About this file

This document is a feasibility study prepared by Reaveley Engineers for GSBS Architects, focusing on seismic upgrades for Building 525 at the University of Utah. The study evaluates three retrofit options for the West and East Ancillary Buildings, MRI Addition, and Radiology Addition, which were constructed between 1979 and 1992. The primary goal is to improve the buildings' seismic performance to meet Risk Category IV standards for Immediate Occupancy (BSE-1E) and Life Safety (BSE-2E) performance levels. The proposed retrofit strategies include concrete jacketing, carbon fiber reinforcement, interconnecting buildings, widening drift joints, and adding shear walls and buckling restrained braced frames.

The cost estimates for each option were prepared by Construction Control Corporation, with total escalated costs ranging from $704,455 to $2,037,665 as of 2023. The estimates cover structural work only and do not include patient/staff relocation costs or associated demolition, architectural, and mechanical replacements. Option 1 involves connecting the buildings, which would reduce seismic force demand but require strengthening the East Ancillary Building. Option 2 focuses on widening building separation joints and modifying moment frame connections. Option 3 proposes adding shear walls and braced frames to stiffen the buildings while maintaining existing connections. The non-structural impact varies from medium to high across options, with potential disruptions to hospital operations, ceiling systems, and floor layouts.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

675 EAST 500 SOUTH SUITE 400 · SALT LAKE CITY, UT 84102

reaveley.com

Building 525 Seismic Upgrades –

Feasibility Study

Dorian Adams, SE

Oliver Burt, PE

Austin Guter, PE

Vanessa Murphy, EIT

University of Utah

August 4, 2022

2022.0009

GSBS

375 West 200 South

Salt Lake City, Utah 84101

P: 801-521-8600

PREPARED FOR PREPARED BY

Page | i

Building 525 Seismic Upgrades

TABLE OF CONTENTS

EXECUTIVE SUMMARY 1

BACKGROUND 3

DESIGN METHODOLOGY AND PERFORMANCE CRITERIA 5

PERFORMANCE CRITERIA DEFINITIONS 5

WEST AND EAST ANCILLARY BUILDING FINDINGS 6

CONCRETE JACKET RETROFIT 6

CARBON FIBER RETROFIT 6

MRI AND RADIOLOGY ADDITION FINDINGS 7

PROPOSED REHABILITATION STRATEGIES: 7

OPTION 1 - CONNECT BUILDINGS TO EAST ANCILLARY BUILDING 7

OPTION 2 - WIDEN DRIFT JOINT 8

OPTION 3 - STRENGTHEN BUILDING WITH SHEAR WALLS/BUCKLING RESTRAINED BRACED

FRAMES 8

COST ESTIMATE 9

SCOPE 9

SCOPE 9

SUMMARY 9

APPENDIX A SCHEMATIC RETROFIT DRAWINGS

APPENDIX B COST ESTIMATE DETAILS

Page | ii

DISCLAIMER

The opinions and recommendations contained in this report are based on available drawings, on field investigations performed as a part of this project, and on analysis and calculations performed based on the information gathered. This report does not address any other portions of the structure other than the areas mentioned, nor does it provide any warranty, either expressed or implied, for any portion of the existing structure.

The recommendations presented in this report are limited by the extent and accuracy of information available to us during this evaluation. Conditions detrimental to the structure may exist which are not documented in the original drawings and were not visible or were not otherwise discovered during the field observation portion of this investigation.

This report is intended for planning purposes only and not for construction.

EXECUTIVE SUMMARY

Scope and Purpose

The purpose of this report is to evaluate the feasibility of structural rehabilitation methods to correct the structural deficiencies identified in previous reports (See UU Project #70240 for detailed reports). This study evaluates the ability of the seismic force resisting system to achieve a Risk Category IV performance level. Structural elements that do not achieve the performance levels associated with this Risk Category

IV structures are label as deficient.

This feasibility study evaluates two retrofit schemes for the East and West Building and three schemes for the MRI and Radiology additions. Each rehabilitation strategy has been developed to a conceptual level with plans, elevations, and details to inform construction cost estimates.

Existing Building Description

Drawings Medical Center Expansion by Gustavson, Nelson, and Panushka (GNP), January 1978, architectural and structural drawings

MRI Addition University of Utah by HDR, October 1985, architectural and structural drawings

University of Utah Radiology Addition by Gerald Nichols & Associates Architects, October 1992, architectural and structural drawings

Construction Years 1978, 1985, 1992

Performance Objective BSE-1E Immediate Occupancy, BSE-2E Life Safety

Risk Category per 2018 IBC IV

Gravity Framing – Roof Metal deck spanning between steel beams, supported by steel columns

Gravity Framing – Floors Concrete over metal deck bearing on steel wide-flange beams and columns

Lateral Resistance West Building and East Ancillary Building

Dual System: Reinforced Concrete Shear wall and Steel Moment Frames

MRI and Radiology Addition – Steel Moment Frame

Foundations West Building and East Ancillary Building – Shallow Conventional Reinforced Concrete

MRI and Radiology Addition – Spread footings and drilled piers/caissons

Page | 2

East and West Building – Concrete Perimeter Frame

Retrofit Options Description Estimate of Probable Cost*

#1 – Concrete Jacketing

See Appendix A

Sheets SF101 to SF301

Increase seismic performance of concrete wall piers and spandrel beams by adding shotcrete to the inside/exterior face of existing concrete at select locations.

$1,573,104*

#2 – Carbon Fiber

See Appendix A

Sheets SF101 to SF301

Increase seismic performance of concrete wall piers and spandrel beams by adding carbon fiber wraps to the existing concrete at select locations.

$3,393,621*

MRI and Radiology Buildings

Retrofit Options Description Estimate of Probable Cost*

#1 – Connect Buildings

See Appendix A

Sheets SF310 to SF315

Interconnect the MRI and Radiology buildings to the East building to eliminate deficient seismic drift joint size.

$760,289*

#2 – Widen Drift Joint

See Appendix A

Sheets SF310 to SF315

Widen drift joints to eliminate the potential of adjacent buildings colliding in seismic event.

$704,455*

#3 – Reinforce Buildings

See Appendix A

Sheets SF310 to SF315

Addition of concrete shearwalls/buckling restrained braced frames at select locations to reinforce and stiffen the existing buildings.

$2,037,665*

*Cost estimate was performed by Construction Control Corporation. See Appendix B for a detailed breakdown of estimated costs.

Page | 3

BACKGROUND

Reaveley Engineers was engaged by GSBS Architects to perform a seismic evaluation of Building 525 on the University of Utah campus. The results of that evaluation are documented in a report dated

February 3, 2020 (University of Utah Project Number 70240). The current effort is to perform a feasibility study to identify specific seismic retrofit options that address the deficiencies discovered in the prior evaluation. This report presents those conceptual retrofit options and provides an estimate of probable cost for each option considering only structural elements in the cost model.

