NSB_Boat_House_100_Plans.pdf
PDF 27 MB Posted
- Attached to
- Police Boat House
- Solicitation number
- 09-26-PD
- Issued by
- Volusia County, Orlando City, Florida
About this file
This is a 100% construction drawing set for the City of New Smyrna Beach Police Boathouse project, prepared by Dredging & Marine Consultants (DMC) and involving permits from the Florida Department of Environmental Protection (FDEP) and the U.S. Army Corps of Engineers (USACE). The project entails construction of a timber dock system with gated access, covered roof structure, and integrated boat lift system to support marine law enforcement operations at the southwest corner of the North Causeway AOB site adjacent to Indian River North in Volusia County, Florida. The facility design includes a 74-foot-3-inch access pier and a 35-foot covered dock with a 10,000-pound capacity boat lift, security gate with locking mechanism, electrical conduit and water line routing, pile-supported structure with both timber and precast prestressed concrete piles, and associated utilities including electrical service and potable water connection. The construction drawings are sealed by Florida-licensed Professional Engineer Vitaly B. Feygin (License No. 65890) and dated April 10, 2026, with permits issued August 13, 2025 (FDEP) and August 26, 2025 (USACE).
The project specifications require the contractor to maintain detailed pile-driving logs, submit all material delivery tickets and testing reports weekly to the engineer, provide advanced notice of critical construction stages, coordinate with the engineer for pile cut-off approval, and complete a pre-construction meeting with all parties including the owner, engineer, prime contractor, subcontractors, surveyor, and applicable tradesmen. Contractors are responsible for all permits related to construction, including mangrove trimming and removal; all materials must comply with applicable Florida Building Code and City of New Smyrna Beach standards. The project includes environmental protections such as floating turbidity barriers, erosion control measures, and the planting of three black mangrove trees as compensatory mitigation. Funding is provided by the Florida Inland Navigation District (FIND), and all work must comply with FDEP Permit No. ERP_0450700-004 and USACE Permit No. SAJ-2025-01042 (GP-ALD), with final project completion requiring an as-built survey signed and sealed by a Florida-licensed professional surveyor, record drawings documenting all field changes, and certification from the engineer of record.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Police_Boat_House_(Addendum_#4_Revision).pdf | ||
| Police_Boat_House.pdf | ||
| Federal_Contract_Provisions.pdf | ||
| USACE_Permit.pdf | ||
| USACE_AP._7-11.pdf | ||
| USACE_AP._1-6.pdf | ||
| USACE_A2._1-9.pdf | ||
| Police_Boathouse_Technical_Specifications.pdf | ||
| Required_Documentation_and_City_Forms.pdf | ||
| Draft_Contract_.pdf | ||
| Geotech_Report.pdf | ||
| FDEP_Permit.pdf | ||
| Public_Records.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: C O
VE
R
/1
0/
FLORIDA
Port Orange, FL 32129 Unit 302 4643 S. Clyde Morris BlvdDredging & Marine Consultants
ENGINEERS SCIENTISTS
Phone:(386) 304-6505 Fax:(386) 304-6506 www.dmces.com
VITALY B. FEYGIN, P.E.
FLORIDA LICENSE No. 65890
ENGINEER CERTIFICATION:
I HEREBY CERTIFY THAT I AM A REGISTERED PROFESSIONAL ENGINEER IN THE
STATE OF FLORIDA PRACTICING WITH DMC, DREDGING & MARINE
CONSULTANTS LLC, A CORPORATION, AUTHORIZED TO OPERATE AS AN
ENGINEERING BUSINESS, CERTIFICATE OF AUTHORIZATION # 9410, BY THE
STATE OF FLORIDA DEPARTMENT OF BUSINESS AND PROFESSIONAL
REGULATION, AND THAT I, OR OTHERS UNDER MY DIRECT SUPERVISION, HAVE
PREPARED OR APPROVED THE EVALUATIONS, FINDINGS, OPINIONS,
CALCULATIONS, CONCLUSIONS OR TECHNICAL ADVICE HEREBY REPRESENTED
BY THESE DRAWINGS.
NOTE TO CONTRACTOR:
THESE DRAWINGS AND THE PROJECT SPECIFICATIONS ARE COMPLEMENTARY,
AND ANY REQUIREMENT OF ONE SHALL BE A REQUIREMENT OF THE OTHER. IT
IS THE CONTRACTOR'S RESPONSIBILITY TO EXAMINE THE DRAWINGS AND
SPECIFICATIONS AND TO COMPARE THE REQUIREMENTS OF EACH DIVISION
AND ENSURE THAT EACH TRADE OR SUBCONTRACTOR IS MAKING THE
ALLOWANCES NECESSARY TO PROVIDE THE OWNER A COMPLETE FACILITY,
OPERATIONAL IN ALL RESPECTS, UNLESS OTHERWISE SPECIFICALLY STATED
IN THE DRAWINGS OR PROJECT MANUAL.
IT IS ALSO THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE ENGINEER OF
RECORD (EOR) ANY DEFICIENCIES OR DISCREPANCIES AMONG THE DIVISIONS
OF THE DRAWING AND SPECIFICATIONS PRIOR TO THE DEADLINE FOR BID
SUBMITTAL. NEITHER THE OWNER OR ENGINEER WILL BE RESPONSIBLE FOR
ANY DEFICIENCIES OR DISCREPANCIES RAISED AFTER THE BID OPENING.
ACCORDINGLY, IN LIGHT OF THESE OBLIGATIONS, THE ENGINEER IS
OBLIGATED TO INTERPRET THE DRAWINGS SPECIFICATIONS IN A MANNER
THAT WILL PROVIDE THE OWNER WITH A COMPLETE, FUNCTIONING FACILITY
FOR THE BID PRICE.
