Appendix A - Project Data Form.pdf

PDF 121 KB Posted

Attached to
UNH Kingsbury Hall - Fire Alarm Replacement
Solicitation number
212026960
Issued by
New Hampshire

About this file

This is a Project Data Form template from the University System of New Hampshire (USNH), specifically for the UNH Kingsbury Hall Fire Alarm Replacement project. The form is designed to collect comprehensive information from contractors bidding on or proposing work for state and local construction projects in New Hampshire. The document requests detailed project information including contractor identification, delivery method selection (design/bid/build, design/build, or CM at risk), and complete contact information for the project owner, architect of record, and engineer of record. Contractors must provide detailed descriptions of relevant past projects, emphasizing similarities to the proposed work, and list employee names and positions for staff who worked on previous projects and those who will work on the proposed fire alarm replacement project.

The form requires contractors to document construction costs including original contract amounts, change orders, and final contract amounts, with explanations required if change orders exceed five percent of the original contract value. Additionally, contractors must provide information on project complexity, schedule details (including notice to proceed date, substantial completion date, and final completion date), and any coordination requirements with other contractors. The form requests project photographs emphasizing complexities and site constraints, and provides space for additional comments and supporting documentation to demonstrate contractor qualifications and experience relevant to the Kingsbury Hall fire alarm system replacement project.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

APPENDIX A - PROJECT DATA FORM

CONTRACTOR: ___________________________________________________________________

DELIVERY METHOD: design/bid/build; design/build; CM at risk

Project Name: ______________________________________________________________________________

Project Address: ______________________________________________________________________________

Owner’s Name: _______________________________________________________________________________

Owner’s Address: ______________________________________________________________________________

Owner’s Contact: _________________________________ Phone Number: _________________________

Owner’s Contact E-mail Address: _________________________________________________________________

Architect of Record: __________________________________________________________________________

Architect’s Address: __________________________________________________________________________

Architect’s Contact: ________________________________ Phone Number: _________________________

Architect’s Contact E-mail Address: _______________________________________________________________

Engineer of Record: __________________________________________________________________________

Engineer’s Address: __________________________________________________________________________

Engineer’s Contact: ________________________________ Phone Number: _________________________

Engineer’s Contact E-mail Address: ________________________________________________________________

Contractor’s Employees who worked on this Project

(Note if these individuals will be working on the proposed project and in what capacity)

Employee Name Position Held on Project Will work on proposed project as (fill in the blank)

1. Project Description: (please emphasize similarities to proposed project):

2. Construction Costs:

Original Contract Amount: $____________________

Change Order Total: $____________________

Final Contract Amount: $____________________

If change order total exceeds 5% of the original contract amount, please explain:

3. Project Complexity: Attach additional page(s) if needed.

4. Project Schedule: Required/Contracted Construction Duration: _________________________________

Notice to Proceed Date: __________________________________________________

Date of Substantial Completion: ___________________________________________

Date of Final Completion (final payment): ___________________________________

5. Coordination: If applicable, describe specific circumstances surrounding the requirement that the general contractor coordinate work with other contractors hired separately by the Owner working in adjacent buildings or roads.

6. Additional Comments/Information: In addition to filling out this form completely, please feel free to attach other project information hereto.

7. Project Photograph(s): Please include one or more photographs of the subject project that emphasize project complexities, site constraints, architectural details and the like.

undefined:
designbidbuild: Off
designbuild: Off
CM at risk: Off
Project Name:
Project Address 1:
Project Address 2:
Owners Name:
Owners Address 1:
Owners Address 2:
Owners Contact:
Phone Number:
Owners Contact Email Address:
Architect of Record:
Architects Address 1:
Architects Address 2:
Architects Contact:
Phone Number_2:
Architects Contact Email Address:
Engineer of Record:
Engineers Address 1:
Engineers Address 2:
Engineers Contact:
Phone Number_3:
Engineers Contact Email Address:
Employee NameRow1:
Position Held on ProjectRow1:
Will work on proposed project as fill in the blankRow1:
Employee NameRow2:
Position Held on ProjectRow2:
Will work on proposed project as fill in the blankRow2:
Employee NameRow3:
Position Held on ProjectRow3:
Will work on proposed project as fill in the blankRow3:
Employee NameRow4:
Position Held on ProjectRow4:
Will work on proposed project as fill in the blankRow4:
Project Description please emphasize similarities to proposed project 1:
Project Description please emphasize similarities to proposed project 2:
Project Description please emphasize similarities to proposed project 3:
Project Description please emphasize similarities to proposed project 4:
Project Description please emphasize similarities to proposed project 5:
Project Description please emphasize similarities to proposed project 6:
Project Description please emphasize similarities to proposed project 7:
Project Description please emphasize similarities to proposed project 8:
Project Description please emphasize similarities to proposed project 9:
undefined_2:
undefined_3:
undefined_4:
If change order total exceeds 5 of the original contract amount please explain 1:
If change order total exceeds 5 of the original contract amount please explain 2:
If change order total exceeds 5 of the original contract amount please explain 3:
If change order total exceeds 5 of the original contract amount please explain 4:
Project Complexity Attach additional pages if needed 1:
Project Complexity Attach additional pages if needed 2:
Project Complexity Attach additional pages if needed 3:
Project Complexity Attach additional pages if needed 4:
RequiredContracted Construction Duration:
Notice to Proceed Date:
Date of Substantial Completion:
Date of Final Completion final payment:
or roads 1:
or roads 2:
or roads 3:
or roads 4:
or roads 5:
or roads 6:

File details come from the government source that posted it. Updated .