(USS WASP) Attachment J-10 Compartment Closeout List.xlsx
XLSX spreadsheet 58 KB Posted
- Solicitation number
- N00024-20-R-4404
About this file
This document contains details regarding a federal solicitation for the USS WASP (LHD 1) FY21 Dry-Docking Selected Restricted Availability. The Naval Sea Systems Command is seeking a contractor to execute maintenance, modernization, and repair of the USS WASP from December 2020 through April 2022. Interested parties must register in the System for Award Management and monitor beta.SAM.gov for release of the solicitation and amendments. A site visit of the contractor's pier and facility capable of accommodating the USS WASP class is required. The solicitation contains pricing workbooks, milestones, and technical specifications that will not be posted publicly. The Navy aims to make a single award by August 2020 for work to be performed at the contractor's East or Gulf Coast facility.
View the file
Other files
Show 40 more
Latest 50 of 53 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Table 1
| WI No. | WI Title | Location of Work | MS/KE Ties (Production) |
| 042-11-001 | Work Completion Certification Data for Chief of Naval Operations (CNO) Availability; provide | Not Applicable | EOA |
| 042-11-002 | Physical Security at Private Contractor's Facility; accomplish | Contractor's Facility | EOA |
| 042-11-003 | General Requirements for Work Within Naval Station Norfolk; accomplish | Not Applicable | EOA |
| 042-11-004 | Marine Coatings Containing Heavy Metals Material; remove and dispose | Throughout lhe Ship | EOA |
| 042-11-005 | Accountability of Manhourand Material Reservation; accomplish | Not Applicable | EOA |
| 077-11-001 | Fire Drill Service; provide | Throughout the Ship | EOA |
| 110-11-001 | Flat Keel Plate; replace | 7-57-2-F, 7-57-1-F | UNDOCK |
| 110-11-002 | Undeiwater Hull; inspect and repair | Undeiwater Hull and Appendages from Flat Keel to 6 Inches Above Upper Limits of Boot Top, to lndude Bilge Keels, Skeg, | UNDOCK |
| 110-21-001 | Fan Room Structural Repair; accomplish | 01-86-2-0, 01-110-2-0 | UNDOCK |
| 120-11-001 | Structural Repair; accomplish | 4-85-1-Q, 01-70-2-0, 01-62-5- |
a. 01-103-1-0. 2-54-4-0, 02-
| 73-B-Q, 02-84-2-Q, 4-125-1-E | UNDOCK | ||
| 120-11-002 | Deck and Bulkhead; repair | 6-81-0-E, 5.5-101-0-E, 4-125- |
2-E, 02-54.5-1-L, 6-53-3-T, 4-
| 97-2-E | UNDOCK | ||
| 120-11-003 | Machinery Room Number One; repair | 6-65-0-E, 7-65-6-F, 6-73-1-F, |
7-66-2-F, 7-67-2-W, 7-69-2-W,
| 7-71-4-W | UNDOCK | |||
| 120-11-004 | Stem Gate Machinery Room Number One; repair | 4-125-1-E | UNDOCK | |
| 120-11-005 | Fan Room Deck and Bulkhead Stiffener: repair | 2-104-1-0, 01-33-4-Q, M0.5· | ||
| 1-Q, 1-90-1-Q, 7-89-4-E | UNDOCK | |||
| 120-11-006 | Structural Repairs; accomplish | 6-73-0-E, 6-45-0-E, 4-49-5-A,7-89C-3-E, 7-89C-4-E, 1-83-0-Q | UNDOCK | |
| 120-11-023 | Structural Repair; accompl!sh | 4-88-1-L, 4-85-1-0 | UNDOCK | |
| 120-11-025 | Fire Pump Room Structura!l repair | 5.5-99-0-E, 5.5-101-0-E,7-97- | ||
| 0-J, 7-101-0-F | UNDOCK | |||
| 120-11-027 | Structural Repair: accomplish | 3-81-4-Q, 2-83-2-L, 2-81-4-Q, 01-88-2-L, 02-87-2-Q, 02-33-9-Q, 2-53-1-Q, 1-125-1-Q, 2-125-1-Q | UNDOCK | |
| 120-11-028 | Structural Repair; a ccompfish | 1-50.5-1-Q, 1-41-1.Q, 01-107- | ||
| 2.Q | UNDOCK | |||
| 120-11-032 | Fan Room Structural Repair; accomplish | 02-73-6-Q, 02-114-2-Q | UNDOCK | |
| 120-11-033 | Structural Repair; accomplish | 4-89-0-A | UNDOCK | |
| 120-11-034 | Slructu,ra Repair; accompllsh | 5-37-0-E | UNDOCK | |
| 120-11-035 | Structural Repair; accompUsh | 5-47.5-1-L, 5-97-01-K, 5-47.5· | ||
| 2-L | UNDOCK | |||
| 120-11-036 | Shaft Alley; repair and preserve | 7-89C-4-E | UNDOCK | |
| 120-11-037 | JP-5 Pump Room; repair | 6-41-0-E, 7-37-2-J, 6-45-0-E | UNDOCK | |
| 120-11-038 | Structural Repair and Preserve; accomplish | 5-97-1-T | UNDOCK | |
| 120-11-039 | Sewage Pump Room Number One: repa[r and preserve | 6-39-0-E | UNDOCK | |
| 120-11-040 | Structural repairs: accomplish | 6-73-0-E, 6-73-2-f. 5.5-73-1-W | UNDOCK | |
| 120-11-041 | Structural Repair: accomplish | 6-81-0-E, 7-81-8-F, 7-83-2-F, 7-81-3-F, 7-89-6-F, 7-81-5-F, 7-87-2-F, 7-84-1-W, 7-85-3-W, | ||
| 7-87-2-F, 7-84-1-W, 7-85-3-W, 7-87-3-W, 7-89-8-W | UNDOCK | |||
| 120-11-043 | Struclural Repair; accomplish | 5-80-1-Q | UNDOCK | |
| 120-11-044 | Escape Trunk Struct1,.1al Repa [r, accomplish | 6-87.5-2-T | UNDOCK | |
| 120-11-045 | Fire Pump Room Structural Repair; accomplish | 5.5-99-0-E, 7-97-0.J | UNDOCK | |
| 120-11-046 | Shaft Alley Structural Repair; accomplish | 7-89C-3-E | UNDOCK | |
| 120-11-047 | Structural Repair; accomplish | 6-65-0·E, 7-67-1-F, Locked-In, | ||
| 7-69-1-W, 7.71.1.w | UNDOCK | |||
| 120-11-048 | Structural Repair; accomplish | 6-45-0-E | UNDOCK | |
| 120-11-049 | Vehlcle Stowage; repair | 4-49-Q.A, 6- 57-1-T, 4-41-2-E | UNDOCK | |
| 120-11-050 | Landing Craft Air Cushion (LCAC) Pump Room; repair | 6·93·0·E | UNDOCK | |
| 120-11-051 | Structural Repair; accomplish | 5-79-0-C, 5-73-7-A. 5-77-2-Q, | ||
| 5-75.5-0-L | UNDOCK | |||
| 120-11-052 | Sewage Pump Room Number 2 Structural Repair; accomplish | 5.5-76-1-E | UNDOCK | |
| 120-11-053 | Fan Room Structural Repair; accomplish | 5-75-0-Q | UNDOCK | |
| 120-11-054 | AFFF Station Number 4 Structural Repair; accomplish | 1-69-4-Q | UNDOCK | |
| 120-11-055 | Structural Repair; accomplish | 2-98-1-Q | UNDOCK | |
| 120-11-056 | Structural Repair; accomplish | 7-121-3-E | UNDOCK | |
| 120-11-057 | Stem Gate Machinery Room Number 2 Structural Repair; accomplish | 4-125-2-E | UNDOCK | |
| 120-11-058 | Structural Repair and Preservation: accomplish | 4-89-2-E, 1-105-3-A, 01-126-4- | ||
| a | UNDOCK | |||
| 120-11-059 | Bulkhead; repair | 1-110-2-Q | UNDOCK | |
| 120-11-060 | Fan Room Structural Repair; accomplish | 01-57-7-Q | UNDOCK | |
| 120.11-061 | Fan Room Structural Repair; accompllsh | 02-73-6-Q | UNDOCK | |
| 120-11-062 | AFFFStation Number 6 Structural Repair; accomplish | 1-100.5-2.Q | UNDOCK | |
| 120.11-063 | Vehicle Stowage Structural Vertical Stiffener; repair | 3-49-0-A | UNDOCK | |
| 123-10-001 | Tank, Vold Cleaning and Pumping; accomplish | 1-L-4-V, 1-N-0-V, 1-97-2-V, 1-113-1-V, 2-130-1-V, 2-130-2-V,3-89-1-V, 3-98-1-V, 4-89-1-V,4-98-1-V, 01-121-1-V, 01-89·2·V, 02-68-1-V, 01-73.5-1-V, 7-80.5-2-V, 7-81-2-V, 1-L-1-V, 7-64.5-0-V, 7-65-0-V, 4-17-1-Q, 4-17-2-Q, 6-37-0-W, 5.5-73-1-W, 3-113-6, 7-63-1-F, 7-61-1-F,7-59-1-F, 7-57-3-F, LHD 1, 7-51·1-F, 7-49-3-F, 5-49-1-F, 7-65-6-F, 7-63·2-F, 7-61-2-F, 7-59-2-F, 7-57-4-F, 7-55-2-F, 7-53-2-F, 7-51-2-F, 7-49-4-F, 5-49-2-F, 7-81-5-F, 7-79-1-F, 7-77-1-F, 7-75-1-F, 7-74-1-F, 7-67-1-F, 7-65-5-F, 7-87-2-F, 7-83-2-F, 7-81-8-F, 7-79-2-F, 7-77-2-F, 7-75-2-F, 7-74-2-F, 6-7-1-J, 6-37-2-J, 7-73-5-F, 7-104-1.J, 7-104-2-J, 7-73-6-F,7-65-1-W, 7-65-3-W, 7-81-4-W,7-81-6-W, 7-37-1-J, 7-97-0-J,7-101-1-J, 6-40-1-J, 6-40-2.J,7-97-1.J, 7-101-2-J, 7-105-0-J, 7-106-0-J, 7-49-3-J, 7-101-0-F, 7-121-4-F, 7-41-0-F, 7-71-2-F, 7-87-1-F, 7-96-2-F, 7-73-2-F, 7-79.5-2-F, 7-73-1-F, 7-67-2-W, 7-69-2-W, 7-71-4-W, 7-84-1-W, 7-85-3-W, 7-87-3-W,locked-In, 7-71-1-W, 7-85-2-W, 7-69-1-W, 4-105-1-W, 4-105-2-W, 4-109-1-W, 4-109-2-W, 4-113-1-W, 4-113-2-W, 4-117-1-W, 4-117-2-W, 5-101-1-W, 5-101-2-W, 5-25-0-W, 5-97-3-W, 5-97-4-W, 7-102-0-W, 7-105-01-W, 7-109-0-W, 7-113-0-W, 7-117-0-W, 7-121-7-W, 7-121-8-W, 7-125-0-W, 7-125-1-W, 7-125-2-W, 7-25-0-W, 7.33.0-W, 7-89-7-W, 7-89-8-W, 7-91-1-W, 7-91-2-W, 7-93-3-W,7-93-4-W, 7-95-1-W, 7-95-2-W,7-K-0-W, 7-71.5-2-W, 7-87.5-1-W, 6-73-1-F, 6-73-2-F, 7-89-5-F, 7-89-6-F, 4.5-73-2-F, 4.5-73-4-F, 4.5-81-2-F, 4.5-81-4-F, 5-73-2-F, 5-73-4-F, 5-81-2-F, 5-81-4-F, 6.5-70-2-F, 6.5-85-1-F,7-91-0-F, 7-89-0-F, 7-53-1-F,7-55-1-F, 7-88-2-F, 7-66-2-F,7-41-1-F, 7-41-2-F, 7-49-1-F,7-49-2-F, 7-57-1-F, 7-57-2-F,7-65-2-F, 7-65-4-F, 7-73-3-F,7-73-4-F, 7-81-1-F, 7-81-3-F,7-89-1-F, 7-89-2-F, 7-93-1-F,7-93-2-F, 7-97-2-J, 7-37-2-J | UNDOCK | |
| 123-11-001 | Fuel Oil Service Tank and Auxiliary Fuel Oil Service Tank; repair | 6-73-1-F, 6-73-2-F, 7-89-5-F, | ||
| 7-89-6-F, 7-89-0-F, 7-91-0-F | UNDOCK | |||
| 123-11-002 | Fuel/Ballast Tank: repair | 7-41-1-F, 7-41-2-F, 7-49-1-F, |
7-49-2-F, 7-57-1-F, 7-57-2-F, 7-73-3-F, 7-81-1-F. 7-89-1-F,
| 7-93-1-F | UNDOCK | |||
| 123-11-003 | Compensated Fuel Tank: repair | 7-49-3-F, 5-49-1-F, 7-79-2-F | UNDOCK | |
| 123-11-004 | Fuel Oil Service Tank: preserve | 6-73-1-F, 6-73-2-F, 7-89-5-F, | ||
| 7-89-6-F, 7-89-0-F, 7-91-0-F | UNDOCK | |||
| 123-11-005 | Fuel/Ballast Tank: preserve | 7-41-1-F, 7-41-2-F, 7-49·1•F, |
7-49-2-F, 7-57-1-F, 7-57-2-F, 7-73-3-F, 7-81-1-F, 7-89-1-F,
| 7-93-1-F | UNDOCK | |||
| 123-11-006 | Compensated Fuel Tank; preserve (touch up) | 7-49-3-F, 5-49-1-F, 7-79-2-F | UNDOCK | |
| 123-11-007 | Fuel Oil Overflow Pipe; replace | 2-96-1-L 7-89-5-F, 3-87-1-Q | UNDOCK | |
| 123-12-002 | JP-5 Tank; preserve | 6-40-1-J. 7-97-2-J | UNDOCK | |
| 123-12-003 | Contaminated Oil Tank: repair | 6-37-1-J, 6-37-2-J, 7-104-1-J, | ||
| 7-104-2-J | UNDOCK | |||
| 123-12-004 | JP-5 Tank; repair | 6-40-1-J. 7-97-2-J | UNDOCK | |
| 123-15-001 | Lube Oil Settling Tank; repair | 6-73-0-E, 4.5-73-4-F | UNDOCK | |
| 123-16-002 | Hydraulic Flooding Valve Pipe Hanger; replace | 7-125·0-W | UNDOCK | |
| 123-16-003 | Ballast Tank; preserve (touch up) | 7-69-1-W, 4-109-2-W, 4-113-2- |
W. 5-101-1-W, 5-101-2-W, 5-
97-4-W, MOS-01-W, 7-121-8-
| W, 7-125-2-W, 7-89-8-W, 7-93- 4-W, 7-95-2-W | UNDOCK | |||
| 123-16-004 | Ballast tank; repair | Locked-In, 7-69-1-W, 4-109-2-W, 4-113-2-W, 5-101-1-W, 5-95-2-W, 101-2-W, 5-97-3-W, 5-97-4-W, | ||
| 7-105-01-W, 7-121-8-W, 7-125-2-W, 7-89-8-W, 7-93-4-W, 7-95-2-W | UNDOCK | |||
| 123-16-005 | Ballast Tank: preserve | 7-109-0-W, 7•117-0-W | UNDOCK | |
| 123-17-001 | Contaminated Oil Tank Sounding Tube; repair | 6-37-1-J. 6-37-2-J | UNDOCK | |
| 123-17-002 | Olly Waste Tank; repair | 7-79.5-2-F, 7-87-1-F, 7-73-2-F, | ||
| 7-71-2-F | UNDOCK | |||
| 123-17-003 | Oily Waste Tank; preserve | 7-87-1-F, 7-73-2-F, 7-79.5-2-F | UNDOCK | |
| 123-17-004 | Oily Waste Tank: preserve (touch up) | 7-71-2-F | UNDOCK | |
| 123-17-005 | Contaminated Oil Tank; preserve (touch up) | 6-37-1-J, 6-37-2-J, 7-104-1-J, | ||
| 7-104-2-J | UNDOCK | |||
| 123-19-001 | Waste Waler Drain Tank: repair | 7-87.5-1-W | UNDOCK | |
| 123-19-003 | Waste Water Drain Tank; preserve | 7-87.5-1-W | UNDOCK | |
| 123-19-004 | Collection, Holding and Transfer (CHT) Tank; preserve | 6-37-0-W, 5.5-73-1-W, 3-113- | ||
| 6-E | UNDOCK | |||
| 123-19-006 | Collection, Holding and Transfer (CHT) Tank; repair | 6-37-0-W, 5.5-73-1-W, 3-113- | ||
| 6-W | UNDOCK | |||
| 123-21-001 | Accessible Vold; repair | 1-97-2-V, 7-64.5-0-V, 7-65-0-V | UNDOCK | |
| 123-21-002 | Accessible Void; preserve | 1-97-2-V, 7-64.5-0-V, 7-65-0-V | UNDOCK | |
| 130-11-001 | Fan Room Deck; repair | 01-110-2-Q, 01-111-2-Q, 1- | ||
| 110-2-Q | UNDOCK | |||
| 130-11-002 | 01 Level Deck; replace | 01-126-4-Q, 01-127-2-Q, 01- |
126-2-Q, 01-125-4-L, 01-122-
| 4-Q | UNDOCK | |||
| 130-11-003 | Structural Repair; accomplish | 01-52.5-2-L, 1-50-4-L, 01-52.5- | ||
| 4-A | UNDOCK | |||
| 130-11-004 | Structural Repair; | |||
| accomplish | 4-89-2-E, 2-122-2-C, AFFF, 1- | |||
| 125-1-Q, 02-49-7-Q, 02-87-2- Q, 02-113.5-1-E | UNDOCK | |||
| 130-11-005 | Aircraft Securing Fitting; replace | Flight Deck, Frame T through 130 | DT | |
| 130-11-007 | AN/SPN-41 | |||
| Azlmuth Antenna Platform; repair | 02 Level, Weather Deck, Frames 131-132, Port | C51LO | ||
| 130-11-008 | Fire Pump Room Deck; repair | 5.5-99-0-E, 7-97-0-J | UNDOCK | |
| 130-11-009 | 02 Level Troop Walkway; repair | Troop Walkway, Underside, 02 Level, Frame 13-130, Port and Starboard | C51LO | |
| 140-11-001 | AN/SLQ-32 | |||
| Antenna Sliding Maintenance Platform; repair | Weather Deck, 08 Level,Frame 72-75. Starboard; Weather Deck, 08 Level,Frame 70-73, Port | C51LO | ||
| 150-11-001 | Superstructure Coa mlng; repair | 03 Level, Frame 53 lo Frame 93, Port and Starboard | C51LO | |
| 150-11-002 | Radar Room Number One Archway Door; remove | 04-67-1-C | C51LO | |
| 161-11-001 | Port and Starboard Hawse Pipe; repair | 01-T-O-Q | UNDOCK | |
| 163-11-001 | Sea Ches!; Inspect and repatr | Underwaler Hull | UNDOCK | |
| 163-11-002 | Waster Sleeve; replace | Throughout lhe Ship | UNDOCK | |
| 167-11-001 | ScutUe; replace | 1-83-0-Q | UNDOCK | |
| 167-11-002 | Watertight Closure; | |||
| repair | 1-74-2-T | UNDOCK | ||
| 167-11-003 | Manhole Cover Stud ; repair | 4-81-1-Q | UNDOCK | |
| 167-12-001 | Watertight Door; | |||
| repair | 01-33-9-Q | UNDOCK | ||
| 167-80-001 | LHD1 Class AER 25/00, Install Quick Acting Watertight Scuttle (OAWTS); accomplish | Throughoutthe Ship | UNDOCK | |
| 168-11-001 | Structural Door Assembly; replace | 03-59-1-A. 06-67-7-C, 03-65-3· Q, 06-65-1-C, CPS Fan Room, 03-73-7-Q, 06-85-3-C, 06-84-3-L, 03-61-1-Q | UNDOCK | |
| 171-11-001 | MastSlgnal Halyard Uphaul Staples; repair | Main Mast | C51LO | |
| 179-11-002 | AntennaPlatform Modification; accomplish | Weather Deck, 01 Level,Frames 108 to 111, Port: Weather Deck. 01 Level.Frames 66 to 68, Starboard | C51LO | |
| 179-11-003 | Antenna Cable Trunk Cover Plate; replace | Weather Deck, 01 Level,Frame 108 to 111, Port; Weather Deck, 01 Level,Frames 66 to 68, Starboard | C51LO | |
| 179-90-004 | Antenna Platform Modification: accomplish | Weather Deck, 01 Level, Frames 114 to 116, Port | C51LO | |
| 221-11-002 | Main Propulsion Boiler Number One Boiler Safety Shut Off Device (SSD); repair | 6-81-0-E | PCD | |
| 221-11-003 | Main Propulsion Boiler Number One Boller Water Gage Glass Assembly; repair | 6-81-0-E | PCD | |
| 221-11-004 | Main Propulsion Boller Isolation/Boundary Valve, High Pressure Steam Drain and Auxiliary Steam System Piping (P-1); replace | 6-81-0-E | PCD | |
| 221-11-005 | Main Propulsion Boller Number One Boiler Dry Lay-Up; accomplish | 6-81-0-E | PCD | |
| 221-11-006 | Main Propulsion Boller Number One Boller Safety Valve: repair | 6-81-0-E | PCD | |
| 221-11-007 | Number One Main Propulsion Boller Soot Blower Piping Ultrasonic Test (UT) Inspection (P-1): accomplish | 6-81-0-E | PCD | |
| 221-11-008 | Main Propulsion Boller 5-Year Strength and Integrity Inspection, Start of Availability Inspection (SAi) and Completion of Availabiltty Inspection(CAI); accomplish | 6-81-0-E | PCD | |
