finished Ceiling Requirements:

1. Finished ceiling must NOT be lower than the bottom of the

Unistrut in order to prevent damage to the finished ceiling during the installation of clip rails. Finished ceiling height to be mounted

" (6mm) to

" (13mm) above bottom of Unistrut.

Fixing Block Installation Requirements:

1. Nothing shall be attached to the Unistrut with any fastener that protrudes into the Unistrut which would interfere with positioning of the fixing block.

2. Fixing blocks for Philips ceiling rails (Clip rails) are designed to be installed in P1000/P1001/5500/5501 Unistrut.

3. The inside of the Unistrut must be clear of obstructions

(including paint).

Unistrut Requirements:

1. Unistrut elements must be rigid and comply with the ceiling structure requirements. See SN sheet, line #4 "Ceiling Support

Apparatus".

2. Welding Unistrut may warp Unistrut and deteriorate the structural integrity of the Unistrut. Consult the Structural

Engineer of Record prior to welding any Unistrut.

Fixing Block

Finished Ceiling

1 4 m m t

1 2 m m

Table ℄

Screws to be kept 3/4" or higher above the bottom of the unistrut channel

3 4 m m

[32mm]

5 8 m m

6"

[152mm]

[21mm] m m

[2mm]

[4mm]

[84mm]

[48mm]

MSA

Detail - AD7 Universal Floor Plate - Notes for Installation

(Not to scale)

1. 1.18" (30mm) thick floor plate, flush mounted with top of slab.

2. Level within 1/32" (1mm) per 39" (1m) across surface of plate.

1. Use Jam nuts M16 (h=8.0mm) or (h=9.5mm)

2. Use only 1 washer.

3. Use loctite 243 instead of a lock washer.

4. Torque value to be determined by structural engineer of record.

(15.0)

Four holes, 0.74" (19mm) dia.

Counterbored 1.57" (40mm) dia. x 0.83" (21mm) deep

1'-8

[525mm]

1'-5

[450mm]

[38mm]

[38mm] m m m m

7 8 m m

Stand m m

[150mm]

[170mm]

Floor plate mounting to the building:

In case threaded rods are used and the nut protrudes above the floor plate surface, DO NOT GRIND DOWN THE NUT, but follow the procedure stated below to ensure the nut is flush with the floor plate surface.

Offset border of floor covering (Vinyl) by 0.16"

(4mm) outwards. Follow outline of raised portion of floor plate. Do not cover holes with floor covering due to fluid protection plate mounting.

Detail - Structural Azurion 7 C20 FlexArm - 4300mm

(Not Site Specific)

AD7 Table

Floor Plate to Floor Bolt Forces:

(Tension) Tmax = 1950 lbs/bolt

(Shear) Vmax = 776 lbs/bolt

(19.0)

FlexArm

FlexArm Bearing Forces:

(Tension) Tmax = 2691 lbs/fixing block

(Shear) Vmax = 1227 lbs/fixing block

27" (685mm) maximum allowed distance between unistrut

Floor plate supplied by Philips / installed by Contractor. Counterbored holes are sized for

" (12mm) anchors per Seismic requirements.

Note: The bearing force shown for the FlexArm is the maximum instantaneous equipment bearing load that can result from abusive use of the system.

This force can occur at two locations (each fixing block) simultaneously on the same Unistrut (or equal) rail.

If seismic forces must be considered, please refer to the seismic calculation sheets provided by Philips for the specific system components.

AD7 Universal

Floor Plate

Floor Plate ℄ (Scribe Mark)

3 8 m m

14'-1

[4300mm]

1'-9

[535mm]

[109mm]

11"

[280mm]

1'-9"

[534mm]

1'-9"

[534mm]

1'-9"

[534mm]

1'-11"

[584mm]

2'-1"

[635mm]

2'-1"

[636mm]

1'-1"

[331mm]

[125mm]

[109mm]

Detail - Clip Rail Spacing

(Not to scale)

(19.0)

Detail - Ceiling Inlet Detail

(Not to scale)

2'-11

[899mm]

4"

[101mm]

4"

[101mm]

4"

[101mm]

1'-6

[480mm]

3'-6

[1070mm] m m

3 8 m m m m

TV

SD2

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

Detail - AD7 Table, Fixed/Pivot Base - Clearance Area

(Not to scale)

1'-1

[350mm]

1'-11

[588mm]

2'-4"

[711mm] m m

1'-11

[595mm]

3'-11

[1200mm] m m m m

[262mm]

Floor Plate ℄

Philips Flush

Mounted Floor Plate

Area available for additional customer and/or non-Philips equipment such as Med Gases, electrical outlets, etc.