Prior analysis found several structural elements do not meet the desired seismic performance objective.

Building deficiencies are listed in the table below. Structural elements not achieving the desired performance levels are deficient. The figure below shows the four areas of Building 525 that were included in the previous evaluation.

Figure 1 – Building Names and Construction Dates

West Building

East Ancillary

Building

Radiology Addition

MRI Addition

Page | 4

Structural Deficiencies

Deficiency Location Description Result

Concrete Spandrel

Beams

(51 Locations)

East & West Building Shear Failure. Does not meet

Life Safety performance deficient by 30%

Severe Cracking

Concrete Wall Piers

(18 Locations)

East & West Building Shear Failure. Does not meet

Life-Safety performance deficient by 33%-77%

Severe Cracking

Moment Frame

Connections

MRI and Radiology

Additions

Brittle Pre-Northridge connection. Panel Zone

Failure

Brittle failure and loss of strength of beam connections.

Building Separation

Joint Dimension

East, MRI, and Radiology Joint dimension between these buildings is too small

Pounding between buildings causing localized damage.

Page | 5

DESIGN METHODOLOGY AND PERFORMANCE CRITERIA

Conceptual seismic upgrade scenarios were designed per ASCE 41-17 Seismic Evaluation and Retrofit of

Existing Buildings following the Nonlinear Static Analysis procedure, also known as a pushover analysis.

Building 525 is a Risk Category IV building according to 2018 IBC and the performance objectives corresponding to the with Risk Category IV structures is shown in the following table.

Hazard Level Performance Level Sxs Sx1

BSE-1E Immediate Occupancy 0.403g 0.213g

BSE-2E Life Safety 1.019g 0.625g

Table 1 – Performance Objective used in the Design of Upgrade Scenarios

The purpose of this dual performance objective is to ensure the building will continue to support the community’s needs in the event of small to moderate earthquake and will also protect life safety during and after large earthquake.

Safety factors were used in the evaluation in accordance with the provisions of ASCE 41. Safety factors vary by element type and failure mechanism. Brittle failure mechanisms have higher safety factors than ductile yielding mechanisms. A knowledge factor of 1.0 has been used for this analysis.

PERFORMANCE CRITERIA DEFINITIONS

Immediate Occupancy

The structure remains safe to occupy and essentially retains its pre-earthquake strength and stiffness but may not function, negligible structural damage and minor non-structural damage, limited interruption to building operations, losses < 15% of value.

Life Safety

The structure has significant structural damage to components but retains a margin against the onset of partial or total collapse, some injuries may occur, extensive non-structural damage, building not safe to occupy until repaired, losses < 30% of value.

Page | 6

WEST AND EAST ANCILLARY BUILDING FINDINGS

Previous analysis of the West and East Ancillary buildings found some deficient exterior wall piers and concrete beams. Part of this evaluation included limited material testing and field verification. This was done to verify strengths of construction materials and to verify building modifications (new openings, infilled openings, etc.) that have occurred over the life of the building.

Two rehabilitation approaches have been evaluated to address deficient wall piers and coupling beams.

Deficient concrete members are proposed to be reinforced with either a new reinforced concrete jacket or a carbon fiber overlay. The retrofit aims to promote flexural hinging of concrete elements, in lieu of shear hinging in concrete elements.

Flexural hinging of concrete is a more ductile failure mechanism than shear hinging. The increase in ductility allows structural elements to deform and absorb more energy before breaking and losing strength. The retrofit measures below aim to achieve flexural hinging, improve ductility, and achieve overall building performance objectives.

CONCRETE JACKET RETROFIT

The concrete jacket retrofit involves placing a minimum of 6” of new reinforced concrete against deficient concrete walls piers and coupling beams. Prior to placing the new reinforced concrete, the existing concrete surface will have to be intetionally roughed and will have epoxy dowels installed along the length of the affected surface to promote good bond between the two layers of concrete.

This concrete can either be placed on the interior or exterior side of a deficient wall or beam. Work on the exterior of the building may be advantageous to the University to reduce distruptions to hospital functions. Work on the interior of the building will likely disrupt hospital operations in the area (dust barriers, temporary room shutdown etc.) Exterior application of concrete introduces a new aesthetic to the building such as intermittent thickened sections and troweled shotcrete finish that will be addressed from an architectural perspective in a future phase of the study.

The cost estimate in this report only considers placing concrete on the interior side of the wall. There will be some savings to apply the concrete to the exterior side of the wall due to less cost to address interior construction; however, those savings will be offset to a large degree by cost for scaffolding and costs to to enhance the exterior wall aesthetic.

CARBON FIBER RETROFIT

The Carbon fiber retrofit of deficient wall piers and coupling beams includes a significant amount of surface preparation prior to the application of carbon fiber strips around existing concrete walls and beams. Surface preparation is time extensive and must follow manufacturer recommendations to ensure proper bond between the carbon fiber and the concrete substrate.

Reaveley has been in contact with carbon fiber contractors to coordinate and assist in the retrofit design.

Typical retrofit schemes involve surface preparation, placing bonding agent, placing layers, (1) - (3) layers, of carbon fiber reinforcing over the length of the affected wall pier or beam in 2’-0” wide strips typically.

Page | 7

MRI AND RADIOLOGY ADDITION FINDINGS

Previous analysis found the following deficiencies of the MRI and Radiology buildings. See previous report for more detailed description of deficiencies.

1. Existing Moment Frame Panel Zones

a. Adequate to meet Life Safety Performance Objectives

b. Do not meet Immediate Occupancy Performance Objectives

2. Moment Frame Connections are Pre-Northridge type connections

a. Beams are not detailed to ensure the beam will yield prior to beam-column connection failure. Beams are susceptible to cracking prior to achieving design deformation.

3. Expansion Joint

a. The building separation joints between East Building, MRI Building, and Radiology

Building is smaller than the expected building movement in a major seismic event.

Pounding at the building interface can cause local damage and potential instability.

PROPOSED REHABILITATION STRATEGIES:

OPTION 1 - CONNECT BUILDINGS TO EAST ANCILLARY BUILDING

This proposed solution assumes the East Ancillary Building is strengthened to resist the added loads imparted by the interconnection of buildings. Rigidly interconnecting the MRI, Radiology, and East

Ancillary buildings together would require the following:

1. Connecting slab interfaces together with steel plates.

2. Interconnecting steel beams between buildings

3. Adding braced frames and/or concrete shearwalls in the MRI and Radiology Buildings

Pros:

1. Interconnection between buildings would reduce the seismic force demand placed on MRI and

Radiology buildings structural members. New forces delivered to the East Ancillary building would require additional strengthening of the East Ancillary building.