| 221-12-001 | Number2 Propulsion Boller Roof Casing Epoxy Coating; repair | 6-65-0-E | PCD | |
| 221-12-002 | Main Propulsion Boller Number 2 Safety Valve: repair | 6-65-0-E | PCD | |
| 221-12-003 | Main Propulsion Boller Number 2 Boller Safety Shut Off Device (SSD); repair | 6-65-0-E | PCD | |
| 221-12-004 | Main Propulsion Boiler Number 2 Boiler Dry Lay-Up; accomplish | 6-65-0-E | PCD | |
| 221-12-005 | Main Propulsion Boiler 5-Year Strength and Integrity Inspection, Start of Availability Inspection (SAi) and Completion of Avallabllity Inspection (CAI); accomplish | 6-65-0-E | PCD | |
| 221-12-006 | Number 2 Main Boller Soot Blower Piping Ultrasonic Test (UT) Inspection (P-1); accomplish | 6-65-0-E | PCD | |
| 231-11-001 | Number One Low Pressure (LP) Turbine Flexible Coupling; repair | 6·81-0·E | PCD | |
| 231-12-001 | Number2 Low Pressure (LP) Steam Turbine; repair | 6-65-0-E | PCD | |
| 243-11-001 | Starboard Propulsion Shafting; repair | Underwater Hull, Aft of Frame 105 | UNDOCK | |
| 243-11-002 | Starboard Stem Tube Shaft Seal; overhaul | 7-89C-3-E | UNDOCK | |
| 243-12-001 | Port Propulsion Shafting; repair | Underwater Hull, AFT of Frame 105 | UNDOCK | |
| 243-12-002 | Port Stem Tube Shaft Seal: overhaul | 7-89C-4-E | UNDOCK | |
| 244-11-001 | Port and Starboard Main Propulsion Shaft Bearing | |||
| Al ignment Verification: accomplish | 6-73-0-E, 6-81-0·E, 7-89A-3-E, |
7-89B-3-E, 7-89C-3-E, 7-89A-
| 4-E, 7-89B-4-E, 7-89C-4-E | PCD | |||
| 244-11-002 | Starboard | |||
| Propulsion Shafting Bearing ; rep lace | 7-89C-3-E | UNDOCK | ||
| 244-12-001 | Port Propulsion Shafting Bearing; replace | 7-89C-4-E | UNDOCK | |
| 244-12-002 | Line Shaft Bearing: repair | 6-81-0-E | PCD | |
| 245-10-001 | Propulsion Propeller, Port and Starboard; repair | Starboard Underwater Hull, Aft of Frame 105; Port Underwater Hull, Aft of Frame 105 | UNDOCK | |
| 251-11-001 | 1A and 1B Forced Draft Blower (FOB) Expansion Joint; replace | 6-81-0-E | PCD | |
| 251-11-002 | 1A and 18 Forced Draft Blower (FOB) Journal Bearing Drain Thennometer; install | 6-81-0-E | PCD | |
| 251-12-001 | 2A and 28 Forced Draft Blower (FOB) Expansion Joint; replace | 6-65-0-E | PCD | |
| 251-12-002 | Forced Draft Blower; overhaul | 6-65-0-E | PCD | |
| 251-12-003 | 2A and 28 Forced Draft Blower (FOB) Journal Bearing Drain Thennometer; install | 6-65-0-E | PCD | |
| 251-21-001 | Port Use Fan (PUF) Shutter; repair | 6-81-0-E | PCD | |
| 251-31-001 | Number One Boiler Combustion Air Intake; repair | 01 Level, Frame 86, Port, Combustion Air Intake | PCD | |
| 254-11-001 | Number One Main Condenser; repair | 6-81-0-E | PCD | |
| 254-11-002 | Number One Main Condenser Water Box Gasket; replace | 6-81-0-E | PCD | |
| 254-11-003 | Number One Main Condenser; dean and Inspect | 6-81-0-E | PCD | |
| 254-11-004 | Number 2 Main Condenser; clean and Inspect | 6-65-0-E | PCD | |
| 254-12-001 | Number 2 Main Condenser; repair | 6-65-0·E | PCD | |
| 254-12-002 | Number 2 Main Engine Air Ejector; repair | 6-65-0-E | PCD | |
| 254-20-001 | Auxiliary Condenser; dean and inspect | 6-65-0-E, 6-73-0·E, 6-81-0-E | PCD | |
| 254-20-002 | Number One and 2 Ships Service Turbine Generator Auxililary Air Ejector; repair | 6-65-0-E | PCD | |
| 254-23-001 | Number 3 Ships Service Turbine Generator Auxililary Air Ejector; repair | 6-73-0-E | PCD | |
| 255-21-001 | Numbers 1A and 1B Main Feed Pump (MFP) Overhaul: accomplish | 6-81-0-E | PCD | |
| 255-22-001 | Numbers 2A and 28 Main Feed Pump (MFP) Overhaul: accomplish | 6-65-0-E | PCD | |
| 255-31-001 | Number 1A and 18 Ma[n Feed Booster Pump: repair | 6-81-0-E | PCD | |
| 255-32-001 | Number 2A and 28 Main Feed Booster Pump; repair | 6-65-0-E | PCD | |
| 255-35-001 | Number One and 2 Emergency Feed and Transfer Pump overhaul; accomplish | ' | ||
| 6-65-0-E, 6-B1-0-E | PCD | |||
| 255-51-001 | Number 1A and 1B Main Condensate Pump; repair | 6-B1-0-E | PCD | |
| 255-52-001 | Number 2A and 28 Main Condensate Pump: repair | 6-65-0·E | PCD | |
| 255-32-001 | Number 2A and 28 Main Feed Booster Pump; repair | 6-65-0-E | PCD | |
| 255-35-001 | Number One and 2 Emergency Feed and Transfer Pump overhaul; accomplish | ' | ||
| 6-65-0-E, 6-B1-0-E | PCD | |||
| 255-51-001 | Number 1A and 1B Main Condensate Pump; repair | 6-B1-0-E | PCD | |
| 255-52-001 | Number 2A and 28 Main Condensate Pump: repair | 6-65-0·E | PCD | |
| 255-71-001 | Number One Deaeratlng Feed Tank Spray and Atomizlng Valve: repair | 6-81·0-E | PCD | |
| 255-72-001 | Number 2 Deaeratlng Feed Tank Spray and Atomizing Valve: repair | 6-65-0-E | PCD | |
| 255-71-001 | Number One Deaeratlng Feed Tank Spray and Atomizlng Valve: repair | 6-81·0-E | PCD | |
| 255-72-001 | Number 2 Deaeratlng Feed Tank Spray and Atomizing Valve: repair | 6-65-0-E | PCD | |
| 256-10-001 | Number One and 2 SSTG Auxiliary Condenser Sea Water Rubber Expansion Joint; replace | 6-65-0-E | PCD | |
| 256-10·002 | Number 3 SSTG Auxiliary Condenser Sea Waler Rubber Expansion Joint; replace | 6-73-0-E | PCD | |
| 256-10-003 | Number 4 and 5 SSTG Auxiliary Condenser Sea Water Rubber Expansion Joint: replace | 6-81-0-E | PCD | |
| 256-11-001 | Auxiliary Condenser Number 2 Overboard Discharge Piping; replace | 6-65-0-E | PCD | |
| 256-11-002 | Pipe Hanger; replace | 5-37-0-E | PCD | |
| 256-11-003 | Plplng Hanger; replace | 4-97-2-E | PCD | |
| 256-12-002 | Number 2 Main Condenser Discharge and Suction Valve Operator; repair | 6-65-0-E | PCD | |
| 256-22-001 | Number 2 Main Circulating Pump; repair | 6-65-0-E | PCD | |
| 256-31-001 | Number One Ship Service Turbine Generator Auxiliary Seawater Circulating Pump: repair | 6-65-0-E | PCD | |
| 300-11-001 | Kick.pipe: repair | Weather Deck, 01 Level, Frames 126 lo 133, Starboard | PCD | |
| 311-14-001 | Number 4 Ship Service Turbine Generator (SSTG) Expansion Joint; replace | 6-81-0-E | PCD | |
| 311-15-001 | Number 5 Ship Service Turbine Generator (SSTG): repair | 6-81-0-E | PCD | |
| 313-90-001 | SCD-13220-LHD1- |
089, Battery Charging Station (BCS) and 1X3
| Stowage Locker (BSL) Foundation Fastener Change- Out; accomplish | 1-67-3-Q | 60HZ/400HZ | ||
| 313-90-002 | SCD 132201<. | |||
| Lithium- ton Battery Shop Vacuum Breaker Valve Installation; accomplish | 1-67-3-Q | 60HZ/400HZ | ||
| 324-11-001 | Power Panel; replace | 2·127•2-E | 60HZ/400HZ | |
| 324-80-001 | LH01 Class AER 14/02, Tns tall Isolation Fuse In Shore Power Switchboard; accomplish | Throughout the Shlp | 60HZ/400HZ | |
| 342-80-001 | ShlpAlt LHD1- 91315D, Emergency Diesel Generator (EOG) Vacuum Breaker Relocation accomplish | 4-41-2-E, 3-114-2-E | 60HZ/400HZ | |
| 406-11-002 | Certified Ordnance Ground Point: install | Flight Deck, 03 Level, Frames 7 lo 122, Port and Starboard | 60HZ/400HZ | |
| 423-15-001 | ANfvVSC-8 (V)2 |
Radar Cable Collar,
| repair | 01-67-3-WEA | 60HZ/400HZ |
| 436-80-001 | ShipAlt LHD1- 876400 , l HD-1 |
Class Combustible Gas and Hydrogen Sulfide Monitor Upgrade;
| accomplish | Throughout the Ship | 60HZ/400HZ | ||
| 471-11-001 | AN/SLQ-32 | |||