(15.0)

3 8 m m

7 8

3 4

5 8

1'-11

Detail - Restricted Ceiling Area for Objects that Project Below Finished Ceiling

(Not site specific)

B

A

No objects that project below finished ceiling are allowed in this area (lights, smoke detectors, sprinkler heads, etc).

All objects placed 4

" (114mm) or less below ceiling are clear, but all objects placed past 4

" (114mm) require an elevation check before installation.

A

B

(19.0)

1'-1

SD3

P r o j e c t

D e t a i l s

P h i l i p s

C o n t a c t s

P r o j e c t

D r a w i n g

N u m b e r

A Z

U R

I O

F L

E X

A R

M

M

M

D a t e

D r a w

Q u o t e

O r d e r

A z u r i o n

C

F l e x A m m

1.22.19

N o n e

N o n e

T H

E

I N

F O

R M

A T

I O

N

C

K A

O

V I D

S

T O

M E

R

C

O N

V E

N I E

N C

E

A

B

E

C

O N

S T

R U

A

R C

H I T

E C

T U

R A

L

D

R A

W I N

C

O N

S T

R U

C T

I O

N

D

O C

U M

E N

T S

P h i l i p s a s s u m e s n o l i a b i l i t y n o r o f f e r s a n y w a r r a n t y f o r t h e f i t n e s s o r a d e q u a c y o f t h e p r e m i s e s o r t h e u t i l i t i e s a v a i l a b l e a t t h e p r e m i s e s i n w h i c h t h e e q u i p m e n t i s t o b e i n s t a l l e d u s e d o r s t o r e d

S t a n d a f e r e n c e

D r a w i n g

N o t

S i t e

S p e c i f i c

R o o m

K o n i n k l i j i l i p s

E l e c t r o n i c s

N

V

A l l r i g h t s r e s e r v e d

R e p r o d u c t i o n o r t i s p r o h i b i t e d w i t h o u t p r i o r w r i t t e n c o n s e n t o f t h e c o p y r i g h t h o l d e r

D r a

P r o j e c t

M a n a g e r

C o n t a c t

N u m b e r

E m a i l

P r o v i s i o n a l

CY

Bolt Forces:

(Tension) Tmax = 14 lbs/bolt

(Shear) Vmax = 25 lbs/bolt

Equipment Option

Anchor Style

(provided by Philips)

Anchor Size

(provided by Philips)

Qty.

Support Size & Material

(provided & installed by customer/contractor)

Control Room Connection

Box (CY)

A

Round Phillips Head

Self Drilling Screws

#10-16 x 1

" (38mm) L

Drywall with minimum 20 gauge

Steel backing

B

SPAX Multipurpose flat head screw

#10 x 1

" (38mm) L

Drywall with minimum 20 gauge

Steel backing

C

Toggler Snaptoggle and

(round head screws)

#BA and (#10-24 x

" (63.5mm) L)

Minimum

" (16mm) Drywall

Anchors for items that are installed/anchored by customer/contractor shall be provided by customer/contractor. Anchors for items that are installed/anchored by Philips shall be provided by Philips. If customer's engineering documents specify anchors other than those listed below, the anchors shall be provided by customer/contractor and installed by Philips. In all instances, the wall and/or floor support are the sole responsibility of the customer/contractor. The customer's architect/engineer of record shall specify wall and/or floor support sufficient for the bolt forces shown on the details.

Pre-Evaluated and -Approved Anchor Reference List for Philips Installers

Detail - CY - Wall Mount Template

(Not to scale)

Wall Raceway

Connection

Box

Connection Box wall…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .