(USS WASP) Attachment S-2 Past Performance Questionnaire.docx

DOCX document 19 KB Posted

Attached to
USS WASP (LHD 1) FY21 Dry-Docking Selected Restricted Availability (DSRA)
Solicitation number
N00024-20-R-4404
Issued by

About this file

This document contains a solicitation and past performance questionnaire for the USS WASP (LHD 1) FY21 Dry-Docking Selected Restricted Availability (DSRA). The Naval Sea Systems Command seeks a contractor to execute maintenance, modernization, and repair of the USS WASP through a combination docking availability. Interested offerors must register in the System for Award Management and monitor the beta.SAM.gov site for release of the solicitation and amendments. The solicitation includes specification packages, work item plans and drawings, milestones, and a pricing workbook. Offerors must submit a signed letter to request the government furnished information. The past performance questionnaire collects information on a contractor's previous contracts to assess performance for source selection. The availability is expected to require substantial facilities and resources capable of coordinating ship maintenance, repair, and modernization. The award is anticipated in August 2020 for work starting in December 2020 and delivery by April 2022.

View the file

Other files

File Type Posted
(USS WASP) Attachment S-7 Proposal Assessment 27Apr20.xlsx XLSX spreadsheet
N00024-20-R-4404_A0005 USS WASP (LHD 1) DSRA.pdf PDF
N00024-20-R-4404_A0004 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 35-55_2020-04-14.xlsx XLSX spreadsheet
USS WASP PPI 34_2020-03-31.xlsx XLSX spreadsheet
USS WASP PPI 14-33_2020-03-26.xlsx XLSX spreadsheet
N00024-20-R-4404_A0003 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 10-13_2020-03-20.xlsx XLSX spreadsheet
(USS WASP) Attachment S-6 (A0001) VATEP.xlsx XLSX spreadsheet
N00024-20-R-4404_A0002 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 1-9_2020-03-16.xlsx XLSX spreadsheet
N00024-20-R-4404_A0001 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP BQs 1-3_2020-03-09.xlsx XLSX spreadsheet
CDRL A011 Status of GFE Rev1.pdf PDF
(USS WASP) Attachment S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
CDRL B005 LMI Interim Support Data Rev1.pdf PDF
CDRL B008 Logistics Product Data Rev1.pdf PDF
CDRL B004 LMI ISIL Rev1.pdf PDF
CDRL A014 Weight and Stability Report Rev1.pdf PDF
(USS WASP) Attachment S-5 Enclosure (1).PDF PDF
CDRL A003 RCC Report Rev1.pdf PDF
CDRL B002 LMI Data Provisioning Rev1.pdf PDF
(USS WASP) Attachment J-7 Schedule Model Review.docx DOCX document
CDRL A015 Performance Report Rev3.pdf PDF
CDRL A016 Enc (1) Final Labor-Duration-Material Data.xlsx XLSX spreadsheet
CDRL B009 LMI Demand Only Trans Rpt Rev1.pdf PDF
CDRL A007 QA Program Plan Fire Prevention-Housekeeping Rev1.pdf PDF
CDRL A008 QA Program Plan PCP Rev1.pdf PDF
CDRL A015 Enclosure 2 (Template) FEB19.xlsx XLSX spreadsheet
CDRL B006 LMI Component Ident Data Rev1.pdf PDF
(USS WASP) Attachment J-5 QASP WASP FY21 DSRA.docx DOCX document
CDRL A012 Key Event Schedule Rev 2.pdf PDF
CDRL C001 COTS Equipment Manual Suprt Rev1.pdf PDF
N00024-20-R-4404 USS WASP (LHD 1) FY21 DSRA Solicitation.pdf PDF
CDRL A009 Technical Report - Welding, Fab, Insp Rev1.pdf PDF
CDRL A001 Small Business Subcontract Rpt Rev1.pdf PDF
CDRL B001 LMI PPL Rev1.pdf PDF
(USS WASP) Attachment S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL B007 Provisioning Tech Docs Rev1.pdf PDF
CDRL A005 Purchase Order Rev1.pdf PDF
CDRL A006 QA Program Plan QMS Rev1.pdf PDF
CDRL A015 Enclosure 1 (BLK 16) FEB19.pdf PDF
(USS WASP) Attachment S-9 PP CPARS Reference List.docx DOCX document
CDRL C002 Tech Manual Rqmts Rev1.pdf PDF
(USS WASP) Attachment S-4 Manpower Performance 15Jan20.xlsx XLSX spreadsheet
(USS WASP) Attachment S-7 Proposal Assessment 15Jan20.xlsx XLSX spreadsheet
CDRL B003 LMI Design Change Notice Rev1.pdf PDF
(USS WASP) Attachment J-10 Compartment Closeout List.xlsx XLSX spreadsheet
(USS WASP) Attachment S-6 Value Adjusted Total Evaluated Price.xlsx XLSX spreadsheet
CDRL A016 Final Labor-Duration-Material Data Rev2.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS WASP (LHD 1) FY21 DSRA

PAST PERFORMANCE QUESTIONNAIRE

Instructions to Offeror

Completed questionnaires shall be forwarded directly to the Naval Sea Systems Command point of contact listed in this letter.

