QUESTIONS AND ANSWERS USCG KETCHIKAN NEW CARPET RQMT.docx

DOCX document 22 KB Posted

Attached to
UNITED STATES COAST GUARD KETCHIKAN ALASKA NEW CARPET INSTALLATION
Solicitation number
Not on record
Issued by
Not on record

About this file

This file is a Questions and Answers (Q&A) document for the United States Coast Guard Ketchikan New Carpet Requirement solicitation. The Q&A addresses contractor inquiries regarding the carpet removal and installation project at USCG Base Ketchikan, Alaska, with an anticipated award and start date in November 2026. Key clarifications include: no asbestos abatement is required as no flooring will be removed; the contractor must provide color swatches in at least six choices per color family, with blue and grey families preferred; all rubber cove base shall be replaced with color choices available, while wood cove base may be reused if in suitable condition after cleaning and nail hole filling; the site has a truck-height dock for deliveries; the existing subfloor in the administrative area is concrete; installation should be phased by building to minimize disruptions; on-site storage is extremely limited, requiring contractors to estimate storage needs or provide off-site storage if the government cannot accommodate; and the contractor is responsible for securing and maintaining a rental roll-off dumpster for old carpet disposal throughout the contract duration. Award will be made to the lowest priced, technically acceptable, qualified contractor and is contingent upon the Coast Guard securing proper funding.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND

USCG/GOVERNMENT ANSWERS

1) Has there been an abatement of the existing carpet? NO. No flooring has been removed or is expected to be removed

2) What color finish are you looking for? Contractor Provide Color swatches, at least 6 choices per color family. Current color attached for reference. Color families should include blue and greys.

3)Will you need new base cove? YES. All Rubber cove base shall be replaced. Color Choices preferred. Wood Cove base can be reused provided it is in suitable condition. Wood Cove Base to be cleaned and nail holes filled prior to reinstall.
4)Does the site have a normal truck height dock for deliveries, YES
5)What is the existing Sub floor? Concrete, wood, raised floor etc… ADMIN – Concrete
6)Will the installation be phased or in one mobilization? Recommend phasing per building, and subphase ADMIN to minimize work disruptions
7)Is on site storage available? Extremely Limited storage: Contractor should provide estimated square footage of storage requested. If unable to accommodate, Contractor will need to provide their own storage space off site.
8)Will there be a dumpster on site? NO. Contractor is responsible for securing rental roll-off dumpster and ensuring it is emptied throughout the contract duration.