(USS WASP) Attachment J-10 Compartment Closeout List.xlsx

XLSX spreadsheet 58 KB Posted

Attached to
USS WASP (LHD 1) FY21 Dry-Docking Selected Restricted Availability (DSRA)
Solicitation number
N00024-20-R-4404
Issued by

About this file

This document contains details regarding a federal solicitation for the USS WASP (LHD 1) FY21 Dry-Docking Selected Restricted Availability. The Naval Sea Systems Command is seeking a contractor to execute maintenance, modernization, and repair of the USS WASP from December 2020 through April 2022. Interested parties must register in the System for Award Management and monitor beta.SAM.gov for release of the solicitation and amendments. A site visit of the contractor's pier and facility capable of accommodating the USS WASP class is required. The solicitation contains pricing workbooks, milestones, and technical specifications that will not be posted publicly. The Navy aims to make a single award by August 2020 for work to be performed at the contractor's East or Gulf Coast facility.

View the file

Other files

File Type Posted
(USS WASP) Attachment S-7 Proposal Assessment 27Apr20.xlsx XLSX spreadsheet
N00024-20-R-4404_A0005 USS WASP (LHD 1) DSRA.pdf PDF
N00024-20-R-4404_A0004 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 35-55_2020-04-14.xlsx XLSX spreadsheet
USS WASP PPI 34_2020-03-31.xlsx XLSX spreadsheet
USS WASP PPI 14-33_2020-03-26.xlsx XLSX spreadsheet
N00024-20-R-4404_A0003 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 10-13_2020-03-20.xlsx XLSX spreadsheet
(USS WASP) Attachment S-6 (A0001) VATEP.xlsx XLSX spreadsheet
N00024-20-R-4404_A0002 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP PPI 1-9_2020-03-16.xlsx XLSX spreadsheet
N00024-20-R-4404_A0001 USS WASP (LHD 1) DSRA.pdf PDF
USS WASP BQs 1-3_2020-03-09.xlsx XLSX spreadsheet
CDRL A011 Status of GFE Rev1.pdf PDF
(USS WASP) Attachment S-8 Pier and Drydock Graphical Representation Template.xlsx XLSX spreadsheet
CDRL B005 LMI Interim Support Data Rev1.pdf PDF
CDRL B008 Logistics Product Data Rev1.pdf PDF
CDRL B004 LMI ISIL Rev1.pdf PDF
CDRL A014 Weight and Stability Report Rev1.pdf PDF
(USS WASP) Attachment S-5 Enclosure (1).PDF PDF
CDRL A003 RCC Report Rev1.pdf PDF
CDRL B002 LMI Data Provisioning Rev1.pdf PDF
(USS WASP) Attachment J-7 Schedule Model Review.docx DOCX document
CDRL A015 Performance Report Rev3.pdf PDF
CDRL A016 Enc (1) Final Labor-Duration-Material Data.xlsx XLSX spreadsheet
CDRL B009 LMI Demand Only Trans Rpt Rev1.pdf PDF
CDRL A007 QA Program Plan Fire Prevention-Housekeeping Rev1.pdf PDF
CDRL A008 QA Program Plan PCP Rev1.pdf PDF
CDRL A015 Enclosure 2 (Template) FEB19.xlsx XLSX spreadsheet
CDRL B006 LMI Component Ident Data Rev1.pdf PDF
(USS WASP) Attachment J-5 QASP WASP FY21 DSRA.docx DOCX document
CDRL A012 Key Event Schedule Rev 2.pdf PDF
CDRL C001 COTS Equipment Manual Suprt Rev1.pdf PDF
N00024-20-R-4404 USS WASP (LHD 1) FY21 DSRA Solicitation.pdf PDF
CDRL A009 Technical Report - Welding, Fab, Insp Rev1.pdf PDF
(USS WASP) Attachment S-2 Past Performance Questionnaire.docx DOCX document
CDRL A001 Small Business Subcontract Rpt Rev1.pdf PDF
CDRL B001 LMI PPL Rev1.pdf PDF
(USS WASP) Attachment S-1 Manpower Utilization Data Sheet.xlsx XLSX spreadsheet
CDRL B007 Provisioning Tech Docs Rev1.pdf PDF
CDRL A005 Purchase Order Rev1.pdf PDF
CDRL A006 QA Program Plan QMS Rev1.pdf PDF
CDRL A015 Enclosure 1 (BLK 16) FEB19.pdf PDF
(USS WASP) Attachment S-9 PP CPARS Reference List.docx DOCX document
CDRL C002 Tech Manual Rqmts Rev1.pdf PDF
(USS WASP) Attachment S-4 Manpower Performance 15Jan20.xlsx XLSX spreadsheet
(USS WASP) Attachment S-7 Proposal Assessment 15Jan20.xlsx XLSX spreadsheet
CDRL B003 LMI Design Change Notice Rev1.pdf PDF
(USS WASP) Attachment S-6 Value Adjusted Total Evaluated Price.xlsx XLSX spreadsheet
CDRL A016 Final Labor-Duration-Material Data Rev2.pdf PDF
Show 40 more

Latest 50 of 53 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1

WI No.WI TitleLocation of WorkMS/KE Ties (Production)
042-11-001Work Completion Certification Data for Chief of Naval Operations (CNO) Availability; provideNot ApplicableEOA
042-11-002Physical Security at Private Contractor's Facility; accomplishContractor's FacilityEOA
042-11-003General Requirements for Work Within Naval Station Norfolk; accomplishNot ApplicableEOA
042-11-004Marine Coatings Containing Heavy Metals Material; remove and disposeThroughout lhe ShipEOA
042-11-005Accountability of Manhourand Material Reservation; accomplishNot ApplicableEOA
077-11-001Fire Drill Service; provideThroughout the ShipEOA
110-11-001Flat Keel Plate; replace7-57-2-F, 7-57-1-FUNDOCK
110-11-002Undeiwater Hull; inspect and repairUndeiwater Hull and Appendages from Flat Keel to 6 Inches Above Upper Limits of Boot Top, to lndude Bilge Keels, Skeg,UNDOCK
110-21-001Fan Room Structural Repair; accomplish01-86-2-0, 01-110-2-0UNDOCK
120-11-001Structural Repair; accomplish4-85-1-Q, 01-70-2-0, 01-62-5-

a. 01-103-1-0. 2-54-4-0, 02-

73-B-Q, 02-84-2-Q, 4-125-1-EUNDOCK
120-11-002Deck and Bulkhead; repair6-81-0-E, 5.5-101-0-E, 4-125-

2-E, 02-54.5-1-L, 6-53-3-T, 4-

97-2-EUNDOCK
120-11-003Machinery Room Number One; repair6-65-0-E, 7-65-6-F, 6-73-1-F,