REPRODUCTION SCALE:
THESE PLANS SHALL BE PRINTED IN COLOR AND
ARE SCALED TO ACCURATELY BE REPRODUCED ON
11X17 SIZED SHEETS. ALL OTHER SHEET SIZES ARE
NOT TO SCALE.
PROJECT LOCATION MAP
SECTION 17, TOWNSHIP 17 SOUTH, RANGE 34 EAST
CITY OF NEW SMYRNA BEACH
POLICE BOATHOUSE
APRIL 10, 2026
CONSTRUCTION DRAWINGS
VOLUSIA
COUNTY
INDEX & LOCATION MAP
EXISTING CONDITIONS
GENERAL NOTES
GENERAL NOTES
ENVIRONMENTAL NOTES
AERIAL
SITE PLAN
UTILITY PLAN
STRUCTURAL NOTES
STRUCTURAL NOTES
PILE / FRAMING PLAN
ACCESS PIER DETAILS
ACCESS PIER DETAILS
DOCK FRAMING PLAN
DOCK DETAILS
ROOF DETAILS
GRADE BEAM DETAILS
GATE DETAILS
SPECIFICATIONS
ELECTRICAL SITE PLAN
ELECTRICAL SITE PLAN - OVERALL
RISER AND SCHEDULES
SECURITY CAMERA DETAILS
ELECTRICAL DETAILS
TOPO. AND HYDRO. SURVEY
TOPO. AND HYDRO. SURVEY
TOPO. AND HYDRO. SURVEY
TOPO. AND HYDRO. SURVEY
TOPO. AND HYDRO. SURVEY
PROJECT AREA
INDIAN RIVER
NORTH
NORTH CAUSEWAY
SOUTH CAUSEWAY /
STATE ROAD 44
170 NORTH CAUSEWAY, NEW SMYRNA BEACH, FL 32169
US
FRED CLEVELAND MAYOR
VALLI PERRINE ZONE 1
LISA MARTIN ZONE 2
JASON MCGUIRK ZONE 3
BRIAN ASHLEY ZONE 4
CVR
C-01 C-02 C-03 C-04 C-05 C-06 C-07 S-01 S-02 S-03 S-04 S-05 S-06 S-07 S-08 S-09 S-10 E-1 E-2 E-2.1 E-3 E-4 E-5
INDEX
SHEET DESCRIPTION
CITY COMMISSION
NEW SMYRNA BEACH
CONTACT: JESSE KOBE,
CAPITAL PROJECTS DIRECTOR
210 SAMS AVE. NEW SMYRNA BEACH, FL 32168
PHONE: (386) 410-2613
OWNER
100% PLANS
ALL WORK MUST BE PERFORMED IN ACCORDANCE
1. FDEP PERMIT No.: ERP_0450700-004 EI, DATE ISSUED: AUGUST 13, 2025
2. USACE PERMIT No.: SAJ-2025-01042 (GP-ALD), DATE ISSUED AUGUST 26, 2025.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
AutoCAD SHX Text
STATE OF
EX
IS
TI
N
G C
O N
D
IT
IO
N
S
C -0
VOLUSIA COUNTY PROPERTY APPRAISER
APPROXIMATE SITE LOCATION, FACING WEST DMC, 05-22-2025
PROPERTY MAP
EXISTING CONDITIONS, FACING SOUTH DMC, 05-22-2025
BLACK MANGROVE
TO BE REMOVED
PROPOSED
BOATHOUSE
LOCATION
PROPOSED
BOATHOUSE
LOCATION
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: E
XI
ST
IN
G C
O N
D
IT
IO
N
S (C
1)
/1 0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
EE
RS
SC
IE
NT
TS
EXISTING ROCKS/BOULDERS TO BE REMOVED
AS NEEDED FOR PILE INSTALLATION AND
REPLACED IN SIMILAR FOOTPRINT
WATER ACCESS AND
STAGING AREA
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
G
EN
ER
AL
N O
TE
S C
-0
2IMPORTANT NOTES TO BIDDERS:
1. The Contractor shall keep a pile driving log as specified in the plans and may not cut off piles until the Engineer has given approval to do so. The Contractor must provide advanced notification of a request to cut off piles so that the Engineer may make field observations, if necessary. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.
2. The Contractor shall retain all material delivery tickets, material testing reports and cut-sheets/shop drawings for manufactured products for the project and provide copies to the Engineer on a weekly basis. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.
3. The Engineer must be given advanced notice of the critical stages of construction such as initial construction stakeout, pile driving, timber framing, boat lift installation, first casting of concrete, etc. The Engineer will not make a structure certification if the Contractor does not comply with this requirement.
4. The location of existing utilities, utility services, facilities, and structural features shown on these plans has been determined from the information available at the time of the preparation of these plans, but do not purport to be absolutely correct and are provided for only the convenience of the Contractor. Any inaccuracy or omission in such information shall not relieve the Contractor of its responsibility to protect the existing features from damage and unscheduled interruption of service or from the responsibility to relocate utilities are required. Should a discrepancy arise between these plans and actual field conditions which would appreciably affect the execution of the plans the Contractor shall stop construction and notify the County and utility or facility owner immediately. The Contractor shall verify, prior to construction, the exact location, elevation, dimensions of all existing utilities, facilities, structures, and other features (whether or not shown in the plans). The Contractor shall be solely responsible for coordination of any utilities to be adjusted by others for the construction of this project and shall coordinate with other utilities and entitles as required to ensure the successful implementation of this project.
5. A pre-construction meeting must be scheduled before start of construction and all parties are to attend including: Owner or Owner's Representative, Engineer, Prime Contractor, Subcontractor(s), Surveyor, Applicable Tradesmen, etc. The Engineer will lead the meeting and provide a list of critical items to discuss.
GENERAL:
1. Owner hereinafter refers to Owner's Representative, City, County, Town, Developer or
Private Entity.
