This is a technical specification section (Section 283110) for fire alarm systems prepared by the University of New Hampshire (UNH) Facilities Project Management as part of the Planning, Design and Construction Guidelines, dated March 04, 2026. The specification governs the replacement of the fire alarm system in Kingsbury Hall, which currently operates three networked fire alarm control units (FACUs) that have experienced networking issues and whose 7100 Series panels are discontinued. The project scope includes replacing the existing E3 FACU's first-generation module with a second-generation module, replacing two 7100 FACUs with S3 FACUs, upgrading INX Transponder modules to third-generation units, and upgrading the INCC Fire Command Center module, while reusing existing cabinetry and notification appliances where compatible. All equipment shall be Gamewell-FCI brand with no substitutions permitted. The system will utilize fiber optic cabling to replace the existing Class A twisted non-shielded wiring network and maintain voice evacuation capabilities through existing Wheelock speaker strobes and booster panels. The project is structured in four phases: verification and shop drawing submission; system upgrade and demolition; acceptance testing; and final cleanup and closeout. Contractors must obtain permits from the State Fire Marshal's Office (SFMO) and coordinate with the Durham Fire Department (DFD), which serves as the Authority Having Jurisdiction (AHJ).

Submittals must be submitted electronically at least 15 days prior to work commencement and include detailed floor plans, riser diagrams, battery calculations, equipment lists, wiring diagrams, and annunciator details for UNH and design professional review. The installing contractor shall provide all labor, materials, equipment, and services necessary for system completion and shall perform 100 percent acceptance testing in accordance with NFPA 72 standards, with at least half of all tests conducted on battery standby power. The contractor must provide a one-year warranty covering all equipment and wiring against inherent defects, with 24/7 availability for first response to trouble signals during the warranty period, and must deliver as-built drawings, three complete sets of operating and instruction manuals, and detailed testing and maintenance instructions prior to project closeout. No specific contract award date, pricing terms, set-asides, or funding amounts are identified in this specification document.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PLANNING, DESIGN AND CONSTRUCTION GUIDELINES March 04, 2026

CHAPTER 5 – TECHNICAL CONSTRUCTION AND RENOVATION STANDARDS

FIRE ALARM SYSTEMS 28 3110 - 1

SECTION 28 3110 - FIRE ALARM SYSTEMS

PART 1 - GENERAL

1.1 GENERAL REQUIREMENTS

A. The general provisions of the contract including General and Special Conditions and General Requirements shall apply to all work under this Section.

B. Building Services Identification Labeling – The University has adopted a comprehensive label identification for the distribution systems for all plumbing, fire protection, air, mechanical piping, electrical, fire alarm, controls, telecommunications, audio/visual, and security. The specific label colors, text, and directional flows for each component part are described in a single comprehensive table that is Chapter 5, Appendix A, Building Services Identification labeling. This labeling system must be part of any construction project, even those that are limited to a portion of a building or a single utility system.

C. See Chapter 5, Division 01, Section 017700.1.1.B.1.i Closeout Procedures - Project Record Documents for equipment list requirements for all equipment provided in this section.

D. See Chapter 5, Division 01, Section 010600 – Regulatory Requirements for permit responsibility.

1.2 DEFINITIONS

A. Owner - The University of New Hampshire.

B. Authority Having Jurisdiction (AHJ) - For buildings and facilities owned by the University, the AHJ is the Office of the State Fire Marshal (SFMO). Authority is typically delegated to the Durham Fire Department (DFD) for progress inspections and witnessing of system tests.

C. Contractor - In the context of this specification section, the contractor is a generic term referring to those responsible for the work including, but not limited to, the general contractor, electrical contractor, fire alarm installer, etc.

D. Fire Alarm Installer - Firm licensed, and firm’s personnel trained, by the fire alarm system manufacturer to sell and install their systems. At a minimum, the Fire Alarm Installer shall:

1. Provide all fire alarm equipment and devices.

2. Perform all programming and troubleshooting of the fire alarm system.

FIRE ALARM SYSTEMS 28 3110 - 2

3. Perform all testing of the fire alarm system and components. Prepare and submit associated NFPA Testing & Inspections and Project Completion reports.

4. Provide first response to trouble signals during warranty period.

1.3 DESCRIPTION OF WORK

A. The work includes providing all labor, materials, equipment, accessories, services and tests necessary to complete and make ready for operation by the Owner a fire alarm system. Perform an acceptance test and make adjustments as required by the authorities having jurisdiction.

B. Verification of Compatibility: Engineering documents intend to provide a complete and functioning system. Contractor, through factory certified technician or distributor, shall ensure compatibility of all components to make a fully functioning system.

C. Provide as shown on drawings a complete fire alarm system, consisting of the following:

1. A fire alarm control panel with microprocessor-based electronics, power supplies, amplifiers, and batteries.

2. Automatic and manual initiating devices.

a. Standard addressable smoke and heat detectors shall be self-test capable.

3. Audible and visual notification appliances.

a. Audible shall be voice speakers unless an exception is made by UNH.

4. Control outputs to ventilation systems.

5. Raceways, wiring and accessories as shown on the drawings and as required for a complete and operable system.

6. A voice evacuation system to function as an integrated fire detection and alarm signaling system.

D. Provide the following additional work where shown on the drawings:

1. Status monitoring of fire suppression systems.

2. Emergency voice/alarm communications

3. Smoke and heat detectors that initiate an elevator recall.

E. The following work is not included unless shown otherwise:

1. Fire suppression, except that wiring in switches is included and emergency generator systems.

F. The Contractor shall prepare all required drawings, wiring and riser diagrams, and make necessary submissions and obtain all approvals as required by the State Fire Marshal’s Office (SFMO), and the Durham Fire Department (DFD).