7-66-2-F, 7-67-2-W, 7-69-2-W,

7-71-4-WUNDOCK
120-11-004Stem Gate Machinery Room Number One; repair4-125-1-EUNDOCK
120-11-005Fan Room Deck and Bulkhead Stiffener: repair2-104-1-0, 01-33-4-Q, M0.5·
1-Q, 1-90-1-Q, 7-89-4-EUNDOCK
120-11-006Structural Repairs; accomplish6-73-0-E, 6-45-0-E, 4-49-5-A,7-89C-3-E, 7-89C-4-E, 1-83-0-QUNDOCK
120-11-023Structural Repair; accompl!sh4-88-1-L, 4-85-1-0UNDOCK
120-11-025Fire Pump Room Structura!l repair5.5-99-0-E, 5.5-101-0-E,7-97-
0-J, 7-101-0-FUNDOCK
120-11-027Structural Repair: accomplish3-81-4-Q, 2-83-2-L, 2-81-4-Q, 01-88-2-L, 02-87-2-Q, 02-33-9-Q, 2-53-1-Q, 1-125-1-Q, 2-125-1-QUNDOCK
120-11-028Structural Repair; a ccompfish1-50.5-1-Q, 1-41-1.Q, 01-107-
2.QUNDOCK
120-11-032Fan Room Structural Repair; accomplish02-73-6-Q, 02-114-2-QUNDOCK
120-11-033Structural Repair; accomplish4-89-0-AUNDOCK
120-11-034Slructu,ra Repair; accompllsh5-37-0-EUNDOCK
120-11-035Structural Repair; accompUsh5-47.5-1-L, 5-97-01-K, 5-47.5·
2-LUNDOCK
120-11-036Shaft Alley; repair and preserve7-89C-4-EUNDOCK
120-11-037JP-5 Pump Room; repair6-41-0-E, 7-37-2-J, 6-45-0-EUNDOCK
120-11-038Structural Repair and Preserve; accomplish5-97-1-TUNDOCK
120-11-039Sewage Pump Room Number One: repa[r and preserve6-39-0-EUNDOCK
120-11-040Structural repairs: accomplish6-73-0-E, 6-73-2-f. 5.5-73-1-WUNDOCK
120-11-041Structural Repair: accomplish6-81-0-E, 7-81-8-F, 7-83-2-F, 7-81-3-F, 7-89-6-F, 7-81-5-F, 7-87-2-F, 7-84-1-W, 7-85-3-W,
7-87-2-F, 7-84-1-W, 7-85-3-W, 7-87-3-W, 7-89-8-WUNDOCK
120-11-043Struclural Repair; accomplish5-80-1-QUNDOCK
120-11-044Escape Trunk Struct1,.1al Repa [r, accomplish6-87.5-2-TUNDOCK
120-11-045Fire Pump Room Structural Repair; accomplish5.5-99-0-E, 7-97-0.JUNDOCK
120-11-046Shaft Alley Structural Repair; accomplish7-89C-3-EUNDOCK
120-11-047Structural Repair; accomplish6-65-0·E, 7-67-1-F, Locked-In,
7-69-1-W, 7.71.1.wUNDOCK
120-11-048Structural Repair; accomplish6-45-0-EUNDOCK
120-11-049Vehlcle Stowage; repair4-49-Q.A, 6- 57-1-T, 4-41-2-EUNDOCK
120-11-050Landing Craft Air Cushion (LCAC) Pump Room; repair6·93·0·EUNDOCK
120-11-051Structural Repair; accomplish5-79-0-C, 5-73-7-A. 5-77-2-Q,
5-75.5-0-LUNDOCK
120-11-052Sewage Pump Room Number 2 Structural Repair; accomplish5.5-76-1-EUNDOCK
120-11-053Fan Room Structural Repair; accomplish5-75-0-QUNDOCK
120-11-054AFFF Station Number 4 Structural Repair; accomplish1-69-4-QUNDOCK
120-11-055Structural Repair; accomplish2-98-1-QUNDOCK
120-11-056Structural Repair; accomplish7-121-3-EUNDOCK
120-11-057Stem Gate Machinery Room Number 2 Structural Repair; accomplish4-125-2-EUNDOCK
120-11-058Structural Repair and Preservation: accomplish4-89-2-E, 1-105-3-A, 01-126-4-
aUNDOCK
120-11-059Bulkhead; repair1-110-2-QUNDOCK
120-11-060Fan Room Structural Repair; accomplish01-57-7-QUNDOCK
120.11-061Fan Room Structural Repair; accompllsh02-73-6-QUNDOCK
120-11-062AFFFStation Number 6 Structural Repair; accomplish1-100.5-2.QUNDOCK
120.11-063Vehicle Stowage Structural Vertical Stiffener; repair3-49-0-AUNDOCK
123-10-001Tank, Vold Cleaning and Pumping; accomplish1-L-4-V, 1-N-0-V, 1-97-2-V, 1-113-1-V, 2-130-1-V, 2-130-2-V,3-89-1-V, 3-98-1-V, 4-89-1-V,4-98-1-V, 01-121-1-V, 01-89·2·V, 02-68-1-V, 01-73.5-1-V, 7-80.5-2-V, 7-81-2-V, 1-L-1-V, 7-64.5-0-V, 7-65-0-V, 4-17-1-Q, 4-17-2-Q, 6-37-0-W, 5.5-73-1-W, 3-113-6, 7-63-1-F, 7-61-1-F,7-59-1-F, 7-57-3-F, LHD 1, 7-51·1-F, 7-49-3-F, 5-49-1-F, 7-65-6-F, 7-63·2-F, 7-61-2-F, 7-59-2-F, 7-57-4-F, 7-55-2-F, 7-53-2-F, 7-51-2-F, 7-49-4-F, 5-49-2-F, 7-81-5-F, 7-79-1-F, 7-77-1-F, 7-75-1-F, 7-74-1-F, 7-67-1-F, 7-65-5-F, 7-87-2-F, 7-83-2-F, 7-81-8-F, 7-79-2-F, 7-77-2-F, 7-75-2-F, 7-74-2-F, 6-7-1-J, 6-37-2-J, 7-73-5-F, 7-104-1.J, 7-104-2-J, 7-73-6-F,7-65-1-W, 7-65-3-W, 7-81-4-W,7-81-6-W, 7-37-1-J, 7-97-0-J,7-101-1-J, 6-40-1-J, 6-40-2.J,7-97-1.J, 7-101-2-J, 7-105-0-J, 7-106-0-J, 7-49-3-J, 7-101-0-F, 7-121-4-F, 7-41-0-F, 7-71-2-F, 7-87-1-F, 7-96-2-F, 7-73-2-F, 7-79.5-2-F, 7-73-1-F, 7-67-2-W, 7-69-2-W, 7-71-4-W, 7-84-1-W, 7-85-3-W, 7-87-3-W,locked-In, 7-71-1-W, 7-85-2-W, 7-69-1-W, 4-105-1-W, 4-105-2-W, 4-109-1-W, 4-109-2-W, 4-113-1-W, 4-113-2-W, 4-117-1-W, 4-117-2-W, 5-101-1-W, 5-101-2-W, 5-25-0-W, 5-97-3-W, 5-97-4-W, 7-102-0-W, 7-105-01-W, 7-109-0-W, 7-113-0-W, 7-117-0-W, 7-121-7-W, 7-121-8-W, 7-125-0-W, 7-125-1-W, 7-125-2-W, 7-25-0-W, 7.33.0-W, 7-89-7-W, 7-89-8-W, 7-91-1-W, 7-91-2-W, 7-93-3-W,7-93-4-W, 7-95-1-W, 7-95-2-W,7-K-0-W, 7-71.5-2-W, 7-87.5-1-W, 6-73-1-F, 6-73-2-F, 7-89-5-F, 7-89-6-F, 4.5-73-2-F, 4.5-73-4-F, 4.5-81-2-F, 4.5-81-4-F, 5-73-2-F, 5-73-4-F, 5-81-2-F, 5-81-4-F, 6.5-70-2-F, 6.5-85-1-F,7-91-0-F, 7-89-0-F, 7-53-1-F,7-55-1-F, 7-88-2-F, 7-66-2-F,7-41-1-F, 7-41-2-F, 7-49-1-F,7-49-2-F, 7-57-1-F, 7-57-2-F,7-65-2-F, 7-65-4-F, 7-73-3-F,7-73-4-F, 7-81-1-F, 7-81-3-F,7-89-1-F, 7-89-2-F, 7-93-1-F,7-93-2-F, 7-97-2-J, 7-37-2-JUNDOCK
123-11-001Fuel Oil Service Tank and Auxiliary Fuel Oil Service Tank; repair6-73-1-F, 6-73-2-F, 7-89-5-F,
7-89-6-F, 7-89-0-F, 7-91-0-FUNDOCK
123-11-002Fuel/Ballast Tank: repair7-41-1-F, 7-41-2-F, 7-49-1-F,

7-49-2-F, 7-57-1-F, 7-57-2-F, 7-73-3-F, 7-81-1-F. 7-89-1-F,

7-93-1-FUNDOCK
123-11-003Compensated Fuel Tank: repair7-49-3-F, 5-49-1-F, 7-79-2-FUNDOCK
123-11-004Fuel Oil Service Tank: preserve6-73-1-F, 6-73-2-F, 7-89-5-F,
7-89-6-F, 7-89-0-F, 7-91-0-FUNDOCK
123-11-005Fuel/Ballast Tank: preserve7-41-1-F, 7-41-2-F, 7-49·1•F,

7-49-2-F, 7-57-1-F, 7-57-2-F, 7-73-3-F, 7-81-1-F, 7-89-1-F,

7-93-1-FUNDOCK
123-11-006Compensated Fuel Tank; preserve (touch up)7-49-3-F, 5-49-1-F, 7-79-2-FUNDOCK
123-11-007Fuel Oil Overflow Pipe; replace2-96-1-L 7-89-5-F, 3-87-1-QUNDOCK
123-12-002JP-5 Tank; preserve6-40-1-J. 7-97-2-JUNDOCK
123-12-003Contaminated Oil Tank: repair6-37-1-J, 6-37-2-J, 7-104-1-J,
7-104-2-JUNDOCK
123-12-004JP-5 Tank; repair6-40-1-J. 7-97-2-JUNDOCK
123-15-001Lube Oil Settling Tank; repair6-73-0-E, 4.5-73-4-FUNDOCK
123-16-002Hydraulic Flooding Valve Pipe Hanger; replace7-125·0-WUNDOCK
123-16-003Ballast Tank; preserve (touch up)7-69-1-W, 4-109-2-W, 4-113-2-

W. 5-101-1-W, 5-101-2-W, 5-

97-4-W, MOS-01-W, 7-121-8-

W, 7-125-2-W, 7-89-8-W, 7-93- 4-W, 7-95-2-WUNDOCK
123-16-004Ballast tank; repairLocked-In, 7-69-1-W, 4-109-2-W, 4-113-2-W, 5-101-1-W, 5-95-2-W, 101-2-W, 5-97-3-W, 5-97-4-W,
7-105-01-W, 7-121-8-W, 7-125-2-W, 7-89-8-W, 7-93-4-W, 7-95-2-WUNDOCK
123-16-005Ballast Tank: preserve7-109-0-W, 7•117-0-WUNDOCK
123-17-001Contaminated Oil Tank Sounding Tube; repair6-37-1-J. 6-37-2-JUNDOCK
123-17-002Olly Waste Tank; repair7-79.5-2-F, 7-87-1-F, 7-73-2-F,
7-71-2-FUNDOCK
123-17-003Oily Waste Tank; preserve7-87-1-F, 7-73-2-F, 7-79.5-2-FUNDOCK
123-17-004Oily Waste Tank: preserve (touch up)7-71-2-FUNDOCK
123-17-005Contaminated Oil Tank; preserve (touch up)6-37-1-J, 6-37-2-J, 7-104-1-J,
7-104-2-JUNDOCK
123-19-001Waste Waler Drain Tank: repair7-87.5-1-WUNDOCK
123-19-003Waste Water Drain Tank; preserve7-87.5-1-WUNDOCK
123-19-004Collection, Holding and Transfer (CHT) Tank; preserve6-37-0-W, 5.5-73-1-W, 3-113-
6-EUNDOCK
123-19-006Collection, Holding and Transfer (CHT) Tank; repair6-37-0-W, 5.5-73-1-W, 3-113-
6-WUNDOCK
123-21-001Accessible Vold; repair1-97-2-V, 7-64.5-0-V, 7-65-0-VUNDOCK
123-21-002Accessible Void; preserve1-97-2-V, 7-64.5-0-V, 7-65-0-VUNDOCK
130-11-001Fan Room Deck; repair01-110-2-Q, 01-111-2-Q, 1-
110-2-QUNDOCK
130-11-00201 Level Deck; replace01-126-4-Q, 01-127-2-Q, 01-