2. All elevations in the project plans are referenced to feet N.A.V.D. 88.
3. The project shall be straight, plumbed, level, and elevations are correct as shown in plans.
4. Any deviation from these plans, notes or specifications must be approved in writing by the Owner or Engineer, or else the deviation will be considered construction non-compliant with the plans and specifications.
5. Any discrepancies amongst the plans, notes, specifications and other bid documents must be resolved in writing by the Owner or Engineer prior to continuing the work in question.
6. These plans, notes and specifications, along with the other components of the project bidding documents, constitute the only instructions to bidders/contractors, unless written addenda are issued.
7. All construction, manufacturing, fabrication and testing of materials shall be performed under the guidelines set forth in applicable local, state and federal codes, and/or under recommendations provided in technical publications of respected professional or industry organizations. Material testing programs, where applicable, shall be presented to the Engineer for review and approval prior to construction.
8. All products constructed or manufactured/supplied for the project shall be accompanied by industry acceptable warranties or guarantees.
9. For the purpose of these specifications. "Project Completion" is defined as completion of an agreed upon list of punchlist items compiled in a planned project walkthrough held at a time the Contractor considers the project to be "Substantially Complete". The Contractor shall notify the Owner and Engineer at least 120 hours in advance of substantial completion and schedule a mutually agreeable walkthrough.
10. A portion of the site lies within flood zones “VE" with a base flood elevation of 9.0 as indicated on Federal Emergency Management Agency Flood Insurance Rate Map Community Panel No.12127C0357J dated September 29, 2017.
11. Any materials interfering with construction, and all abandoned utility lines, pipes, structures and other subterranean objects to be removed, shall be disposed of as directed by the Owner. All materials not claimed by the Owner shall be disposed of at the Contractor's expense in areas provided by the Contractor.
12. All materials to be removed from the existing structures per the construction plans.
13. The Contractor shall endeavor to protect private property. Any damage caused by the
Contractor in the performance of his work shall be corrected to the satisfaction of the Engineer at the Contractor's expense. Payment shall not be made for this work.
14. Any damage to state, county, or local roads caused by the Contractor's hauling or excavation equipment shall be repaired by the Contractor to the satisfaction of the Engineer. Payment shall not be made for this work.
15. The construction lengths indicated in these plans are approximate. Actual limits may be set in the fields as directed by the Engineer.
16. During land alteration and construction activities, it shall be unlawful to remove vegetation by grubbing, or to place soil deposits, debris, solvents, construction material, machinery or other equipment of any kind within the dripline of a tree to remain on site unless approved by the Engineer.
17. All trimming undertaken on a tree protected by provisions of the land development code shall be pruned in accordance with the National Arborist Association (NAA) Pruning Standards.
18. The Owner and the Engineer reserve the right to perform quality assurance testing on all materials delivered to project and to reject all materials not meeting acceptable standards.
19. The Contractor shall be responsible for the complete stake-out of the project, i.e., line, grade, slope stake, utility relocations or any other stake-out that may be required to complete the project in accordance with the plans and specifications. Any and all expenses incurred for this work shall be included in the unit price bid for other items. No additional payment shall be made for this work. Contractor shall also be required to provide a certified as-built survey of the grading, drainage and earthwork improvements and meet any minimum requirements of Owner.
20. Overall cleanup shall be accomplished by the Contractor in accordance with Owner standards or as directed by the Engineer. Any and all expenses incurred for this work shall be included in the unit price bid for other items.
21. If, during construction activities, any evidence of historic resources including, but not limited to, aboriginal or historic pottery, prehistoric stone tools, bone or shell tools, historic trash pits, or historic building foundations are discovered, work shall come to an immediate stop and the client and the Florida Division of Historical Resources shall be notified within two working days.
22. All materials and construction shall be in accordance with the more stringent of the current FDOT Standards and Specifications or City of New Smyrna Beach Standards and Specifications.
23. Contractor shall be responsible for independently calculating all quantities for the project including earthwork. It is the Contractors responsibility to verify the Engineers estimated quantities included on the bid schedule.
24. The Contractor shall provide pumping equipment and devices to properly remove and dispose of water during construction, if needed.
25. Refer to construction pollution prevention plan for erosion control notes.
SURVEY INFORMATION:
Topographic information shown hereon from survey performed by Arc Surveying & Mapping, Inc. January 2, 2023. Referenced on the North American Vertical Datum of 1988 (N.A.V.D. 88).
SOIL BORINGS:
Structural calculations based on the Subsurface Soil Exploration and Geotechnical Engineering Evaluation, dated March 5, 2025 by Universal Engineering Sciences, LLC. The Subsurface Soil Exploration and Geotechnical Report has a total of eight borings, B-1, B-2, B-3, B-4, B-5, B-6, B-7, and B-8. Refer to the Geotechnical Report.
ENVIRONMENTAL AND PERMITS:
1. The U.S. Army Corps of Engineers (USACE), Florida Department of Environmental
Protection (FDEP) and the local city or county may exert jurisdiction over construction of the project. The Contractor shall be responsible to understand and comply with all applicable permit conditions imposed by the jurisdictional agencies, if permits are necessary. The Contractor is responsible for all permits required for construction, including but not limited to mangrove trimming, mangrove removal, etc. as stated in the USACE and FDEP permits indicated on the cover sheet of this plan set.
2. Contractor must comply with general state water quality standards for siltation and guidelines for encounters with threatened and endangered species.
3. All building and construction-related permits from the local (city or county) or state authorities are the responsibility of the Contractor.
4. The Contractor shall be responsible for penalties and/or fines levied due to work that is not in accordance with permit conditions.