| Antenna Enclosure Purge Air VenUlatlon; repair | 05-73-1-C, 05-71-1-0 , 06-70-3· L | 60HZ/400HZ | ||
| 475-11-001 | Degaussing Equipment and Cable; repair | 4-41-0-A | PCD | |
| 505-11-001 | Pipe Hanger: replace | 4-89-0-A | UNDOCK | |
| 505-11-002 | smcon Aluminum Bronze (SAB) Union Fitting; Inspect and replace | Throughout the Ship | UNDOCK | |
| 506-11-001 | Fuel OU Overflow and Air Escape Plplng; replace | 3-73-2-L, 1-65-8-L | UNDOCK | |
| 508-11-001 | Lagging and Insulation, Inside Machinery Space; replace | Inside Machinery Spaces | DT | |
| 508-12-001 | Lagging and Insulation, Outside Machinery Space; replace | Outside Machinery Spaces | DT | |
| 511-11-002 | Ventilation Heater; replace | 01-33-2-0 | HENL/BENL | |
| 511-11-003 | Ventilation Heater; replace | 01-125-3·0 | HENL/BENL | |
| 511-11-004 | Ventilation Heater; replace | 01-106-2-Q | HENL/BENL | |
| 511-11-005 | Ventilation Heater: replace | 01-107-2-Q | HENL/BENL | |
| 511-11·006 | Ventilation Healer; replace | 02-98-3-0 | HENL/BENL | |
| 511-11-007 | Ventilation Heater; replace | 1-58-2-Q | HENL/BENL | |
| 511-11-008 | VenUlation Heater; replace | 1-69-3-0 | HENL/BENL | |
| 511-11-010 | Ventilation Heater; replace | 01-49 1/2-2-Q, 1-79-1-L, 1-85- |
1-0, 01-85-3-A, 01-122- 4-Q,
| 02-73-3-L, 02-114-2-Q | HENL/BENL | ||
| 511-11-011 | Ventilation Heater; replace | 1-53-3-0, 01-70-2-Q, 1-83-0-Q, |
01-102-1-Q, 01-103-1-Q, 01- 106-2-0, 01-107-2-Q, 01-110-
| 2-0. 01-111-2-Q, 01-125-5-0 | HENL/BENL | |||
| 511-11-012 | Ventilation Heater; replace | 01-111-2-Q, 01-49.5-2-0, 01- | ||
| 41-0-L | HENL/BENL | |||
| 511-11-013 | Service Steam Piping: replace | 1-49-0-0 | UNDOCK | |
| 511-11-014 | Service Steam Piping; replace | 1-45·0-0 | UNDOCK | |
| 511-11-015 | Service Steam Piping; replace | 02-37.5-0-0 | UNDOCK | |
| 512-11-001 | Gatley and Laundry Exhaust Ventilation Cleaning; accomplish | Throughout the Ship | HENL/BENL | |
| 512-11-002 | Cooling Coil; replace | 01-57-6-Q | HENL/BENL | |
| 512-11-003 | Supply Fan Motor; repair | 01-125-5-0, 01-126-4-0, 01- | ||
| 110-1-Q | HENL/BENL | |||
| 512-11-004 | Gaylord Wash Down System; repair | 1-41-4-0, 1-45-0-0, 02-37.5-0- | ||
| o | HENL/BENL | |||
| 512-11-005 | Supply Vent Fan; repair | 01-126-4-Q, 2-121-4-Q | HENL/BENL | |
| 512-11-006 | Cooling Coll; replace | 02-65-5-Q | HENL/BENL | |
| 512-11-007 | Ventilation Ducting; replace | 02-122-5-0 | HENL/BENL | |
| 512-11-008 | Exhaust Ventilatoin; replace | 4-89-0-A, 2-89-1-0 | HENL/BENL | |
| 512-11-009 | Venlllallon and | |||
| Exhaust Duct; repair | 2-98-2-0 | HENL/BENL | ||
| 512-11-010 | Exhaust Fan E01- 55-4; repari | 01-55-2-0 | HENL/BENL | |
| 512-11-011 | Preheater and Ventilation Ducting; replace | 01- 77-3-K | HENL/BENL | |
| 512-11-012 | Access Panel; Install | 01-57-6-Q | HENL/BENL | |
| 512-11-013 | Natural Supply Ventilation Spool; replace | 1-102-2-0 | HENL/BENL | |
| 512-11-014 | Ventilation Closure Valve; repair | 4-89-2-E | HENL/BENL | |
| 512-11-015 | Ventilation Ducting: repair | 2-105-2-A | HENL/BENL | |
| 512-11-016 | Ventilation Ducting; install | 2-122-3-A | HENL/BENL | |
| 512-11.017 | Ventilation Ducting; replace | 4-49-0-A | HENL/BENL | |
| 512-11-018 | Venttlali onDucting; install | 2-101-1-Q | HENL/BENL | |
| 512-90-001 | ShipAlt LHD1- 82975K, M-L | |||
| Replace Ventilation Trunk/Install Moisture Separalor - Laundry; accomplish (Option Item) | Throughout the Ship | HENL/BENL | ||
| 513-90-001 | ShipAlt LHD1- 82966K, M-L | |||
| Replace Ventilation Trunk/Install MoistureSeparator Machinery Room Number One; accomplish (Option Item) | Throughout the Shlp | HENL/BENL | ||
| 513-90-002 | ShlpAlt LHD1- 82971K, M-L | |||
| Replace Ventilation Trunk/Install Moisture Separator, Machinery Room Number 2: accomplish (OpUon Item) | Throughout the Shlp | HENL/BENL | ||
| 513-90-003 | ShipAlt LHD1- 82972K, M-L | |||
| Replace Ventilation Trunk/Install Moisture Separator - Emergency Generator Room Number One and Number 2: accomplish (Option Item) | Throughout the Ship | HENL/BENL | ||
| 513-90-004 | ShlpAlt LHD1- 82974K, M-L |
Replace Ventilation
| Trunk/Install Moisture Separator - Auxiliary Machinery Room: accomplish(Option Item) | Throughout the Ship | HENL/BENL | ||
| 514-11-001 | Chilled Water System Segregation Valve; replace | 02-57-01-L, 3-49-0-A | UNDOCK | |
| 514-11-002 | Chilled Water Valve; replace | 02-41-2-L | UNDOCK | |
| 514-11-003 | Chilled Water Isolation Valve; replace | 4-41-2-E | UNDOCK | |
| 514-11-004 | Chilled Water System Segregation Valve; replace | 2-33-0-L, 2-122-3-A, 02-97-0-L | UNDOCK | |
| 514-11-005 | Chill Water System; repair | 02-79-3-Q, 02-39-4-Q, 04-89- |
3-Q, 01-33-2-Q, 02-125-3-0,
| 02-T-1-Q | UNDOCK | |||
| 514-11-006 | Chilled Water Segregation Valve; replace | 3-49-0-A | UNDOCK | |
| 514-11-007 | Chilled Water Pipe Hanger; replace | 2-122-3-A | UNDOCK | |
| 514-21-001 | Air Conditioning Plant; repair | 4-41-2-E, 6-73-0-E | UNDOCK | |
| 514-22-001 | Air Conditioning Plant Condenser Water Control Valve; repair | 6-73-0-E, 4-89-2-E, 4-41·2-E | UNDOCK | |
| 516-11-001 | Refrigeration Plant; repair | 6-45.().E, 4-46 112-2-L, 5-47-1- | ||
| l , 1-49-1-A, 5-44-0·A, 5-41-Q. A, 4-45-0-A, 4-47·2-A | UNDOCK | |||
| 520-10-003 | Sea Valve; repair and replace | 10-003 | UNDOCK | |
| 521-11-001 | Flremaln Pipe Hanger; replace | 4-89-0-A | UNDOCK | |
| 521-11-002 | Remote Operator and Valve; repair | Throughout the Ship | UNDOCK | |
| 521-11-003 | Flremalr. Pipe System; repair | 2·122-3-A | UNDOCK | |
| 521-21-001 | Number 12 Fire Pump; repair | 5.5-99-0-E | PCD | |
| 521-21-002 | Number 9 Flre PumpMechancial Seal; replace | 5.5-99-0-E | PCD | |
| 521-21-003 | Number 5 and 6 Fire Pump Mechanical Seal, replace | 6-65-0-E | PCD | |
| 526-11-001 | Split Pipe Scuppe;r replace | Freeborad, Port and Starboard | UNDOCK | |
| 526-12-001 | Force Draft Btower Drain li ne: install | 6-81-Q.E | PCD | |
| 526-12-002 | Synthetic Downcomer; repair | Hull, 01 Level to First Platform, Frame 15 to Stem, Port and Starboard | UNDOCK | |
| 528-11-001 | Collectlon. Holding and Transfer (CHT) Piping; replace | 2-39.5·0-L,3-49-0-Q | UNDOCK | |
| 528-11-002 | Colfectlon, Holding and Transfer Piping; | |||
| replace | 02-97-0-L | UNDOCK | ||
| 529-11-001 | Main Drainage Eductor Valve; replace | 6-65.().E | UNDOCK | |
| 529-11-002 | Eductor Valve and Remote Operator.; reparr | 6-41-0-E, 5-4M-L | UNDOCK | |
| 529-11-003 | Maln Drainage System Valve; replace | 6-81-0-E | UNDOCK | |
| 529-11-004 | Firemaln Supply Valve: replace | 5-9M-T | UNDOCK | |
| 529-11-005 | Remote Operaot r: repair | 5.5-97-0-E, 5-97-1-T, 3-114-2- E, 3-121-2-L | UNDOCK | |
| 529-11-006 | Main Drainage Valve; replace | 6-41-0-E | UNDOCK | |
| 529-11-007 | Ballast Tank Relief Valve; repair | 01-T-O-Q, 2-89 1/2-2-Q, 2-93- | ||
| 2-A, 3-89-3-A | UNDOCK | |||
| 529-11-008 | Bilge Pocket Drain Piping; replace | 4-97-2-E, 5-37-0-E | UNDOCK | |
| 529-21-001 | Olly Waste Piping; replace | 6-65-0·E | UNDOCK | |
| 529-21-002 | Number One Waste Water Transfer Pump Foundation; repair | 6-65-0-E | UNDOCK | |