126-2-Q, 01-125-4-L, 01-122-

4-QUNDOCK
130-11-003Structural Repair; accomplish01-52.5-2-L, 1-50-4-L, 01-52.5-
4-AUNDOCK
130-11-004Structural Repair;
accomplish4-89-2-E, 2-122-2-C, AFFF, 1-
125-1-Q, 02-49-7-Q, 02-87-2- Q, 02-113.5-1-EUNDOCK
130-11-005Aircraft Securing Fitting; replaceFlight Deck, Frame T through 130DT
130-11-007AN/SPN-41
Azlmuth Antenna Platform; repair02 Level, Weather Deck, Frames 131-132, PortC51LO
130-11-008Fire Pump Room Deck; repair5.5-99-0-E, 7-97-0-JUNDOCK
130-11-00902 Level Troop Walkway; repairTroop Walkway, Underside, 02 Level, Frame 13-130, Port and StarboardC51LO
140-11-001AN/SLQ-32
Antenna Sliding Maintenance Platform; repairWeather Deck, 08 Level,Frame 72-75. Starboard; Weather Deck, 08 Level,Frame 70-73, PortC51LO
150-11-001Superstructure Coa mlng; repair03 Level, Frame 53 lo Frame 93, Port and StarboardC51LO
150-11-002Radar Room Number One Archway Door; remove04-67-1-CC51LO
161-11-001Port and Starboard Hawse Pipe; repair01-T-O-QUNDOCK
163-11-001Sea Ches!; Inspect and repatrUnderwaler HullUNDOCK
163-11-002Waster Sleeve; replaceThroughout lhe ShipUNDOCK
167-11-001ScutUe; replace1-83-0-QUNDOCK
167-11-002Watertight Closure;
repair1-74-2-TUNDOCK
167-11-003Manhole Cover Stud ; repair4-81-1-QUNDOCK
167-12-001Watertight Door;
repair01-33-9-QUNDOCK
167-80-001LHD1 Class AER 25/00, Install Quick Acting Watertight Scuttle (OAWTS); accomplishThroughoutthe ShipUNDOCK
168-11-001Structural Door Assembly; replace03-59-1-A. 06-67-7-C, 03-65-3· Q, 06-65-1-C, CPS Fan Room, 03-73-7-Q, 06-85-3-C, 06-84-3-L, 03-61-1-QUNDOCK
171-11-001MastSlgnal Halyard Uphaul Staples; repairMain MastC51LO
179-11-002AntennaPlatform Modification; accomplishWeather Deck, 01 Level,Frames 108 to 111, Port: Weather Deck. 01 Level.Frames 66 to 68, StarboardC51LO
179-11-003Antenna Cable Trunk Cover Plate; replaceWeather Deck, 01 Level,Frame 108 to 111, Port; Weather Deck, 01 Level,Frames 66 to 68, StarboardC51LO
179-90-004Antenna Platform Modification: accomplishWeather Deck, 01 Level, Frames 114 to 116, PortC51LO
221-11-002Main Propulsion Boiler Number One Boiler Safety Shut Off Device (SSD); repair6-81-0-EPCD
221-11-003Main Propulsion Boiler Number One Boller Water Gage Glass Assembly; repair6-81-0-EPCD
221-11-004Main Propulsion Boller Isolation/Boundary Valve, High Pressure Steam Drain and Auxiliary Steam System Piping (P-1); replace6-81-0-EPCD
221-11-005Main Propulsion Boller Number One Boiler Dry Lay-Up; accomplish6-81-0-EPCD
221-11-006Main Propulsion Boller Number One Boller Safety Valve: repair6-81-0-EPCD
221-11-007Number One Main Propulsion Boller Soot Blower Piping Ultrasonic Test (UT) Inspection (P-1): accomplish6-81-0-EPCD
221-11-008Main Propulsion Boller 5-Year Strength and Integrity Inspection, Start of Availability Inspection (SAi) and Completion of Availabiltty Inspection(CAI); accomplish6-81-0-EPCD
221-12-001Number2 Propulsion Boller Roof Casing Epoxy Coating; repair6-65-0-EPCD
221-12-002Main Propulsion Boller Number 2 Safety Valve: repair6-65-0-EPCD
221-12-003Main Propulsion Boller Number 2 Boller Safety Shut Off Device (SSD); repair6-65-0-EPCD
221-12-004Main Propulsion Boiler Number 2 Boiler Dry Lay-Up; accomplish6-65-0-EPCD
221-12-005Main Propulsion Boiler 5-Year Strength and Integrity Inspection, Start of Availability Inspection (SAi) and Completion of Avallabllity Inspection (CAI); accomplish6-65-0-EPCD
221-12-006Number 2 Main Boller Soot Blower Piping Ultrasonic Test (UT) Inspection (P-1); accomplish6-65-0-EPCD
231-11-001Number One Low Pressure (LP) Turbine Flexible Coupling; repair6·81-0·EPCD
231-12-001Number2 Low Pressure (LP) Steam Turbine; repair6-65-0-EPCD
243-11-001Starboard Propulsion Shafting; repairUnderwater Hull, Aft of Frame 105UNDOCK
243-11-002Starboard Stem Tube Shaft Seal; overhaul7-89C-3-EUNDOCK
243-12-001Port Propulsion Shafting; repairUnderwater Hull, AFT of Frame 105UNDOCK
243-12-002Port Stem Tube Shaft Seal: overhaul7-89C-4-EUNDOCK
244-11-001Port and Starboard Main Propulsion Shaft Bearing
Al ignment Verification: accomplish6-73-0-E, 6-81-0·E, 7-89A-3-E,

7-89B-3-E, 7-89C-3-E, 7-89A-

4-E, 7-89B-4-E, 7-89C-4-EPCD
244-11-002Starboard
Propulsion Shafting Bearing ; rep lace7-89C-3-EUNDOCK
244-12-001Port Propulsion Shafting Bearing; replace7-89C-4-EUNDOCK
244-12-002Line Shaft Bearing: repair6-81-0-EPCD
245-10-001Propulsion Propeller, Port and Starboard; repairStarboard Underwater Hull, Aft of Frame 105; Port Underwater Hull, Aft of Frame 105UNDOCK
251-11-0011A and 1B Forced Draft Blower (FOB) Expansion Joint; replace6-81-0-EPCD
251-11-0021A and 18 Forced Draft Blower (FOB) Journal Bearing Drain Thennometer; install6-81-0-EPCD
251-12-0012A and 28 Forced Draft Blower (FOB) Expansion Joint; replace6-65-0-EPCD
251-12-002Forced Draft Blower; overhaul6-65-0-EPCD
251-12-0032A and 28 Forced Draft Blower (FOB) Journal Bearing Drain Thennometer; install6-65-0-EPCD
251-21-001Port Use Fan (PUF) Shutter; repair6-81-0-EPCD
251-31-001Number One Boiler Combustion Air Intake; repair01 Level, Frame 86, Port, Combustion Air IntakePCD
254-11-001Number One Main Condenser; repair6-81-0-EPCD
254-11-002Number One Main Condenser Water Box Gasket; replace6-81-0-EPCD
254-11-003Number One Main Condenser; dean and Inspect6-81-0-EPCD
254-11-004Number 2 Main Condenser; clean and Inspect6-65-0-EPCD
254-12-001Number 2 Main Condenser; repair6-65-0·EPCD
254-12-002Number 2 Main Engine Air Ejector; repair6-65-0-EPCD
254-20-001Auxiliary Condenser; dean and inspect6-65-0-E, 6-73-0·E, 6-81-0-EPCD
254-20-002Number One and 2 Ships Service Turbine Generator Auxililary Air Ejector; repair6-65-0-EPCD
254-23-001Number 3 Ships Service Turbine Generator Auxililary Air Ejector; repair6-73-0-EPCD
255-21-001Numbers 1A and 1B Main Feed Pump (MFP) Overhaul: accomplish6-81-0-EPCD
255-22-001Numbers 2A and 28 Main Feed Pump (MFP) Overhaul: accomplish6-65-0-EPCD
255-31-001Number 1A and 18 Ma[n Feed Booster Pump: repair6-81-0-EPCD
255-32-001Number 2A and 28 Main Feed Booster Pump; repair6-65-0-EPCD
255-35-001Number One and 2 Emergency Feed and Transfer Pump overhaul; accomplish'
6-65-0-E, 6-B1-0-EPCD
255-51-001Number 1A and 1B Main Condensate Pump; repair6-B1-0-EPCD
255-52-001Number 2A and 28 Main Condensate Pump: repair6-65-0·EPCD
255-32-001Number 2A and 28 Main Feed Booster Pump; repair6-65-0-EPCD
255-35-001Number One and 2 Emergency Feed and Transfer Pump overhaul; accomplish'
6-65-0-E, 6-B1-0-EPCD
255-51-001Number 1A and 1B Main Condensate Pump; repair6-B1-0-EPCD
255-52-001Number 2A and 28 Main Condensate Pump: repair6-65-0·EPCD
255-71-001Number One Deaeratlng Feed Tank Spray and Atomizlng Valve: repair6-81·0-EPCD
255-72-001Number 2 Deaeratlng Feed Tank Spray and Atomizing Valve: repair6-65-0-EPCD
255-71-001Number One Deaeratlng Feed Tank Spray and Atomizlng Valve: repair6-81·0-EPCD
255-72-001Number 2 Deaeratlng Feed Tank Spray and Atomizing Valve: repair6-65-0-EPCD
256-10-001Number One and 2 SSTG Auxiliary Condenser Sea Water Rubber Expansion Joint; replace6-65-0-EPCD
256-10·002Number 3 SSTG Auxiliary Condenser Sea Waler Rubber Expansion Joint; replace6-73-0-EPCD
256-10-003Number 4 and 5 SSTG Auxiliary Condenser Sea Water Rubber Expansion Joint: replace6-81-0-EPCD
256-11-001Auxiliary Condenser Number 2 Overboard Discharge Piping; replace6-65-0-EPCD
256-11-002Pipe Hanger; replace5-37-0-EPCD
256-11-003Plplng Hanger; replace4-97-2-EPCD
256-12-002Number 2 Main Condenser Discharge and Suction Valve Operator; repair6-65-0-EPCD
256-22-001Number 2 Main Circulating Pump; repair6-65-0-EPCD
256-31-001Number One Ship Service Turbine Generator Auxiliary Seawater Circulating Pump: repair6-65-0-EPCD
300-11-001Kick.pipe: repairWeather Deck, 01 Level, Frames 126 lo 133, StarboardPCD
311-14-001Number 4 Ship Service Turbine Generator (SSTG) Expansion Joint; replace6-81-0-EPCD
311-15-001Number 5 Ship Service Turbine Generator (SSTG): repair6-81-0-EPCD
313-90-001SCD-13220-LHD1-

