About this file

This is a Performance Work Statement (PWS) and Specifications document for carpet removal and installation services at the United States Coast Guard (USCG) Base Ketchikan, Alaska. The USCG is procuring the removal of existing carpet and installation of brand new carpet on the 3rd floor of the Administrative building at Base Ketchikan. The contractor must provide all necessary labor, equipment, materials, supplies, and transportation to complete the work in accordance with industry standards and manufacturer specifications. Work shall be performed Monday through Friday between 0700 and 1630 Alaska Standard Time, or by scheduled appointment coordinated with the Contracting Officer's Representative. The anticipated award date and start of services is November 2026, contingent upon the availability of funded appropriations.

The contract will be awarded to the lowest priced, technically acceptable, and qualified contractor. Contractors are required to submit pricing on a single line item basis for the removal and installation project at Base Ketchikan, and must include regular and overtime labor rates for any additional labor categories proposed. The scope is scalable to include additional tasks, services, or locations as required and determined by the Contracting Officer's Representative. Contractors are encouraged to recommend cost-effective revisions that would provide savings to both the government and contractor. No facility keys will be provided to contractors, and all work must comply with established government work schedules and coordination requirements.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CARPET CLEANING Services

ANTICIPATED AWARD DATE/START OF CARPET INSTALLATION SERVICES SHALL BE CONTINGENT ON AVAILABILTY OF A FUNDED AWARD.

EXPECT AWARD & START DATE TO BE November OF 2026.

CLIN
Schedule of Supplies/Services
Qty
Unit
Unit Price
Total Amount
CARPET INSTALLATION Services AS SPECIFIED IN ATTACHED SOW, SPECS AND MAP- Base Ketchikan
1
EACH
Total
$0.00
Total Contract Value
$0.00

*The Contractor shall also include regular and overtime rates for any other labor categories proposed.

Preparation of this quote is completely voluntary and shall be submitted to the United States Government by date specified herein .

This shall be awarded to the LOWEST PRICED/ TECHNICALLY ACCEPTABLE/ QUALIFIED CONTRACTOR AND IS CONTINGENT ON THE UNITED STATES COAST GUARD SECURING PROPER FUNDING.

Attachment 1
1.0General

1.1 Background

The United States Coast Guard (USCG) is procuring CARPET CLEANING Services as described within this PWS for USCG Base Ketchikan, AK. Base Ketchikan serves as the single touch point for the support of Coast Guard operations within the 17th Coast Guard District, standing shoulder-to-shoulder with our operational partners to ensure the delivery of professional, responsive, and cost-effective services to the American public.

1.2 Scope

The Contractor shall provide the proper mix of personnel, management, supervision, materials, supplies, equipment, tools, transportation, and other items or services (except utilities and limited facilities as defined in section 12.0) necessary to accomplish the CARPET REMOVAL AND INSTALLATION OF BRAND NEW CARPET services required by this PWS. The efforts to be accomplished under this contract are scalable in nature to include other tasks, services, or locations within scope, as required. The contractor is encouraged to assess the work requirements and recommend revisions that would provide beneficial savings to the contractor and the government.

1.2.1 REMOVE EXISTING CARPET AND INSTALL BRAND NEW CARPETcleaning Base Ketchikan for: Administrative building 3RD FLOOR ONLY.

a. GENERAL REQUIREMENTS:

b. Services to Be Preformed: Carpet REMOVAL AND INSTALLATION OF NEW CARPET is required at each location specified below as determined by the Contracting Officer’s Representative (COR). The Contractor shall provide all necessary labor, equipment, and supplies required to perform these services. All cleaning procedures and treatment shall be accomplished in accordance with the manufacturer’s directions and/or listed specifications and industry standards applicable to the Professional Cleaning & Restoration Industry.

1.2.2 Location of Work Performance:

Administrative building 3rd Floor – SEE ATTACHED MAP FOR: sqft

2.3 Work Hours: All carpet REMOVAL AND NEW installation services shall be performed between the hours of 0700 and 1630 AKST. Monday through Friday or by appointment scheduled in advance. The Contractor shall notify the designated Contracting Officer Representative of any deviations to the previously agreed upon appointment and schedule an alternate appointment carpet cleaning. No keys to Government facilities are to be provided to Contractors under any circumstances.

3. PERFORMANCE REQUIREMENTS:

OLD CARPET SHALL BE REMOVED AND BRAND NEW CARPET SHALL BE INSTALLED IN according to industry standard to protect the investment as part of a maintenance program that will preserve the appearance and extend the life of the carpet. The contractor will develop a cost-effective cleaning strategy, plan, and schedule.

MAPS OF AREAS WITH CARPET TO BE CLEANED: ATTACHED HERE……..