Updated_Bid_Form_CC-5725-24.xlsx

XLSX spreadsheet 31 KB Posted

Attached to
Master Services Agreement for Trail Edge Restoration and Repairs
Solicitation number
CC-5725-24/HSM
Issued by
Seminole County, Florida

About this file

The document is a Bid Form (CC-5725-24/HSM) for a Master Services Agreement issued by the Seminole County Board of County Commissioners in Florida for Trail Edge Restoration and Repairs. The project scope involves comprehensive trail maintenance, including sod replacement, clean fill dirt, concrete work, road replacement, and asphalt repair across Seminole County trails. The bid form details various material and service quantities, such as 3,000 linear feet of concrete replacement, 1,500 cubic feet of asphalt replacement, 10,000 square feet of sod replacement, and 3,000 cubic yards of base material and fill dirt. The Engineer's estimated project value is $328,750.00, with bid documents available on the Seminole County website.

The bid form includes multiple line items for various materials and services, with quantities specified for each, such as pea rock, regular rock, stabilization materials, and erosion control elements like floating turbidity barriers and sediment barriers. The solicitation encourages M/WBE (Minority/Women-owned Business Enterprise) participation and provides specific instructions for bidders, including a caution against contacting county staff outside the designated contact person. The procurement process is conducted through a secure online portal, with interested parties directed to search current active solicitations on the Seminole County website.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Form

CC-5725-24/HSM- Master Services Agreement for Trail Edge Restoration and Repair
DescriptionEstimated QuantityUnit of MeasureUnit Price PerTotal Price
Mobilization (Percentage of Project Bid Price Subtotal, Excluding Mobilization, Maintenance of Traffic, Prevention Control and Abatement of Erosion & Water Pollution, Clearing & Grubbing, Regular Excavation, and Maintenance of By-Pass Flow Pay Items. See *Note 1 below)LSNo Bid ItemN/A
Maintenance of Traffic (Percentage of Project Bid Price Subtotal, Excluding Mobilization, Maintenance of Traffic, Prevention Control and Abatement of Erosion & Water Pollution, Clearing & Grubbing, Regular Excavation, and Maintenance of By-Pass Flow Pay Items. See *Notes 2 Below.)LSNo Bid ItemN/A
Concrete Replacement3000Linear Feet (LF)
Aspahlt Replacement1500Cubic Feet (CF)
Sod Replacement10000Square Feet (SF)
Base Materal3000Cubic Yards
Fill Dirt3000Cubic Yards
3000 PSI Pea Rock100CY
4000 PSI Pea Rock100CY
Fiber Reinforced Concrete100CY
3000 PSI Regular Rock100CY
4000 PSI Regular Rock100CY
SuperPave Asohaltlc Concrete 12.5 Traffic C500SY
Type "B" Stabilization500SY
Lime rock Base100CY
Concrete Fines500CY
Asphalt Millings500CY
Rip Rap100TN
Sodding Bahia10,000SQFT
Topsoil100CY
Clean Fill Dirt500CY
Floating Turbidity Barrier100LF
Sediment Barrier100LF
Grand Total
Note 1: Maximum Allowable Percentages for Lump Sum Items to be Determined by Project Manager on a Per Project Basis, Prior to Bid Solicitation for Individual Work Order.
Note 2: Project Bid Price for Lump Sum Items: Mobilization, Maintenance of Traffic to be Calculated by Multiplying Subtotal of All Other Pay Items in Bid Solicitation by a Percentage Determined by Contractor, not to Exceed the Maximum Allowable Established for Each Pay Item in Bid Solicitation for Individual Work Order.

&"Arial,Regular"&12Bid Form image1.png

File details come from the government source that posted it. Updated .