FIRE ALARM SYSTEMS 28 3110 - 3

G. All work shall be performed by qualified personnel, with all necessary licenses as required by the local agency having jurisdiction.

H. All equipment, components and assemblies shall be listed by Underwriters Laboratories, Factory Mutual or other recognized third-party listing agency.

I. The exact location of all equipment shall be coordinated with existing equipment, HVAC ducts, etc.

J. Under no circumstances shall the input power to the control panel (120 VAC) or auxiliary 24 VDC power from the power supply of the panel be utilized for auxiliary external control functions (e.g. Fusible links, damper, etc.).

K. All initiating and indicating circuits are polarized and supervised. Polarity must be observed and no parallel-branching (tee-tapping) will be permitted.

1.4 RELATED WORK IN OTHER SECTIONS

A. All work must comply with the University of New Hampshire Construction Guidelines;

including but not limited to Division 1 - General Requirements and Division 26 - Electrical.

1.5 STANDARDS

A. The system shall conform to the following latest National Fire Protection Standards and shall be installed as per all local and state building and life safety codes.

B. The “Durham Fire Department Specifications for the Installation and Maintenance of Fire Protection Systems, Fire Hydrants and Fire Lanes”, apply to and is an integral part of all work covered under this specification. SFMO must be satisfied that UNH has complied with the DFD reference document. Any question must be addressed to the design professional for clarification.

C. Accessory components as required shall be catalogued by the manufacturer and UL listed to operate with the manufacturer's control panel.

D. Except as modified by governing codes and by the Contract Documents, comply with the latest applicable provisions, recommendations, and requirements of the following:

1. State of New Hampshire List of adopted Building and Fire Codes:

https://www.firemarshal.dos.nh.gov/laws-rules-regulatory/state-fire-building-codes

2. Refer to 01 1000.1.4 for all other relevant regulatory and code references that apply to all projects at the University of New Hampshire.

FIRE ALARM SYSTEMS 28 3110 - 4

1.6 SUBMITTALS

A. All submittals shall be electronic. No paper submittals shall be accepted. Reviewing party shall provide electronic review of submittals.

B. All submittals shall include a cover letter/transmittal sheet noting the date of submittal, information contained in submittal and any deviations drawings or specifications.

C. Minimum submittal requirements:

1. Plans for proposed fire detection and alarm systems shall be submitted to University and design professional least 15 days prior to any work being performed. The submittal shall include:

a. Detailed floor plan to scale showing:

(1) Code Summary to include code editions used and relevant exceptions cited.

(2) Connected and non-connected detection devices.

(3) Evacuation signals, including visual and audible ratings with riser diagram showing wattage tap and candela rating.

(4) Main control panel location.

(5) Remote annunciator location.

(6) Location of outside A/V signal(s) with riser diagram showing wattage tap and candela rating.

(7) The proposed Use of the building.

(8) Anticipated ambient noise levels.

(9) Type of construction.

(10) Unique or unusual features (ceiling pockets, sloped or multi- leveled ceilings, atria etc.).

(11) Location of HVAC units and associated air flow volumes.

(12) Location of the key box(es).

(13) 100 % completion date.

b. A riser diagram of the complete fire alarm system including water flow, tamper, and any connections to other fire protection systems. Riser diagram shall include wattage taps and candela ratings for all notification devices.

c. Associated battery calculations showing the adequacy of the batteries with respect to system powering. System shall include a 20% factor of safety.

d. An annunciator detail drawing showing proposed labeling. Devices are not to be solely numbered but are to be labeled on plan in English depicting location (i.e. Floor 2 Near Rm 230).

(1) Durham Fire Department shall be consulted and review device / module descriptions prior to final testing and acceptance.

2. Detailed component and equipment list with model and Manufacturer’s part numbers, and product sheets for each item of equipment.

FIRE ALARM SYSTEMS 28 3110 - 5

3. A set of plans indicating University approval shall be available at the job site until after completion of the required acceptance test.

4. Any changes from the originally proposed or approved plans that should occur during construction will be documented by a written revision and be approved by the SFMO.

5. Additions or modifications of existing systems shall require a new approval.

6. Plans showing actual “As Built” shall be submitted after completion and acceptance of the system. These plans shall become the record of the University.

7. The University shall review and approve or disapprove all submittals within thirty days of date of submittal.

8. Submit the following to the University prior to ordering equipment:

a. Wiring diagrams showing connections between all system components.

b. Description of system operation.

c. Annunciator schedule showing titles for each fire alarm and supervisory zone and/or device.

d. Manufacturer's installation instructions, operations and maintenance instructions.

e. A complete layout of the entire system including conduit routing, conduit sizes, wire sizes and types.

f. Confirmation of the University color code schedule for wiring.

g. Battery sizing calculations indicating circuit loading and power supply loading. Voltage drop calculations shall be submitted for all notification appliance circuits exceeding 1.5 Amps or 300 feet in length.

h. Submittals shall be as a complete set. Partial submittal will not be acceptable.

i. Drawings shall not be on less than 22 x 34 inch sheets and shall identify all symbols used.

j. Submittals shall comprise:

(1) Detailed component and equipment lists with model numbers.

(2) Manufacturer's specification sheets for each item of equipment.

(3) Description of how specified system functions.

(4) Confirmation that manufacturer's representative will provide jobsite supervision during installation, perform final testing, and instruct operating personnel on system operation.

(5) Standby battery calculations showing all system components and the adequacy of their capacity with respect to system powering.

Calculations shall be provided with the plan submittal. Component (including amplifiers) power requirements and formulas used to compute 60-hour required standby power plus 15 minutes of alarm at the end of this period. Notification appliance circuit load calculations shall be by speaker and strobe circuits. Indicate formula and basis used for worst possible case.