089, Battery Charging Station (BCS) and 1X3

Stowage Locker (BSL) Foundation Fastener Change- Out; accomplish1-67-3-Q60HZ/400HZ
313-90-002SCD 132201<.
Lithium- ton Battery Shop Vacuum Breaker Valve Installation; accomplish1-67-3-Q60HZ/400HZ
324-11-001Power Panel; replace2·127•2-E60HZ/400HZ
324-80-001LH01 Class AER 14/02, Tns tall Isolation Fuse In Shore Power Switchboard; accomplishThroughout the Shlp60HZ/400HZ
342-80-001ShlpAlt LHD1- 91315D, Emergency Diesel Generator (EOG) Vacuum Breaker Relocation accomplish4-41-2-E, 3-114-2-E60HZ/400HZ
406-11-002Certified Ordnance Ground Point: installFlight Deck, 03 Level, Frames 7 lo 122, Port and Starboard60HZ/400HZ
423-15-001ANfvVSC-8 (V)2

Radar Cable Collar,

repair01-67-3-WEA60HZ/400HZ
436-80-001ShipAlt LHD1- 876400 , l HD-1

Class Combustible Gas and Hydrogen Sulfide Monitor Upgrade;

accomplishThroughout the Ship60HZ/400HZ
471-11-001AN/SLQ-32
Antenna Enclosure Purge Air VenUlatlon; repair05-73-1-C, 05-71-1-0 , 06-70-3· L60HZ/400HZ
475-11-001Degaussing Equipment and Cable; repair4-41-0-APCD
505-11-001Pipe Hanger: replace4-89-0-AUNDOCK
505-11-002smcon Aluminum Bronze (SAB) Union Fitting; Inspect and replaceThroughout the ShipUNDOCK
506-11-001Fuel OU Overflow and Air Escape Plplng; replace3-73-2-L, 1-65-8-LUNDOCK
508-11-001Lagging and Insulation, Inside Machinery Space; replaceInside Machinery SpacesDT
508-12-001Lagging and Insulation, Outside Machinery Space; replaceOutside Machinery SpacesDT
511-11-002Ventilation Heater; replace01-33-2-0HENL/BENL
511-11-003Ventilation Heater; replace01-125-3·0HENL/BENL
511-11-004Ventilation Heater; replace01-106-2-QHENL/BENL
511-11-005Ventilation Heater: replace01-107-2-QHENL/BENL
511-11·006Ventilation Healer; replace02-98-3-0HENL/BENL
511-11-007Ventilation Heater; replace1-58-2-QHENL/BENL
511-11-008VenUlation Heater; replace1-69-3-0HENL/BENL
511-11-010Ventilation Heater; replace01-49 1/2-2-Q, 1-79-1-L, 1-85-

1-0, 01-85-3-A, 01-122- 4-Q,

02-73-3-L, 02-114-2-QHENL/BENL
511-11-011Ventilation Heater; replace1-53-3-0, 01-70-2-Q, 1-83-0-Q,

01-102-1-Q, 01-103-1-Q, 01- 106-2-0, 01-107-2-Q, 01-110-

2-0. 01-111-2-Q, 01-125-5-0HENL/BENL
511-11-012Ventilation Heater; replace01-111-2-Q, 01-49.5-2-0, 01-
41-0-LHENL/BENL
511-11-013Service Steam Piping: replace1-49-0-0UNDOCK
511-11-014Service Steam Piping; replace1-45·0-0UNDOCK
511-11-015Service Steam Piping; replace02-37.5-0-0UNDOCK
512-11-001Gatley and Laundry Exhaust Ventilation Cleaning; accomplishThroughout the ShipHENL/BENL
512-11-002Cooling Coil; replace01-57-6-QHENL/BENL
512-11-003Supply Fan Motor; repair01-125-5-0, 01-126-4-0, 01-
110-1-QHENL/BENL
512-11-004Gaylord Wash Down System; repair1-41-4-0, 1-45-0-0, 02-37.5-0-
oHENL/BENL
512-11-005Supply Vent Fan; repair01-126-4-Q, 2-121-4-QHENL/BENL
512-11-006Cooling Coll; replace02-65-5-QHENL/BENL
512-11-007Ventilation Ducting; replace02-122-5-0HENL/BENL
512-11-008Exhaust Ventilatoin; replace4-89-0-A, 2-89-1-0HENL/BENL
512-11-009Venlllallon and
Exhaust Duct; repair2-98-2-0HENL/BENL
512-11-010Exhaust Fan E01- 55-4; repari01-55-2-0HENL/BENL
512-11-011Preheater and Ventilation Ducting; replace01- 77-3-KHENL/BENL
512-11-012Access Panel; Install01-57-6-QHENL/BENL
512-11-013Natural Supply Ventilation Spool; replace1-102-2-0HENL/BENL
512-11-014Ventilation Closure Valve; repair4-89-2-EHENL/BENL
512-11-015Ventilation Ducting: repair2-105-2-AHENL/BENL
512-11-016Ventilation Ducting; install2-122-3-AHENL/BENL
512-11.017Ventilation Ducting; replace4-49-0-AHENL/BENL
512-11-018Venttlali onDucting; install2-101-1-QHENL/BENL
512-90-001ShipAlt LHD1- 82975K, M-L
Replace Ventilation Trunk/Install Moisture Separalor - Laundry; accomplish (Option Item)Throughout the ShipHENL/BENL
513-90-001ShipAlt LHD1- 82966K, M-L
Replace Ventilation Trunk/Install MoistureSeparator Machinery Room Number One; accomplish (Option Item)Throughout the ShlpHENL/BENL
513-90-002ShlpAlt LHD1- 82971K, M-L
Replace Ventilation Trunk/Install Moisture Separator, Machinery Room Number 2: accomplish (OpUon Item)Throughout the ShlpHENL/BENL
513-90-003ShipAlt LHD1- 82972K, M-L
Replace Ventilation Trunk/Install Moisture Separator - Emergency Generator Room Number One and Number 2: accomplish (Option Item)Throughout the ShipHENL/BENL
513-90-004ShlpAlt LHD1- 82974K, M-L

Replace Ventilation

Trunk/Install Moisture Separator - Auxiliary Machinery Room: accomplish(Option Item)Throughout the ShipHENL/BENL
514-11-001Chilled Water System Segregation Valve; replace02-57-01-L, 3-49-0-AUNDOCK
514-11-002Chilled Water Valve; replace02-41-2-LUNDOCK
514-11-003Chilled Water Isolation Valve; replace4-41-2-EUNDOCK
514-11-004Chilled Water System Segregation Valve; replace2-33-0-L, 2-122-3-A, 02-97-0-LUNDOCK
514-11-005Chill Water System; repair02-79-3-Q, 02-39-4-Q, 04-89-

