UHHZ170100_Pricing Worksheet.pdf
PDF 201 KB Posted
- Attached to
- Civil Engineering Multiple Award Construction Contract III, IDIQ Federal contract opportunity
- Solicitation number
- FA8501-22-R0023
About this file
This document contains a federal contract opportunity solicitation and related pricing worksheet for construction services. The solicitation seeks bids for the Civil Engineering Multiple Award Construction Contract III, an indefinite delivery, indefinite quantity contract to provide general construction services at Robins Air Force Base in Georgia and other locations supported by the Air Force Sustainment Center. Services may include maintenance, repair, alteration, mechanical, electrical, and other construction disciplines. The combined maximum value of task orders over the five-year contract period is $300 million. Individual task orders are typically valued between $150,000 to $2 million. The solicitation is designated for Service-Disabled Veteran Owned Small Businesses and responses are due as indicated when the solicitation is posted to SAM.gov. The pricing worksheet requests fixed-price quotes for drawings, schematics, testing, and construction services for project UHHZ170100 at building B350 to replace air handling units.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UHHZ170100
BIDDING SCHEDULE
ITEM DESCRIPTION AMOUNT
0001 Provide all drawings, schematics, layout, calculations, testing, and analysis for UHHZ170100 to RPR/RPL AHU’s Production
Bay, Warehouse Supply Equipment Depot, B350. ____________
TOTAL ==> ________________
BIDDING COMPANY: ____________________________
PERSON: _______________________________________
TITLE: __________________________________________
DATE: __________________________________________
NOTE: We strongly recommended the contractor visit the site to determine the complexity of the work and the amount of material required for this project. Field measurements may have been necessary to determine the size and quantity of materials. Conditions that the Contracting
Officer decides would have been obvious or visible to the contractor on inspection at the site visit will not be considered under the Differing Site Conditions provision of the contract.
0002 Provide all , plant, labor, materials, equipment, and supplies in strict accordance with the Drawings and Specifications for for UHHZ170100 to RPR/RPL AHU’s Production Bay, Warehouse Supply Equipment Depot, B350. ____________