(6) Detailed wiring diagrams of specified system and all interconnection wiring. Wiring diagrams shall include total risers, terminal-to-terminal, exact color-coding, location, and function of each device. Drawing indicating one-line diagrams or typical wiring diagrams will not be accepted.

FIRE ALARM SYSTEMS 28 3110 - 6

(7) Manufacturer’s original catalog data and descriptive information shall be supplied for all major components of the equipment to be supplied.

Supplier’s qualifications shall indicate years in business, service policies, warranty definitions, and a list of similar installations.

(8) Contractor’s qualifications shall indicate years in business and prior experience with installations that include the type of equipment that is to be supplied. All pertinent information shall be furnished regarding the reliability and operation of the equipment to be supplied. Delivery dates of the equipment to be supplied shall be furnished.

(9) Sufficient information shall be furnished so that the exact function of each installed device is known.

k. Submittals shall include proposed annunciating language of each device for review and approval by UNH and Durham Fire Department (DFD). An editable electronic copy shall also be provided for University modifications.

l. Submittal of shop drawings shall contain at least one (1) set of original manufacturer’s specification and installation instruction sheets. Subsequent sets may be copied. All equipment and devices on the shop drawings to be furnished under this contract shall be clearly marked in the specification sheets.

m. The University will have ownership of system programming upon project completion, and the details and access will be shared with the University fire alarm service contractor. Available pre-recorded messages shall be submitted to University SFMO for approval

D. Submit prior to final acceptance testing.

1. Contractor shall submit, upon completion of system verification, an NFPA Testing and Inspections form providing a point-by-point check list indicating the date and time of each item inspected and a Record of Completion confirming that the inspection has been completed and the system is installed and functioning in accordance with the specifications.

1.7 PERMITS

A. The installing contractor must obtain a fire protection permit from State Fire Marshall Office (SFMO) prior to working on the fire alarm.

B. Anyone performing maintenance or testing on any fire protection system must secure a permit from SFMO before starting any work on the system. Any additions or modifications to an existing system will require a new permit.

C. This permit is in addition to any required mechanical, plumbing, or electrical permit required by the SFMO.

D. Prior to conducting any work that has any chance of transmitting a trouble of fire alarm signal, the Durham-UNH Communications Center shall be notified (862-1392). During

FIRE ALARM SYSTEMS 28 3110 - 7

periods of system shut down, the permit holder is responsible for occupant and fire department notification, should an emergency arise. Unexplained system activations are to be investigated.

E. Systems shall not be shut down overnight. The fire department should be notified anytime that a fire protection system is left out of service.

F. The permit holder is responsible for restoring the system prior to leaving the building.

The permit holder shall verify with the dispatch center the alarm condition and explain if the system is left in trouble.

G. The permit holders are responsible for system security. Control panels or other equipment are not to be left unlocked, nor are keys or codes to be left in the panel or control box.

1.8 RECORD DOCUMENTS, OPERATIONS AND MAINTENANCE MANUALS

A. Complete record documents before scheduling acceptance test. Record documents shall include all information required by the above SUBMITTALS section.

1.9 GUARANTEE

A. The contractor shall warranty all equipment and wiring free from inherent mechanical and electrical defects for one year (365 days) from the date of final acceptance. The contractor shall provide a phone number answered 24 hours per day, 7 days per week, and also a phone number for a replacement part source answered 24 hours per day, 7 days per week. During the warranty period, the installing contractor shall provide first response to trouble signals that report into UNH Dispatch, and determine cause and take corrective action that does not void the warranty, or necessitate the University maintenance service contractor to assume responsibility for malfunctioning systems.

1.10 PHASE SEQUENCING

A. The Contractor shall perform construction in phases sequenced as described below.

The Contractor shall provide dates for completion of each work phase.

1. Phase 1:

a. Verify fire alarm system devices and wiring.

b. Submit shop drawings for approval.

c. Order all components.

d. Develop and submit impairment plan.

e. Commence installation of raceways and cabling for the new fiber optic network. Terminate fiber optic cabling at all existing and new nodes intended to be connected, such that the network is fully prepared for final connection and activation.

FIRE ALARM SYSTEMS 28 3110 - 8

2. Phase 2:

a. If interruption of the existing fire alarm system is required, the Contractor must first obtain written permission from the Owner not less than 5 business days prior to such interruptions. The Owner shall coordinate with the Durham Fire Department and with maintenance subcontract personnel.

b. When requesting permission to interrupt service, the Contractor shall specifically state the work to be performed, together with the exact time and length of service interruption. Separate permission shall be requested for each interruption.

c. Upgrade the existing E3 FACU, 7100 FACU’s, INX Transponders, and INCC as part of a complete system upgrade.

d. Demolish and remove existing Class A, 14 AWG twisted, non-shielded wiring networking all the FACU’s and nodes together.

e. All work concerning the active portions of the fire alarm system shall be coordinated with the Owner to prevent false alarms and avoid unnecessary loss of protection.

f. Post a temporary plastic laminated sign ("Out of Service” – final wording to be approved by Owner) on any new or existing pull station during such times that it is installed but not in service. These signs shall be provided and maintained by the Contractor.

3. Phase 3:

a. Provide acceptance testing for 100% of the fire alarm system upon completion of installation of the upgraded fire alarm control panels.

4. Phase 4:

a. Where abandoned conduits are embedded in the structure, cap existing empty conduits, provide blank cover plates and plug open knockouts in existing electrical equipment.

b. Include as part of the scope of work all cutting, patching, finishing, etc., for removed and relocated electrical equipment. All holes and damage caused by the demolition work shall be properly patched with suitable materials to match existing surfaces.

c. All materials, equipment and debris resulting from demolition shall become the property of the Contractor and shall be removed from the site and disposed of properly by the Contractor.