| 531-11-001 | Distilling Plant Number One Feedwater Heater/After Condenser; clean, inspect and repair | 6-65-0-E | PCD | |
| 531-12-001 | Distilling Plant Number2 Feedwater Heater/After Condenser; replace | 6-81-0·E | PCD | |
| 531-12-002 | ||||
| • | Distilling Plant Number 2 Feedwater Heater/After Condenser; clean, inspect and repair (Option Item) | 6-81-0-E | PCD | |
| 531-80-001 | ShipAlt LHD1- 93453D, Distillate Pump\Motor and Power Upgrade; accomplish | 6-65-0-E, 6-81-0-E, 7-65-1-W | PCD | |
| 532-11-001 | Electronics Cooling Water Pump; repair | 02-79-3-Q | 60HZ/400HZ | |
| 533-11-001 | Flight Deck Potable Water Washdown Station; repair | 02-109-2-Q, 02-114-2-Q, 02- |
59-8-L, 02-41-1-L, 02-27-3-L,
| 02-65-2-L, 02-41-2-L, 02-25-8- L | 60HZ/400HZ | |||
| 534-80-001 | LHD1 Class AER 12/02, Forced Draft Blower (FOB) Low Point Drain; accomplish | 6-65-0-E, 6-81-0·E | PCD | |
| 541-21-001 | Number 2 Fuel Oil Transfer Pump (FOTP) and Motor; repair | 6-65-0-E | PCD | |
| 542-11-002 | JP-5 Fueling Station Hose Reel; replace | F-112-J, F-109.J, F-86.J, F· | ||
| 86.J, F-62-J, F- 62-J, F-36.J, F-31.J | PCD | |||
| 542-21-001 | JP-5 Fuel/Defuel Pump: overhaul | F-112-J, F-86-J, F-36-J. F-31- J, 1-83-0-Q, H-112-J | PCD | |
| 542-22-001 | Number 4 JP-5 Transfer Purifier: repair | 5.5-101-0-E | PCD | |
| 551-11-001 | Number One Emergency Diesel Generator Starting Air Marotta Pressure Reducing Manifold; overhaul | 4-41-2-E | PCD | |
| 551-11-002 | High Pressure Air System Regulating Manifold; repair | 5-37-0-E, 4-97-2-E | Firemain/HP-LP Air/AFFF | |
| 551-11-003 | Number One Emergency Diesel Generator Starting Air Marotta Pressure Reducing Manifold; overhaul | 4-41-2-E | Firemain/HP-LP Air/AFFF | |
| 551-51-002 | High Pressure Air Compressor Overhaul; accomplish | 5-37-0-E, 4-97-2-E | Firemain/HP-LP Air/AFFF | |
| 551-53-001 | Low Pressure Air Compressor (LPAC) and Motor; overhaul | 6-65-0-E, 6-81-0-E | Firemain/HP-LP Air/AFFF | |
| 551-53-002 | Low Pressure Air Compressor (LPAC) and Motor Controller; repair | 5-37-0-E, 4-97-2-E | Firemain/HP-LP Air/AFFF | |
| 555-12-001 | Aqueous Film Forming Foam (AFFF) Hose Reel and Foundation; repair and preserve | Weather Deck, 02 Level, Frame 23, Starboard, AFFF Hose Station Number One: Weather Deck, 02 Level, Frame 5, Starboard, AFFF Hose Station Number One A; Weather Deck, 02 Level, Frame 22, Port, AFFF Hose Station Number 2; Weather Deck, 02 Level, Frame 5, Port, AFFF Hose Station Number 2A; | PCD | |
| 555-12-001 | ||||
| (cont'd) | Aqueous Film Forming Foam (AFFF) Hose Reel and Foundation; repair and preserve | Weather Deck, 02 Level, Frame 36, Starboard, AFFF Hose Station Number 3; Weather Deck, 02 Level, Frame 35, Port, AFFF Hose Station Number 4; Weather Deck, 02 Level, Frame 49, Starboard, AFFF Hose Station Number 5; Weather Deck, 02 Level, Frame 49, Port, AFFF Hose Station Number 6; Weather Deck, 03 Levei, Frame 64, Centerline, AFFF Hose Station Number 7; Weather Deck, 02 Level, Frame 63, Port, AFFF Hose Station Number 8; Weather Deck, 03 Level, Frame 71, Starboard, AFFF Hose Station Number 9; Weather Deck, 02 Level, Frame 72, Port, AFFF Hose Station Number 10; Weather Deck, 03 Level, Frame 76, Starboard, AFFF Hose Station Number 11; Weather Deck, 02 Level, Frame 84, Port, AFFF Hose Station Number 12; Weather Deck, 03 Level, Frame 88, Starboard, AFFF Hose Station Number 13; Weather Deck, 03 Level, Frame 89, Starboard, AFFF Hose Station Number 14; Weather Deck, 02 Level, Frame 97. Starboard, AFFF Hose Station Number 15: Weather Deck, 02 Level, Frame 111, Port. AFFF Hose Station Number 16; Weather Deck, 02 Level, Frame 1OB. Starboard, AFFF Hose Station Number 17; Weather Deck, 02 Level, Frame 124, Port, AFFF Hose Station Number 18.; Weather Deck. 02 Level. | ||
| Frame 124, Starboard, AFFF Hose Station Number 19 | PCD | |||
| 555-12·002 | Aqueous Film Forming Foam (AFFF)GP5 | |||
| Isolation Valve; replace | 3-49-0-Q | UNDOCK | ||
| 561-11-001 | 2A and 2B Steering Gear Pump; replace | M 21· 2·E | UNDOCK | |
| 562-11-001 | Port and Starboard Rudder Bearing Seal and Rudderstock Seal; repair | 7-121-3-E, 7-121-2-E | UNDOCK | |
| 562-11 -002 | Port Rudder Stock Bearing: replace | 7-121-2-E | UNDOCK | |
| 562-11-003 | Port Rudder: repalr | 7+121 +2-E | UNDOCK | |
| 562-11-004 | Starboard Rudder: repalr | M 21-3-E | UNDOCK | |
| 562-11-005 | Starboard Rudder Stock Bearing; replace | 7-121-3-E | UNDOCK | |
| 571-31-001 | Fuellng At Sea (FAS) Static Load Test; accompllsh | H S-1-0 , 1-98-1-Q, 1-90-1-0 | PCD | |
| 572-11-001 | Dumbwaiter Number One; repair | 1-41-2-T | HENL/BENL | |
| 575-20-001 | Skleport Vehlcle Ramp Assembl repalr | Weather Deck, 03 Leve1, Frames 100 to 106, Port | PCD | |
| 581-11-002 | Anchor and Anchor Chain; Inspect and P reserve | 01-T-O-Q, 1-13- 0-Q, 4-17-1.Q, | ||
| 4-17-2-Q | PCD | |||
| 582-11·002 | Ralchetlng Capstan Removal; accompllsh | 4-89-0-A | PCD | |
| 583-21-002 | Encapsulated Lifeboat, tnflatable; remove, store and Install | 02 Level, Port and Starboard | PCD | |
| 583-90-001 | ShlpAIILHD1- 75091K, LHA/LHD | |||
| Class Boat Davit Replacement: accompllsh | Throughout the Ship | CREW MOVE ABOARD | ||
| 584-13-001 | Well Deck Vent | |||
| Plenum Door; overhaul | 1-73-5-T, 1-74-2-T, 1-81-2-T | PCD | ||
| 584-21-001 | Upper Stem GateRepairs and Stem | |||
| Gate Seal Replacement; accompllsh | 4-89-0-A | PCD | ||
| 584-21-002 | Stem Gale Upper and Lower Hydraullc Cylinder Assembly; repair | 4-125-1-E, 4-125-2-E, 2-127-1- E, 2-127-2-E | PCD | |
| 584-21-003 | Upper Stem Gate Latch Release Assembly; replace | 4-89-0-A, 2-127-2-E, 2-127-1-E | PCD | |
| 584-31-001 | Hinged Vehicle Ramp; repair | 3-49-0-A, 4-49-0-A | PCD | |
| 584-31-002 | Vehicle Hinged Ramp Motor Controller; repair | 4-49-0-A | PCD | |
| 588-11-001 | Aircraft Elevator Door Lower Wiper; replace | 1-83-0-Q | PCD | |
| 588-11-002 | Aircraft Elevator, Hinged Leaf, Gusset and Structural; repair | 3-89-2-E | PCD | |
| 588-21-001 | Naval Air Warfare Center, Aviation Facilities Assist Visit Discrepancy; correct | Various | PCD | |
| 589-21-001 | Aircraft Bridge Crane Load Test; accomplish | 1-83-0-Q | PCD | |
| 589-21-002 | Starboard Sideport Cargo Crane: repair and welght test | 3-65-1-A | PCD | |
| 589-62-001 | Port and Starboard Sldeport Shell Door Assembly; repair | 3-65-2-A, 3-65-1-A | PCD | |
| 589-62-002 | Port Sldeport Inner Door Assembly; repair | 3-65-2-A | PCD | |
| 593-11-001 | Collection, Holding and Transfer (CHT) Piping System Chemical Cleaning; accomplish | Throughout the Ship | UNDOCK | |
| 593-11-003 | Collection, Holding and Transfer (CHT) Tank Spray Nozzle Piping; replace | 6-37-0-W | UNDOCK | |
| 593-11-004 | Collection, Holding and Transfer (CHT) Piping; replace | 4-89-1-V, 6-81-0-E, 4-93-1-E | UNDOCK | |
| 593-12-001 | Service Sink Drain Piping; replace | 3-113-6-W | UNDOCK | |
| 602-11-001 | Tank Identification Pla card; install | 5-49-1-F, 6-37-1-J | UNDOCK | |
| 611-11-001 | Well Deck Cloverleaf Socket; replace | 4-89-0-A | PCD | |
| 612-11-002 | Debarkation Platfonn Removal and Fixed Safety Ran Ins tallation; accomplish | 4-89-0-A | PCD | |