5. National Marine Fisheries Services has special conditions for manatees. See details.
SUBMITTALS:
All submittals shall be made to the Engineer of Record for review and approval, in writing, prior to ordering and before construction. Submittals also include but are not limited to, shop drawings, mark-up drawings, sketches, cut-sheets, product literature, additional specifications, photographs and letters.
Submittals list:
1. Schedule for completion of work with tasks and durations defined.
2. Shipping, Stockpile and Site Administration Plan (SSSAP).
3. Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker's parking and construction equipment.
4. Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site. See "Site Safety" heading.
5. The Contractor is responsible for obtaining and submitting all required shop drawing submittals as required by the construction plans and technical specifications for construction of the project to the Engineer at the pre-construction meeting. Any uncertainties of the shop drawings as related to the plans or specifications shall be presented to the Engineer prior to or during the pre-construction meeting.
6. Changes, alternates or other methods different from project plans must be approved, in writing, via submittals required by the Engineer and/or Owner.
7. After completing the punchlist in the field, the Contractor must submit a itemized punchlist, as-built survey and record drawings for final changes and the Engineer of Record approving in writing.
8. The Contractor shall be responsible for keeping a log of change orders, RFI's and shop drawings. The log shall be updated and available upon request.
INSPECTION COORDINATION:
1. The Engineer will be conducting routine observations and observations at critical stages of construction. A minimum of 120 hours notice shall be given to the Engineer prior to commencing the critical stages of construction. In general, critical stages are the initial work on the major structure components. Examples of critical stages of construction include: initial construction stakeout, pile driving, timber framing, boat lift installation, first casting of concrete, etc.
2. The local city or county may perform their own construction observations in addition to the Engineer. No observers other than the Engineer or his/her designated representative shall have the authority to determine compliance with plans and specifications.
3. Other observers may relay information to the Engineer, but it will be the Contractor's ultimate responsibility to maintain contact and resolve disputes, questions, field changes, payment requests, etc. directly with the Owner or Engineer.
CONSTRUCTION SURVEYING:
1. Stake-out survey of the project is the responsibility of the Contractor. Beginning and end points will be provided by the Owner or Engineer in the project drawings.
2. The staked project must be approved by the Engineer prior to commencing construction.
The Engineer reserves the right to make alignment changes based on conditions portrayed by the initial stakeout.
3. Methods and frequency of continuing stake-out during construction shall be submitted to the Engineer for approval prior to beginning construction.
4. The Contractor must perform an independent construction record survey (as-built survey) as a check for compliance at the end of the project. The record survey must be signed and sealed by a State of Florida Licensed Professional Surveyor. The record survey must be referenced to feet N.A.V.D. 88.
5. The Prime Contractor is advised that certification of the project elevations and alignment is required by the Engineer for final acceptance of work.
SITE SAFETY:
The Contractor shall prepare and adhere to a Site-Specific Safety Plan. The contents of the plan are:
1. Identification of potential hazards and injuries pertaining to the specific site and project.
2. Location of nearest hospital.
3. Assure availability of at least one working cell phone and one vehicle on site at all times.
4. Emergency contacts within the Subcontractor's organization and at the Prime
Contractor's organization.
5. All field personnel shall wear appropriate safety attire and utilize appropriate personal protection equipment for a given task/operation such as safety glasses/goggles, masks, shields, gloves, harnesses, hard hats, steel-toed boots,etc.
6. Safety kit shall be available onsite at all times with appropriate materials for potential hazards and injuries.
7. The Site-Specific Safety Plan shall be distributed and reviewed with all site workers prior to said workers commencing work on the project site.
8. The Contractor shall follow all applicable local, state, and federal codes regarding site safety.
9. The Contractor shall adjust the means and methods of this plan as appropriate for maintaining site and operational safety.
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: G N
(C 2)
/1
0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: G N
(C 3)
/1
0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
G
ER
AL
N O
TE
S C
-0
3SITE MAINTENANCE:
1. The Contractor shall maintain a clean and neat site, void of loose debris, trash, remnant parts or materials.
2. Trash receptacles and removal service shall be maintained by the Contractor specifically for this project. Pre-existing trash/debris facilities shall not be used to maintain the project.
3. Temporary debris piles shall be limited in number as much as practical and contained in designated areas until removal. Debris and trash shall not be scattered in areas outside the limited designated areas at any time.
4. Removal of trash/debris shall be scheduled as appropriate to not allow piles to reach five-feet in height or greater than ten-feet in diameter. Debris individually larger than these dimensions shall be removed from the site within five working days. Receptacles shall not overflow at any time.
5. Where necessary, the Contractor shall employ a Temporary Traffic Control plan (TTC) for vehicles and pedestrians, including material deliveries, stockpile area(s), worker parking and construction equipment. The plan must be in writing, including sketches or drawings, and must be submitted to the Owner or Engineer for review and approval before commencement of any work.
6. The Contractor shall follow all applicable local, state and federal codes regarding site maintenance.
MOBILIZATION AND DEMOBILIZATION:
1. It is understood that this project will require work in and over water. Access to near water construction areas is required for material storing, hauling, erection and construction. All facilities, public or private, used for such purposes shall be repaired to their original condition following "Completion" of the project, including grade and topping (sod, tree/vegetation cover, established road, etc.)
2. The Contractor shall present a Shipping, Stockpile and Site Administration Plan (SSSAP) to the Owner or Engineer for approval. The plan shall be specific to the project requirements for the particular materials to be delivered to the site, describing delivery points, stockpile areas, temporary debris/trash storage areas, temporary field office (including utilities maintained there), fencing, security and a statement of commitment and details for maintaining safety on the site.
3. The Owner or Engineer shall have the right to exercise reasonable alterations or additions to the SSSAP.
4. It is the Contractor's responsibility to coordinate, and pay for, necessary utilities to occupy the site and perform the work.
