About this file

This document is a technical scope and existing conditions analysis for the University of New Hampshire (UNH) Boiler Plant Equipment Replacement Project, prepared as part of architectural and engineering design services. The project encompasses the replacement of major boiler plant equipment at UNH's Combined Heat & Power facility, with design documentation dated July 12, 2026. The scope includes demolition of four existing boilers, installation of two new 1,200 horsepower boilers (CBJT-2W-1200HP models), replacement of the condensate tank system with a new 4,000-gallon atmospheric tank, upgrades to water softening systems, installation of three new electric boiler feedwater pumps (40 HP each), replacement of the deaerator with a new 120,000 PPH unit, installation of new heating hot water pumps, and relocation of the facility generator to an external location. The project also includes installation of a new 32-inch boiler stack through the roof, reconstruction of roof structure and access platforms, replacement of safety relief valves, and demolition of abandoned piping systems. Critical project considerations include phasing strategy to maintain plant operations during construction, potential need for temporary rental boilers, evaluation of the circa-1970 electrical switchboard for continued use or replacement, and coordination of construction sequencing with building access limitations through an existing loading dock measuring 6'8" x 7'11".

The document emphasizes several key technical and logistical factors affecting project execution. The existing condensate surge tank (approximately 4,000 gallons) is identified as insufficient for handling plant transient conditions, and the engineer must evaluate whether to replace or supplement this tank with an additional vessel for improved cost efficiency and redundancy. Existing fuel oil piping, natural gas, and processed landfill gas (PLG) systems will be reused and redirected to new boiler locations. The oil-water separator and condensate pump will be repurposed to serve only the Siemens fuel oil heater, with consideration given to eliminating this device entirely through alternate solutions. Construction must include temporary full-height dust barriers to isolate the operating plant from renovation areas, and the engineer must confirm that all piping designated as existing-to-remain is appropriate for continued service. Combustion air requirements must be engineered, though the document notes that combustion rates are not increasing from existing firing rates and the facility has not experienced negative pressure issues historically. The project requires careful coordination with UNH regarding temporary stair access, roof access points, and site grading changes following stack demolition.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

UP

A B C D E F G H

"ø

"ø

"ø

5"ø

6"ø

"ø

6"ø

6"ø

"ø

"ø

3"ø

3"ø

"ø

"ø

3"ø

"ø

FOR

FOS

D C

W

D C

WS

o ft e n e d M a k e u p W a te r

H

IG

H P

R E S S U

R E S

T E A M

LO PRESS STEAM

"ø

"ø

6"ø

5"ø

4"ø

6"ø

6"ø

5"ø

5"ø

Steam

Natural Gas

DCW

Heating Water Supply

Steam

Steam

Steam

Condensate

12"ø

8"ø

8"ø

"ø

"ø

6"ø

3"ø 4"ø

"ø

"ø

"ø

C o n d e n sa te

L o w

P re ss u re

R e tu rn

Low Pressure Return

Natural Gas

Blended Gas

PLG

Domestic Cold Water

Pumped Condensate

C o n d e n sa te

Dual Temp Supply

Dual Temp Return

Dual Temp Return

Softened Makeup Water

PRV 100psig to 18psig

Pumped Condensate

(E) FUEL OIL

TRANSFER

PUMP

(E) BLOW

DOWN TANK

5"ø

5"ø

3"ø

5"ø

HWR

HWS

LPCR

HPS

BOILER ABOVE

(SHOWN FOR REFERENCE ONLY)

GARAGE DOOR EXTERIOR

RAMP UP TO GRADE

High Press Steam

6"ø Steam UP

5"ø Steam UP

6"ø Steam UP

10"ø Steam UP

3"ø Condensate UP

3" UP

CAPPED

CAPPED

CAPPED

CAPPED

CAPPED

6"ø Steam UP

6"ø Steam UP

10"ø Steam UP

(E)SyncroFlo

Pumps

3" DN

5"ø PLG UP 4"ø Natural Gas UP 4"ø Feedwater UP

5"ø Condensate UP

4" UP

6"ø Heating Water Return UP6"ø Heating Water

Return UP

CAPPED

1"ø FOR UP

1"ø FOS UP

CONTROL SKID

PLG

BLG

Natural Gas

Natural Gas

P L G

PLG

S o ft e n e d M a k e u p W a te r

C o n d e n sa te

PLG

BLG

BLG

BLGBLG

BLG

PLG

PIPE TUNNEL

5' 5" DEEP

6"ø

NEW PLANT

WATER

BOOSTER

SYSTEM

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :2

P

M

M101

BASEMENT NEW

WORK PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

1/4" = 1'-0"