B. The Contractor may submit alternate approaches and phasing. Alternate deduct(s) to reuse existing conduit or wiring, while minimizing the time frame of potential nuisance alarms, may be considered by the Owner if the risks are manageable.

1. The Contractor shall specify work periods for work concerning the active portions of the fire alarm system, during which nuisance alarms may occur.

2. The fire alarm system or portions thereof may not be inoperable for extended periods of time.

3. If interruption of the existing fire alarm system is required, the Contractor must first obtain written permission from the Owner not less than 5 business days prior to such interruptions. The Owner shall coordinate with the local authority having jurisdiction and with maintenance subcontract personnel.

FIRE ALARM SYSTEMS 28 3110 - 9

4. In all cases where existing branch circuit conduit and wiring is to be re-used within the remodeled area, the Contractor shall test for grounding continuity and shall test the existing branch circuit wiring as though new, in accordance with the testing procedures outlined elsewhere in these Specifications.

PART 2 - PRODUCTS

2.1 BASE BID MANUFACTURERS

A. Equipment shall be Gamewell - FCI, with the exception of manual pull stations and non-system combination smoke / CO alarms. No substitutions will be considered. All devices shall be compatible with Gamewell - FCI fire alarm panels.

1. Panels shall be models E3 and S3.

2.2 SYSTEM DESCRIPTION

A. The Kingsbury hall building is currently served by three networked fire alarm control units (FACUs). These panels include an FCI E3 Series panel located in the Fire Alarm Command Center (Room S142), an FCI 7100 panel in Electrical Room N124A, and another FCI 7100 panel in Electrical Room W124. The three FACPs are interconnected through an RPT-E3-UTP network repeater card using Class A, 14 AWG twisted, non-shielded wiring. Along with the FACU’s noted above there are also INX intelligent network transponder cabinets and an INCC Intelligent Network Command Center.

Reference the plans for the existing panel and node locations.

B. Currently there is a networking issue between the FACPs. When one panel goes into alarm, the other panels do not activate or initiate the building’s notification appliances.

This issue is the main reason that a system upgrade is being proposed. The 7100 Series panels are also discontinued, which adds to the need for replacement.

C. System notification is a voice evacuation system. The intent is to leave the existing Wheelock speaker strobes and booster panels existing to reuse with the upgraded FACU’s and Nodes

2.3 FIRE ALARM CONTROL UNITS & NODES

A. E3 FACU

1. Replace the existing E3 FACU 1st Generation ILI-MB-E3 module with the 2nd generation ILI-MB-E3 module.

2. Provide a new RPT-E3-UTP module with FSL-E3 fiber module

3. Utilize the existing cabinet to install new modules after verifying listing compatibility. Provide new enclosure if required.

FIRE ALARM SYSTEMS 28 3110 - 10

4. Turn over any removed modules to UNH.

5. Contractor shall own all reconfiguration of wiring and re-programming to facilitate the installation of the new modules.

B. S3 FACU

1. Replace the existing 7100 FACU’s with the S3 FACU’s

2. Utilize the existing 7100 FACU’s cabinets after confirming suitability to install the new S3 FACU’s utilizing the Gamewell/FCI retrofit kit.

3. Provide a new RPT-E3-UTP module with FSL-E3 fiber module

4. Turn over any removed modules to UNH.

5. Contractor shall own all reconfiguration of wiring and re-programming to facilitate the installation of the new S3 FACU’s and modules.

C. INX Transponder

1. Furnish and install a new 3rd generation INI-VGX module at each existing INX Transponder

2. Furnish and install the FSL-E3 fiber module to connect to the new fiber optic network at each existing INX Transponder

3. Utilize the existing INX Transponder cabinet to install the new modules

4. The existing amplifier modules are intended to remain existing.

5. Turn over any removed modules to UNH.

6. Contractor shall own all reconfiguration of wiring and re-programming to facilitate the installation of the new modules.

D. INCC Fire command Center

1. Furnish and install a new 3rd generation INI-VGC module at the INCC

2. Furnish and install the FSL-E3 fiber module to connect to the new fiber optic network

3. Utilize the existing INCC cabinet to install the new modules after confirming suitability.

4. Turn over any removed modules to UNH.

5. Contractor shall own all reconfiguration of wiring and re-programming to facilitate the installation of the new modules.

2.4 SYSTEM OPERATION

A. Campus Connection:

1. The existing fire alarm system is currently connected to UNH Dispatch via a dialer.

Refer to Add Alternate No. 2 – Replacement of Existing Dialer with Keltron LS NET9000 Transceiver in Section 01 23 00 – Alternates and Unit Prices for associated scope of work.

FIRE ALARM SYSTEMS 28 3110 - 11

2.5 SYSTEM COMPONENTS

A. General System:

1. The analog/multiplex system shall consist of, but not be limited to the following units, components, and peripheral devices, each of which is described in detail in this section.

B. System Cabinet:

1. Except as otherwise approved by Owner, the system cabinet shall be semi-flush mounted with a red or black finish, at Owner’s option, and shall consist of backbox, backplate, trim ring, dress panels, battery panels and door. The system cabinet houses the microprocessor and related system circuitry modules. The cabinet shall be labeled with the manufacturer's name and logotype to assure the integrity of the complete system.

2. The cabinet shall be of dead-front construction and 16-gauge cold rolled steel. The door lock system shall consist of two locks, which will each accept the same key.

One CAT-30 Operative "OPER" key shall allow dead front access to the module displays for all operator functions and shall also allow access to all control panel electronics, without further dismantling of the cabinet, control unit, or wiring.