3-Q, 01-33-2-Q, 02-125-3-0,

02-T-1-QUNDOCK
514-11-006Chilled Water Segregation Valve; replace3-49-0-AUNDOCK
514-11-007Chilled Water Pipe Hanger; replace2-122-3-AUNDOCK
514-21-001Air Conditioning Plant; repair4-41-2-E, 6-73-0-EUNDOCK
514-22-001Air Conditioning Plant Condenser Water Control Valve; repair6-73-0-E, 4-89-2-E, 4-41·2-EUNDOCK
516-11-001Refrigeration Plant; repair6-45.().E, 4-46 112-2-L, 5-47-1-
l , 1-49-1-A, 5-44-0·A, 5-41-Q. A, 4-45-0-A, 4-47·2-AUNDOCK
520-10-003Sea Valve; repair and replace10-003UNDOCK
521-11-001Flremaln Pipe Hanger; replace4-89-0-AUNDOCK
521-11-002Remote Operator and Valve; repairThroughout the ShipUNDOCK
521-11-003Flremalr. Pipe System; repair2·122-3-AUNDOCK
521-21-001Number 12 Fire Pump; repair5.5-99-0-EPCD
521-21-002Number 9 Flre PumpMechancial Seal; replace5.5-99-0-EPCD
521-21-003Number 5 and 6 Fire Pump Mechanical Seal, replace6-65-0-EPCD
526-11-001Split Pipe Scuppe;r replaceFreeborad, Port and StarboardUNDOCK
526-12-001Force Draft Btower Drain li ne: install6-81-Q.EPCD
526-12-002Synthetic Downcomer; repairHull, 01 Level to First Platform, Frame 15 to Stem, Port and StarboardUNDOCK
528-11-001Collectlon. Holding and Transfer (CHT) Piping; replace2-39.5·0-L,3-49-0-QUNDOCK
528-11-002Colfectlon, Holding and Transfer Piping;
replace02-97-0-LUNDOCK
529-11-001Main Drainage Eductor Valve; replace6-65.().EUNDOCK
529-11-002Eductor Valve and Remote Operator.; reparr6-41-0-E, 5-4M-LUNDOCK
529-11-003Maln Drainage System Valve; replace6-81-0-EUNDOCK
529-11-004Firemaln Supply Valve: replace5-9M-TUNDOCK
529-11-005Remote Operaot r: repair5.5-97-0-E, 5-97-1-T, 3-114-2- E, 3-121-2-LUNDOCK
529-11-006Main Drainage Valve; replace6-41-0-EUNDOCK
529-11-007Ballast Tank Relief Valve; repair01-T-O-Q, 2-89 1/2-2-Q, 2-93-
2-A, 3-89-3-AUNDOCK
529-11-008Bilge Pocket Drain Piping; replace4-97-2-E, 5-37-0-EUNDOCK
529-21-001Olly Waste Piping; replace6-65-0·EUNDOCK
529-21-002Number One Waste Water Transfer Pump Foundation; repair6-65-0-EUNDOCK
531-11-001Distilling Plant Number One Feedwater Heater/After Condenser; clean, inspect and repair6-65-0-EPCD
531-12-001Distilling Plant Number2 Feedwater Heater/After Condenser; replace6-81-0·EPCD
531-12-002
•Distilling Plant Number 2 Feedwater Heater/After Condenser; clean, inspect and repair (Option Item)6-81-0-EPCD
531-80-001ShipAlt LHD1- 93453D, Distillate Pump\Motor and Power Upgrade; accomplish6-65-0-E, 6-81-0-E, 7-65-1-WPCD
532-11-001Electronics Cooling Water Pump; repair02-79-3-Q60HZ/400HZ
533-11-001Flight Deck Potable Water Washdown Station; repair02-109-2-Q, 02-114-2-Q, 02-

59-8-L, 02-41-1-L, 02-27-3-L,

02-65-2-L, 02-41-2-L, 02-25-8- L60HZ/400HZ
534-80-001LHD1 Class AER 12/02, Forced Draft Blower (FOB) Low Point Drain; accomplish6-65-0-E, 6-81-0·EPCD
541-21-001Number 2 Fuel Oil Transfer Pump (FOTP) and Motor; repair6-65-0-EPCD
542-11-002JP-5 Fueling Station Hose Reel; replaceF-112-J, F-109.J, F-86.J, F·
86.J, F-62-J, F- 62-J, F-36.J, F-31.JPCD
542-21-001JP-5 Fuel/Defuel Pump: overhaulF-112-J, F-86-J, F-36-J. F-31- J, 1-83-0-Q, H-112-JPCD
542-22-001Number 4 JP-5 Transfer Purifier: repair5.5-101-0-EPCD
551-11-001Number One Emergency Diesel Generator Starting Air Marotta Pressure Reducing Manifold; overhaul4-41-2-EPCD
551-11-002High Pressure Air System Regulating Manifold; repair5-37-0-E, 4-97-2-EFiremain/HP-LP Air/AFFF
551-11-003Number One Emergency Diesel Generator Starting Air Marotta Pressure Reducing Manifold; overhaul4-41-2-EFiremain/HP-LP Air/AFFF
551-51-002High Pressure Air Compressor Overhaul; accomplish5-37-0-E, 4-97-2-EFiremain/HP-LP Air/AFFF
551-53-001Low Pressure Air Compressor (LPAC) and Motor; overhaul6-65-0-E, 6-81-0-EFiremain/HP-LP Air/AFFF
551-53-002Low Pressure Air Compressor (LPAC) and Motor Controller; repair5-37-0-E, 4-97-2-EFiremain/HP-LP Air/AFFF
555-12-001Aqueous Film Forming Foam (AFFF) Hose Reel and Foundation; repair and preserveWeather Deck, 02 Level, Frame 23, Starboard, AFFF Hose Station Number One: Weather Deck, 02 Level, Frame 5, Starboard, AFFF Hose Station Number One A; Weather Deck, 02 Level, Frame 22, Port, AFFF Hose Station Number 2; Weather Deck, 02 Level, Frame 5, Port, AFFF Hose Station Number 2A;PCD
555-12-001
(cont'd)Aqueous Film Forming Foam (AFFF) Hose Reel and Foundation; repair and preserveWeather Deck, 02 Level, Frame 36, Starboard, AFFF Hose Station Number 3; Weather Deck, 02 Level, Frame 35, Port, AFFF Hose Station Number 4; Weather Deck, 02 Level, Frame 49, Starboard, AFFF Hose Station Number 5; Weather Deck, 02 Level, Frame 49, Port, AFFF Hose Station Number 6; Weather Deck, 03 Levei, Frame 64, Centerline, AFFF Hose Station Number 7; Weather Deck, 02 Level, Frame 63, Port, AFFF Hose Station Number 8; Weather Deck, 03 Level, Frame 71, Starboard, AFFF Hose Station Number 9; Weather Deck, 02 Level, Frame 72, Port, AFFF Hose Station Number 10; Weather Deck, 03 Level, Frame 76, Starboard, AFFF Hose Station Number 11; Weather Deck, 02 Level, Frame 84, Port, AFFF Hose Station Number 12; Weather Deck, 03 Level, Frame 88, Starboard, AFFF Hose Station Number 13; Weather Deck, 03 Level, Frame 89, Starboard, AFFF Hose Station Number 14; Weather Deck, 02 Level, Frame 97. Starboard, AFFF Hose Station Number 15: Weather Deck, 02 Level, Frame 111, Port. AFFF Hose Station Number 16; Weather Deck, 02 Level, Frame 1OB. Starboard, AFFF Hose Station Number 17; Weather Deck, 02 Level, Frame 124, Port, AFFF Hose Station Number 18.; Weather Deck. 02 Level.
Frame 124, Starboard, AFFF Hose Station Number 19PCD
555-12·002Aqueous Film Forming Foam (AFFF)GP5
Isolation Valve; replace3-49-0-QUNDOCK
561-11-0012A and 2B Steering Gear Pump; replaceM 21· 2·EUNDOCK
562-11-001Port and Starboard Rudder Bearing Seal and Rudderstock Seal; repair7-121-3-E, 7-121-2-EUNDOCK
562-11 -002Port Rudder Stock Bearing: replace7-121-2-EUNDOCK
562-11-003Port Rudder: repalr7+121 +2-EUNDOCK
562-11-004Starboard Rudder: repalrM 21-3-EUNDOCK
562-11-005Starboard Rudder Stock Bearing; replace7-121-3-EUNDOCK
571-31-001Fuellng At Sea (FAS) Static Load Test; accompllshH S-1-0 , 1-98-1-Q, 1-90-1-0PCD
572-11-001Dumbwaiter Number One; repair1-41-2-THENL/BENL
575-20-001Skleport Vehlcle Ramp Assembl repalrWeather Deck, 03 Leve1, Frames 100 to 106, PortPCD
581-11-002Anchor and Anchor Chain; Inspect and P reserve01-T-O-Q, 1-13- 0-Q, 4-17-1.Q,
4-17-2-QPCD
582-11·002Ralchetlng Capstan Removal; accompllsh4-89-0-APCD
583-21-002Encapsulated Lifeboat, tnflatable; remove, store and Install02 Level, Port and StarboardPCD
583-90-001ShlpAIILHD1- 75091K, LHA/LHD
Class Boat Davit Replacement: accompllshThroughout the ShipCREW MOVE ABOARD
584-13-001Well Deck Vent
Plenum Door; overhaul1-73-5-T, 1-74-2-T, 1-81-2-TPCD
584-21-001Upper Stem GateRepairs and Stem
Gate Seal Replacement; accompllsh4-89-0-APCD
584-21-002Stem Gale Upper and Lower Hydraullc Cylinder Assembly; repair4-125-1-E, 4-125-2-E, 2-127-1- E, 2-127-2-EPCD
584-21-003Upper Stem Gate Latch Release Assembly; replace4-89-0-A, 2-127-2-E, 2-127-1-EPCD
584-31-001Hinged Vehicle Ramp; repair3-49-0-A, 4-49-0-APCD
584-31-002Vehicle Hinged Ramp Motor Controller; repair4-49-0-APCD
588-11-001Aircraft Elevator Door Lower Wiper; replace1-83-0-QPCD
588-11-002Aircraft Elevator, Hinged Leaf, Gusset and Structural; repair3-89-2-EPCD
588-21-001Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy; correctVariousPCD
589-21-001Aircraft Bridge Crane Load Test; accomplish1-83-0-QPCD
589-21-002Starboard Sideport Cargo Crane: repair and welght test3-65-1-APCD
589-62-001Port and Starboard Sldeport Shell Door Assembly; repair3-65-2-A, 3-65-1-APCD
589-62-002Port Sldeport Inner Door Assembly; repair3-65-2-APCD
593-11-001Collection, Holding and Transfer (CHT) Piping System Chemical Cleaning; accomplishThroughout the ShipUNDOCK
593-11-003Collection, Holding and Transfer (CHT) Tank Spray Nozzle Piping; replace6-37-0-WUNDOCK
593-11-004Collection, Holding and Transfer (CHT) Piping; replace4-89-1-V, 6-81-0-E, 4-93-1-EUNDOCK
593-12-001Service Sink Drain Piping; replace3-113-6-WUNDOCK
602-11-001Tank Identification Pla card; install5-49-1-F, 6-37-1-JUNDOCK
611-11-001Well Deck Cloverleaf Socket; replace4-89-0-APCD
612-11-002Debarkation Platfonn Removal and Fixed Safety Ran Ins tallation; accomplish4-89-0-APCD
612-11-004Uferall and Cableway Suppor;t replaceWeather Deck, 03 Level, Frames 85 to 88, PortPCD
612-21-001Safety Net and Frame: repair and preserveFi ght Deck, 03 Level, Frame T to Frame 130, Port and StarboardPCD
612-21-002Safety Net Frame; preserveFlight Deck, Outboard of Elevator Platfonn, Frames 88 to 98, Port Flight Deck, Outboard of Elevator Platform, Frames 112 to 122, StarboardPCD
612-90-001ShlpAtt LH01- 82183K, Safety Improvement to LHD Access Trunk Safety Net; accomplish (Option Item)Throughout the ShipUNDOCK
621-11-001Metal Joiner Bulkhead: repair2-105-3-LHENL/BENL
622-11-001Deck Grating; replace4-97-2-EHENL/BENL
623-21-001Accommodation Ladder; repair2-78-2-WEA, 2-76-1-WEAHENL/BENL
624-11-001Balanced Joiner Door; remove, store and Install6-65-0-E, 6-73-0-E, 6-81-0-EHENL/BENL
625-11-002Aviation Weapon Movement Control Station Window; replace01- 98-2-QHENL/BENL
625-11-004Pilot House
Window; replace06-65-1-CHENL/BENL
631-11-001Bilge; preserve6-93-0-EPCD
631-11-002Machinery Space
BIige; preserve6-65-0-E, 6-81-0-E, 6-73-0-EPCD
631-11-003Deck Grating; replace6-73-0-EHENL/BENL
631-11-004LCAC Pump Room Bilge: preserve6-93-0-E, 7-93-1-F, 7-93-2-FPCD
631-11-005Stem Gate Machinery Room; preserve4-125-1-E, 4-125-2-E, 2-127-1- E, 2-127-2-EPCD
631-11-006JP-5 Pump Room Number One BIige; preserve6-41-0-EPCD
631-12-001Sewage Receiving Station Deck; preserve3-113-6-W, 4-113-2-WPCD
631-12-002Machinery Room Number 2 Deck; preserve6-B1-0-EPCD
631-12-003JP-5 Pump Room Number 2 Deck; preserve5.5-101-0-EPCD
631-12-004Shaft Alley;
preserve7-89A-3-EPCD
631-12-005Shaft Alley; preserve (touch-up)7-89B-3-EPCD
631-12-006Machinery Room Number One; preserve (touch-up}6-65-0-EPCD
631-13-003Well Deck Overhead; preserve4-69-0-A, 3-49-0-APCD
631-13-004Aircraft Elevator Power Stanchion Room; preserve02-112.5-1-EPCD
631-13-005Ramp and Sump; preserve4-89-0-APCD
631-13-007Number 10 Flammable Liquid Cargo Bulkhead; preserve5-97-01-KPCD
631-13-008Escape Trunk Bulkhead and Deck; preserve6-80.5-2-TPCD
631-13-009Access Trunk Bulkhead; preserve6-105-1-TPCD
631-13-010Access Trunk Bulkhead; preserve7-121-5-TPCD
631-13-011Well Deck Vent Tunnel; preserve1-74-2-TPCD
631-21-001Mast: preserveForward Mast, Frame 73, 06