2. Existing moment frame connections are not required to be modified or strengthened.

Cons:

1. Increased strengthening of East Ancillary building would be required.

2. Interconnection of slabs could be disruptive along building interface, each side of existing joint.

Page | 8

OPTION 2 - WIDEN DRIFT JOINT

This proposed solution increases the joint dimension and modifies existing structural moment frames to achieve the desired performance objectives. This solution requires the following:

1. Increase joint between floor slabs by cutting back existing floor slab on the Radiology building at level 2. Not required at MRI Building.

2. Increase joint between roof of Radiology and MRI buildings by cutting back roof deck.

3. Repair column and beam connections moment frame connections

1. No major structural work at slab edges and building interfaces.

2. No additional strengthening of the East Ancillary building.

3. No addition of braced frames or concrete shearwalls

1. Work is required at all columns and may be intrusive and interrupt operations

2. Interconnection of slabs could be disruptive along building interface, each side of existing joint.

OPTION 3 - STRENGTHEN BUILDING WITH SHEAR WALLS/BUCKLING RESTRAINED BRACED FRAMES

This proposed method avoids modifications to existing beam-columns joints and avoids modifications to the joint between buildings by adding new structural elements to stiffen the existing building. This proposed solution requires the following:

1. Addition of new braced frames in the MRI

2. Addition of new concrete shear walls and/or Braced Frames in the Radiology building

3. Strengthening of existing foundations

1. No work along slab edges and building interfaces.

2. No modifications required at existing beam-column joints (Except at new frame locations)

3. No modification to East Ancillary building

4. Most of work is located at exterior perimeter of MRI and Radiology buildings

1. Addition of new braces or shear walls are intrusive and could interrupt operations

2. Foundation strengthening is required and could be intrusive and time extensive.

3. New shearwalls will likely interfere with current floor layouts

Page | 9

COST ESTIMATE

SCOPE

Construction Control Corporation developed the following estimates of probable cost. Details of the estimates are included in Appendix B.

SCOPE

Structural elements are included in the cost and impact to non-structural elements is not included. For instance, removal and replacement of ceilings, interior, and exterior finishes to install concrete walls is excluded, but the cost of the concrete, formwork and reinforcement is included.

SUMMARY

East and West Building

Retrofit Options Estimate of Probable Cost Non-Structural Impact

#1 – Concrete Jacketing $1,573,104 High (Medium if exterior installation)

#2 – Carbon Fiber $3,393,621 High

MRI and Radiology Buildings

Retrofit Options Estimate of Probable Cost Non-Structural Impact

#1 – Connect Buildings $760,289 Medium

#2 – Widen Drift Joint $704,455 Medium

#3 – Reinforce Buildings $2,037,665 High

Non-structural Impact

All seismic retrofit options will disrupt the use of the space where the work is being performed and will require the removal and replacement of non-structural elements. The amount of disruption depends on factors such as materials (placing concrete or installing steel elements), construction methods (welding, cutting, drilling, grinding), the size of the area required to perform the work, noise, and the potential for dust/debris. In each case, University policies will be followed for containment and cleanliness. The levels of non-structural impact are intended to provide general descriptions for comparison among the options.

Low Impact: Structural elements can be installed with isolated impact on non-structural systems (may require phasing to reduce impact). Room size areas are disrupted.

Medium Impact: Interior or exterior non-structural elements must be removed to install structural elements

(all work performed from either interior or exterior). Some structural elements require removal of exterior veneer. Larger areas are disrupted compared to “Low Impact”.

High Impact: Non-structural elements at interior and exterior are required to be removed to install structural elements. Larger areas are disrupted compared to “Medium Impact”.

APPENDIX A

SCHEMATIC RETROFIT DRAWINGS

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:2

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

3D ISOMETRIC

VIEWS

SF101

SCALE:

NORTH EAST ISOMETRIC

SCALE:

SOUTH ISOMETRIC

SF207

A1

SF205

A1 @ EAST

BLDG WALL

SF203

A1

SF202

A1

SF205

A1

SF204

A1

SF204

A1 @ WEST

BLDG WALL

WEST BUILDING

EAST - SOUTH BUILDING RADIOLOGY

BUILDING

ADDITION

MRI ADDITION BUILDING

SF21

1A2

SF21

1A2

SF211

A3

SF210

A3

SF210

A1

SF201

A1

SF209

A1

SF202

A1

SF201

A1

SF203

A1

SF208

A1

SF208

A1

SF207

A1

SF209

A1

SF210

A1

SF211

A3

SF210

A3

@ EAST

BLDG WALL

SF206

A1

@ EAST

BLDG WALL

SF206

A1

@ EAST

BLDG WALL

@ EAST

BLDG WALL

EAST - NORTH BUILDING

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:3

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

OVERALL PLAN

SF102

NO SCALESF102

A1 OVERALL PLAN

LEVEL A

0"

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

ROOF

99' - 9"

PENTHOUSE

114' - 6"

234 1.W681113 9 7 512 10

16" Conc

16" Conc

16" Conc

38" Conc

10" Conc

16" Conc

36" Conc

12" Conc

18" Conc

12" Conc

12" Conc

18" Conc

12" Conc

18" Conc

12" Conc

18" Conc

6" Conc

SF301

MRI FOOTING LEVEL

-14' - 0"

SF301

SF301

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:3

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

WEST BLDG - WEST

SHEARWALL

ELEVATIONS

SF201NO SCALESF201

A1 WEST BLDG - WEST SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

ROOF

99' - 9"

PENTHOUSE

114' - 6"

L M NKJHGF.WE.W

16" Conc

16" Conc 38" Conc

14" Conc

48" Conc

14" Conc

20.5" Conc

14" Conc

18" Conc

18" Conc

18" Conc

8" Conc 10" Conc 12" Conc 8" Conc 8" Conc

8" Conc8" Conc12" Conc

12" Conc

12" Conc 10" Conc

10" Conc

18" Conc

18" Conc

18" Conc

18" Conc18" Conc

6" Conc 6" Conc

18" Conc 18" Conc

36" Conc

12" Conc 12" Conc

36" Conc

10" Conc

14" Conc14" Conc16" Conc

16" Conc

10" Conc

16" Conc

38" Conc

14" Conc14" Conc

12" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:3

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

WEST BLDG -

NORTH SHEARWALL

ELEVATIONS

SF202

NO SCALESF202

A1 WEST BLDG - NORTH SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

ROOF

99' - 9"