BASEMENT NEW WORK

marks Polygon marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks PolyLine marks PolyLine marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Rectangle marks Line marks Line marks Line marks Callout

4" PCR @ 12'-0" AFF

marks Callout

NEW CONDENSATE TANK ~4,000 GAL

NEW CONDENSATE RETURN PUMPS AND REFEED ALL RETURN LINES.

marks Callout CONNECT EXISTING CONDENSATE RETURN LINES TO NEW TANK PRIOR TO DEMOLITION OF EXISTING TANK marks Text Box

TO CONDENSATE TANK

marks Callout

NEW WATER SOFTENERS

marks Ellipse marks Ellipse marks PolyLine marks PolyLine marks PolyLine marks PolyLine marks Snapshot marks Text Box NEW 4,000 GALLON CONDENSATE/ SURGE TANK CLEAVER BROOKS SRG-4000 OR SIMILAR. TANK IS ATMOSPHERIC AND DOES NOT REQUIRE AN ASME STAMP. FIELD FABRICATION MAY BE NECESSARY.

marks Text Box PROVIDE NEW WATER SOFTENERS FOR THE THE CONDENSATE RETURN SYSTEM. EXISTING TANKS ARE LIKELY SIZED FOR TOO LOW OF FLOW, THIS IS CAUSING MAKE-UP ISSUES WITH THE CONDENSATE RECEIVER. COUPLING THIS WITH A LARGER CONDENSATE RETURN VESSEL/SURGE TANK WILL ASSIST WITH BOILER FILLING CONCERNS.

marks Ellipse marks Ellipse marks Ellipse marks Callout

REFEED NEW BOILERS WITH EXISTING NG, PLG, AND FUEL OIL PIPING

marks Callout

UPDATE WATER SOFENERS TO HIGHER FLOW SYSTEM. RELOCATE IF NECESSARY

marks Callout EXISTING TANK AND PUMPS TO ONLY BE DEMOLISHED AFTER NEW SYSTEM IS OPERATIONAL AND ALL LINES RE-FED TO NEW TANK

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow Text Box M. Schow

Mark Schow Rectangle

Mark Schow Callout OIL WATER SEPARATOR AND CONDENSATE PUMP WILL NOW ONLY BE SERVING THE SIEMENS FUEL OIL HEATER. CONSIDER ALTERNATE SOLUTIONS THAT COULD FULLY ELIMINATE THIS DEVICE.

Mark Schow Callout EXISTING SURGE TANK IS ABOUT 4,000 GALLONS AND IS INSUFFICIENT TO DEAL WITH PLANT TRANSIENT CONDITIONS. EVALUATE SYSTEM NEEDS TO DETERMINE THE ACTUAL TANK REQUIREMENTS. CONSIDER ADDING AN ADDTIONAL TANK TO WORK WITH THIS TANK RATHER THAN REPLACING THIS TANK. THIS APPROACH WOULD BE LOWER COST, MORE SPACE EFFICIENT, AND PROVIDE SOME REDUNDANCY. EVALUATE EXISTING TANK FOR CONTINUED SERVICE.

Mark Schow Rectangle

Mark Schow Callout CIRCA 1970 SWITCHBOARD SHALL BE EVALUATED FOR CONTINUED USE OR REPLACEMENT. ANALYSIS SHALL INCLUDE TEMPORARY EQUIPMENT AND IMPACT TO PLANT DURING CONSTRUCTION AS AN EXTENDED OUTAGE IS NOT VIABLE.

Mark Schow Callout PHASING IS A CRITICAL PART OF THIS PROJECT AND DETERMINIATION OF SEQENCING AND THE POTENTIAL NEED FOR RENTAL BOILERS AND ISOLALTION AND CONNECTION POINTS SHALL BE EVALUATED.

DN

A B C D E F G H

LOW PRESS STEAM

Pumped Cond.

