This document is Attachment 3 of a bid submission form for the University of New Hampshire (UNH) Kingsbury Hall Fire Alarm Replacement project, administered by the University System of New Hampshire (USNH) Facilities Project Management. The attachment provides the framework for bidders to submit alternate bid pricing for two specific alternates to the base fire alarm system replacement project located in Durham, New Hampshire. Alternate One involves replacing existing addressable smoke and heat detectors with new equivalent addressable devices, including programming, testing, and documentation. Alternate Two involves replacing the existing fire alarm dialer with a Keltron LS NET9000 transceiver, including integration, programming, and end-to-end testing. For each alternate, bidders must indicate whether the work represents an addition to or deduction from the base bid and provide corresponding dollar amounts. Bidders may also identify modifications to sub-bid amounts or propose substitute sub-bidders if pricing differs from listed sub-bidders.
The document requires bidders to complete pricing information for each alternate and identify any sub-bid impacts by reference number. Bidders must specify whether each alternate increases or decreases individual sub-bid amounts and may propose substitute sub-bidders for any line items. The Owner has indicated in the bidding documents whether each alternate is anticipated to be additive or deductive to assist in determining the low bidder. Sub-bid modifications and sub-bidder substitution information are designated as confidential for use by the Owner and its consultants, while the actual alternate bid amounts are designated as public information. The form requires the bidder name and submission date upon completion.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3 - ALTERNATE BIDS
To Bid of: _____________________________________________, Bidder
For: USNH Event # 212026960
UNH Kingsbury Hall - Fire Alarm Replacement
UNIVERSITY OF NEW HAMPSHIRE
DURHAM, NEW HAMPSHIRE
ALTERNATES
To the above base bid sum, the following amounts shall be added or deducted for each alternate, as listed below.
Bidder shall indicate whether each alternate is an “Add” or “Deduct”, as applicable. It shall be noted that, for the purposes of determining low bidder, the Owner has indicated, with bold print, whether each alternate is anticipated to be additive or deductive. Affected sub-bids shall be identified by the sub-bid reference number(s) listed in Attachment One.
Alternate One – Replace existing addressable smoke and heat detectors with new equivalent addressable devices, including programming, testing, and documentation.
1) (Add) (Deduct) $ ______________________
2) (Increases) (Decreases) Sub-bid # _________ by $ _______________________
(Increases) (Decreases) Sub-bid # _________ by $ _______________________
3) Name of substitute Sub-bidder(s) if price is not from listed Sub-bidder(s):
Sub-bid # _____ Substitute Sub-bidder _______________________________
Alternate Two – Replace the existing fire alarm dialer with a Keltron LS NET9000 transceiver, including integration, programming, and end-to-end testing.
1) (Add) (Deduct) $ ______________________
2) (Increases) (Decreases) Sub-bid # _________ by $ _______________________
(Increases) (Decreases) Sub-bid # _________ by $ _______________________
3) Name of substitute Sub-bidder(s) if price is not from listed Sub-bidder(s):
The foregoing sub-bid modifications and sub-bidder substitutions shall be confidential information only for the use of the Owner together with its Consultants while the actual alternate amounts shall be public information.
Bidder: ______________________________________________ Date: ______________
END OF ATTACHMENT 3
| To Bid of: |
| Add Deduct: |
| Increases Decreases Subbid: |
| by: |
| Increases Decreases Subbid_2: |
| by_2: |
| Increases Decreases Subbid_3: |
| by_3: |
| Increases Decreases Subbid_4: |
| by_4: |
| Increases Decreases Subbid_5: |
| by_5: |
| Subbid: |
| Substitute Subbidder: |
| Subbid_2: |
| Substitute Subbidder_2: |
| Add Deduct_2: |
| Increases Decreases Subbid_6: |
| by_6: |
| Increases Decreases Subbid_7: |
| by_7: |
| Increases Decreases Subbid_8: |
| by_8: |
| Increases Decreases Subbid_9: |
| by_9: |
| Increases Decreases Subbid_10: |
| by_10: |
| Subbid_3: |
| Substitute Subbidder_3: |
| Subbid_4: |
| Substitute Subbidder_4: |
| Bidder: |
| Date: |
File details come from the government source that posted it. Updated .