LMN K J H G F.WF.E

16" Conc14" Conc

20.5" Conc

14" Conc

36" Conc

12" Conc

18" Conc

18" Conc

12" Conc

18" Conc

10" Conc12" Conc

8" Conc

8" Conc 10" Conc

10" Conc 12" Conc

10" Conc

18" Conc 18" Conc

8" Conc 8" Conc

8" Conc

18" Conc

18" Conc

10" Conc

10" Conc

18" Conc

18" Conc

12" Conc

36" Conc

14" Conc

10" Conc

14" Conc

38" Conc

14" Conc16" Conc

14" Conc

36" Conc 36" Conc

18" Conc

18" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:3

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

WEST BLDG - SOUTH

SHEARWALL

ELEVATIONS

SF203NO SCALESF203

A1 WEST BLDG - SOUTH SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

ROOF

99' - 9"

PENTHOUSE

114' - 6"

2 3 41.W 6 8 11 13 149 1210

28" Conc

14" Concrete

14" Conc

14" Conc

12" Conc

28" Conc

14" Conc

14" Conc

14" Conc

12" Conc

12" Conc

12" Conc

12" Conc

10" Conc

10" Conc

10" Conc

10" Conc

8" Conc

18" Conc

8" Conc

18" Conc

6" Conc 6" Conc

18" Conc

8" Conc

18" Conc

8" Conc

10" Conc

10" Conc

10" Conc

10" Conc

12" Conc

12" Conc

14" Conc

34" Conc 18" Conc

12" Conc

20" Conc

14" Conc

18" Conc

10" Conc

10" Conc

18" Conc

8" Conc

18" Conc

8" Conc

18" Conc

8" Conc

18" Conc

18" Conc

34" Conc

SF301

MRI FOOTING LEVEL

-14' - 0"

SF301

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

WEST BLDG - EAST

SHEARWALL

ELEVATIONS

SF204

NO SCALESF204

A1 WEST BLDG - EAST SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

234 1.W689 7 5 1.E10

12" Conc 12" Conc

10" Conc

8" Conc

10" Conc

10" Conc

10" Conc

8" Conc

8" Conc

14" Conc

8" Conc8" Conc

8" Conc

10" Conc

14" Conc

10" Conc

SF301

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

EAST BLDG - WEST

SHEARWALL

ELEVATIONS

SF205

NO SCALESF205

A1 EAST BLDG - WEST SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

E.WA B C D EC.A

10" Conc

10" Conc

8" Conc

8" Conc

8" Conc

18" Conc 18" Conc

6" Conc

8" Conc

14" Conc 10" Conc

38" Conc

12" Conc

36" Conc

10" Conc

18" Conc

8" Conc

18" Conc

8" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

EAST BLDG - NORTH

SHEARWALL

ELEVATIONS

SF206

NO SCALESF206

A1 EAST BLDG - NORTH SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

2 3 4 6 8 91.E 108.A6.1.A6.A5.1.A5.A4.1.A 7.1.A

12" Conc

38" Conc

12" Conc

10" Conc

12" Conc

36" Conc

12" Conc10" Conc12" Conc10" Conc

18" Conc

36" Conc

12" Conc

12" Conc

8" Conc

8" Conc8" Conc

18" Conc

8" Conc

8" Conc

10" Conc

MRI FOOTING LEVEL

-14' - 0"

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

EAST BLDG - EAST

SHEARWALL

ELEVATIONS

SF207

NO SCALESF207

A1 EAST BLDG - EAST EXISTING SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

G F.W ABCDEF.E

12" Conc

38" Conc

10" Conc

12" Conc

36" Conc

10" Conc

18" Conc

8" Conc

18" Conc

8" Conc

18" Conc

6" Conc 8" Conc

18" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

MK

AG

EAST BLDG - SOUTH

SHEARWALL

ELEVATIONS

SF208

NO SCALESF208

A1 EAST BLDG - SOUTH SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

ABCD C.A

10" Conc

10" Conc

8" Conc

8" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

EXISTING

SHEARWALL

ELEVATION

SF209

NO SCALESF209

A1 EXISTING SHEARWALL ELEVATIONS

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

LEVEL 6

85' - 6"

11 13 14 151210

14" Conc

8" Conc

10" Conc

36" Conc

8" Conc

18" Conc

8" Conc

18" Conc

8" Conc

6" Conc

18" Conc

LEVEL A

0"

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

LEVEL 5

71' - 3"

A BC.A

14" Conc

38" Conc

10" Conc

36" Conc

8" Conc

18" Conc

8" Conc

18" Conc

8" Conc

18" Conc

6" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

EXISTING

SHEARWALL

ELEVATION

SF210

NO SCALESF210

A1 EXISTING SHEARWALL ELEVATION

NO SCALESF210

A3 EXISTING SHEARWALL ELEVATION

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

14" Conc

10" Conc

38" Conc

36" Conc

8" Conc

18" Conc

8" Conc

18" Conc

6" Conc

LEVEL A

0"

LEVEL 1

14' - 3"

LEVEL 2

28' - 6"

LEVEL 3

42' - 9"

LEVEL 4

57' - 0"

1113 912 10

14" Conc

38" Conc

10" Conc

36" Conc

8" Conc

18" Conc

8" Conc

18" Conc

6" Conc

1. DENOTES CONCRETE WALL PIER RETROFIT.

2. DENOTES CONCRETE WALL SPANDREL RETROFIT.

CONCRETE RETROFIT NOTES

CONCRETE RETROFIT - 6" REINFORCED SHOTCRETE WALL TO

EXISTING CONCRETE WALL PIER/SPANDREL

CARBON FIBER REINFORCEMENT RETROFIT - TYPICALLY (2) LAYERS

OF CARBON FIBER WRAP AROUND EXISTING CONCRETE WALL

PIER/SPANDREL

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

EXISTING

SHEARWALL

ELEVATION

SF211

NO SCALESF211

A2 EXISTING SHEARWALL ELEVATION

NO SCALESF211

A3 EXISTING SHEARWALL ELEVATION

EAST BUILDING, ONE SIDED CONSTRUCTION MIGHT BE THE ONLY FEASIBLE MEANS

E X

P A

N S

IO

N

J O

IN

T

EXISTING REINFORCED CONCRETE WALL

#5 @ 12" O.C. HORITZONTALLY

INTENTIONALLY ROUGH EXISTING

SURFACE TO 1/4" AMPLITUDE

(5) #4 VERTICAL

N

E-C12x20.7

INTENTIONALLY

ROUGHEN EXISTING

CONCRETE TO 1/4" AMPLITUDE

3/4"Ø HSA @ 12"o.c.