| 612-11-004 | Uferall and Cableway Suppor;t replace | Weather Deck, 03 Level, Frames 85 to 88, Port | PCD | |
| 612-21-001 | Safety Net and Frame: repair and preserve | Fi ght Deck, 03 Level, Frame T to Frame 130, Port and Starboard | PCD | |
| 612-21-002 | Safety Net Frame; preserve | Flight Deck, Outboard of Elevator Platfonn, Frames 88 to 98, Port Flight Deck, Outboard of Elevator Platform, Frames 112 to 122, Starboard | PCD | |
| 612-90-001 | ShlpAtt LH01- 82183K, Safety Improvement to LHD Access Trunk Safety Net; accomplish (Option Item) | Throughout the Ship | UNDOCK | |
| 621-11-001 | Metal Joiner Bulkhead: repair | 2-105-3-L | HENL/BENL | |
| 622-11-001 | Deck Grating; replace | 4-97-2-E | HENL/BENL | |
| 623-21-001 | Accommodation Ladder; repair | 2-78-2-WEA, 2-76-1-WEA | HENL/BENL | |
| 624-11-001 | Balanced Joiner Door; remove, store and Install | 6-65-0-E, 6-73-0-E, 6-81-0-E | HENL/BENL | |
| 625-11-002 | Aviation Weapon Movement Control Station Window; replace | 01- 98-2-Q | HENL/BENL | |
| 625-11-004 | Pilot House | |||
| Window; replace | 06-65-1-C | HENL/BENL | ||
| 631-11-001 | Bilge; preserve | 6-93-0-E | PCD | |
| 631-11-002 | Machinery Space | |||
| BIige; preserve | 6-65-0-E, 6-81-0-E, 6-73-0-E | PCD | ||
| 631-11-003 | Deck Grating; replace | 6-73-0-E | HENL/BENL | |
| 631-11-004 | LCAC Pump Room Bilge: preserve | 6-93-0-E, 7-93-1-F, 7-93-2-F | PCD | |
| 631-11-005 | Stem Gate Machinery Room; preserve | 4-125-1-E, 4-125-2-E, 2-127-1- E, 2-127-2-E | PCD | |
| 631-11-006 | JP-5 Pump Room Number One BIige; preserve | 6-41-0-E | PCD | |
| 631-12-001 | Sewage Receiving Station Deck; preserve | 3-113-6-W, 4-113-2-W | PCD | |
| 631-12-002 | Machinery Room Number 2 Deck; preserve | 6-B1-0-E | PCD | |
| 631-12-003 | JP-5 Pump Room Number 2 Deck; preserve | 5.5-101-0-E | PCD | |
| 631-12-004 | Shaft Alley; | |||
| preserve | 7-89A-3-E | PCD | ||
| 631-12-005 | Shaft Alley; preserve (touch-up) | 7-89B-3-E | PCD | |
| 631-12-006 | Machinery Room Number One; preserve (touch-up} | 6-65-0-E | PCD | |
| 631-13-003 | Well Deck Overhead; preserve | 4-69-0-A, 3-49-0-A | PCD | |
| 631-13-004 | Aircraft Elevator Power Stanchion Room; preserve | 02-112.5-1-E | PCD | |
| 631-13-005 | Ramp and Sump; preserve | 4-89-0-A | PCD | |
| 631-13-007 | Number 10 Flammable Liquid Cargo Bulkhead; preserve | 5-97-01-K | PCD | |
| 631-13-008 | Escape Trunk Bulkhead and Deck; preserve | 6-80.5-2-T | PCD | |
| 631-13-009 | Access Trunk Bulkhead; preserve | 6-105-1-T | PCD | |
| 631-13-010 | Access Trunk Bulkhead; preserve | 7-121-5-T | PCD | |
| 631-13-011 | Well Deck Vent Tunnel; preserve | 1-74-2-T | PCD | |
| 631-21-001 | Mast: preserve | Forward Mast, Frame 73, 06 |
Level to 188' 6" ABL, including Stub Mast, Yardarms, and
| tforms; Aft Mast, Frame 85, 0 7 Level lo 215' 8" ABL, lncludlng Stub Mast. Yardarms, and Platforms | PCD | |
| 631-21-002 | Port 50 Caliber |
Platform Number 4
| Nonskid ; replace | Port 50 Caliber Platform Number 4, 02 Level, Frame 58, Port | PCD | ||
| 631-21-003 | Wealher Deck Covering and Nonskid: replace | Port to Starboard | PCD | |
| 631-21-004 | Deck Edge Aircraft E levator; preserve | Port Deck Edge Aircraft Elevator; Starboard Deck Edge Aircraft Elevator. Wealher Deck, 02 Level, Frames 89 and | ||
| 97. Port; Weather Deck, 02 Level, Frames 113 and121, Starboard | PCD | |||
| 631-31-001 | Underwater Hull; p reserve | Underwater Surfaces, Keel to Upper Boot Top Limits; Underwater Hull From Flat Keels to Six Inches Above the Boot Top, to Include BIige | ||
| Keels, Skeg, Fln Stablllzer. Rudders, | UNDOCK | |||
| 631-41-001 | Freeboard; preserve | Entire surfaces of the Freeboard from 6 Inches below the upper boot top up to underside of flight deck draln troughs, Port and Starboard; Gallery decks, including underside of fUght deck, walkways, fantail includes |
bulkheads, overhead, gunnels,drop decks, ladders,; Interior and exterior side of upper and lower stem gate; Undersides and sides of Aircraft elevators, wells, and tracks extendingoutside of both hangar bay
| doors, and includtng all antenna | UNDOCK | |||
| 633-21-002 | fmpressed CurrentCalhodlc Protection | |||
| (ICCP) System:inspect and repair | Throughout the Ship | UNDOCK | ||
| 634-11-001 | Food Service Office Chemical- Resistant Floor Covering System; Install | 1-65-2-Q | UNDOCK | |
| 634-11-002 | Deck Covering, Electrical Grade Matting; Install | DCC, 5-79-0-C | UNDOCK | |
| 634-11-003 | Deck Covering, Electrical Grade Sheeting; replace | 02-65-0-C | UNDOCK | |
| 634-11-005 | Deck Covering; replace | 5-97-01-K | UNDOCK | |
| 634-11-007 | AFFF Station Deck; preserve | 1-50.5-4-Q, 2-49-4-Q | PCD | |
| 634-11-010 | Cleaning Gear Locker Chemical - Resistant Floor Covering System; replace | 1-39-4-A | PCD | |
| 634-11-013 | 25MM/Alrcraft Component Storeroom Chemical | |||
| - Resistant Floor Covering System; Install | 02-117-4-A | PCD | ||
| 634-11-014 | 25 MM/50 CAL | |||
| Platform Deck Covering, Nonskid; replace | 02-16-1-WEA, 02-16-2-WEA, |
02-83-5-WEA, 02-126-1-WEA,
| 02-126-2-WEA | PCD | |||
| 634-11-015 | Chemical- Resistant Floor Covering System; replace | 01-83-4-L | UNDOCK | |
| 634-21-001 | Flight Deck, Catwalk and Platform Nonskid; replace | behind the Island | PCD | |
| 637-11-001 | Overhead Sheathing and Structural; repair | 1-40-1-L. 02-53-3-L, 02-54.5-1- L, 02-56-1-L | UNDOCK | |
| 641-11-001 | Officer Space Habitability Repair (ORPR-S9820); | |||
| accomplish | 02-19-2-L, 02-20-2-L, 02-13-2- |
L, 02-20-0-L, 02-13-0·L, 02-13- 1-L, 02-51-3-L, 02-31-2-L, 02- 51.5-6-L, 02-19-0-L, 02-35-4-A, 02-35-8-L, 02-33-12-L, 02-49- 4-L, 02-53-6-L, 02-63-8-L, 02- 58.5-0-L, 02-64-1-L, 02-19-1-L, 02-41-4-L, 02-35-2-L, 02-35-1- L, 02-36.5-1-L, 02-51-1-L, 02- 45-1-L, 02-25-1-L, 02-25-0-L, 02-25-2-L, 02-27-4-L, LHD 1, 02-31-4-L, 02-59-8-L, 02-56.5-
| 2-L, 02-56.5-4-L, 02-63-3-L | HENL/BENL | |||
| 643-11-001 | Troop Uving Space HabitabilityProject (BTRP-S9670) | |||
| Installation; accomplish (OPTION ITEM) | 01-41-0-L | HENL/BENL | ||
| 643-11-003 | Troop Living Space Habitability Project (BTRP-S9892) | |||
| Installation; accomplish (OPTION ITEM) | 01-49-01-L | HENL/BENL | ||
| 644-11-001 | Troop Sanitary Space HabltabHity Project(HTRP- S0416) Installation; accomplish (OPTION ITEM) | 01-47-0-L, 01-47-01-L, 01- | ||
| 47.5-1-A, 01-48-1-L | HENL/BENL | |||
| 644-11-003 | Habitability Project HTRP-S9893, Troop | |||
| Sanitary Space Modification: accomplish (OPTION ITEM) | 01-49-0-L, 01-49-1-L, 01-50.5- | |||
| 0-L, 01-51-1-A | HENL/BENL | |||
| 651-11-001 | Crew and Troop Galley: repair | 1-49-0-0 | HENL/BENL | |
| 651-11-002 | Dishwasher, replace | 02- 39-2-0 | HENL/BENL | |
| 651-11-003 | Crew& Troop Scullery Number 2 Dishwasher, replace | 1-65-4-0 | HENL/BENL | |
| 651-11-004 | Messroom | |||
| Beverage Service Stand; repair | 02-41-01-L, 1--41- 0 1- l , 1 -57 -0- L | HENL/BENL | ||
| 651-11-005 | Hotwell Drain Plplng; repair | 02-37 1/2-0-Q, 1-45-0-0 , 1-49- | ||
| 0-Q | HENL/BENL | |||
| 651-90-001 | JSF Freezer Tie Down; Install | 02-122-5-A | HENL/BENL | |
| 652-11-001 | Medical Privacy Curtain Track; replace | 01-57-0-L, 01-65-0-L | HENL/BENL | |