5. The Contractor shall not demobilize until project completion, and all parties have agreed and signed off in writing.
TECHNICAL SPECIFICATIONS FOR SITE PLAN TESTING:
1. MATERIAL
The inspection and testing of materials and finished articles to be incorporated in the work shall be made by bureaus, laboratories, or agencies approved by the Engineer of Record.
The Contractor shall submit such samples, or such special or test pieces of materials as the Engineer of Record may require. The Contractor shall not incorporate any material or finished article into the work until the results of the inspections or tests are known and the Contractor has been notified by the Engineer of Record that the material or finished article is accepted. All materials must be of the specified quality and be equal to the approved sample if a sample has been submitted. Certified copies of all tests made shall be submitted to the Engineer of Record as well as to the Owner's designated site inspector.
The Owner's designated site inspector must receive copies of all testing reports and certificates prior to the Engineer of Record requesting a final project inspection from the Owner.
2. LABORATORY CONTROL AND CERTIFICATES SPECIFICATIONS:
Sampling, testing, and laboratory methods shall be in accordance with the standard specifications of the AASHTO or ASTM. Where AASHTO or ASTM specifications are used, the reference shall be construed to be the most recent standard specifications or tentative specifications of the AASHTO or ASTM in force on the date of the test.
TEST AND CERTIFICATES:
The Contractor shall engage an approved testing laboratory to provide the following tests and certifications signed by a registered Engineer of the State of Florida. All technicians performing the tests shall be state certified for the testing performed. Additional tests that may be required by either the Engineer of Record or the Owner shall also be provided by the Contractor, and the following shall not be taken as a complete and exhaustive list of the Contractor's testing responsibilities.
a. Soil analysis for structural fill material prior to installation.
b. Proctor densities, moisture content, compacted field densities and Atterberg limits.
EROSION AND TURBIDITY CONTROL:
The following measures represent minimum standards to be adhered to by the Contractor throughout the construction of this project. The Owner reserves the right to require additional measures to be employed when warranted by extreme conditions and/or the failure of the Contractor to employ the appropriate erosion and turbidity control best management practices.
Failure to comply with these provisions shall result in the issuance of a "stop work order".
1. It shall be the responsibility of the Contractor to have all protective vegetation barricades, erosion and turbidity control structures and measures in place prior to the commencement of any work. These measures include, but are not limited to, temporary construction fences, hay bales, silt fences, and floating turbidity barriers. Further, it shall be the responsibility of the Contractor to maintain all erosion control devices throughout the duration of the entire project. Maintenance shall include periodic inspection and removal of debris abutting erosion control devices.
2. Prior to the installation of any fill materials on subject site, silt fences shall be installed (1) along subject site boundary and property lines, (2) at the edge of conservation easements and wetlands, (3) adjacent to natural landscape buffers, (4) around the perimeter of existing storm water treatment facilities, and (5) at any additional areas that the Owner deems necessary to be protected from potential erosion impacts during construction. These conditions shall apply in all instances where fill material is being installed within 25-feet of any of the aforementioned locations. While these items represent the minimum requirements, the Owner reserves the right to impose additional protective measures, as determined during actual site visits conducted throughout project construction.
3. At a minimum, the Contractor shall seed and mulch all disturbed areas. Sufficient grass coverage is to be established within thirty days.
4. Soils are to be stabilized by water or other means during construction. This is intended to reduce soil erosion and the impact to neighboring communities. Adequate watering methods should be employed to allow daily coverage of the entire limits of all areas that do not have an established vegetative cover. Methods to be employed include, but are not limited to, water trucks, permanent irrigation systems, temporary sprinkler systems operated by pumping units connected to wet retention ponds, water cannons, temporary irrigation systems mounted atop stockpile areas, and other methods as deemed necessary by the Owner.
5. Any permitted demolition or removal from submerged lands or adjacent uplands shall be fully contained within siltation devices such that permit turbidity requirements and state water quality standards are met.
FILL MATERIAL AND SURFACE TREATMENT:
1. Fill material shall be from an upland source and shall be clean, construction quality free from organics, oils, grease, and debris. The source company shall provide a sieve analysis to the Engineer for approval prior to shipping material.
2. Fill material shall be placed in maximum 6-inch lifts and compacted to minimum 98% percent optimum proctor moisture content and density. Testing shall be at the expense of the Contractor, by a qualified independent testing company. The testing company name, qualifications and contact information shall be provided to the City or Engineer for approval prior to commencing soil testing.
3. The filling and compaction should be performed with the smallest practical equipment to reduce surcharge on the structure during the operation. Heavy equipment shall not be operated within 25-feet of the grade beam or structures. The Contractor shall review backfilling procedure with the Engineer prior to commencing.
4. Area to be filled shall be stripped of organic materials prior to filling.
5. If any much material is discovered, it shall be required to be removed and replaced with a suitable material that is properly filled, compacted and tested using AASHTO T-180 modified proctor method.
DEMOLITION, CLEARING AND RESTORATION:
1. Demolition or clearing may require permits. The Contractor shall acquire all necessary building permits from the local municipality prior to commencing work.
2. Clearing and removal of vegetation, concrete with exposed rebar, necessary soil, and debris will be required within the project structure footprint.
3. Demolition or removal of objects, debris, or material specified or obstructing construction shall take place only to the extent necessary.
4. The site shall be restored by removing and finishing all evidence of construction including temporary haul roads, vehicle ruts, stockpile areas, shoreline slopes and vegetation, sod and areas subject to project work.
AS-BUILT SURVEY AND RECORD DRAWINGS:
1. As-built survey and record drawings shall be submitted at the time of the punchlist review and shall be reviewed by the Engineer for completeness and correctness.
2. The record drawings shall be a designated set of drawings maintained on site for the purpose of hand-making all changes and deviations from the original design, no matter how slight. Color markings are preferred.
3. The record drawings shall also contain any and all field changes with respect to location, alignment, height, width, length, depth, materials, products, etc.