Level to 188' 6" ABL, including Stub Mast, Yardarms, and

tforms; Aft Mast, Frame 85, 0 7 Level lo 215' 8" ABL, lncludlng Stub Mast. Yardarms, and PlatformsPCD
631-21-002Port 50 Caliber

Platform Number 4

Nonskid ; replacePort 50 Caliber Platform Number 4, 02 Level, Frame 58, PortPCD
631-21-003Wealher Deck Covering and Nonskid: replacePort to StarboardPCD
631-21-004Deck Edge Aircraft E levator; preservePort Deck Edge Aircraft Elevator; Starboard Deck Edge Aircraft Elevator. Wealher Deck, 02 Level, Frames 89 and
97. Port; Weather Deck, 02 Level, Frames 113 and121, StarboardPCD
631-31-001Underwater Hull; p reserveUnderwater Surfaces, Keel to Upper Boot Top Limits; Underwater Hull From Flat Keels to Six Inches Above the Boot Top, to Include BIige
Keels, Skeg, Fln Stablllzer. Rudders,UNDOCK
631-41-001Freeboard; preserveEntire surfaces of the Freeboard from 6 Inches below the upper boot top up to underside of flight deck draln troughs, Port and Starboard; Gallery decks, including underside of fUght deck, walkways, fantail includes

bulkheads, overhead, gunnels,drop decks, ladders,; Interior and exterior side of upper and lower stem gate; Undersides and sides of Aircraft elevators, wells, and tracks extendingoutside of both hangar bay

doors, and includtng all antennaUNDOCK
633-21-002fmpressed CurrentCalhodlc Protection
(ICCP) System:inspect and repairThroughout the ShipUNDOCK
634-11-001Food Service Office Chemical- Resistant Floor Covering System; Install1-65-2-QUNDOCK
634-11-002Deck Covering, Electrical Grade Matting; InstallDCC, 5-79-0-CUNDOCK
634-11-003Deck Covering, Electrical Grade Sheeting; replace02-65-0-CUNDOCK
634-11-005Deck Covering; replace5-97-01-KUNDOCK
634-11-007AFFF Station Deck; preserve1-50.5-4-Q, 2-49-4-QPCD
634-11-010Cleaning Gear Locker Chemical - Resistant Floor Covering System; replace1-39-4-APCD
634-11-01325MM/Alrcraft Component Storeroom Chemical
- Resistant Floor Covering System; Install02-117-4-APCD
634-11-01425 MM/50 CAL
Platform Deck Covering, Nonskid; replace02-16-1-WEA, 02-16-2-WEA,

02-83-5-WEA, 02-126-1-WEA,

02-126-2-WEAPCD
634-11-015Chemical- Resistant Floor Covering System; replace01-83-4-LUNDOCK
634-21-001Flight Deck, Catwalk and Platform Nonskid; replacebehind the IslandPCD
637-11-001Overhead Sheathing and Structural; repair1-40-1-L. 02-53-3-L, 02-54.5-1- L, 02-56-1-LUNDOCK
641-11-001Officer Space Habitability Repair (ORPR-S9820);
accomplish02-19-2-L, 02-20-2-L, 02-13-2-

L, 02-20-0-L, 02-13-0·L, 02-13- 1-L, 02-51-3-L, 02-31-2-L, 02- 51.5-6-L, 02-19-0-L, 02-35-4-A, 02-35-8-L, 02-33-12-L, 02-49- 4-L, 02-53-6-L, 02-63-8-L, 02- 58.5-0-L, 02-64-1-L, 02-19-1-L, 02-41-4-L, 02-35-2-L, 02-35-1- L, 02-36.5-1-L, 02-51-1-L, 02- 45-1-L, 02-25-1-L, 02-25-0-L, 02-25-2-L, 02-27-4-L, LHD 1, 02-31-4-L, 02-59-8-L, 02-56.5-

2-L, 02-56.5-4-L, 02-63-3-LHENL/BENL
643-11-001Troop Uving Space HabitabilityProject (BTRP-S9670)
Installation; accomplish (OPTION ITEM)01-41-0-LHENL/BENL
643-11-003Troop Living Space Habitability Project (BTRP-S9892)
Installation; accomplish (OPTION ITEM)01-49-01-LHENL/BENL
644-11-001Troop Sanitary Space HabltabHity Project(HTRP- S0416) Installation; accomplish (OPTION ITEM)01-47-0-L, 01-47-01-L, 01-
47.5-1-A, 01-48-1-LHENL/BENL
644-11-003Habitability Project HTRP-S9893, Troop
Sanitary Space Modification: accomplish (OPTION ITEM)01-49-0-L, 01-49-1-L, 01-50.5-
0-L, 01-51-1-AHENL/BENL
651-11-001Crew and Troop Galley: repair1-49-0-0HENL/BENL
651-11-002Dishwasher, replace02- 39-2-0HENL/BENL
651-11-003Crew& Troop Scullery Number 2 Dishwasher, replace1-65-4-0HENL/BENL
651-11-004Messroom
Beverage Service Stand; repair02-41-01-L, 1--41- 0 1- l , 1 -57 -0- LHENL/BENL
651-11-005Hotwell Drain Plplng; repair02-37 1/2-0-Q, 1-45-0-0 , 1-49-
0-QHENL/BENL
651-90-001JSF Freezer Tie Down; Install02-122-5-AHENL/BENL
652-11-001Medical Privacy Curtain Track; replace01-57-0-L, 01-65-0-LHENL/BENL
652-80-001ShlpAlt LHD1- 761780, Blood Bank Freezer Replacement; accomplish01-73-4-L, 1-73-8-L, 01-73-0-L,