| 652-80-001 | ShlpAlt LHD1- 761780, Blood Bank Freezer Replacement; accomplish | 01-73-4-L, 1-73-8-L, 01-73-0-L, |
01-63 1/2-2-L, 01-73-2-L, 1-74-
| 2-T, 1-67-2-L | HENL/BENL | |||
| 654-11-001 | Brig Cell 0-Type Locker; replace | 5-73-5-L | HENL/BENL | |
| 655-11-001 | Laundry Press; replace | 4-73-0-Q | HENL/BENL | |
| 665-10-001 | Workbench; replace | 5-47.Q.C, 5-77-0-C, 02-57-3-Q | HENL/BENL | |
| 671-11-001 | Locker; replace | 1-90-1-Q | HENL/BENL | |
| 703-90-001 | ShlpAlt LHD1- 92048D, Indoor Simulated Marksmanship Trainer (ISMT); accomplish (OPTION ITEM) | 5-25-0-W | HENL/BENL | |
| 721-11-001 | NATO Sea Sparrow Missile System (NSSMS) Launcher Ring; replace | NSSMS Launcher Platfonn Number One, 04 Level, Frame 57, Slbd | C51LO | |
| 763-11-001 | Pistol Locker; replace | 2-50-3-Q | HENL/BENL | |
| 763-11-002 | Ordnance Locker; preserve | 01-132-0-WEA, 02-83-5-WEA, |
02-83-6-WEA, 02-23-5-WEA,
02-21-6-WEA, 02-74-5-WEA,
| 02-126-2-WEA | HENL/BENL | |
| 763-90-001 | ShlpAlt LHD1- 89007.02K, Troop |
Rifle Stowage and Marine Air Ground Task Force (MAGTF) Supporting Elemenl (SE)Space Reconfiguralionand ShlpAlt LHD1· 83907.020 Welghl and Moment Compensation
| Well Deck Cargo Monorail Syslem Remova:l accomplish (Option llem) | Throughoul the Ship | HENL/BENL | |
| 772-20-001 | Number One, 3 and 5 Cargo Elevalor Hydraulic Control Manifold; replace | 03-53-1-Q, 6-57-1-T, 03-85-3-Q | |
| HENL/BENL | |||
| 782-11-001 | Bomb Jettison Ramp; repair | Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 38, Stbd; Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 60, Stbd; Bomb JetUson Ramp, Flight Deck/Catwalk, 03 Le,ve. Frame 91, Stbd; Bomb JettisonRamp, Flight Deck/Catwalk, 03 Level, Frame 45, Port Aircraft Elevator. |
Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame
121. Stbd Aircraft Elevator; Bomb Jettison Ramp, Flight Deck/Catwalk, 03 Level, Frame 126, Port; Bomb JetUson Ramp, Flight Deck/Catwalk, 03 Level, Frame 97, Port; Bomb Jettison Ramp, Flight Deck/Catwalk. 03 Level,Frame
| 117, Port | PCD | |||
| 830-80-001 | ShlpAlt LHD1- 83907.010, Weight and Moment Compensation - Main Drainage System Remote Operating Gear Removal: accomplish | Throughoutthe Ship | PCD | |
| 830-80-002 | ShlpAlt LHD1-83907.030 , Weight and Moment Compensation - Main Balloon Inflation Helium System Removal; accomplish | 01-127-2-Q, 1-125-2-Q, 1-125- | ||
| 4-Q , 01-122-4-Q | PCD | |||
| 830-80-003 | ShlpAlt LH01- 83907.040, | |||
| LHA6/LHD1 Class Weight and Moment Compensation - Well Deck and Vehicle Deck Carbon Monoxide Monitoring System Removal; accomplish | 2·122·2-C, Lower, 3-49-0-A, Upper, 4-49-0-A, 4-89-0-A | PCD | ||
| 837-11-001 | Antenna Photographs; provide | Topside | EOA | |
| 857-11-001 | Temporary Duty Section Berthing |
Off-Ship; provide (Out ofHomeport)(Option
| l Item) | Not Applicable | EOA | ||
| 857-11-002 | Temporary Galley and Messing Facility; provide (Out of Homeport)(Oplion Item) | Vicinity of Ship or Berthing Facility | EOA | |
| 857-11-003 | Temporary Off-Ship Berthing Equivalent to BOQ/BEQ; provide (Out of Homeport)(Option Item) | Not Applicable | EOA | |
| 867-21-001 | Combat Systems Discrepancy Correction; accomplish | Throughout the Ship | EOA | |
| 897-11-001 | Availability Program Management Multi Cable Transit Cableway Integrator; provide | Throughout the Ship | EOA | |
| 980-11-001 | Combat Systems Industrial Support Service; provide | Various | EOA | |
| 980-11-002 | Industrial Support Service; provide | Various | EOA | |
| 980-11-004 | Office Trailer; provide | 1-83-0-Q | EOA | |
| 980-11-005 | Norfolk Naval Shipyard (NNSY) Core-Work Support Service; provide | 4-49-0-A, 6-65-0-E, 6-81-0-E | EOA | |
| 980-31-001 | Office Space Without Computer for In-Plant Availability; provide | Contractor's Plant | EOA | |
| 980-31-002 | Temporary Office, Classroom, and Parking for Ship's Force; provide | Contractor's Facility | EOA | |
| 980-80-001 | SCD 1827, | |||
| ANISPQ-9B Initial Install, Alteration Installation Team (AIT) Support Service; provide | 08-86-0-MST | EOA | ||
| 980-80-002 | ShipAlt LHD1- 85677D, Install Radar Tank Level Indicators(TLI) on Collection, Holding and Transfer (CHT) Tanks, Alteration lnstaDalion Team (AIT) Support Service: provide | 5-37-0-E, 6-39-0·E, 6-73-0-E, | ||
| 5-76-3-Q, 5-75-1-L | EOA | |||
| 980-80-003 | ShlpA[t LHD1- 85667, Install Radar TLls/TDRs on Auxiliary Tanks, Alteration Installation Team (AIT) Support Service; provide | 5-73-2-F, 5-73-4-F, 4.5-73-2-F, |
4.5-73-4-F, 5-81-2-F, 5-81-4-F, 4.5-81-2-F. 4.5-81-4-F, 7-73-1- F, 7-73-2-F, 7-79.5-2-F. 7-41-0- F, 7-91- 0-F, 7-89-0-F, 7-87-1- F, 6.5-85-1-F, 7-71-2-F, 6.5-70- 2-F, 7-121-4-F, 7-101-0-F, 7- 71.5-2-W, 7-87.5-1-W, 7-96-2- F. 4-87-2-W, 6-41-0-E, 4-73-0- Q, 4-80-2-L, 4-76-2-Q, 6-73-0-
E, LHD 1, 5-88.5-2-L, 5-65-0-E,
6-65-0-E, 5-86.5-0-E,6-81-0-E, 7-89-4-E, 6-93-0-E, 7-121-2-E,
| 5.5-101-0-E | EOA | ||
| 980-80-004 | ShlpAlt LHD1- 934530 - ShlpAlt LHD1-71894, | ||
| Distillate Pump, Motor and Demlneralizer Upgrade, Alteration Installation Team (Aff) Support Service: provide | 6-65-0-E, 6-81-0-E | EOA | |
| 980-80-005 | ShlpAlt 81942D, Cargo Weapons EtevatorsProximity Switch Upgrade, Afteralion Installation Team (All) Support Service; provide | CWE, 6-53-3-T, 2-49-1-E, 03- |
53-3, 3-49-0-A, 5-49-01-M, 6- 49-0-M, 6-53-1-M, 6-54-2-T, 2- 54-2-E, 3-43-0-A, 6-53-2-M, 6-
| 51-0-M | EOA | |||
| 980-80-006 | ShipAlt 872850, Dissolved Oxygen Monitoring System, Alteration fnstallation Team (All) Support Service; provide | 6-65-0-E, 6-81-0-E | EOA | |
| 980-80-007 | ShlpAlt 761010, DossertLugConnector |
Replacement, Alteration InstallationTeam (AIT) Support Service; provide 1-1-2-Q, 4-41-2-E, 3-49-5-Q, 2- 49-4-Q, 6-73-0-E, 2-77-1-0 , 2- 74.5-2-Q, 2-87-3-Q, 2-89.5-2-
Q, 6-81-0-E, OM10-1-Q, 01-
97-2-L, 2-125-1-0 . 01-122-6-Q,
| 6-65-0-E, 3-114-2-E | EOA | |||
| 980-80-008 | ShipAlt 862600, LHD OFT Sight Glass Upgrade, Alteration Installation Team (AIT) Support Service; provide | 6-65-0-E, 6-81-0-E | EOA | |
| 980-B0-009 | ShlpAlt LHD1- 84178D, Aircraft Elevator Plalfonn Bumper (MSA), Alteration Installation Team (AIT) Support Service; provide | Throughout the Ship | EOA | |
| 980-80-010 | ShipAlt LHD1- 874290, Soot | |||
| Blower System Modification. Alteration Installation Team (AIT) Support Service; provide | 6-65-0-E, 6-81-0-E | EOA | ||
| 980-80-011 | ShipAlt LHD1- 869910, Boiler Combustion Monitoring System (BCMS) Upgrade, Alteration Installation Team (AIT) Support Service; provide | 6-65-0-E, 6-81-0-E | EOA | |
| 980-80-012 | ShipAlt, LHD1· |
81818K, Propulsion/Au x Control and ShlpAlt LHD1-92190K, Ballast and Damage Co n trol Alteration, Alteration InstallationTeam (AIT) Support Service; provide 3-77-2-0 , 1-98· 2-Q, 3-49-5-Q,ADP, 02-89-3-0 , 2-85-1-C,5-75-0-0 , 5-79-0-C,01-86-2-0 ,4-77-2-Q, 2-101-1-0 , 2-89-1-Q,06-65-1-C. 02-103.5-20-, 01-06-65-1-C. 02-103.5-20-, 01-25-1-A, 1-42.5-1-Q, 02-57-3-Q,5-65-0-E, 05-71-1-0 , 5-86.5-0- E, 02-101-0-A, 02-117-0-Q, 02-
| 101-2-Q, 5-77-0-C,2-68-2-Q,LHD 1. 6-73-0-E, 07-86-1-Q, 1-123-1-Q, 1-65-5-Q, 02-126.5-3-A, 02-T-1-Q, 02-39-9-0 , 01-33·2-0 . 02-79-3-Q, 04-89-3-Q, 01-125-3-a , 03. 73. 3. a . 02-91-1-Q | EOA | |||
