USACE_AP._1-6.pdf

PDF 261 KB Posted

Attached to
Police Boat House
Solicitation number
09-26-PD
Issued by
Volusia County, Orlando City, Florida

About this file

This document contains Project Design Criteria (PDCs) issued by the U.S. Army Corps of Engineers (USACE) in accordance with a Programmatic Biological Opinion (JaxBO) from the National Marine Fisheries Service (NMFS) to address Endangered Species Act requirements for the City of New Smyrna Beach Police Boathouse construction project. The project involves construction of a new police boathouse facility at the southwest corner of the North Causeway AOB site adjacent to the Indian River North to support marine law enforcement operations, search and rescue, and waterway safety enforcement. The scope of work includes installation of a timber dock system with gated access, covered roof structure, integrated boat lift system, electrical service with controls and lighting, and potable water connection. All construction activities must comply with applicable local, state, and federal regulations, and the project has already obtained required environmental permits from the Florida Department of Environmental Protection and USACE.

The PDCs establish mandatory compliance requirements for all project activities, including adherence to in-water activity guidelines, noise mitigation standards for pile and sheet pile installation, habitat protection measures for mangroves, seagrasses, corals, and hard bottom areas, and species-specific protections including smalltooth sawfish, Gulf sturgeon, Atlantic sturgeon, North Atlantic right whale, sea turtles, and Bryde's whale. All activities must be completed during daylight hours only. Contractors must complete a self-certification statement of compliance following project completion, and failure to comply with applicable PDCs where a take of listed species occurs constitutes an unauthorized take and permit noncompliance. The project is funded by the Florida Inland Navigation District (FIND), and all required documents must be submitted through the City's eProcurement Portal with compliance monitored by NMFS.

View the file

Other files

File Type Posted
Police_Boat_House_(Addendum_#4_Revision).pdf PDF
Police_Boat_House.pdf PDF
Federal_Contract_Provisions.pdf PDF
USACE_Permit.pdf PDF
USACE_AP._7-11.pdf PDF
USACE_A2._1-9.pdf PDF
Police_Boathouse_Technical_Specifications.pdf PDF
NSB_Boat_House_100_Plans.pdf PDF
Required_Documentation_and_City_Forms.pdf PDF
Draft_Contract_.pdf PDF
Geotech_Report.pdf PDF
FDEP_Permit.pdf PDF
Public_Records.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Design Criteria (PDCs) Applicable to All Projects

NOTE - You are required to comply with the following PDCs, which serve to address requirements pursuant to Section 7, Endangered Species Act (ESA) for those listed species and designated critical habitat under purview of the National Marine Fisheries Service Protected, Resources Division. These PDCs are taken from the Programmatic Biological Opinion (PBO) referred to as JaxBO. These criteria serve to address ESA requirements only, and additional conditions may be required to address other Federal laws, including the Magnuson-Stevens Fishery Conservation and Management Reauthorization Act. Authorization under this permit is conditional upon your compliance with all applicable PDCs, which are made part of this permit.

You are reminded that you must complete the attached self-certification statement of compliance following completion of the authorized work. Your statement of compliance does not obviate the need to satisfy all PDCs, including those requirements (e.g., such as structural dimensions and educational signs) that are observable post-construction, and those requirements (e.g., construction methods or procedures to be followed) that are not observable post-construction. Please note that failure to comply with the applicable PDCs of this PBO, where a take of the listed species occurs, would constitute an unauthorized take, and it would also constitute noncompliance with this permit. The NMFS is the appropriate authority to determine compliance with the terms and conditions of this PBO.

AP.1. The applicant must agree to adhere to PDCs for In-Water Activities (provided below).

AP.2. All projects involving the installation of piles or sheet piles shall follow the PDCs for In- Water Noise from Pile and Sheet Pile Installation (Section 2.2). This Opinion does not cover projects that use seismic surveys, low frequency sonar, explosions, and seismic air guns.

AP.3. All projects proposed in or near areas with mangroves, seagrasses, corals, or hard bottom habitat must refer to PDCs for Mangroves, Seagrasses, Corals, and Hard Bottom for All Projects (provided below) to determine whether the project is covered under the Opinion and, if it is covered, to ensure it is sited, designated, and implemented following all of the PDCs in that section.

AP.4. For every project, the USACE must determine if the project is located within:

a) Smalltooth sawfish critical habitat limited exclusion zones (Section 2.1.1.1)

b) Gulf sturgeon critical habitat migratory restriction zones (Section 2.1.1.2)

c) Atlantic sturgeon critical habitat exclusion zone (St. Marys River) (Section 2.1.1.3)

d) North Atlantic right whale educational sign zones (Section 2.1.1.4)

e) U.S. Caribbean sea turtle critical habitat restriction zones (Section 2.1.1.5)

f) Bryde’s whale exclusion zone (Section 2.1.1.6)

Where the activity is excluded from the Opinion within a particular zone, the application must be processed under a separate consultation. Where additional restrictions apply to activities within that zone, the USACE or other authorizing entity must ensure that the project meets the requirements for that zone.

AP.5. This Opinion only covers new construction (i.e., installation, repair, replacement) and does not apply to after-the-fact consultations or enforcement actions handled by the Corps.

AP.6. All activities must be completed during daylight hours.

k3rdnald Highlight

File details come from the government source that posted it. Updated .