UP/DN

12"ø

12"ø

12"ø

12"ø

8"ø

12"ø

"ø

"ø

"ø

"ø

"ø

"ø 1 "ø 6"ø

6"ø

4"ø

"ø

10"ø

10"ø

6"ø

"ø

10"ø

8"ø

3"ø

6"ø

6"ø 6"ø

"ø

"ø

6"ø

"ø

10"ø

10"ø

12"ø Heating Water Return UP

6"ø

"ø

PLGPLG

Steam

Steam

Condensate

Heating Water Supply

6"ø Steam DN

Heating Water Return

(E)

GENERATOR

CAPPED

TEE DN

TAP

DN

6"ø Steam DN

6"ø Steam UP 5"ø Steam DN

10"ø Heating Water Return UP

6"ø Heating Water Return UP

CAPPED

CAPPED

Disconnected

CAPPED

3" DN

5" DN

6" UP

6" DN 4" DN

6" UP

6" DN

4" UP

6" UP

4" UP VTR

CAPPED

TO HEAT EXCHANGER

7 AT MEZZ. LEVEL

(E)

Water

Heater

10"ø Steam UP

10" DN

3" DN

UP/DN

CAPPED

UP/DN

4" DN

6"ø Steam UP

10"ø Condensate

DN

FROM DEAERATOR

6" DN

6" DN

UP/DN

8" UP

(E) BOILER 4

TO HEAT EXCHANGER 5

6" UP

12" DN

10"ø Heating Water Return UP

10"ø Heating Water Return UP

TO HEAT EXCHANGER 1

TO HEAT EXCHANGER 3

1"ø FOR DN 1"ø FOS DN

Heating Water Supply Heating Water Return

Condensate Steam

3"ø Condensate UP

6" UP VTR

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :2

P

M

M102

GROUND LEVEL

NEW WORK PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

1/4" = 1'-0"

GROUND LEVEL NEW WORK

marks Snapshot marks Snapshot marks Callout

RE-FEED NEW B-1 & B-2 WITH EISTING NG, PLG, AND FUEL OIL

marks Callout

CBJT-2W-1200HP

marks Length Measurement 7'-0" marks Length Measurement 7'-0" marks Callout

CBJT-2W-1200HP

marks Callout

PROVIDE NEW STAIRS TO NEW ACCESS PLATFORMS. IMPROVE WIDTH AND RISE/RUN RATIOS.

EXISTING COLUMNS WILL NEED TO BE DEMOLISHED FOR THE NEW BOILERS.

marks Callout

EVLAUATE EXISTING CHEMICAL TREATMENT FOR REUSE

marks Callout

EVLAUATE EXISTING CHEMICAL TREATMENT FOR REUSE

marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Rectangle marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Line marks Rectangle marks Line marks Callout INSTALL TEMPORARY FULL HEIGHT DUST BARRIER DURING DEMO/CONSTRUCTION TO ISOLATE EXISTING (OPERATING) PLANT FROM PORTION OF PLANT UNDER CONSTRUCTION marks Rectangle marks Rectangle marks PolyLine marks PolyLine marks Callout

EXISTING LOADING DOCK PROVIDES 6'8" X 7'11" CLEAR ACCESS

marks Callout CONSIDER BOILER OPTIONS THAT CAN FIT THROUGH EXISTING PATHWAY WITHOUT OPENING THE ROOF marks Callout

NEW ACCESS PANELS ARE APPOXIMATELY 9.5' X 10.5' CLEAR.

marks Callout

ACCESS TO THE NEW PANELS FROM THE EXTERIOR IS LIMITED.

marks Callout

SCHEDULE OUTAGE AND CAP BOILER FEED WATER

marks Callout

RE-FEED NEW BOILERS WITH EXISTING FEEDWATER PIPING

marks Rectangle marks Callout PROVIDE (3) NEW BOILER FEED WATER PUMPS. PHASE PUMPS SO THAT THREE (3) PUMPS ARE ALWAYS AVAILABLE OR COORDINATE WORK WITH PLANT SHUTDOWNS. ALL NEW PUMPS SHALL BE ELECTRIC 40 HP.

REUSE AS MUCH EXISTING FEEDWATER PIPING AS POSSIBLE. REPLACE PUMP INLET/OUTLET PIPING AS NECESSARY.

marks Callout

CONNECT TO NEW DEAERATOR DURING PLANT OUTAGE

marks Callout ENGINEER TO DETERMINE COMBUSTION AIR REQUIREMENTS. COMBUSTION RATES ARE NOT INCREASING FROM EXISTING FIRING RATES AND FACILITY HAS NOT HAD ISSUES WITH NEGATIVE PRESSURE.