3. The system components shall be installed on a hinged mounting plate which may be removed to facilitate easy installation and testing of field wiring. A minimum of a 1-inch wiring gutter space shall be provided behind the mounting plate to protect the system electronics at completion of the installation. Wiring shall be terminated on removable terminal blocks to allow field servicing of all modules without disrupting system wiring.

C. AC Unit (ACU):

1. All AC line connections shall be isolated from the power supply unit and circuitry for all system power supplies to meet U.L. Standard 864 for "brown-out" operation.

The ACU shall operate from either 120 or 240 VAC as a standard feature.

2. Loss of AC power trouble signal shall be programmable with a variable (adjustable) delay preventing trouble signals upon minor power sags. All remote stations shall be neatly and permanently labeled, as to the particular device it serves.

D. Power Supply Unit (PSU):

1. The power supplies shall be transformer-converted to low voltage, rectified and filtered 24 VDC (nominal) for system operation and to eliminate the possibility of line voltage being present on any internal panel components.

2. The system shall be fully supervised and contain an integral, filtered, nominal 24 VDC at 5 amps power supply, which shall comply with UL Standard 864 for power-limited operation.

3. The system shall have a separate, lockable AC circuit disconnect provided. A circuit breaker in an electrical panel containing other circuits shall not be acceptable.

FIRE ALARM SYSTEMS 28 3110 - 12

4. Primary Power LED Indicator and Outputs:

a. A green LED on the power supply card shall indicate the presence of primary power.

b. Power supply outputs shall be as follows:

(1) 24 VDC Non-Resettable, 1.75 amp. max., power limited.

(2) 24 VDC Resettable, 1.75 amp. max., power limited.

(3) NOTE: Maximum combined output for both shall be 3.0 amps.

5. Battery Charger:

a. The power supply shall contain a battery charger with a maximum average charging current of 1.0 amp. (This current shall be sufficient to maintain the system batteries at full charge). If the system loses AC power, a “System Trouble” shall occur. The charger output shall be supervised and fused.

b. Battery charger cabinet shall be equipped with a lock cylinder and be "CAT 30" Key Operative.

6. Batteries:

a. Batteries shall be supervised and monitored.

b. Batteries shall be of sufficient capacity to provide power for the entire system upon loss of normal AC power for a period of sixty (60) hours with fifteen (15) minutes of alarm signaling at the end of this sixty-hour (60) period.

c. Battery enclosure shall be equipped with a lock cylinder and be CAT-30 Operative.

E. Connections And Circuits:

1. Connections to the light and power service shall be on a dedicated branch circuit in accordance with the National Electrical Code (NEC). The circuit and connections shall be mechanically protected. The circuit disconnect shall be located electronically before the main service disconnect. The circuit disconnecting means shall be accessible only to authorized personnel and shall be clearly marked "FIRE ALARM SYSTEM."

F. System Control Unit (SCU):

1. Enclosed within the system cabinet, the SCU shall contain the microprocessor, memory, system operating software stored on a non-volatile EPROM, system configuration memory stored on a non-volatile EEPROM, and the circuits necessary to support a fire alarm system. The SCU shall function as the system information and control center, processing all messages from the field devices (supervisory, trouble, alarm).

2. SCU Microprocessor:

a. The SCU microprocessor shall execute all supervisory programming to detect and report the failure or disconnection of any module or peripheral device. An isolated "watchdog" circuit shall monitor the microprocessor and

FIRE ALARM SYSTEMS 28 3110 - 13

upon failure shall activate the system trouble circuits and the "DEGRADE"

LED.

b. The SCU microprocessor shall access the system program, which is stored in non-volatile EEPROM memory, for all control-by-event (CBE) functions.

The system program shall not be lost upon failure of both primary and secondary power. Volatile memory shall not be acceptable.

c. A common RS485 style communications bus network shall tie the SCU microprocessor on-line with all other microprocessors within the multiprocessor network, to afford rapid response to all alarm, or trouble conditions within the system.

3. Programming/Diagnostic Center:

a. A Touchscreen Display shall be provided to annunciate system operation, programming, and internal trouble-shooting features.

4. Notification Appliance Circuits:

a. Two (2) independent notification appliance circuits shall be provided on the SCU unit, each polarized and rated at 1.75 amps DC, individually FTC protected and supervised for opens, grounds, and short circuits. They shall be wired Class A, supervised and FTC protected. Specifications are as follows:

(1) Voltage Current:

a) 24 VDC Non-regulated 1.75 amps: Maximum alarm.

b) .001 amps: Normal standby.

(2) Provide a minimum of one audible and one visual circuit per floor, per stair and per elevator cab.

5. Trouble Input:

a. The trouble input, if used, shall accept a 5 to 24 volt input from an external source.

b. Trouble Dry Contacts (Form A or Form B; jumper selectable) shall be provided rated 2 amps @ 24 VDC (resistive) and shall transfer whenever a system trouble occurs.

6. Alarm Dry Contacts:

a. Alarm dry contacts (Form C) shall be provided rated 2 amps @ 24 VDC (resistive) and shall transfer whenever a system alarm occurs.

7. Digital /Addressable Signaling Line Circuits:

a. Analog/Addressable signaling line circuits (initiating/control) shall be wired as Class A, Style 7.

FIRE ALARM SYSTEMS 28 3110 - 14

G. Display Unit:

1. Shall furnish audible and visual annunciation of all alarm, trouble, supervisory and security signals. Indicators shall be provided for:

a. Power (green).

b. Controls Active (green).

c. Fire Alarm (red).

d. Pre-Alarm (red).

e. Security (blue) if applicable.

f. Supervisory (yellow).

g. System Trouble (yellow).

h. Other Event (yellow).

i. Signals Silenced (yellow).

j. Point Disabled (yellow).

k. CPU Failure (yellow).