6" 1' - 6"

#4 STIRRUPS @ 12"o.c

(4) #4 CONT

EXISTING 4.3/4" CONC OVER METAL DECK

#3 DOWELS @ 12"oc VERTICALLY

AND HORIZONTALLY

IN SELECT LOCATIONS,

CONTINUOUS (E) TOP AND BOT

BEAM REINFORCING TO BE

CUT

STRIP TYP

2' - 0" WIDE

(2) LAYERS OF TYFO SCH-41

IN U-WRAP CONFIGURATION

24" WIDE STRIPS @ 24"o.c.

(FULL COVERAGE)

SF301

EXISTING CONCRETE SPANDREL BEAM

(2) LAYERS OF TYFO SCH-41

IN U-WRAP CONFIGURATION

24" WIDE STRIPS @ 24"o.c.

(FULL COVERAGE)

EXISTING CONCRETE SPANDREL BEAM

E-C12x20.7

EXISTING 4.3/4" CONC OVER METAL DECK

PREPARE SURFACES IN ACCORDANCE WITH

CARBON FIBER MANURFACTURER REC'S.

(ROUND CONCRETE CORNERS AS REQ'D

CLEAN SURFACE AS REQUIRED)

LEVEL 3

42' - 9"

SF301

2'

APPLY ONE LAYER OF THE TYFO SCH-41

SYSTEM IN THE HORIZONTAL

CONFIGURATION. 24'' WIDE STRIPS

SPACED AT 24'' O.C. (FULL COVERAGE).

EXTEND REINFORCEMENT AROUND THE

WALL PIER AND PROVIDE A MINIMUM 12''

OVERLAP

T H

IC

K

N E

S S

V A

R

IE

S

EXISTING CONCRETE WALL PIER

OVERLAP TYP

1' - 0"

APPLY ONE LAYER OF THE TYFO SCH-41

SYSTEM IN THE HORIZONTAL

CONFIGURATION. 24'' WIDE STRIPS

SPACED AT 24'' O.C. (FULL COVERAGE).

EXTEND REINFORCEMENT AROUND THE

WALL PIER AND PROVIDE A MINIMUM 12''

OVERLAP

WALL PIER LENGTH VARIES

PREPARE SURFACES IN ACCORDANCE WITH

CARBON FIBER MANURFACTURER REC'S.

(ROUND CONCRETE CORNERS AS REQ'D

CLEAN SURFACE AS REQUIRED)

EXISTING STEEL CHANNEL

EXISTING STEEL COLUMN

6"

EXSITING CONCRETE

COLUMN REINFORCING

DBA TO MATCH HORIZONTAL BEAM REINFORCING

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ag ut er H

F K

H P

.rv t

5/

/2

3:

:4

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

CONCRETE

RETROFIT

SF301

SCALE:SF301 1" = 1'-0"

1 CONCRETE - TYPICAL WALL PIER REINFORCEMENT

SCALE:SF301 1" = 1'-0"

2 CONCRETE - TYPICAL SPANDREL BEAM REINFORCEMENT DETAIL

SCALE:SF301 1/2" = 1'-0"

4 CARBON FIBER - TYPICAL SPANDREL BEAM REINFORCEMENT

SCALE:SF301 1" = 1'-0"

5 CARBON FIBER - TYPICAL SPANDREL BEAM REINFORCEMENT

SCALE:SF301 1/2" = 1'-0"

3 CARBON FIBER - TYPICAL WALL PIER REINFORCEMENT

SCALE:SF301 1" = 1'-0"

6 CARBON FIBER - TYPICAL WALL PIER REINFORCEMENT SECTION

SCALE:SF301 1" = 1'-0"

7 CONCRETE - EXISTING COLUMN/BEAM INTERSECTION

A865

A565

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1608A

1570E

16311641 1637

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

F

E

D

C

N E

W B

R B

B R

A C

E D

F R

A M

E

SF310D

BF1

B

SF310A

A

SF310A

A

B

C

D

E

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO UU 525 SLAB

ADD 2 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO RADIOLOGY ADDITION ADD BRBF

J

SF310A

G

SF310A

H

SF310A

TYP

G

SF310A

TYP

N E

W B

R B

B R

A C

E D

F R

A M

E

SF310D

BF1

LEGEND

ADD NEW STEEL

BEAM COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

NEW COLLECTOR

CONNECTION SEE

DEATIL /SF310AH

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

6/ 1/

:1

3:

P M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

MRI OPTION 1

SF310

SCALE:SF310 1/8" = 1'-0"

A1 MRI FLOOR FRAMING PLAN

SCALE:SF310 1/8" = 1'-0"

A3 MRI ROOF FRAMING PLAN

OPTION 1:

INTERCONNECT EXISTING MRI BUILDING, RADIOLOGY BUILDING, AND EAST ANCILLARY BUILDINGS

TOGETHER. NEW STEEL BRACED FRAMES MAY BE REQUIRED.

PROS:

1. TAKE ADVANTACE OF EAST ANCILLARY BUILDING STRENGTHENING. ADDITIONAL STRENGTHENING OF EAST BUILDING WOULD BE REQUIRED, BUT WOULD ELIMINATE THE NEED TO MODIFY EXISTING BEAM-

COLUMN CONNECTIONS.

2. NO FOUNDATION STRENGTHENING

3. NEW STRUCTURAL BRACES WOULD BE LOCATED AT EXTERIOR PERIMETER OF THE BUILDING

CONS:

1. REQUIRE ADDITIONAL STRENGTHENING OF BLDG 525. FORCE INCREASE OF APPROXIMATELY 20%.

2. INTERCONNECTION OF FLOOR SLAB, ROOF DECK, AND COLLECTOR BEAMS IS POTENTIALLY DISRUPTIVE

ON EACH SIDE OF BUILDING JOINT.

1881 1873

189118951899

18531897

28222807 2819

28152813 2829

2845A

2845B

2837B

2837C

2837D

2849B

2849A

A

2849C

2849D

A

C

A

SF207

A1

8 7.1 44.155.166.17

F

E

D

C

ADD BRBF OR SHEAR

WALL IN NORTH SOUTH

DIRECTION

CONTINUOUS OR UNIFORM

STEEL ANGLE CONNECTION

TO UU 525 SLAB

J

SF310A

NEW STEEL BEAM

NEW STEEL BEAM BLW

G

SF310A

SIM @ L3 &

ROOF ONLY

H

SF310A

TYP

SF310D

BF1

SF207

A1

8 7.1 44.155.166.17

F

E

D

C

ADD BRBF IN NORTH

SOUTH DIRECTION

CONTINUOUS OR UNIFORM

STEEL ANGLE CONNECTION

TO UU 525 SLAB

H

SF310A

TYP G

SF310A

TYP

J

SF310A

NEW STEEL BEAM

NEW STEEL BEAM BLW

SF310D

BF1

LEGEND

ADD NEW STEEL

BEAM COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

NEW COLLECTOR

CONNECTION SEE

DEATIL /SF310AH

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

6/ 1/

:1

3:

P M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

RADIOLOGY OPTION

SF313

SCALE:SF313 1/8" = 1'-0"

C2 RADIOLOGY FLOOR FRAMING PLAN

SCALE:SF313 1/8" = 1'-0"

A2 RADIOLOGY ROOF FRAMING PLAN

OPTION 1:

INTERCONNECT EXISTING MRI BUILDING, RADIOLOGY BUILDING, AND EAST

ANCILLARY BUILDINGS TOGETHER. NEW STEEL BRACED FRAMES MAY BE

REQUIRED.