PROVIDE MAKEUP AIR UNIT IF REQUIRED.

marks Rectangle marks Callout

PROVIDE NEW PUMPS FOR HEATING HOT WATER SYSTEM

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow Text Box M. Schow

Mark Schow Rectangle

Mark Schow

OLD PLANT GENERATOR TO BE DEMOLISHED AND A NEW GAS FIRED GENERATOR LOCATED IN THE ALLEY.

DN

A B C D E F G H

12"ø

"ø

"ø

"ø

10"ø

10"ø

12"ø

"ø

"ø

"ø

8"ø

"ø

6"ø

12"ø

6"ø

6"ø

12"ø

"ø

"ø

12"ø

"ø

"ø

12"ø

"ø

"ø

12"ø

"ø

"ø

12"ø

12"ø

12"ø

"ø

8"ø3"ø

"ø

"ø

"ø

"ø

S te a m

C o n d e n sa te

High Press Steam

6" DN

6"ø Heating Water Return DN

6" DN

6" UP VTR

6" UP VTR

(E) BOILER 4

10" DN

10" DN

6" UP VTR

6" UP VTR

4" UP VTR

6"ø Heating Water Return DN

6" UP VTR

6" UP VTR

10"ø Heating Water Return DN

Heating Water Return

10" DN

(E) DUCT UP THRU ROOF

6"ø Heating Water Return DN

5"ø Condensate DN

12"ø Heating Water Return DN

3"ø Condensate DN

5"ø Steam DN 3"ø Condensate DN

Steam

6" UP VTR

Heating Water Supply

Heating Water Return

4" UP VTR

5"ø PLG DN 4"ø PLG DN

P L G

P L G

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :2

P

M

M103

MEZZANINE NEW

WORK PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

1/4" = 1'-0"

MEZZANINE NEW WORK

marks Polygon marks Ellipse marks PolyLine marks PolyLine marks Line marks Callout

NEW 120,000 PPH DEAERATOR WORK TO BE PERFORMED DURING PLANT OUTAGE

marks Callout EVALUATE ALL SAFETY RELIEF VALVES FOR CONTINUED USE, REFURBISHMENT, OR REPLACEMENT marks Callout

RE-FEED NEW B-1 & B-2 WITH EISTING NG, PLG, AND FUEL OIL

marks Callout

VTR (2-1/2")

marks Callout

CBJT-2W-1200HP

marks Snapshot marks Snapshot marks Rectangle marks Rectangle marks Length Measurement 7'-0" marks PolyLine marks Line marks Line marks Line marks Length Measurement 7'-0" marks Line marks Line marks Line marks Line marks Text Box

STACK

marks Text Box

GAS TRAIN

marks Line marks Line marks Line marks Line marks Callout

CBJT-2W-1200HP

marks Text Box

MANHOLE

marks Line marks Line marks Text Box

STEAM OUTLET

marks Line marks Line marks PolyLine marks PolyLine marks Line marks Text Box

FUEL OIL

marks Text Box

FUEL OIL

marks Line marks Callout CATWALKS AND STAIRS IN BOILER ROOM ARE ASSUMED TO BE ALL. EVALUATE IF ANY ARE EXISTING TO REMAIN.

marks Line marks Callout INSTALL TEMPORARY FULL HEIGHT DUST BARRIER DURING DEMO/CONSTRUCTION TO ISOLATE EXISTING (OPERATING) PLANT FROM PORTION OF PLANT UNDER CONSTRUCTION marks Callout

EVALUATE BOILER SIZING TO MEET CAMPUS LOADS AND REDUNDANCY.

marks PolyLine marks PolyLine marks PolyLine marks Callout

NEW ISOLATION VALVES TO SUPPORT CONSTRUCTION

marks Callout

ISOLATION VALVE & BLANK FOR FUTURE TIE IN

marks Rectangle marks Callout

PROVIDE NEW STEAM TO HOT WATER HEAT EXCHANGERS

marks Snapshot

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow Text Box M. Schow

Mark Schow Rectangle

Mark Schow

CONSIDER BUILDING NEW DA TANK IN THIS LOCATION AND THEN DEMOLISHING THE EXISTING AS THIS WILL SIGNIFICANTLY REDUCE PRESSURE ON OUTAGE WORK

A B C D E F G H

(E) BOILER #4 STACK

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :3

P

M

M104

ROOF NEW WORK

PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

1/4" = 1'-0"