2. The display unit shall contain a touchscreen display that shall provide status of all analog/addressable sensors, monitor and control points, and that shall permit selection of functions. The display shall be of the liquid crystal type (LCD), clearly visible in the dark, and under all light conditions.

3. The display unit shall contain eleven LED status indicators:

a. Power.

b. Controls Active.

c. Fire Alarm.

d. Pre-Alarm.

e. Security.

f. Alert.

g. Supervisory.

h. Trouble.

i. Signal Silence.

j. CPU Failure.

k. Point Disabled.

l. Other event.

4. The system shall support up to 32 remote ACS annunciators and modules.

H. Dual Signal Unit (DSU):

1. Dual Signal Units (DSU) shall be provided in accordance with the number of notification circuits required by the plans and specifications. Each DSU shall provide two (2) notification circuits, each polarized and rated at 1.75 amps DC, PTC protected and supervised for opens, grounds, and short circuits. They shall be capable of being wired Class A, supervised and PTC protected.

FIRE ALARM SYSTEMS 28 3110 - 15

I. Fault Indicator Module:

1. Isolator modules shall be provided to automatically isolate wire-to-wire short circuits on an SLC Class A or Class B branch. The isolator module shall limit the number of modules or detectors that may be rendered inoperative by a short circuit fault on the SLC loop segment or branch. At least one isolator module shall be provided for each floor or protected zone of the building.

2. If a wire-to-wire short occurs, the isolator module shall automatically open-circuit (disconnect) the SLC. When the short circuit condition is corrected, the isolator module shall automatically reconnect the isolated section.

3. The isolator module shall not require any address-setting, and its operations shall be totally automatic. It shall not be necessary to replace or reset an isolator module after its normal operation.

4. The isolator module shall mount in a standard 4-inch (101.6 mm) deep electrical box or in a surface mounted backbox. It shall provide a single LED that shall flash to indicate that the isolator is operational and shall illuminate steadily to indicate that a short circuit condition has been detected and isolated.

J. Flashscan Relay Module (FRM):

1. The FRM shall provide two (2) independent Form "C" relay contacts rated 2 amps @ 24 VDC (resistive only). This relay output shall be used to perform auxiliary functions and may be programmed through the system software or may be hardwired directly from a 24 VDC input. When a FRM relay is activated, the green "ON" LED shall light.

2. All relay coils shall be supervised for opens and shall light the "OFF" LED steadily and activate the system trouble circuit when a fault condition is detected.

3. Line voltage shall be switched through an intermediary relay such as an RIB21CDCRD to isolate the FRM from line voltage.

2.6 PERIPHERAL DEVICES

A. Smoke Detectors:

1. Analog Photo Electronic Smoke Sensors for duct detection application.

a. These sensors shall be of the photo electronic type. Each sensor shall be capable of being set at four or more sensitivity settings of "LOW, MEDIUM, NORMAL, and HIGH" levels, with a predefined setting of LOW.

(1) Automatic and manual functional sensitivity and performance tests shall be possible on all. Photo electronic sensors without the need of generating smoke. This test method shall test all sensor circuitry and a "Failed Test" indication shall be provided on the KDU upon any failed test.

(2) Two LED visual indicators providing local 360-degree visibility of operating status and alarm indication shall be provided on each

FIRE ALARM SYSTEMS 28 3110 - 16

sensor. The LEDs shall pulse periodically indicating that the sensor is receiving power, and communication is being supplied. This feature shall be field programmable. Upon alarm these two LEDs shall light continuously. A visible alarm signal shall be capable of being remotely annunciated.

(3) The system shall check the sensitivity of each sensor periodically. If a sensor alarm threshold sensitivity has changed, due to aging and/or dust accumulation, the system shall automatically compensate for this sensitivity change (drift compensation).

(4) The sensor screen and cover assembly must be easily removable for field cleaning. Wire connection shall be made by clamping plate and screw.

(5) Each sensor shall be interchangeable with analog photo sensors and analog thermal sensors via twist lock mounting base, to ensure matching the proper sensor to the potential hazards of the areas being protected. In all cases, the system shall recognize when an improper sensor type has been installed in a previously programmed sensor type location.

B. AUXILIARY DEVICES

1. Analog Thermal Sensor Series:

a. Analog thermal sensors shall operate on the combination "Rate-of-Rise" and "Fixed Temperature" principles with the fixed temperature operation at 135 Deg F unless noted otherwise. The sensor shall also contain state-of-the-art dual thermistor sensing circuitry for fast response.

b. Two LED visual indicators providing local 360-degree visibility of operating status and alarm indication shall be provided on each sensor. The LEDs shall pulse periodically, indicating that power and communication is being supplied to the sensor. This feature shall be field programmable. Upon alarm these two LEDs shall light continuously. A visible alarm signal shall be capable of being remotely annunciated.

c. Each sensor shall be interchangeable with analog photo electronic sensors via twist lock mounting base, to ensure matching the proper sensor to the potential hazards of the areas being protected. In all cases, the system shall recognize when an improper sensor type has been installed in a previously programmed sensor type location.

2. Addressable Monitor Module:

a. An addressable monitor module with an initiating circuit capable of being configured Class A, Style 7 shall be furnished to provide an address for individual normally open (N.O.) contact devices.

b. The monitor module shall contain a yellow status LED that shall flash when in a quiescent mode and light continuously when activated. The status LED shall be field programmable not to provide quiescent status indication, if so desired.

FIRE ALARM SYSTEMS 28 3110 - 17

c. The monitor module shall be visible. In the event that the module is not visible (i.e., mounted above an accessible ceiling), provide a wall mounted remote indicator/test station below the ceiling in a visible location.