PROS:

1. TAKE ADVANTACE OF EAST ANCILLARY BUILDING STRENGTHENING.

ADDITIONAL STRENGTHENING OF EAST BUILDING WOULD BE REQUIRED, BUT

WOULD ELIMINATE THE NEED TO MODIFY EXISTING BEAM-COLUMN

CONNECTIONS.

2. NO FOUNDATION STRENGTHENING

3. NEW STRUCTURAL BRACES WOULD BE LOCATED AT EXTERIOR PERIMETER

OF THE BUILDING

CONS:

1. REQUIRE ADDITIONAL STRENGTHENING OF BLDG 525. FORCE INCREASE OF

APPROXIMATELY 20%.

2. INTERCONNECTION OF FLOOR SLAB, ROOF DECK, AND COLLECTOR BEAMS

IS POTENTIALLY DISRUPTIVE ON EACH SIDE OF BUILDING JOINT.

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1570E

16311637

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

SF208

A1

F

E

D

C

A

B

C

D

E

ADDITIONAL SUPPORT BEAM NEEDED

TO ADD COLLECTOR CONNECTION

ADD 3 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO BUILDING UU 525

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO UU 525 SLAB

ADD 2 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO RADIOLOGY ADDITION

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO RADIOLOGY SLAB IF

RADIOLOGY IS TO BE

CONNECTED TO UU 525

ADD BRBF IN EAST/WEST

DIRECTION

LEGEND

COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

3/

/2

2:

:5

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

MRI OPTION 1

SF310

SCALE:SF310 1/8" = 1'-0"

A1 MRI FLOOR FRAMING PLAN

SCALE:SF310 1/8" = 1'-0"

A3 MRI ROOF FRAMING PLAN

oburt Rectangle oburt Text Box A oburt Text Box oburt Text Box

OPTION 1 DETAILS

oburt Snapshot oburt Line oburt Polygon oburt PolyLine oburt Text Box oburt Polygon oburt Ellipse oburt Arrow oburt Polygon oburt Line oburt Polygon oburt Polygon oburt PolyLine oburt Text Box oburt Text Box oburt Polygon oburt Text Box oburt Text Box oburt Arrow oburt Arrow oburt FreeText E oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Polygon oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt Snapshot oburt Polygon oburt Polygon oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt 1"Ø Nut End oburt PolyLine oburt Text Box oburt Polygon oburt Line oburt Polygon oburt Arrow oburt Arrow oburt Snapshot oburt FreeText F oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Ellipse oburt Arrow oburt Polygon oburt PolyLine oburt Text Box oburt Text Box oburt Polygon oburt Text Box oburt Text Box oburt Snapshot oburt Rectangle oburt Snapshot oburt FreeText oburt Building Section - Up oburt FreeText

DET

oburt Polygon oburt Line oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Line oburt Polygon oburt Polygon oburt Polygon oburt Polygon oburt FreeText A oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line oburt PolyLine oburt Line oburt Rectangle oburt Rectangle oburt W12x19 oburt Rectangle oburt Rectangle oburt Rectangle oburt Line oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt W3 - 6.1/2" Total Perp oburt FreeText B oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line oburt PolyLine oburt FreeText D oburt Building Section - Up oburt FreeText

DET

oburt Polygon oburt Line oburt FreeText C oburt Building Section - Up oburt FreeText

DET

oburt Polygon oburt Line oburt Ellipse oburt Line oburt FreeText F oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Callout CHIP AND REMOVE TOP CONCRETE COVER TO EXPOSE REINFORCEMENT PRIOR TO INSTALLATION OF STEEL EMBED PLATE AND EPOXY ANCHORS.

oburt Callout

NEW BRB 2.0 IN2 STEEL CORE. WELDED CONNECTIONS.

oburt Line oburt Polygon oburt Polygon oburt PolyLine oburt Text Box oburt Text Box oburt Polygon oburt Text Box oburt Text Box oburt Arrow oburt Arrow oburt Text Box

TYP

oburt Rectangle oburt Epoxy 7/8"Ø x 10.5" oburt Epoxy 7/8"Ø x 10.5" oburt 7/8"Ø Nut Side oburt 7/8"Ø Nut Side oburt Epoxy 7/8"Ø x 10.5" oburt Epoxy 7/8"Ø x 10.5" oburt 7/8"Ø Nut Side oburt 7/8"Ø Nut Side oburt Callout

EXIST STEEL COLLUMN

oburt Callout

EXIST STEEL BEAM

oburt Ellipse oburt Line oburt FreeText E oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Callout

EXISTING CONCRETE PIER

oburt Callout

EXISTING CONCRETE GRADE BEAM

oburt Snapshot oburt Snapshot oburt FreeText B oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Text Box

EXISTING CONCRETE GRADE BEAM

oburt Rectangle oburt Snapshot oburt FreeText D oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Rectangle oburt Snapshot oburt FreeText C oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Rectangle oburt Snapshot oburt Callout

EXISTING CONCRETE WALL

oburt Callout

EXISTING STEEL BEAM

oburt Callout NEW WT12x47x6'-0" LONG oburt Callout

3/4" STEEL PLATE W/ 4-3/4" DIAM EPOXY ANCHORS W/ 12" MIN EMBED

oburt Arrow oburt Line oburt Polygon oburt Polygon oburt PolyLine oburt Text Box 5/16 oburt Text Box 5/16 oburt Polygon oburt Text Box oburt Text Box oburt Arrow oburt FreeText K oburt Building Section - Up oburt FreeText