01-63 1/2-2-L, 01-73-2-L, 1-74-

2-T, 1-67-2-LHENL/BENL
654-11-001Brig Cell 0-Type Locker; replace5-73-5-LHENL/BENL
655-11-001Laundry Press; replace4-73-0-QHENL/BENL
665-10-001Workbench; replace5-47.Q.C, 5-77-0-C, 02-57-3-QHENL/BENL
671-11-001Locker; replace1-90-1-QHENL/BENL
703-90-001ShlpAlt LHD1- 92048D, Indoor Simulated Marksmanship Trainer (ISMT); accomplish (OPTION ITEM)5-25-0-WHENL/BENL
721-11-001NATO Sea Sparrow Missile System (NSSMS) Launcher Ring; replaceNSSMS Launcher Platfonn Number One, 04 Level, Frame 57, SlbdC51LO
763-11-001Pistol Locker; replace2-50-3-QHENL/BENL
763-11-002Ordnance Locker; preserve01-132-0-WEA, 02-83-5-WEA,

02-83-6-WEA, 02-23-5-WEA,

02-21-6-WEA, 02-74-5-WEA,

02-126-2-WEAHENL/BENL
763-90-001ShlpAlt LHD1- 89007.02K, Troop

Rifle Stowage and Marine Air Ground Task Force (MAGTF) Supporting Elemenl (SE)Space Reconfiguralionand ShlpAlt LHD1· 83907.020 Welghl and Moment Compensation

Well Deck Cargo Monorail Syslem Remova:l accomplish (Option llem)Throughoul the ShipHENL/BENL
772-20-001Number One, 3 and 5 Cargo Elevalor Hydraulic Control Manifold; replace03-53-1-Q, 6-57-1-T, 03-85-3-Q
HENL/BENL
782-11-001Bomb Jettison Ramp; repairBomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 38, Stbd; Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 60, Stbd; Bomb JetUson Ramp, Flight Deck/Catwalk, 03 Le,ve. Frame 91, Stbd; Bomb JettisonRamp, Flight Deck/Catwalk, 03 Level, Frame 45, Port Aircraft Elevator.

Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame

121. Stbd Aircraft Elevator; Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 126, Port; Bomb JetUson Ramp, Flight Deck/Catwalk, 03 Level, Frame 97, Port; Bomb Jettison Ramp, Flight Deck/Catwalk. 03 Level,Frame

117, PortPCD
830-80-001ShlpAlt LHD1- 83907.010, Weight and Moment Compensation - Main Drainage System Remote Operating Gear Removal: accomplishThroughoutthe ShipPCD
830-80-002ShlpAlt LHD1-83907.030 , Weight and Moment Compensation - Main Balloon Inflation Helium System Removal; accomplish01-127-2-Q, 1-125-2-Q, 1-125-
4-Q , 01-122-4-QPCD
830-80-003ShlpAlt LH01- 83907.040,
LHA6/LHD1 Class Weight and Moment Compensation - Well Deck and Vehicle Deck Carbon Monoxide Monitoring System Removal; accomplish2·122·2-C, Lower, 3-49-0-A, Upper, 4-49-0-A, 4-89-0-APCD
837-11-001Antenna Photographs; provideTopsideEOA
857-11-001Temporary Duty Section Berthing

Off-Ship; provide (Out ofHomeport)(Option

l Item)Not ApplicableEOA
857-11-002Temporary Galley and Messing Facility; provide (Out of Homeport)(Oplion Item)Vicinity of Ship or Berthing FacilityEOA
857-11-003Temporary Off-Ship Berthing Equivalent to BOQ/BEQ; provide (Out of Homeport)(Option Item)Not ApplicableEOA
867-21-001Combat Systems Discrepancy Correction; accomplishThroughout the ShipEOA
897-11-001Availability Program Management Multi Cable Transit Cableway Integrator; provideThroughout the ShipEOA
980-11-001Combat Systems Industrial Support Service; provideVariousEOA
980-11-002Industrial Support Service; provideVariousEOA
980-11-004Office Trailer; provide1-83-0-QEOA
980-11-005Norfolk Naval Shipyard (NNSY) Core-Work Support Service; provide4-49-0-A, 6-65-0-E, 6-81-0-EEOA
980-31-001Office Space Without Computer for In-Plant Availability; provideContractor's PlantEOA
980-31-002Temporary Office, Classroom, and Parking for Ship's Force; provideContractor's FacilityEOA
980-80-001SCD 1827,
ANISPQ-9B Initial Install, Alteration Installation Team (AIT) Support Service; provide08-86-0-MSTEOA
980-80-002ShipAlt LHD1- 85677D, Install Radar Tank Level Indicators(TLI) on Collection, Holding and Transfer (CHT) Tanks, Alteration lnstaDalion Team (AIT) Support Service: provide5-37-0-E, 6-39-0·E, 6-73-0-E,
5-76-3-Q, 5-75-1-LEOA
980-80-003ShlpA[t LHD1- 85667, Install Radar TLls/TDRs on Auxiliary Tanks, Alteration Installation Team (AIT) Support Service; provide5-73-2-F, 5-73-4-F, 4.5-73-2-F,

4.5-73-4-F, 5-81-2-F, 5-81-4-F, 4.5-81-2-F. 4.5-81-4-F, 7-73-1- F, 7-73-2-F, 7-79.5-2-F. 7-41-0- F, 7-91- 0-F, 7-89-0-F, 7-87-1- F, 6.5-85-1-F, 7-71-2-F, 6.5-70- 2-F, 7-121-4-F, 7-101-0-F, 7- 71.5-2-W, 7-87.5-1-W, 7-96-2- F. 4-87-2-W, 6-41-0-E, 4-73-0- Q, 4-80-2-L, 4-76-2-Q, 6-73-0-

E, LHD 1, 5-88.5-2-L, 5-65-0-E,

6-65-0-E, 5-86.5-0-E,6-81-0-E, 7-89-4-E, 6-93-0-E, 7-121-2-E,

5.5-101-0-EEOA
980-80-004ShlpAlt LHD1- 934530 - ShlpAlt LHD1-71894,
Distillate Pump, Motor and Demlneralizer Upgrade, Alteration Installation Team (Aff) Support Service: provide6-65-0-E, 6-81-0-EEOA
980-80-005ShlpAlt 81942D, Cargo Weapons EtevatorsProximity Switch Upgrade, Afteralion Installation Team (All) Support Service; provideCWE, 6-53-3-T, 2-49-1-E, 03-

53-3, 3-49-0-A, 5-49-01-M, 6- 49-0-M, 6-53-1-M, 6-54-2-T, 2- 54-2-E, 3-43-0-A, 6-53-2-M, 6-

51-0-MEOA
980-80-006ShipAlt 872850, Dissolved Oxygen Monitoring System, Alteration fnstallation Team (All) Support Service; provide6-65-0-E, 6-81-0-EEOA
980-80-007ShlpAlt 761010, DossertLugConnector

Replacement, Alteration InstallationTeam (AIT) Support Service; provide 1-1-2-Q, 4-41-2-E, 3-49-5-Q, 2- 49-4-Q, 6-73-0-E, 2-77-1-0 , 2- 74.5-2-Q, 2-87-3-Q, 2-89.5-2-

Q, 6-81-0-E, OM10-1-Q, 01-

97-2-L, 2-125-1-0 . 01-122-6-Q,

6-65-0-E, 3-114-2-EEOA
980-80-008ShipAlt 862600, LHD OFT Sight Glass Upgrade, Alteration Installation Team (AIT) Support Service; provide6-65-0-E, 6-81-0-EEOA
980-B0-009ShlpAlt LHD1- 84178D, Aircraft Elevator Plalfonn Bumper (MSA), Alteration Installation Team (AIT) Support Service; provideThroughout the ShipEOA
980-80-010ShipAlt LHD1- 874290, Soot
Blower System Modification. Alteration Installation Team (AIT) Support Service; provide6-65-0-E, 6-81-0-EEOA
980-80-011ShipAlt LHD1- 869910, Boiler Combustion Monitoring System (BCMS) Upgrade, Alteration Installation Team (AIT) Support Service; provide6-65-0-E, 6-81-0-EEOA
980-80-012ShipAlt, LHD1·

81818K, Propulsion/Au x Control and ShlpAlt LHD1-92190K, Ballast and Damage Co n trol Alteration, Alteration InstallationTeam (AIT) Support Service; provide 3-77-2-0 , 1-98· 2-Q, 3-49-5-Q,ADP, 02-89-3-0 , 2-85-1-C,5-75-0-0 , 5-79-0-C,01-86-2-0 ,4-77-2-Q, 2-101-1-0 , 2-89-1-Q,06-65-1-C. 02-103.5-20-, 01-06-65-1-C. 02-103.5-20-, 01-25-1-A, 1-42.5-1-Q, 02-57-3-Q,5-65-0-E, 05-71-1-0 , 5-86.5-0- E, 02-101-0-A, 02-117-0-Q, 02-