3. Addressable Output Module:

a. An addressable output module shall be connected to the same signaling line circuit as the analog/address-able monitor devices and shall provide a relay output (Form "C" 2 amp @ 24 VDC, resistive only), or a notification appliance circuit output (1 amp @ 24 VDC, requiring separate power input). The output module shall contain a yellow status LED, which shall be field programmable not to provide quiescent status indication, if so desired.

b. Addressable output modules shall be located in visible locations. In the event it is not visible, provide a remote indicating test station in a visible location.

4. Manual Fire Alarm Stations:

a. Double Action Manual Station:

(1) Furnish and install a manual station at each location indicated on the drawings or called for within this Specification. Each manual station shall be of the non-coded double action type, requiring an outer door to be lifted to expose the actuator door. Upon the pulling forward of the actuator door, the unit shall lock into a readily observable "alarm" position. The manual station shall be constructed of aluminum (6063/T5). Each manual station shall not be equipped with a break glass rod or any other part or component that breaks upon operation of the station and require replacement. Each manual station shall require a key to reset the actuated station. This key shall be keyed alike with the fire alarm control panels, battery boxes and be "CAT 30" Key Operative. CAT 30 key shall be front operable (side mounted operators will not be accepted). The manual stations shall employ a highly reliable action to activate an alarm. This feature shall provide an exceptionally high resistance to accidental operation.

(2) Manufacturer shall be Reliable Security Group, Lakewood, CA.

5. Remote indicators:

a. Shall be LED with an integral magnetically operated remote test station. The combination shall be mounted in a single box. Separate devices will not be accepted. All remote indicators/test stations shall be visible and easily accessible at 6'-0" A.F.F. unless noted otherwise.

6. Evacuation Signal Devices:

a. All devices shall:

(1) Be predominately red in color.

(2) Be labeled “FIRE.”

(3) Comply with the Americans with Disabilities Act.

FIRE ALARM SYSTEMS 28 3110 - 18

b. Visual signals shall be a flashing strobe behind translucent lenses. Visual signals must be synchronized.

(1) Exception: Synchronized visual signals are not required if the visual signals have been tested by an independent testing laboratory and shown not to induce seizures.

c. Devices shall be engineered to comply with NFPA 72.

d. Devices shall be engineered to be such in number and location as to assure the evacuation signal is readily heard in all occupied areas of the building. In no case shall the evacuation signal be less than fifteen (15) decibels above averaged ambient sound levels.

e. Audible signals shall have a sound level of not less than 75 dBA at ten (10) feet or more than 120 dBA at the minimum hearing distance from the audible appliance.

f. Buildings occupied by or having the potential to be occupied by deaf or hearing-impaired persons shall provide for occupant notification as necessary to ensure evacuation of these occupants.

g. The audio evacuation signal shall be provided with a temporal tone audio evacuation signal followed by a pre-recorded voice evacuation signal.

h. In addition, the fire alarm system shall have live voice communication capabilities. Live voice communication from the fire alarm panel shall override the pre-recorded message. Should there be a failure of the pre-recorded message, the temporal tone shall be continuous.

i. The AHJ (authority having jurisdiction) must approve all pre-recorded messages.

(1) Message is to be repeated twice.

j. Exterior weatherproof audiovisual (A/V) devices shall be provided. Exterior audible devices shall be horns. Such devices shall be located in the immediate vicinity of each building entrance/exit. The exterior A/V devices shall be on a dedicate circuit, non-silenceable and must remain in operation until the system is reset.

(1) A silenceable soft key shall be programmed for use during annual testing and for use of DFD if required. Soft key shall put system in trouble to ensure Dispatch is notified when active.

7. Fire Protection System Alarm Devices:

a. Provide Type OSYS-U UL listed and FM approved fire protection gate valve tamper switch(es), with two single-pole/double-throw contacts, as shown on Drawings. Provide mounting bolts and hardware. Wire to fire alarm system.

b. Provide UL listed and FM approved fire protection water-flow alarm switch(es) with two single-pole/double-throw contacts, adjustable time delay and mounting collar hardware. Switch components that contact water shall be non-corrosive.

FIRE ALARM SYSTEMS 28 3110 - 19

c. Provide UL listed and FM approved fire protection water pressure alarm switch(es).

2.7 AUXILIARY FUNCTIONS

A. HVAC Control (when applicable):

1. Each designated HVAC unit shall be controlled through an addressable relay unit after an alarm condition has been initiated from any device as shown on the plans.

B. Magnetic Door Holders (when applicable):

1. Electromagnetic door holders shall be provided to hold fire and smoke barrier doors open until released by an alarm condition. The door holders shall have approximately 35 lb. (15.9 kg) holding power and offer fail-safe operation. Furnish and install where shown on plans.

2. All magnetic door holders shall release through the contacts of the control panel, after an alarm condition has been initiated from any zone on the plans, or loss of power. All door holder circuits shall be separately fused.

3. Magnetic door holders shall be wall mounted behind the door with the exact location coordinated between the electrical contractor and the University of New Hampshire. Provide blocking in wall suitable to support weight of door on hold open.

4. Magnetic door holders shall operate at 24 volts DC.

5. Magnetic door/holder may utilize chain extension, not to exceed 1 foot in length, for doors that do not swing immediately next to wall.

C. The system shall allow the operator to disable sprinkler-related devices, smoke detectors by floor, elevator-related devices, door holders, and individual strobe and speaker circuits. Whenever a zone or device is disabled the panel must show a trouble signal.

D. The system shall allow the operator or technician to disable any auxiliary function via the keypad.

E. Elevators:

1. All elevators that travel 25 feet or more shall be connected to the building fire alarm system and be equipped with elevator recall. Each elevator lobby, at each level and the elevator machine room(s). The elevator system/fire alarm system interface shall match existing conditions and be coordinated with UNH and its elevator service contractor.