DET

oburt Polygon oburt Polygon oburt Line oburt FreeText H oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Rectangle oburt FreeText J oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Snapshot oburt Rectangle oburt Rectangle oburt Rectangle oburt Polygon oburt Rectangle oburt Rectangle oburt Rectangle oburt Rectangle oburt Line oburt Polygon oburt Polygon oburt PolyLine oburt Text Box 5/16 oburt Text Box 5/16 oburt Polygon oburt Text Box oburt Text Box oburt Arrow oburt Line oburt Polygon oburt Polygon oburt PolyLine oburt Text Box 5/16 oburt Text Box 5/16 oburt Polygon oburt Text Box oburt Text Box oburt Arrow oburt Callout NEW STEEL COLLECTOR BEAM WT7x45 oburt Dimension 2'-0" oburt Callout NEW STEEL ANGLE: 2L5x5x1/2x4'-0" LONG oburt Line oburt Polygon oburt PolyLine oburt Text Box 5/16 oburt Polygon oburt Ellipse oburt Arrow

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1570E

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

F

E

D

C

EXISTING 1" BUILDING

SEPARATION JOINT

TO REMAIN AS IS

O

SF310B

TYP

N

SF310B

TYP

A

B

C

D

E

CUT BACK SLAB EDGE 6-8"

TO INCREASE DRIFT JOINT

BETWEEN MRI ADDITION

AND UU 525

CUT BACK SLAB EDGE UP

TO 6-8" TO INCREASE DRIFT

JOINT BETWEEN MRI

ADDITION AND RADIOLOGY

ADDITION

ALL MOMENT FRAME COLUMNS WILL

NEED 8' - 0" x 8" - 0" ACCESS FOR

RETROFIT OF BEAM/COLUMN JOINT

EXISTING 1" BUILDING

SEPARATION JOINT

TO REMAIN AS IS

CONNECTIONS

REQUIRING

MODIFICATION, TYP

NEW MOMENT FRAME

BRACING, TYP

O

SF310B

TYP

N

SF310B

TYP

M

SF310B

SF310B

L

LEGEND

CUT BACK SLAB EDGE,

SEE DETAIL

ACCESS FOR

BEAM/COLUMN JOINT

MODIFICATION SEE

DETAIL

MOMENT FRAME

CONNECTION

MODIFICATION

REQUIRED

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

6/ 1/

:1

3:

P M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

MRI OPTION 2

SF311SCALE:SF311 1/8" = 1'-0"

A1 MRI FLOOR FRAMING PLAN

SCALE:SF311 1/8" = 1'-0"

A3 MRI ROOF FRAMING PLAN

OPTION 2:

WIDEN BUILDING SEPARATION JOINT. MODIFY EXISTING MOMENT FRAME

CONNECTIONS

ROOF DECK EDGE TO BE CUT BACK 8" - 1'-2" TO PROVIDE ADQUATE JOINT

DIMENSION AND PREVENT BUILDINGS FROM POUNDING IN MAJOR SEISMIC

EVENT.

EXISTING MOMENT FRAME CONNECTIONS IN MRI AND RADIOLOGY BUILDINGS

WOULD REQUIRE MODIFICATION TO MEET CURRENT CODE REQUIREMENTS.

PROS:

1. WORK IS LIMITED TO ROOF FRAMING ONLY. MODIFYING JOINT BETWEEN

BUILDINGS AND MOMENT FRAME BEAM TO COLUMN CONNECTIONS.

2. NO FLOOR OR FOUNDATION WORK

CONS:

1. EACH COLUMN REQUIRES MODIFICAITON WITH 26 BEAM TO COLUMN

CONNECTIONS. APPROXIMATELY 8' x 8' AREA AROUND COLUMNS WOULD

NEED TO BE PARTITIONED OFF TO PERFORM WORK.

2. SLAB AND ROOF DECK MODIFICATIONS COULD BE DISRUPTIVE.

3. MOMENT FRAME BRACING WILL NEED TO BE ADDED IN IDENTIFIED

LOCATIONS

1881 1873

189118951899

18531897

28222807 2819

28152813 2829

2845A

2845B

2837B

2837C

2837D

2849B

2849A

A

2849C

2849D

A

C

A

SF207

A1

8 7.1 44.155.166.17

F

E

D

C

8' - 0" x 8' - 0" OPENINGS CUT

AROUND ALL COLUMN TO

STRENGTHEN BEAM/COLUMN

JOINTS, TYP

CUT BACK SLAB UP TO

6-8" EDGE TO INCREASE

DRIFT JOINT BETWEEN

RADIOLOGY ADDITION

AND MRI ADDITION

O

SF310B

TYP

W18x35 W18x35 W18x35 W18x35 W18x35 W18x35

1. REMOVE EXISTING PERIMETER STEEL BEAM.

2. CUT BACK EXISTING SLAB UP TO 14".

3. CUT BACK EXISTING CANTILEVER STEEL BEAM.

4. ADD NEW STEEL W18x35 ALONG GRID C.5

5. ADD NEW MOMENT FRAME BEAM BRACING

M

SF310B

TYP

P

SF310C

TYP

SF310B

L TYP

SIM

NEW MOMENT FRAME BRACE

NEW STEEL BEAM

SF207

A1

8 7.1 44.155.166.17

F

E

D

C

8' - 0" x 8' - 0" OPENINGS CUT

AROUND ALL COLUMN TO

STRENGTHEN BEAM/COLUMN

JOINTS, TYP

CUT BACK SLAB UP TO

6-8" EDGE TO INCREASE

DRIFT JOINT BETWEEN

RADIOLOGY ADDITION

AND MRI ADDITION

W18x35 W18x35 W18x35 W18x35 W18x35

M

SF310B

TYP

P

SF310C

TYP SF310B

L TYP 1. REMOVE EXISTING PERIMETER STEEL BEAM.

2. CUT BACK EXISTING SLAB UP TO 14".

3. CUT BACK EXISTING CANTILEVER STEEL BEAM.

4. ADD NEW STEEL W18x35 ALONG GRID C.5

5. ADD NEW MOMENT FRAME BEAM BRACING

O

SF310B

TYP

LEGEND

ADD NEW STEEL

BEAM COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

NEW COLLECTOR

CONNECTION SEE

DEATIL /SF310AH

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

6/ 1/

:1

3:

P M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

RADIOLOGY OPTION

SF314

SCALE:SF314 1/8" = 1'-0"

C3 RADIOLOGY FLOOR FRAMING PLAN

SCALE:SF314 1/8" = 1'-0"

A3 RADIOLOGY ROOF FRAMING PLAN

OPTION 2:

WIDEN BUILDING SEPARATION JOINT. MODIFY EXISTING MOMENT FRAME CONNECTIONS

ROOF DECK EDGE TO BE CUT BACK 8" - 1'-2" TO PROVIDE ADQUATE JOINT DIMENSION AND

PREVENT BUILDINGS FROM POUNDING IN MAJOR SEISMIC EVENT.