ROOF NEW WORK

marks Line marks Callout INSTALL TEMPORARY FULL HEIGHT DUST BARRIER DURING DEMO/CONSTRUCTION TO ISOLATE EXISTING (OPERATING) PLANT FROM PORTION OF PLANT UNDER CONSTRUCTION marks Callout

REPAIR WINDOWS

PROVIDE EXHAUST FAN IN ONE WINDOW

marks Rectangle marks Callout

REFRAME STRUCTURE AND REINSTALL ROOF

marks Ellipse marks Ellipse marks Callout 32" BOILER STACK UP THROUGH ROOF. STACK TO BE FREESTANDING ~20' ABOVE TOP OF STEEL AT LOW ROOF AS DETERMINED BY THE AIR PERMIT.

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow Text Box M. Schow

UP

"ø

"ø

"ø

5"ø

6"ø

"ø

6"ø

6"ø

"ø

"ø

3"ø

3"ø

"ø

"ø

3"ø

"ø

FOR

FOS

D C

W

D C

WS

o ft e n e d M a k e u p W a te r

H

IG

H P

R E S S U

R E S

T E A M

LO PRESS STEAM

"ø

"ø

6"ø

5"ø

4"ø

6"ø

6"ø

5"ø

5"ø

Steam

Natural Gas

DCW

Heating Water Supply

Steam

Steam

Steam

Condensate

12"ø

8"ø

8"ø

"ø

"ø

6"ø

3"ø 4"ø

"ø

"ø

"ø

C o n d e n sa te

L o w

P re ss u re

R e tu rn

Low Pressure Return

Natural Gas

Blended Gas

PLG

Domestic Cold Water

Pumped Condensate

C o n d e n sa te

Dual Temp Supply

Dual Temp Return

Dual Temp Return

Softened Makeup Water

PRV 100psig to 18psig

Demolish abandoned chilled water pipes.

M105

(E)

CONDENSATE

TANK

(E)

ELECTRIC

CONDENSATE

PUMP 1

(E) STEAM

TURBINE

CONDENSATE

PUMP

Pumped Condensate

(E) FUEL OIL

TRANSFER

PUMP

(E) BLOW

DOWN TANK

5"ø

5"ø

3"ø

5"ø

HWR

HWS

LPCR

HPS

BOILERS ABOVE (SHOWN FOR REFERENCE ONLY)

GARAGE DOOR EXTERIOR

RAMP UP TO GRADE

High Press Steam

6"ø Steam UP

5"ø Steam UP

6"ø Steam UP

10"ø Steam UP

CAPPED

(E)

ELECTRIC

CONDENSATE

PUMP 2

3"ø Condensate UP

3" UP

CAPPED

CAPPED

CAPPED

CAPPED

CAPPED

6"ø Steam UP

6"ø Steam UP

10"ø Steam UP

(E)SyncroFlo

Pumps

3" DN

5"ø PLG UP 4"ø Natural Gas UP 4"ø Feedwater UP

5"ø Condensate UP

4" UP

6"ø Heating Water Return UP6"ø Heating Water

Return UP

CAPPED

1"ø FOR UP

1"ø FOS UP

1"ø FOS UP

1"ø FOR UP

1"ø FOR UP 1"ø FOS UP

1"ø FOR UP

1"ø FOS UP

CONTROL SKID

PLG

BLG

Natural Gas

Natural Gas

P L G

PLG

S o ft e n e d M a k e u p W a te r

C o n d e n sa te

A B C D E F G H

PLG

BLG

BLG

BLGBLG

BLG

PLG

Mechanic's Office

Demolish abandoned chilled water pipes.

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :3

P

M

M105

BASEMENT

DEMOLITION PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

1/4" = 1'-0"

BASEMENT DEMO

No. Description Date

Abandoned Chilled Water Pipes to Demo marks Callout ENGINEER TO CONFIRM PIPING SHOWN AS EXISTING-TO-REMAIN IS APPROPRIATE FOR CONTINUED SERVICE marks Callout

RELOCATE ANTIQUE AIR COMPRESSOR

marks Ellipse marks Ellipse marks Ellipse marks Callout

DEMOLISH OR RELOCAT WATER SOFTENING SYSTEM AS NECESSARY

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

LOW PRESS STEAM

Pumped Cond.