FIRE ALARM SYSTEMS 28 3110 - 20

2.8 GRAPHIC MAP

A. Contractor shall provide a graphic layout of the building. Level of detail and size of graphic to be coordinated with UNH and Durham Fire. Graphic map to be printed on heavy bond glossy paper with indelible ink and mounted in a GD8 Graphic Display Frame supplied by Space Age Electronics, Inc., or approved equal.

2.9 RACEWAYS AND CONDUCTORS

A. All systems shall be wired as Class A such that a single break in any conductor shall not prevent the detection or signaling of an alarm.

B. All fire alarm system wiring shall be installed in conduit raceway, ¾” minimum, unless otherwise approved by the Owner. It is the responsibility of the installer to comply fully with the National Electric Code; however, particular attention shall be paid to wire fill limitations and derating requirements. All junction and pull boxes and covers shall be painted red. All boxes shall be labeled with circuit information and include the function when housing a remote control or monitor module. Each junction box shall be sized to accommodate a 40% future increase in wiring. A maximum of one box extender may be used before the contractor must use a larger box.

C. Grounding:

1. All fire alarm raceway/conduit systems shall have an equipment grounding conductor pulled in with the other fire alarm conductors. Each joint and termination must be tight so that there is electrical continuity.

2. All junction boxes, pull boxes, switch boxes, outlet boxes, etc., shall be bonded to the equipment grounding conductor by means of a green bonding jumper and screw.

D. Raceways containing conductors shall be identified as "Fire Protective Control Panel" conductors and shall not contain any other conductors. No AC current carrying conductors shall be allowed in the same raceway with the DC fire alarm detection and signaling conductors.

E. Fire alarm cable shall be UL-listed FPLR with twisted #14 AWG minimum solid copper conductors. Shielding and jacket color-coding shall be as follows:

1. Initiating circuits - solid red jacket; unshielded. If a second circuit is needed it shall be solid red jacket with an orange stripe. If more than two initiating circuits within a building shall be differentiated via permanent labeling (Brady labels or similar) at all terminations and junction/pull boxes.

2. Horn/strobe circuits - red jacket with white stripe; unshielded.

3. Speaker circuits - red jacket with blue stripe; shielded.

4. Power (24-volt) circuits - red jacket with black stripe; unshielded.

5. Communications line - red jacket with yellow stripe; shielded.

6. Audio interconnect – red jacket with green stripe; shielded

FIRE ALARM SYSTEMS 28 3110 - 21

7. Booster interconnect – red jacket with purple stripe; shielded

F. Fire alarm related fiber optic cabling shall be labeled at all terminations and junction boxes to read “Fire Alarm – Do Not Remove” and to indicate source and/or destination, as applicable.

2.10 IDENTIFICATION AND LABELS

A. Labeling:

1. Panels shall be labeled "Fire Alarm Control" on outside cabinet front in contrasting lettering at least 1" in height and 1/16" stroke. All labels/tags applied to the exterior of the fire alarm control panel shall be laser etched metal, mechanically secured.

2. A copy of the cabling color code schedule shall be permanently affixed in each fire alarm cabinet.

PART 3 - EXECUTION

3.1 INSTALLER’S RESPONSIBILITIES

A. The installer shall coordinate the installation of the fire alarm equipment with the manufacturer or his authorized distributor.

B. All conductors and wiring shall be installed according to the manufacturer's recommendations.

C. It shall be the installer’s responsibility to coordinate with the supplier regarding the correct wiring procedures before installing any conduits or conductors.

D. Any conflicts between the manufacturer’s wiring requirements and the wire and cable requirement specified herein shall be brought to the attention of the Owner immediately.

3.2 INSTALLATION OF SYSTEM COMPONENTS

A. System components shall be installed in accordance with the latest revisions of the appropriate NFPA Standards, the requirements contained herein, National Electrical Code, local and state regulations, the requirements of the fire department and other applicable authorities having jurisdiction (AHJ).

B. All wire used on the fire alarm system shall be U.L. listed as fire alarm protection signaling circuit cable per the National Electrical Code, Article 760.

FIRE ALARM SYSTEMS 28 3110 - 22

3.3 WIRING

A. Label wiring at all termination points.

B. Contractor shall clearly re-label all Fire Alarm Control Panels with new zones with typed labels.

C. In general, it is the intent of this specification that all fire alarm wiring be run in conduit concealed within walls and/or above ceilings. Surface mounted raceways will only be permitted when approved by UNH. Where surface mounted, the conduit shall be painted to match the surface mounted to. All painting shall be in accordance with University Construction Standards. Fire alarm cable shall contain a 2 – hour circuit integrity rating where required.

D. Cutting, drilling and patching of existing masonry walls shall be the responsibility of the fire alarm contractor. All holes through existing masonry shall be made with dry or wet coring only. When dry coring. A vacuum collar shall be used the control dust. Rotary hammers or demolition hammers will not be allowed. The fire alarm contractor shall be responsible for all clean up. All floor wall and ceiling penetrations shall be fire caulked using approved methods and materials and finished to match existing conditions. All fire stopping materials and methods must be submitted for approval prior to installation.

E. Notification appliance circuits shall be limited to 75 percent of available power provided by power supply.

F. Design wattage of speakers shall not exceed 80% of the maximum allowable input for the unit.

3.4 FIRESTOPPING OF PENETRATIONS

A. The fire alarm contractor shall be responsible for providing firestopping for all penetrations associated with fire alarm work, including but not limited to conduit, raceways, sleeves, and cable penetrations through fire-resistance-rated assemblies.

B. Firestopping shall be provided at all penetrations of fire-rated walls, floors, ceilings, and smoke…