| 980-90-001 | OrdAlt 79686, CIWS Block 1B Next Generation, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | 05-65-3-C, 01-130-0-C | EOA | |
| 980-90-002 | ShipAlt 83463K, AF27T-12-HCTS, | |||
| Alteration tnstallation Team (AIT) Support Service: provide (OPTION ITEM) | 1-106-2-Q, 1-83-0-Q, 2-105-4- | |||
| Q | EOA | |||
| 980-90.003 | ShlpAlt 93500K, JSF SAP-F Planner Cell Mods, Alteration Installation Team (AIT) Support Service: provide (OPTION ITEM) | 03-85.5-3-Q, 02-82-1-Q, 02-85- |
3-C, 02-85-1-0, 02-81-5-L, 02- 87-1-0, 02-86.5-1-Q, 02-84-3-a.02-a5-5-a. 1-s3-o-a. 01-85-
| 1-0 . 03-85-3-Q | EOA | ||
| 980-90-004 | ShipAlt 86950K, S- IBS Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | 02-65-0-C, 06-65-1-C, 06-67-7- | |
| C, 06-70-3-L, 5-77-0-C | EOA | ||
| 980-90-007 | EC82924K, PEOC41 SLEP SW |
5.0.1 SMQ-11 EC1, Alteration
Ins tallationTeam
| (AIT) Support Service; provide (OPTION ITEM) | Throughout the Ship | EOA |
| 980-90-008 | ShipAlt 92964K, CANES HW1.2 | |
| Tech Refresht Alteration Installation Team (AIT) Support Service: provide (OPTION ITEM) | 02-13-4-A, 02-37.5-4-C, 2-30- |
0-L, 2-49-2-Q, 01-66-3-A, 1-69- 2-Q , 02-65-3-C , 02-7 1 -2 -Q, 02- 73-0-C, 02-78-2-C, 02-71-1-C, 02-79-1-C, 02-81-0-C, 02-85-0- C, 02-89-2-C, 02-89-3-Q, 01-
| 122-4-Q, 02-113-2-Q, 04-67-1- C | EOA | |
| 980-90-009 | ShlpAlt 81798K, |
NAVMACS
Technical Refresh, Alteration
| InstallationTeam (AIT) Support Service: provide (OPTION ITEM) | 02-89-2-C, 1-83-0-Q | EOA | ||
| 980-90-010 | Shfp Alt 84700K, LMMT AFLOAT. | |||
| Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | 02-65-0-C, 02-77-0-C, 02-73-0- | |||
| C, 02-85-0-C, 02-71-1-C, 5-47- 0-C, 02-79-1-C | EOA | |||
| 980-90-011 | ShipAll 86539K, C2P Tech Refresh, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | 02-65-0-C, 02-71-1-C | EOA | |
| 980-90-012 | ShipAlt 93327K, DCGS-N New | |||
| Sensor Rack, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM} | 02-81-0-C, 02-85-0-C | EOA | ||
| 980-90-013 | ShlpAlt 82776K, ShipAll 78069K, TMP 93545 JPALS | |||
| NPC Install, Alteration Installation Team (AIT} Support Service; provide (OPTION ITEM} | 02-70-2-C, 04-69-1-C, 162 |
Feel Lower Plalfonn and 185 Feet Upper Plalfonn, 03 Level, Port Side, Frames 28/40/41/117, 03 Level, Starboard Side, Frame 23, 02- 7-2-Q, 02-7-1-Q, 02-113-4-Q,
| 02-27-1-L, 02-27-0-L, 02-41-4- A | EOA | |
| 980-90-014 | ShipAlt 80020K, MORIAH/JPALS |
Connection, ShlpAlt LHD-1 OA 88133,
| Shock Mod, Shock Mod, Alteration Installation Team (AIT) Support Service; provide (OPTION ITEM) | 04-67-1-C, 07-86-1-Q, 2-85-1- | ||
| C, 02-71-1-C, 05-89.5-1-C | EOA | ||
| 980-90-015 | SA 23980K NSSM MOD 12, NATO SEA SPARROW ALTERATION, AIT SUPPORT SERVICES (OPTION ITEM} | 04-63-3-A, 04LVL-48" AFT OF FR 57, TOPSIDE 02-12" AFT of FR132, 04-65-3-C, 05-67-3- | |
| C, 05-87-1-C, 01-130-3-C, 02- 65-0-C, 02-127-2-A | EOA | ||
| 980-90-016 | ShipAlt LHD1- 87179K, LHD Hydra P25 and BDCS Midlife Upgrade, Alteration | ||
| In stallationTeam (AIT) Support Service: provide (OPTION ITEM) | 07-86-1-Q, OS.SS.3-C, 06-65-1- |
C, 03-86 1/2-1-Q, 03-72-1-Q, 03-69-1-Q, 03-67-1-Q, 03-65- 1-Q, 03-57-1-Q. 03-53-1-Q, 02- 117-1-Q, 02-110-1-Q, 02-110- 3-Q, Eng Log Rm, 02-101-4-Q, 02-101-1-Q, 02-95-1-Q, 02-89 1/2-2-E, 02-57-3-Q, 02-51-9-Q, 02-T-2-Q, 01-127-3-Q, 1-123- 1-A, 1-102-2-0. 01-97-1-C, 1- 86-2-Q, 1-67-4-Q, 1-65-5-Q, LHD 1, 1-54-2-0, 1-42 1/2-1-0, 2-85-1-C, 2-50-3-Q, 5-79-0-C, 5-74-1-L, 6-81-0-E, 6-65-0-E.
| 02-89-3-C | EOA | ||
| 980-90-017 | ShipAlt LHD1· 84776K, One Way Announcing System Upgrade, Alteration Installation Team (AIT) Support Servlce; provide (OPTION ITEM) | 06-65-1-C, 5-65-0-E, 5-86.5-0- |
E, 07 Leve,l Weatherdeck, 03- 69-1-Q, 06-85-3-C, 07-86-1-Q, 4-49-1-C, 2-61-2-C, 2-65-1-C, 4-72-2-C, 01-83-2-C, 2-85-1-C, 01-97-1-C, 01-121-0-C, 2-122- 2-C, 02-65-0-C, 02-T·O·C , 3- 65-1-A, 3-65-2-A, 2-73-1-Q, 2-
| 76-2-Q, 5-77-0-C. 05-65-1-Q | EOA | |
| 980-90-018 | ShlpAlt LHD1- 75874K, Ship's Signal Expk>llation Equipment (SSEE) Increment F, Alteration | |
| InstallationTeam (AIT) Support Service; provide (OPTION ITEM) | SSES, 02-85-2-C, 06-65-1-C, |
02-81-2-L, 05-69-1-C, 06-85-3- L, 02-73-0-C, 02-89-0-C, 05- 81-3-C, 04-79-1-C, 02-T-1-Q, 02-81-3-L. 02-8 9-2-C, 1-83-0- Q, 02-97-0-L, 02-93-0-C,1- 125-2-Q,01-41-0-L, 5-77-0-C,
| 5-47-0-C, 02-71-1-C, 06-70-1-L | EOA | |
| 980-90-019 | ShlpAlt 92014K, ICOP Full lnfrasUSMC Transport, Alteration | |
| lnslallation Team (AIT) Support Service; provide (OPTION ITEM) | 04-79-1-C, 02-81-0-C | EOA |
| 980-90-080 | ShlpAlt SA-93501K, BFTT FST At-SeaConnectivity, OA 86125 BFTT T46D (AIT) Support Service; provide (OPTION ITEM) |
Build. Alteration
| l nstanatlonTeam | 02-71-1-C, 2-93-0-C | EOA | ||
| 982-41-001 | Dock Trial Discrepancy Correclion: accomplish | Throughout the Ship | EOA | |
| 982-41-002 | Sea Trial Discrepancy Correction; accomplish | Throughout the Shfp | EOA | |
| 991-12-003 | Number 2 Boiler Firebox Scaffolding: Install | 6-6S.O-E | EOA | |
| 992-11-001 | Ship's Force Park ing ; provide | Contractor's Facility | EOA | |
| 992-11·002 | Temporary Service; provide | Throughout lhe Ship | EOA | |
| 992-11-003 | Temporary Flammable Liquid Hazardous Waste and Hazardous Material Storage for Ship's Force Use at Contractor's Facility; provide | Adjacent to Ship | EOA | |
| 992-11.()04 | Demlneralized Water; provide | Aboard and Ashore | EOA | |
| 992-11-005 | Transport Control Protocol/Internet Protocol Based T-1 Type Computer Network (T-1 Line) Support Service; provide | Contractor's Facility | EOA | |
| 992-11-006 | Temporary Refrigerated Storage Facility, 7,000 Cubic Feet; provide | Contractor's Plant Adjacent to | ||
| Ship | EOA | |||
| 992-11-007 | Fuel Assistance and Towboat Service for Fuel Barge; provide | Not Applicable | EOA | |
| 992-11-008 | Temporary Side Port Door Ramp; provide | Not AppPcable. | EOA | |
| 992-11-009 | Temporary Air Conditioning; provide | 1-42.5-0 , 5-47-0-C, 5-77-0-C, | ||
| 02-41-0-L, 02-46-3..t., 02-46-1- L, 02-89-3-C, 02-65-0-C | EOA | |||
| 992-11-010 | Support Service for Ship's Force Security; provide | Not Applicable | EOA | |
| 992-11-011 | Fleet Technical Assessment (FTA) Team Support; provide | Throughout the Ship | EOA | |
| 992-11-012 | Oil Spinage and Floating Sandblasting Debris Boom; instaU | Around Entire Perimeter of Ship/Barge/Craft | EOA | |
| 992-11-014 | Messing and Berthing Barge, Temporary Service, Inspection and Repair In Contractor Plant, Electric Barge; accomp6sh (Option) | Throughout the Barge | EOA | |
| 992-11-015 | Messing and Berthtng Barge, Temporary Servlce, Inspection and Repair In Contractor Pfant, Steam Barge; accompllsh(Option) | Throughout the Barge | EOA | |
| 992-11-016 | Messing and Berthing Barge Electric Temporary Service in Contractor Plant; provide (Option) | Throughout the Barge | EOA | |
| 992-11-017 | Messing and Berthing Barge Steam Temporary Service In Contractor Plant: provide (Option) | Throughout the Barge | EOA |
This is the start of the file's text. The full file is on GovTribe.