SECURITY GATE AND LOCK:
1. Security gate shall be marine grade aluminum minimum 7-feet tall with wings at 45°.
2. Security gate shall include a locking mechanism, with a weatherproof cover.
3. All shop drawings shall be submitted to Engineer for approval.
BOAT LIFT:
1. Boat Lift Mfg. - DECO or approved equal
2. Minimum Capacity: 10,000 lbs
3. Design vessel parameters by New Smyrna Beach:
a. Metal Shark 21 Relentless
4. Lifts shall be aluminum, six-post, side mounted stainless steel cable type with carpeted bunks for easy boat loading/off-loading.
5. All shop drawings shall be submitted to Engineer for approval.
PLUMBING:
1. All construction will be in compliance with Florida Building Code: Plumbing, latest edition.
2. All plumbing lines shall be P.V.C. schedule 80 plastic pipe.
WATER SERVICE:
1. Locations of potable water and other underground utility lines are approximate as depicted on the plans. The Contractor is responsible for requesting all needed utility locates from Sunshine 811, and other underground utility service providers with facilities within or adjacent to the project prior to starting any excavation or demolition activity. The Contractor will be responsible for any damage and stabilization to underground utilities that have been located.
2. Potable water connections and service components shall be constructed in accordance with City of New Smyrna Beach standards, specifications, details, and procedures.
3. Contractor shall be responsible for determining if City staff must be present to observe critical stages of potable water service construction, or to perform connections. The Contractor shall be responsible for providing sufficient notification period to the City and the Engineer to permit scheduling or observation or connection duties. No additional contract time shall be approved if this notification is not given, and any work performed without required observation shall be rejected and replaced by the Contractor at no additional cost to the City.
4. The Contractor shall perform all required pressure, bacteriological and other testing as required by the City, other local and state regulatory agencies, and Engineer. These testing results shall be submitted to the City and Engineer prior to project close-out, and must be available for inspection at any time at the request of the City, other local and state agencies, and Engineer.
MANGROVE PLANTING:
1. Each mangrove shall consist of well-developed nursery stock, provided in a maximum
3-gallon container with an approximate container diameter of 10 to 11 inches.
2. Mangroves shall be planted within 1 to 2 feet landward of the Mean Low Water (MLW) line and spaced to maintain a minimum clear distance of 3 feet between plants.
3. Each mangrove shall be securely staked immediately following planting to prevent displacement due to tidal action, wave energy, or wind. The stakes shall remain in place until the mangrove has adequately established itself and can withstand high-energy environmental conditions.
4. Contractor shall verify final planting locations with Engineer prior to installation to ensure suitable substrate, and tidal/sun exposure.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
VI
R O
N M
EN
TA
L N
O
TE
S
C -0
NOTES:
D1= 5'-0" STD. (SINGLE PANEL FOR DEPTHS 5'-0" OR LESS)
D2= 5'-0" STD. (ADDITIONAL PANEL FOR DEPTHS > 5'-0")
CURTAIN TO REACH BOTTOM UP TO DEPTHS OF 10 FEET. TWO (2) PANELS TO BE USED
FOR DEPTHS GREATER THAN 10 FEET UNLESS SPECIAL DEPTH CURTAINS
SPECIFICALLY CALLED FOR IN THE PLANS OR AS DETERMINED BY THE ENGINEER.
16" GALVANIZED
CHAIN (TYP.)
18 OZ. NYLON REINFORCED
PVC FABRIC (300 PSI TEST)
WITH LACING GROMMETS
CLOSED CELL SOLID PLASTIC FOAM
FLOATATION (6" DIS. EQUIV.)
(12 LBS. PER FT. BUOYANCY)
D1
D2
6061-T6 MARINE GRADE
ALUMINUM STRESS PLATES
6" POLY ROPE SEALED
IN VERTICAL HEM TO
REINFORCE GROMMETS
TYPE II FLOATING TURBIDITY BARRIER
1" = 4'
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: E N
V (C
4)
/1 0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
AE
R
IA
L
C -0
INDIAN RIVER NORTH
AERIAL
1" = 20'
PROPOSED COVERED POLICE
BOAT DOCK WITH BOAT LIFT
MEAN LOW WATER LINE
EL.=(-)1.68' NAVD88
MEAN HIGH WATER LINE
EL.=(+)0.60' NAVD88
Feet 0 20 40
PROPOSED CONCRETE
GRADE BEAM
PROPOSED
SECURITY GATE
(3) PROPOSED BLACK
MANGROVES TO BE PLANTED
(1) EXISTING BLACK
MANGROVE TO BE REMOVED
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: A
ER
IA
L
(C 5)
/1
0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
NOTE:
ANY EXISTING ROCK/BOULDERS WITHIN PROPOSED DOCK FOOTPRINT SHALL BE
REMOVED AS NEEDED AND REPLACED IN SIMILAR FOOTPRINT AFTER PILE
INSTALLATION. NO ROCK SHALL BE PERMANENTLY REMOVED FROM THE PROJECT SITE.
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
SI
TE
P
LA
N
P R
O
FI
LE C
-0
INDIAN RIVER
NORTH
SITE PLAN
1" = 10'
PROPOSED TIMBER
ACCESS PIER
PROPOSED COVERED POLICE
BOAT DOCK WITH BOAT LIFT
PROPOSED TEMPORARY
SILT FENCE
PROPOSED TEMPORARY
TYPE II FLOATING
TURBIDITY BARRIERAPPROXIMATE
TOP OF BANK
CONCRETE
GRADE BEAM
20'-9"
PROPOSED
SECURITY GATE
MEAN LOW WATER LINE
EL.=(-)1.68' NAVD88
MEAN HIGH WATER LINE
EL.=(+)0.60' NAVD88
-7 -6-5-4-3-2
-2
-1
5'-0"
75'-3" 33'-0"
Feet 0 10 20
HOSE BIB
SECURITY CAMERA
SECURITY CAMERA
& (2) FLOOD LIGHTS
-8
(4) PROPOSED
DOCK LIGHTS
NOTES:
· PROPOSED ELECTRICAL CONDUIT AND WATER LINE SHOWN FOR BIDDING PURPOSES.