UP/DN

12"ø

12"ø

12"ø

12"ø

8"ø

12"ø

"ø

"ø

"ø

"ø

"ø

"ø 1 "ø 6"ø

6"ø

4"ø

"ø

10"ø

10"ø

6"ø

"ø

10"ø

8"ø

3"ø

6"ø

6"ø 6"ø

"ø

"ø

6"ø

"ø

10"ø

10"ø

12"ø Heating Water Return UP

6"ø

"ø

PLGPLG

Steam

Steam

Condensate

Heating Water Supply

6"ø Steam DN

Demolish abandoned chilled water pipes.

Heating Water Return

(E) Heating

Hot Water

Pump 1

(E) Heating

Hot Water

Pump 2

(E) Heating

Hot Water

Pump 3

(E) Heating

Hot Water

Pump 4

(E) Heating

Hot Water

Pump 5

(E)

GENERATOR

CAPPED

TEE DN

TAP

DN

6"ø Steam DN

6"ø Steam UP 5"ø Steam DN

10"ø Heating Water Return UP

6"ø Heating Water Return UP

CAPPED

CAPPED

Disconnected

CAPPED

3" DN

5" DN

6" UP

6" DN 4" DN

6" UP

6" DN

4" UP

6" UP

4" UP VTR

CAPPED

TO HEAT EXCHANGER

7 AT MEZZ. LEVEL

(E)

Water

Heater

10"ø Steam UP

10" DN

3" DN

UP/DN

CAPPED

UP/DN

4" DN

6"ø Steam UP

(E) BOILER

FEED

WATER

PUMP 4

(E) BOILER

FEED

WATER

PUMP 1

(E) BOILER

FEED

WATER

PUMP 2

(E) BOILER

FEED

WATER

PUMP 3

10"ø Condensate

DN

FROM DEAERATOR

6" DN

6" DN

UP/DN

8" UP

(E) BOILER 1 (E) BOILER 2 (E) BOILER 3

(E) BOILER 4

TO HEAT EXCHANGER 5

6" UP

12" DN

10"ø Heating Water Return UP

10"ø Heating Water Return UP

TO HEAT EXCHANGER 1

TO HEAT EXCHANGER 3

1"ø FOR DN 1"ø FOS DN

1"ø FOR DN

1"ø FOS DN

1"ø FOS DN

1"ø FOR DN1"ø FOR DN

1"ø FOS DN

A B C D E F G H

Heating Water Supply Heating Water Return

Condensate Steam

3"ø Condensate UP

6" UP VTR

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :3

P

M

M106

GROUND LEVEL

DEMOLITION PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

1/4" = 1'-0"

GROUND LEVEL DEMO

No. Description Date marks Callout

DEMOLISH EXISTING CONTROL SYSTEM INCLUDING ALL CONDUITS AND SENSING LINES

marks Callout ENGINEER TO CONFIRM PIPING SHOWN AS EXISTING-TO-REMAIN IS APPROPRIATE FOR CONTINUED SERVICE marks Callout

RE-FEED FUEL OIL PIPING TO NEW BOILER LOCATIONS

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow Text Box M. Schow

Mark Schow Rectangle

Mark Schow Callout

DEMO EXISTING COLUMNS AND CATWALKS TO ACCOMODATE NEW BOILER LAYOUT

Mark Schow Rectangle

Mark Schow

OLD PLANT GENERATOR TO BE DEMOLISHED AND A NEW GAS FIRED GENERATOR LOCATED IN THE ALLEY.

DN

12"ø

"ø

"ø

"ø

10"ø

10"ø

12"ø

"ø

"ø

"ø

8"ø

"ø

6"ø

12"ø

6"ø

6"ø

12"ø

"ø6 "ø

"ø

12"ø

"ø

"ø

12"ø

"ø 6 "ø

"ø

"ø

12"ø

"ø

"ø

12"ø

12"ø

12"ø

"ø

8"ø3"ø

"ø

"ø

"ø

"ø

S te a m

C o n d e n sa te

High Press Steam

6" DN

6"ø Heating Water Return DN

(E)

DEAERATOR

6" DN

6" UP VTR

6" UP VTR

(E) BOILER 1 (E) BOILER 2 (E) BOILER 3

(E) BOILER 4

10" DN

10" DN

6" UP VTR

6" UP VTR

4" UP VTR

6"ø Heating Water Return DN

(E) HEAT

EXCHANGER

(E) HEAT

EXCHANGER

(E) HEAT

EXCHANGER

1 (E) HEAT

EXCHANGER

(E) HEAT

EXCHANGER

(E) HEAT

EXCHANGER

(E) HEAT

EXCHANGER

6" UP VTR

6" UP VTR

10"ø Heating Water Return DN

Heating Water Return

10" DN

(E) DUCT UP THRU ROOF (E) DUCT UP THRU ROOF

6"ø Heating Water Return DN

5"ø Condensate DN

12"ø Heating Water Return DN

3"ø Condensate DN

5"ø Steam DN 3"ø Condensate DN

Steam

A B C D E F G H

6" UP VTR

Heating Water Supply

Heating Water Return

4" UP VTR

5"ø PLG DN 4"ø PLG DN

P L G

P L G

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :4

P

M

M107

MEZZANINE

DEMOLITION PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

1/4" = 1'-0"

MEZZANINE DEMO

No. Description Date marks Callout

EVALUATE EXISTING PIPING AND ELECTRICAL FOR REPLACEMENT (E.G., ROOF DRAINS)

marks Callout DEMOLISH ALL ABANDONED PIPING AND ELECTRICAL (E.G., CONTROL SYSTEM CONDUITS AND SENSING LINES) marks Callout

RETAIN UNH PLATE LOCATED ON BOILER

marks Rectangle marks Callout

SCOPE OF ROOF DEMOLITION ABOVE

marks Callout ENGINEER TO CONFIRM PIPING SHOWN AS EXISTING-TO-REMAIN IS APPROPRIATE FOR CONTINUED SERVICE marks Callout

REWORK NATURAL GAS AND PROCESSED LANDFILL GAS (PLG) TO FEED NEW BOILERS

marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Callout Safety relief vents to be demolished or reused marks Callout Safety relief vents to be demolished or reused

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

A B C D E F G H

(E) BOILER #4 STACK

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

1/4" = 1'-0"

:1 :4

P

M

M108

ROOF DEMOLITION

PLAN

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

1/4" = 1'-0"

ROOF DEMO

No. Description Date marks Rectangle marks Callout COORDINATE ROOF ACCESS DURING CONSTUCTION AS THE ONLY CURRENT ROOF ACCESS IN JUNE 2026 IS THROUGH THIS DOOR.

CONSIDER NEW ACCESS POINTS.

EXISTING STAIRS ARE 2 FT WIDE AND ADDITIONAL WIDTH IS DESIRED.

marks Callout JUNE 2026 PROJECT IS ACTIVELY PROVIDING STAIRS TO THIS POINT, BUT WILL ONLY BE ACCESSIBLE BY A LADDER FROM THE COGEN BUILDING marks Callout

DEMO ROOF AND STRUCTURE FOR REMOVAL OF EXISTING BOILERS.

USE SAME OPENING TO INSTALL NEW BOILERS.

REFRAME STRUCTURE AND REINSTALL ROOF

marks Callout COORDINATE WITH UNH FOR GRADING AND CHANGES TO THE SITE AFTER DEMOLITION OF THE STACK marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Ellipse marks Callout Safety relief vents to be demolished or reused marks Callout Safety relief vents to be demolished or reused

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

Scale

Date

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

:1 :4

P

M

M900

BASEMENT LEVEL

ISO

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

BASEMENT ISO VIEW

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

:1 :4

P

M

M901

GROUND LEVEL ISO

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

FIRST LEVEL ISO VIEW

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

Drawn By

Checked By

Project Number

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

Consultant

Address

Address

Address

Phone

:1 :5

P

M

M902

MEZZANINE UP

THRU ROOF ISO

UNIVERSITY OF

NEW HAMPSHIRE

BOILER PLANT

Checker

Author

Issue Date

Project Number

No. Description Date

MEZZANINE UP THRU ROOF ISO VIEW

Mark Schow Text Box A Bid Docs for Engineering Design 7/1/2026

Mark Schow Text Box 7/12/2026

Mark Schow Text Box I. Anderson

Mark Schow

Sheets
M101 - BASEMENT NEW WORK PLAN
M102 - GROUND LEVEL NEW WORK PLAN
M103 - MEZZANINE NEW WORK PLAN
M104 - ROOF NEW WORK PLAN
M105 - BASEMENT DEMOLITION PLAN
M106 - GROUND LEVEL DEMOLITION PLAN
M107 - MEZZANINE DEMOLITION PLAN
M108 - ROOF DEMOLITION PLAN
M900 - BASEMENT LEVEL ISO
M901 - GROUND LEVEL ISO
M902 - MEZZANINE UP THRU ROOF ISO