EXISTING MOMENT FRAME CONNECTIONS IN MRI AND RADIOLOGY BUILDINGS WOULD REQUIRE

MODIFICATION TO MEET CURRENT CODE REQUIREMENTS.

PROS:

1. WORK IS LIMITED TO ROOF FRAMING ONLY. MODIFYING JOINT BETWEEN BUILDINGS AND

MOMENT FRAME BEAM TO COLUMN CONNECTIONS.

2. NO FLOOR OR FOUNDATION WORK

CONS:

1. EACH COLUMN REQUIRES MODIFICAITON WITH 26 BEAM TO COLUMN CONNECTIONS.

APPROXIMATELY 8' x 8' AREA AROUND COLUMNS WOULD NEED TO BE PARTITIONED OFF TO

PERFORM WORK.

2. SLAB AND ROOF DECK MODIFICATIONS COULD BE DISRUPTIVE.

3. MOMENT FRAME BRACING WILL NEED TO BE ADDED IN IDENTIFIED LOCATIONS

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1570E

16311637

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

SF208

A1

F

E

D

C

A

B

C

D

E

ADDITIONAL SUPPORT BEAM NEEDED

TO ADD COLLECTOR CONNECTION

ADD 3 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO BUILDING UU 525

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO UU 525 SLAB

ADD 2 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO RADIOLOGY ADDITION

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO RADIOLOGY SLAB IF

RADIOLOGY IS TO BE

CONNECTED TO UU 525

ADD BRBF IN EAST/WEST

DIRECTION

LEGEND

COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

3/

/2

2:

:5

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

MRI OPTION 1

SF310

SCALE:SF310 1/8" = 1'-0"

A1 MRI FLOOR FRAMING PLAN

SCALE:SF310 1/8" = 1'-0"

A3 MRI ROOF FRAMING PLAN

oburt Rectangle oburt Text Box B oburt Text Box oburt Text Box

OPTION 2 DETAILS

oburt Snapshot oburt Rectangle oburt FreeText L oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Snapshot oburt FreeText M oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Text Box

EXISTING

oburt Text Box

NEW

oburt Text Box

NEW

oburt Text Box

EXISTING

oburt Snapshot oburt Snapshot oburt FreeText N oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line oburt Callout CUT EXISTING ROOF DECK BACK AS REQUIRED TO CREATE A 6"-8" EXPANSION JOINT DIMENSION oburt Callout

EXISTING FLOOR JOINT TO REMAIN AS IS

oburt Line oburt Text Box

EXPANSION JOINT DETAIL - OPTION 2 (MRI - EAST ANCILLARY JOINT)

oburt Snapshot oburt Callout

EXISTING FLOOR JOINT TO REMAIN AS IS

oburt Snapshot oburt Rectangle oburt Callout CUT EXISTING ROOF DECK BACK AS REQUIRED TO CREATE A 6"-8" EXPANSION JOINT DIMENSION oburt Arrow oburt FreeText O oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line oburt Text Box

EXPANSION JOINT DETAIL - OPTION 2 (MRI - RADIOLOGY)

Rectangle

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1570E

16311637

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

SF208

A1

F

E

D

C

A

B

C

D

E

ADDITIONAL SUPPORT BEAM NEEDED

TO ADD COLLECTOR CONNECTION

ADD 3 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO BUILDING UU 525

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO UU 525 SLAB

ADD 2 - COLLECTORS THAT

CONNECT TO MRI ADDITION

TO RADIOLOGY ADDITION

CONTINUOUS OR UNIFORM

STEEL PLATE CONNECTION

TO RADIOLOGY SLAB IF

RADIOLOGY IS TO BE

CONNECTED TO UU 525

ADD BRBF IN EAST/WEST

DIRECTION

LEGEND

COLLECTORS

CONTINUOUS STEEL

PLATE

BRACED FRAME

CUT BACK SLAB EDGE

ACCESS FOR

BEAM/COLUMN JOINT

DRAWING NUMBER:

DRAWING TITLE:

NO. DESCRIPTION

REVISIONS:

DATE

DRAWN BY:

CHECKED BY:

DRAWING DATE:

E

1 2 3 4 5

D

C

B B

C

D

E

1 2 3 4 5 6

A A

C :\R ev it

M od el s\

-0

U

U B ui ld in g

E va lu at io n-v2 1_ ss he ph er d@ re av el ey .c om .r vt

3/

/2

2:

:5

P

M

U U

B ui ld in g

E va lu at io n

Issue Date

Author

Checker

MRI OPTION 1

SF310

SCALE:SF310 1/8" = 1'-0"

A1 MRI FLOOR FRAMING PLAN

SCALE:SF310 1/8" = 1'-0"

A3 MRI ROOF FRAMING PLAN

oburt Rectangle oburt Text Box C oburt Text Box oburt Text Box

OPTION 2 DETAILS

oburt FreeText P oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line oburt Text Box

EXPANSION JOINT DETAIL - OPTION 2 (RADIOLOGY - EAST ANCILLARY JOINT)

oburt Snapshot oburt Snapshot oburt Snapshot oburt Callout

NOTHING REQUIRED AT THIS LEVEL

oburt W18x35 oburt W18x35 oburt Rectangle oburt Callout

CUT AND REMOVE EXISTING DECK AND BEAMS IN SHADED AREA.

oburt Callout

NEW STEEL BEAM CONNECTED TO EXISTING STEEL BEAMS

oburt W18x35 oburt Callout

NEW STEEL BEAM

oburt Rectangle oburt Callout

CUT AND REMOVE EXISTING BEAMS AND DECK IN SHADED AREA

oburt Callout

NEW STEEL BEAM CONNECTED TO EXISTING STEEL BEAMS

oburt Rectangle oburt Callout

CUT AND REMOVE EXISTING DECK AND BEAMS IN SHADED AREA.

oburt W18x35 oburt Callout

NEW STEEL BEAM

oburt Rectangle oburt Callout

CUT AND REMOVE EXISTING BEAMS AND DECK IN SHADED AREA

oburt Arrow oburt Arrow oburt FreeText Q oburt Building Section - Up oburt FreeText

DET

oburt Line oburt FreeText R oburt Building Section - Up oburt FreeText

DET

oburt Line oburt Line

Line

A570

A572

A576

A578

A665 A680

A685

A690

A680

A

TV

1570E

1849A

1810E

1810B

1810G

1810H

1810D

1810A

1810K

1810F

1829A

1829B

1829C

A

B

C

D

E

6 - ADDED BUCKLING

RESTRAINED BRACES (BRB's)

ALONG WEST, SOUTH AND EAST

FACES

EXISTING 1" BUILDING

SEPARATION JOINT

TO REMAIN AS IS

NEW BRB BRACED FRAME

NEW BRB BRACED FRAME