LOCATIONS MAY VARY.
· ANY EXISTING ROCK/BOULDERS WITHIN PROPOSED DOCK FOOTPRINT SHALL BE REMOVED
AS NEEDED AND REPLACED IN SIMILAR FOOTPRINT AFTER PILE INSTALLATION.
ACCESS PIER & DOCK PROFILE
1" = 10'
MLW EL.=(-)1.68' NAVD88
MHW EL.=(+)0.60' NAVD88
TOP OF DECK
EL.=(+)5.00' NAVD88
APPROXIMATE
MUDLINE
12" SQ. FDOT PRE-STRESSED
CONCRETE PILES
12" DIA. TIMBER PILES,
GRADE PER ASTM D25
74'-3" ACCESS PIER 35'-0" ROOF
SEE GRADE BEAM
DETAILS, SHEET S-08
9'-0"
SECURITY GATE W/ CAMERA
& (2) FLOOD LIGHTS
SECURITY CAMERA
PILE GUARD, INSTALL
18" BELOW MUDLINE
TO 15" ABOVE MHW
12" OVERHANG (TYP.)
D M
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: S
IT
E (C
6)
/1 0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
4'-413 16"
4'-413 16"
3'-6"
46'-6"
9'-6"TOP OF DECK
EL.=(+)5.00
SECURITY CAMERA
SECURITY CAMERA
4'-0"
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
C J
O B
N O
C
AD
SC
AL
E
D
AT
E
D R
AW
IN
G
AP
PR
O
VE
D
C H
EC
KE
D
D R
AW
N
PR
O
JE
C
T N
AM
E:
C
LI
EN
T:
SH
EE
T N
O
D ra w in g N am e:
C :\U se rs
\n te ja da
\D re dg in g
M ar in e
C on su lta nt s\
D M
C
D oc um en ts \D
M C
P ro je ct s\
- C ity o f N ew
S m yr na
B ea ch \2
4-
8-
P ol ic e
Bo at ho us e\ D ra w in gs
\N
SB
B oa t H ou se
_R .d w g
B y:
n te ja da
T ab
: U
TI
LI
TY
(C 7)
/1
0/
-1
0-
VF
C 3D
AS
S
H O
W N
BL VF
-1
-1
C
IT
Y O
F N
EW
S
M
YR
N A
BE
AC
H
PO
LI
C E
BO
AT
H O
U
SE
FL
O
R
ID
A
LI
C
EN
SE
N o.
VI
TA
LY
B
. F
EY
G
IN
Po rt
Or an ge , F
L 3
Un it 3
S . C lyd e M or ris
B lvd
Ph on e:(
6)
4-
Fa x:(
6)
4-ww w.
dm ce s.c om
D re dg in g
M ar in e
C on su lta nt s
EN
G
IN
NT
U
TI
LI
TY
P
LA
N
C -0
CAMERA/LIGHT POST CONNECTION
1" = 2'
HOSE BIBB MOUNTING DETAIL
1" = 2'
12" SQ. FDOT
PRE-STRESSED
CONCRETE PILE40HT HOSE BIBB OR
APPROVED EQUAL
4" DIA. SCH. 80 WHITE PVC
POTABLE WATER LINE. ATTACH w/ S.S. CONDUIT CLAMPS w/ S.S.
SCREWS SPACED EVERY 24"
HOSE BIBB NOTES:
· WOODFORD MODEL 40HT-LH
OR APPROVED EQUAL
· LEVER HANDLE
· FINISH FOR USE IN MARINE
ENVIRONMENT
· 3
4" INLET/OUTLET
· CONTRACTOR SHALL SUBMIT
SHOP DRAWINGS PRIOR TO
ORDERING AND INSTALLING
HOSE BIBB & COMPONENTS.
· EXACT PLACEMENT TO BE
DETERMINED IN THE FIELD
BY ENGINEER.
HOSE BIBB
UTILITY PLAN
1" =100'
PROPOSED DOCK
PROPOSED
ELECTRICAL LINE,
SEE ELECTRICAL
PLANS E-1
THROUGH E-5 FOR
SPECIFICATIONS
AND DETAILS
280± LF PROPOSED
4" PVC POTABLE
WATER LINE
CONNECT TO EXISTING
WHITE PVC WATER LINE
2'-0"
CONNECT TO EXISTING
POWER POLE
NOTES:
· INSTALL 11
4" DIA. SCHEDULE 80 WHITE PVC POTABLE WATER LINE.
PVC PIPE MUST BE CAPABLE OF CONNECTING TO STANDARD
DUCTILE IRON VALVES AND FITTINGS USING MECHANICAL JOINTS.
· CONTRACTOR SHALL BE RESPONSIBLE FOR FIELD LOCATING AND
CONNECTING TO THE EXISTING WATER LINE SHOWN.
· EXISTING DUCTILE IRON RECLAIM PIPE DIAMETER VARIES; PIPE
SHALL BE FIELD LOCATED TO CONTRACTOR, REMAIN IN PLACE,
AND BE PROTECTED DURING CONSTRUCTION. IF REQUIRED, A
SINGLE CROSSING OF THE PIPE WITH A VERTICAL CLEARANCE OF
1' MINIMUM MAY BE PERMITTED TO CONNECT TO THE PROPOSED
DOCK. POTABLE WATER LINE SHALL BE HAVE A MINIMUM OF 3'
HORIZONTAL DISTANCE FROM EXISTING DUCTILE IRON RECLAIM
PIPE.