NOTE: ONCE COMPLETED BY THE POC, QUESTIONNAIRES MUST BE DIRECTLY TRANSMITTED TO THE GOVERNMENT AS DESCRIBED ON THE FOLLOWING PAGE. COMPLETED QUESTIONNAIRES RECEIVED FROM OFFERORS ARE NOT ACCEPTABLE.

Instructions to Evaluator

The Naval Sea Systems Command is requesting an evaluation of an Offeror’s past performance for source selection purposes. Accordingly, request your candid assessment of the Offeror’s past performance; please see Section A below for the identity of the Offeror and contract of interest.

Once completed, this questionnaire and any appended information becomes Source Selection Sensitive and must be protected from disclosure. Access to this information shall be limited to Government procurement officials.

Hand-written evaluations are acceptable. Please answer each question in SECTION B by circling one of the ratings: E V S M U N/A, where:

EExceptional; VVery Good; S-Satisfactory;

MMarginal; UUnsatisfactory; N/ANot Applicable

Exceptional - Contractor performance substantially exceeded expected levels of performance.

Very Good - Contractor performance exceeded expected levels.

Satisfactory – Performance met expected levels.

Marginal - Performance was less than expected.

Unsatisfactory - Performance was significantly less than expected.

In addition, please provide supporting comments for each rating. Please use your supporting comments to highlight the Offeror’s specific strengths and weaknesses. You may use additional sheets if required. Your ratings and comments should reflect only “contractor liable” performance. You may supplement your knowledge with the knowledge and judgment of others in your organization.

Please enter the requested information in SECTION C for the person primarily responsible for completing the questionnaire, then transmit the completed questionnaire to the point of contact identified above. Thank you for your assistance in this matter.

PLEASE DO NOT PROVIDE COMPLETED QUESTIONNAIRES TO THE OFFEROR

SECTION A (To Be Completed by the Offeror)

1. Name of Offeror/Contractor: __________________________________________________

Address of Offeror/Contractor: ________________________________________________

2A. Contract Number (between Prime and Sub):_______________________________________

Task or Order No., where applicable: ___________________________________________

2B. Contract Number (between Government and Prime):________________________________

Task or Order No., where applicable: ___________________________________________

3A. Period of Performance: ______________________________________________________

3B. Place of Performance: _______________________________________________________

4. Description of Work/Scope of Effort (max. 50 words): _____________________________

5.POCName:
Address:
Tel. No.:
Voice:
Facsimile:

6. Method and Date Questionnaire Sent to POC:

Date: ____________________
Method: _______________________________

SECTION B (To Be Completed by Evaluator)

E Exceptional; V-Very Good; S-Satisfactory;

M Marginal; U Unsatisfactory; N/A Not Applicable

1. Overall Contract Outcome: E V S M U N/A Ability to satisfactorily complete all tasks while conforming to customer requirements, standards of good workmanship and safe practices.

Comments: _____________________________________________________________________

2. Cost Performance: E V S M U N/A Ability to accurately forecast and control costs throughout all phases of the contract.

Comments: _____________________________________________________________________

3. Schedule Performance: E V S M U N/A Ability to develop accurate work schedules and adhere to those schedules, as well as the ability to adapt to changes in requirements and work schedules.

Comments: _____________________________________________________________________

4. Technical Performance (Quality of Product): E V S M U N/A Ability to overcome technical challenges by applying sound engineering principles, complete required engineering analyses and develop adequate technical reports and plans.

Comments: _____________________________________________________________________

4. Subcontracting Plan Adherence and Coordination: E V S M U N/A If a subcontracting plan was required please describe the offerors success in meeting planned goals and/or efforts made to overcome goal deficiencies and challenges as well as the offeror’s ability to successfully manage and integrate subcontractors.

Comments: _____________________________________________________________________

SECTION C (To Be Completed by Evaluator)

1. Name of Evaluator: _____________________________________________________________

2. Position Title: _________________________________________________________

3. Administrating Authority/Agency: _________________________________________________

4. Telephone Number:Voice __________________
Facsimile _______________

5. Signature: ______________________________Date: ____________