101-2-Q, 5-77-0-C,2-68-2-Q,LHD 1. 6-73-0-E, 07-86-1-Q, 1-123-1-Q, 1-65-5-Q, 02-126.5-3-A, 02-T-1-Q, 02-39-9-0 , 01-33·2-0 . 02-79-3-Q, 04-89-3-Q, 01-125-3-a , 03. 73. 3. a . 02-91-1-QEOA
980-90-001OrdAlt 79686, CIWS Block 1B Next Generation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)05-65-3-C, 01-130-0-CEOA
980-90-002ShipAlt 83463K, AF27T-12-HCTS,
Alteration tnstallation Team (AIT) Support Service: provide (OPTION ITEM)1-106-2-Q, 1-83-0-Q, 2-105-4-
QEOA
980-90.003ShlpAlt 93500K, JSF SAP-F Planner Cell Mods, Alteration Installation Team (AIT) Support Service: provide (OPTION ITEM)03-85.5-3-Q, 02-82-1-Q, 02-85-

3-C, 02-85-1-0, 02-81-5-L, 02- 87-1-0, 02-86.5-1-Q, 02-84-3-a.02-a5-5-a. 1-s3-o-a. 01-85-

1-0 . 03-85-3-QEOA
980-90-004ShipAlt 86950K, S- IBS Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)02-65-0-C, 06-65-1-C, 06-67-7-
C, 06-70-3-L, 5-77-0-CEOA
980-90-007EC82924K, PEOC41 SLEP SW

5.0.1 SMQ-11 EC1, Alteration

Ins tallationTeam

(AIT) Support Service; provide (OPTION ITEM)Throughout the ShipEOA
980-90-008ShipAlt 92964K, CANES HW1.2
Tech Refresht Alteration Installation Team (AIT) Support Service: provide (OPTION ITEM)02-13-4-A, 02-37.5-4-C, 2-30-

0-L, 2-49-2-Q, 01-66-3-A, 1-69- 2-Q , 02-65-3-C , 02-7 1 -2 -Q, 02- 73-0-C, 02-78-2-C, 02-71-1-C, 02-79-1-C, 02-81-0-C, 02-85-0- C, 02-89-2-C, 02-89-3-Q, 01-

122-4-Q, 02-113-2-Q, 04-67-1- CEOA
980-90-009ShlpAlt 81798K,

NAVMACS

Technical Refresh, Alteration

InstallationTeam (AIT) Support Service: provide (OPTION ITEM)02-89-2-C, 1-83-0-QEOA
980-90-010Shfp Alt 84700K, LMMT AFLOAT.
Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)02-65-0-C, 02-77-0-C, 02-73-0-
C, 02-85-0-C, 02-71-1-C, 5-47- 0-C, 02-79-1-CEOA
980-90-011ShipAll 86539K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)02-65-0-C, 02-71-1-CEOA
980-90-012ShipAlt 93327K, DCGS-N New
Sensor Rack, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM}02-81-0-C, 02-85-0-CEOA
980-90-013ShlpAlt 82776K, ShipAll 78069K, TMP 93545 JPALS
NPC Install, Alteration Installation Team (AIT} Support Service; provide (OPTION ITEM}02-70-2-C, 04-69-1-C, 162

Feel Lower Plalfonn and 185 Feet Upper Plalfonn, 03 Level, Port Side, Frames 28/40/41/117, 03 Level, Starboard Side, Frame 23, 02- 7-2-Q, 02-7-1-Q, 02-113-4-Q,

02-27-1-L, 02-27-0-L, 02-41-4- AEOA
980-90-014ShipAlt 80020K, MORIAH/JPALS

Connection, ShlpAlt LHD-1 OA 88133,

Shock Mod, Shock Mod, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM)04-67-1-C, 07-86-1-Q, 2-85-1-
C, 02-71-1-C, 05-89.5-1-CEOA
980-90-015SA 23980K NSSM MOD 12, NATO SEA SPARROW ALTERATION, AIT SUPPORT SERVICES (OPTION ITEM}04-63-3-A, 04LVL-48" AFT OF FR 57, TOPSIDE 02-12" AFT of FR132, 04-65-3-C, 05-67-3-
C, 05-87-1-C, 01-130-3-C, 02- 65-0-C, 02-127-2-AEOA
980-90-016ShipAlt LHD1- 87179K, LHD Hydra P25 and BDCS Midlife Upgrade, Alteration
In stallationTeam (AIT) Support Service: provide (OPTION ITEM)07-86-1-Q, OS.SS.3-C, 06-65-1-

C, 03-86 1/2-1-Q, 03-72-1-Q, 03-69-1-Q, 03-67-1-Q, 03-65- 1-Q, 03-57-1-Q. 03-53-1-Q, 02- 117-1-Q, 02-110-1-Q, 02-110- 3-Q, Eng Log Rm, 02-101-4-Q, 02-101-1-Q, 02-95-1-Q, 02-89 1/2-2-E, 02-57-3-Q, 02-51-9-Q, 02-T-2-Q, 01-127-3-Q, 1-123- 1-A, 1-102-2-0. 01-97-1-C, 1- 86-2-Q, 1-67-4-Q, 1-65-5-Q, LHD 1, 1-54-2-0, 1-42 1/2-1-0, 2-85-1-C, 2-50-3-Q, 5-79-0-C, 5-74-1-L, 6-81-0-E, 6-65-0-E.

02-89-3-CEOA
980-90-017ShipAlt LHD1· 84776K, One Way Announcing System Upgrade, Alteration Installation Team (AIT) Support Servlce; provide (OPTION ITEM)06-65-1-C, 5-65-0-E, 5-86.5-0-

E, 07 Leve,l Weatherdeck, 03- 69-1-Q, 06-85-3-C, 07-86-1-Q, 4-49-1-C, 2-61-2-C, 2-65-1-C, 4-72-2-C, 01-83-2-C, 2-85-1-C, 01-97-1-C, 01-121-0-C, 2-122- 2-C, 02-65-0-C, 02-T·O·C , 3- 65-1-A, 3-65-2-A, 2-73-1-Q, 2-

76-2-Q, 5-77-0-C. 05-65-1-QEOA
980-90-018ShlpAlt LHD1- 75874K, Ship's Signal Expk>llation Equipment (SSEE) Increment F, Alteration
InstallationTeam (AIT) Support Service; provide (OPTION ITEM)SSES, 02-85-2-C, 06-65-1-C,

02-81-2-L, 05-69-1-C, 06-85-3- L, 02-73-0-C, 02-89-0-C, 05- 81-3-C, 04-79-1-C, 02-T-1-Q, 02-81-3-L. 02-8 9-2-C, 1-83-0- Q, 02-97-0-L, 02-93-0-C,1- 125-2-Q,01-41-0-L, 5-77-0-C,

5-47-0-C, 02-71-1-C, 06-70-1-LEOA
980-90-019ShlpAlt 92014K, ICOP Full lnfrasUSMC Transport, Alteration
lnslallation Team (AIT) Support Service; provide (OPTION ITEM)04-79-1-C, 02-81-0-CEOA
980-90-080ShlpAlt SA-93501K, BFTT FST At-SeaConnectivity, OA 86125 BFTT T46D (AIT) Support Service; provide (OPTION ITEM)

Build. Alteration

l nstanatlonTeam02-71-1-C, 2-93-0-CEOA
982-41-001Dock Trial Discrepancy Correclion: accomplishThroughout the ShipEOA
982-41-002Sea Trial Discrepancy Correction; accomplishThroughout the ShfpEOA
991-12-003Number 2 Boiler Firebox Scaffolding: Install6-6S.O-EEOA
992-11-001Ship's Force Park ing ; provideContractor's FacilityEOA
992-11·002Temporary Service; provideThroughout lhe ShipEOA
992-11-003Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use at Contractor's Facility; provideAdjacent to ShipEOA
992-11.()04Demlneralized Water; provideAboard and AshoreEOA
992-11-005Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provideContractor's FacilityEOA
992-11-006Temporary Refrigerated Storage Facility, 7,000 Cubic Feet; provideContractor's Plant Adjacent to
ShipEOA
992-11-007Fuel Assistance and Towboat Service for Fuel Barge; provideNot ApplicableEOA
992-11-008Temporary Side Port Door Ramp; provideNot AppPcable.EOA
992-11-009Temporary Air Conditioning; provide1-42.5-0 , 5-47-0-C, 5-77-0-C,
02-41-0-L, 02-46-3..t., 02-46-1- L, 02-89-3-C, 02-65-0-CEOA
992-11-010Support Service for Ship's Force Security; provideNot ApplicableEOA
992-11-011Fleet Technical Assessment (FTA) Team Support; provideThroughout the ShipEOA
992-11-012Oil Spinage and Floating Sandblasting Debris Boom; instaUAround Entire Perimeter of Ship/Barge/CraftEOA
992-11-014Messing and Berthing Barge, Temporary Service, Inspection and Repair In Contractor Plant, Electric Barge; accomp6sh (Option)Throughout the BargeEOA
992-11-015Messing and Berthtng Barge, Temporary Servlce, Inspection and Repair In Contractor Pfant, Steam Barge; accompllsh(Option)Throughout the BargeEOA
992-11-016Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (Option)Throughout the BargeEOA
992-11-017Messing and Berthing Barge Steam Temporary Service In Contractor Plant: provide (Option)Throughout the BargeEOA