· PROPOSED POTABLE WATER LINE SHALL BE BURIED MINIMUM 3'
BELOW GRADE.
· ALL UTILITIES MUST BE INSTALLED IN ACCORDANCE WITH THE
CITY OF NEW SMYRNA BEACH UTILITIES COMMISSION RULES,
DESIGN, AND CONSTRUCTION SPECIFICATIONS.
· SEE GENERAL NOTES FOR TESTING REQUIREMENTS.
EXISTING DUCTILE IRON
RECLAIM PIPE TO REMAIN
AND BE PROTECTED (TYP.)
EXISTING WHITE
PVC WATER LINE
POLE NOTES:
1. POLE BASE TO BE
ATTACHED TO DECK WITH
STAINLESS STEEL (S.S.)
HARDWARE.
2. LIGHT POLE SHALL BE
ATTACHED TO RAILING
POST AT A PILE LOCATION.
ATTACH WITH (3) 3 4"
DIAMETER THREADED
RODS, CAP NUTS, NUTS &
WASHERS THROUGH THE
6"x6" RAILING POSTS.
3. MODIFICATION/CUTTING OF
LIGHT POLES IS REQUIRED.
THE CUT SHALL BE
STRAIGHT AND FLAT TO
ENSURE FLUSH FITMENT
TO DECK AND A
PROTECTIVE EPOXY
COATING SHALL BE
APPLIED TO CUT PORTION
OF THE POLE.
4. EXACT PLACEMENT TO BE
DETERMINED IN THE FIELD
BY ENGINEER.
TR34-11 COMPOSITE POLE
OR APPROVED EQUAL
4" DIA. THREADED
RODS, CAP NUTS,
NUTS, & WASHERS
6" X 6" RAILING POSTS,
S.Y.P. No.1 GRADE
3" X 14" CAP BOARDS,
S.Y.P. No.2 GRADE
12" DIA. TIMBER PILE,
GRADE PER ASTM D25
CAMERA/LIGHT POLE
EXISTING PVC SEWER
PIPE TO REMAIN AND BE
PROTECTED (TYP.)
BASE PLATE PER
MANUFACTURER
WATER LINE
SAMPLE POINT 1
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text F
AutoCAD SHX Text L
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text D
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text No. 65890 6589065890
ST
U C
TU
R
AL
N
O
TE
S S-
01GENERAL:
1. Contractor is advised that all plans, dimensions and details depict field conditions as known at time of design, Minor variations to be expected.
2. Contractor shall secure all required approvals and permits from the appropriate agencies, as required.
3. Do not scale these drawings. Written dimensions take precedence over the drawing scales.
4. It is solely Contractor's responsibility to verify all existing conditions and verify all field dimensions prior to job commencement. Contractor shall verify job site conditions and immediately notify Engineer of Record of any found discrepancies.
5. All dimensions shown on the plans are nominal dimensions and show design intent only.
Contractor shall be responsible for any required field adjustments accounting for minor dimension variations.
6. Contractor is fully responsible for temporary supports, formwork, shoring, bracing, scaffolding, temporary loads, means and methods of construction, and shall provide all materials and labor necessary for constructing the items and systems depicted on these plans, sections, details and specifications (if provided). The plans, sections and details shown on these drawings represent the finished product, unless noted otherwise.
7. All subcontractors hired by General Contractor shall be experienced or at all times supervised by experienced supervisor with at least 5 years of similar job experience.
8. It is the sole responsibility of the Contractor to locate, remove and reset/ reconnect all utilities as necessary.
9. Contractor shall review all completed work with the Engineer of Record (EOR) and/ or Owner's Representative, and demonstrate satisfactory operation of the structural system and mechanical equipment. Any found deficiencies shall be corrected by the contractor without additional expense to the owner.
10.Contractor shall turn over to the Owner a clean facility with the certificate of occupancy, record documents depicting as-built conditions, inspection certificates, warranties and bonds, evidence of payment, release of liens, and any operation and /or maintenance manuals.
11.Engineer of Record is responsible for structural system and geotechnical conditions shown on these drawings only. Should contractor find soil conditions to be different from conditions shown in these design documents, contractor shall immediately notify EOR.
12.Engineer is not responsible for any part of these package unless all sheets are electronically or wet sealed and signed by the EOR.
13. Any revisions and corrections indicated on the drawings shall be computer generated, and such revisions or addendums to these drawings will be valid only if one of the following methods are utilized:
a. The affected part of the set will be addressed by way of letter and/ or detail shown on 8.5” x 11” or 11” x 17” sheet signed and sealed by EOR
b. The affected sheets will be reissued in the whole entirety, and will contain the seal and signature of EOR.
14. Alterations to the structural system or construction materials will void EOR seal and signature.
ELEVATION DATUM:
1. All drawing elevations are referenced to North American Vertical Datum of 1988 (NAVD
88).
LOAD AND COMBINATIONS:
1. Dead Gravity Load:
· Weight of the timber deck and timber framing
2. Live Gravity Load:
· Live Gravity Load on the deck - 60 psf
· Boat Weight in suspended position - 30 kip
3. Lateral Load
· Transient Load
· Wind Load
· Wind Exposure - D
· Ultimate Wind Speed - 150 mph
4. Service Load Combinations:
· LC 1 = LL + DL
· LC2 = 0.6 Wind Load (No boat)
5. Factored Load Combinations:
· LC2 = 1.2 DL + 1.6 LL
· LC3 = 1.0 WL
6. Wind load and other live loads are not combined for the purpose of the dock analysis.
CAST-IN-PLACE CONCRETE:
1. Contractor shall perform all concrete work in strict accordance with applicable building codes: ACI 301, ACI 315, and ACI 318 latest editions.
2. Contractor shall review all plans, sections and…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .