Robins Base Facility Standards 2022.pdf
PDF 10 MB Posted
- Attached to
- Civil Engineering Multiple Award Construction Contract III, IDIQ Federal contract opportunity
- Solicitation number
- FA8501-22-R0023
About this file
This document outlines a federal indefinite delivery, indefinite quantity construction contract opportunity with the Department of the Air Force. The Civil Engineer Multiple Award Construction Contract III is seeking to establish a pool of multiple awardees to complete construction and repair projects at Robins Air Force Base in Georgia on a competitive task order basis. The aggregate maximum value of task orders over the five-year ordering period is $300 million, with individual task orders expected to range from $150,000 to $2 million. Eligible work includes general construction, repair, alteration, mechanical, electrical, and other services. The primary North American Industry Classification code is 236220. Awards will be made to responsible small business contractors using a lowest price technically acceptable process.
View the file
Other files for this federal contract opportunity
Show all 50
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RAFB BFS 2022
ROBINS AIR FORCE BASE
APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED
2022 BASE FACILITY STANDARDS
Any copyrighted material included in this document is identified at its point of use.
Use of the copyrighted material apart from this document must have the permission of the copyright holder.
BASE FACILITY STANDARD
Indicate the preparing activity beside the Service responsible for preparing the document.
AIR FORCE MATERIAL COMMAND/ 78 AIR BASE WING/ 78 CIVIL ENGINEER
GROUP
This update of the Base Facility Standards is a major update of the document formatting. As such it should be reviewed in its entirety as some sections, figures, and tables have been completely renumbered.
Record of Changes (changes are indicated by \1\ ... /1/)
Change No. Date Location
This Base Facility Standard all previous versions.
FOREWORD
The Robins AFB Base Facility Standards (BFS) is both a resource and a guidebook to facilitate the design and construction of successful, high-performance buildings and infrastructure projects. The guidance provided in this document applies to all new construction and renovations carried out by all Mission Partners at Robins AFB.
The 2022 Edition is a major format update. The 2019 Edition of the Base Facility Standards was more significant and included major changes for clarity and technical content. Note that the Criteria Reference Documents are combined into Appendix A at the end of the document, and Forms are consolidated into Appendix B. Thanks go to the many subject matter experts that provided their time and expertise to make this happen.
Please contact the Chief, Project Execution Section with all recommendations for updates, corrections, or changes.
AUTHORIZED BY:
LOUIS E. LILLEY, NH-04, DAF MARSHALL S. WALL, JR., P.E.
Deputy Director Chief, Engineering Division
78th Civil Engineer Group 78th Civil Engineer Group
Terry “Ross” Stinson Chief, Project Execution Support Section
78th CEG/CENME
Derek A. Grimsley, P.E.
Chief, Project Execution Section
78th CEG/CENMP
ACKNOWLEDGEMENTS
Special thanks go to the following individual Subject Matter Experts that assisted with the review and re-development of the 2019 and 2022 versions of this document.
Architectural Compatibility Standards Stefanie Dawson, 78 CEG/CENMP Rachel Weekley, 78 CEG/CENMP David Trescott, 78 CEG/CENMP
Mechanical Elements Dustin Smith, EIT, 78 CEG/CENMP Eric Rice, 78 CEG/CENMP
Antiterrorism/Force Protection Derek A. Grimsley, PE, 78 CEG/CENMP
Electrical Elements Dan Bishop, PE, 78 CEG/CENMP Ed Langdon, 78 CES, CEOFP Communications Roger Vann, 78 ABW/SCXP
Jin A Hess, 78 ABW/SCXP
Safety James “Kenny” Cox, 78 CES/CEOFE
Roy Locke, 78 CES/CEOER, Retired Terry “Ross” Stinson, 78 CEG/CENME
Harold “Hal” Livingston, 78 CEG/CEMP
SCADA
Billy Bandy, 78 CES/CEOFE Traffic Signals Reggie Tharpe, 78 CEG/CENME Fire Protection Lupe Diaz, 778 CES/CEXFP Energy
Steve Hall, 78 CEG/CENPE All About Getting It Built
Roy Crittenden, 78 CEG/CENME
Stefanie Dawson, 78 CEG/CENMP
Terry “Ross” Stinson, 78 CEG/CENME
Intrusion Detection Systems
James Berta, 78 CES/CEOFA
David Brown, 78 CES/DD
SSgt Kendric Coleman, 78 SFS/S3O
Civil Engineering
Stuart Farmer, PE, 78 CEG/CENMP
Derek A. Grimsley, PE, 78 CEG/CENMP
Structural Engineering Derek A. Grimsley, PE, 78 CEG/CENMP Bioenvironmental Cynthia Alligood, 78 MDG/SGPB
Roofing Terry “Ross” Stinson, 78 CEG/CENME
Environmental Requirements
Natalie Holder, 78 CEG/CEIEC
Kimberly Mullins, 78 CEG/CEIEC
Andrea Pyron, 78 CEG/CEIER
Indi Brown, 78 CEG/CEIEC
Stormwater Management
Russell Adams, AFCEC/CZO-E
Victoria Cheplak, P.E. Geosyntec Consultants
Stuart Farmer, PE, 78 CEG/CENMP
Leanne Morrow, 78 CEG/CEIEC
Water Operations and Management Mike Decardenas, 78 CES/CEOI Graphic Art, Illustrations and Photography Suzy O’Neal, RLA, 78 CEG/CEN Derek A. Grimsley, PE, 78 CEG/CENMP
TABLE OF CONTENTS RAFB BFS 2022
i
TABLE OF CONTENTS
CHAPTER 1 SPECIAL STANDARDS
SECTION 1A GEOBASE PROGRAM
1A-1 GENERAL REQUIREMENTS
SECTION 1B SAFETY PROVISIONS
1B-1 SAFETY PLAN REQUIREMENTS
1B-2 FALL PROTECTION
1B-3 SITE PROTECTION
1B-4 OPERATIONS SAFETY
1B-5 ELECTRICAL SAFETY
1B-6 OVERHEAD DOOR OPERATIONS
1B-7 GUIDANCE FOR CLEAN WORK AREAS
SECTION 1C PRE-ENGINEERED METAL BUILDINGS
1C-1 SYSTEM COMPONENTS AND DESIGN REQUIREMENTS
1C-2 WARRANTIES
SECTION 1D GREEN PROCUREMENT PLAN
1D-1 GENERAL
SECTION 1E FLIGHTLINE PHOTOGRAPHY
1E-1 GENERAL GUIDANCE
1E-2 PROHIBITED PHOTOGRAPHY
1E-3 PHOTOGRAPHIC DEVICES
CHAPTER 2 ENVIRONMENTAL REQUIREMENTS
SECTION 1560
SECTION 2A GENERAL GUIDANCE
2A-1 REGULATORY COMPLIANCE MANDATE
2A-2 ENVIRONMENTAL TRAINING
2A-3 NO NOTICE INSPECTIONS
2A-4 SUBMITTALS AND REGULATORY COORDINATION
SECTION 2B WASTE AND HAZARDOUS MATERIAL MANAGEMENT
2B-1 DISPOSAL OF WASTE AND EXCESS MATERIAL
2B-2 DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE (DODAAC)
ACCOUNT
2B-3 NON-HAZARDOUS SOLID WASTE DISPOSAL METHODS
ii
2B-4 NON-HAZARDOUS SOLID WASTE DISPOSAL REQUIREMENTS ... 22
2B-5 HAZARDOUS WASTE DISPOSAL
2B-6 ASBESTOS CONTAINING MATERIALS
2B-7 LEAD BASED PAINT (LBP)
2B-8 POLYCHLORINATED BIPHENYLS (PCBS)
2B-9 HAZARDOUS MATERIALS (HAZMAT)
SECTION 2C AIR QUALITY
2C-1 GENERAL
2C-2 SUBMITTALS, NOTIFICATIONS AND APPROVALS
SECTION 2D PESTICIDES
2D-1 GENERAL REQUIREMENTS
2D-2 REQUIREMENTS FOR USE
SECTION 2E STORAGE TANKS
2E-1 GENERAL
2E-2 NOTIFICATIONS
2E-3 TANK INSTALLATION REQUIRMENTS (INITIAL INSTALLATION OR
REPLACEMENT)
2E-4 TANK REMOVAL OR CLOSURE
2E-5 SEPTIC TANKS
SECTION 2F WETLANDS
2F-1 GENERAL
2F-2 GUIDANCE
SECTION 2G PLANT AND WILDLIFE (THREATENED AND ENDANGERED
SPECIES)
2G-1 PROTECTED PLANTS
2G-2 PROTECTED ANIMALS
2G-3 COORDINATION
SECTION 2H PRESERVING HISTORICAL AND ARCHAELOGICAL
RESOURCES 40
2H-1 PROGRAMMATIC AGREEMENT
2H-2 COORDINATION
2H-3 DISCOVERIES
2H-4 ARCHAEOLOGICAL FINDS
SECTION 2I GREEN INFRASTRUCTURE PLAN (GIP)
iii
2I-1 GENERAL
SECTION 2J PROTECTION OF WATER AND LAND RESOURCES
2J-1 GENERAL
2J-2 STORMWATER MANAGEMENT FOR FEDERAL FACILITIES -
SECTION 438 OF THE ENERGY INDEPENDENCE AND SECURITY
ACT (EISA)
2J-3 STORMWATER MANAGEMENT DURING CONSTRUCTION
2J-4 POST CONSTRUCTION STORMWATER MANAGEMENT
CHAPTER 3 STRUCTURAL AND CIVIL ENGINEERING ELEMENTS
SECTION 3A STRUCTURAL REQUIREMENTS
3A-1 GENERAL STRUCTURAL REQUIREMENTS
3A-2 SPECIAL STRUCTURAL REQUIRMENTS
3A-3 FOUNDATIONS
SECTION 3B CIVIL ENGINEERING AND SITE PLANNING
3B-1 PLAN REQUIREMENTS
3B-2 SITE VISIT
SECTION 3C WASTE WATER TREATMENT
3C-1 GENERAL INFORMATION
3C-2 WASTEWATER TREAMENT SYSTEM
3C-3 WASTEWATER SYSTEM CONSTRUCTION
SECTION 3D SUB-SURFACE INVESTIGATION
3D-1 GENERAL REQUIREMENTS
3D-2 DIGGING AND EXCAVATION REQUIREMENTS
3D-3 PRESERVING HISTORICAL AND ARCHAEOLOGICAL RESOURCES
SECTION 3E TERMITE PRE-TREATMENT
3E-1 GENERAL REQUIREMENTS
3E-2 SAFETY REQUIRMENTS FOR USE AND HANDLING
SECTION 3F LAWN SPRINKLER SYSTEMS
3F-1 GENERAL REQUIREMENTS
3F-2 DESIGN REQUIREMENTS
3F-3 INSTALLATION
3F-4 POST CONSTRUCTION REQUIREMENTS
iv
CHAPTER 4 Architectural compatibility and installation facility standards
(ACS/IFS) 70
SECTION 4A SPECIFICATIONS, REGULATIONS & STANDARDS
4A-1 ARCHITECTURAL COMPATIBLITY STANDARD AND THE
INSTALLATION FACILITY STANDARD
4A-2 INSTALLATION DEVELOPMENT PLAN
4A-3 HIERARCHY OF REQUIREMENTS
4A-4 SUSTAINABILITY
4A-5 ACCESSIBILITY
4A-6 ANTITERRORISM/FORCE PROTECTION (AT/FP)
SECTION 4B EXTERIOR FACILITY STANDARDS
4B-1 DESIGN ANALYIS NARRATIVE
4B-2 ARCHITECTURAL CHARACTER
4B-3 EXTERIOR COLOR PLAN
4B-4 OUTSIDE WALLS AND FINISHES
4B-5 Metal
4B-6 Wood Framing, Sheathing and Decking
4B-7 ROOFING
4B-8 DOORS AND WINDOW
SECTION 4C VEHICULAR CIRCULATION & PARKING
4C-1 ATFP REQUIREMENTS FOR ROADS AND PARKING
4C-2 PARKING DESIGN GUIDELINES
4C-3 PEDESTRIAN CIRCULATION
SECTION 4D LANDSCAPING
4D-1 SOIL STABILIZATION
4D-2 TREE SELECTION GUIDANCE
4D-3 SHRUBS AND GROUNDCOVER SELECTION GUIDELINES
SECTION 4E SITE ELEMENTS
4E-1 WALLS AND FENCES
4E-2 DUMPSTERS
4E-3 OUTDOOR EQUIPMENT CABINETS
4E-4 SITE FURNISHINGS
4E-5 OUTDOOR LIGHTING
4E-6 OUTDOOR SIGNAGE
v
SECTION 4F INTERIOR FACILITY GUIDELINES
4F-1 INTERIOR FINISHES AND COLORS
4F-2 CEILING TILES
4F-3 RESTROOMS
4F-4 BREAKROOMS
4F-5 INTERIOR PAINT COLOR OPTIONS
CHAPTER 5 MECHANICAL ENGINEERING ELEMENTS
SECTION 5A MECHANICAL STANDARDS
5A-1 GENERAL REQUIREMENTS
5A-2 SYSTEM REQUIREMENTS
5A-3 MAINTENANCE REQUIREMENTS
SECTION 5B HEATING, VENTILATION, AND AIR CONDITIONING STANDARDS
5B-1 DESIGN REQUIREMENTS
5B-2 HVAC WATER TREATMENT
5B-3 SYSTEM COMMISSIONING OF HVAC
5B-4 SYSTEM MAINTAINABILITY
SECTION 5C WATER DISTRIBUTION SYSTEMS
5C-1 SYSTEM WATER SUPPLY
5C-2 BUILDING WATER SUPPLY
5C-3 BACKFLOW PREVENTION DEVICES (BPDS)
SECTION 5D COMPRESSED AIR
5D-1 GENERAL REQUIREMENTS
5D-2 ENERGY CONSERVATION
5D-3 AIR COMPRESSORS
5D-4 AIR DRYERS
5D-5 RECEIVER TANKS
5D-6 PIPING SYSTEMS
5D-7 AIR DROPS AND CONNECTORS
5D-8 AUTOMATIC DRAIN VALVES
SECTION 5E FIRE SUPPRESSION
5E-1 GENERAL GUIDANCE
5E-2 SUPPRESSION SYSTEM DESIGN
vi
SECTION 5F WHOLE FACILITY METERING
5F-1 GENERAL REQUIREMENTS
5F-2 INTERFACE WITH VIRTUAL CE LAN
5F-3 ELECTRICAL CONNECTION
5F-4 NATURAL GAS CONNECTION
5F-5 WATER CONNECTION
5F-6 SEWAGE CONNECTION
5F-7 INDUSTRIAL WASTE CONNECTION
5F-8 STEAM CONNECTION
5F-9 CHILLED WATER CONNECTION
5F-10 RENOVATION AND DEMOLITION
CHAPTER 6 ELECTRICAL ENGINEERING ELEMENTS
SECTION 6A BROAD ELECTRICAL GUIDELINES
6A-1 GOVERNANCE
6A-2 ENERGY CONSERVATION
6A-3 EQUIPMENT PADS
6A-4 UTILITY BOLLARDS
6A-5 UNDERGROUND UTILITY PLACEMENT
6A-6 ELECTRICAL CLOSETS
6A-7 RECEPTACLE PLACEMENT
6A-8 STANDARD PLAN AND OPERATIONS REQUIREMENTS
SECTION 6B MEDIUM TO LOW VOLTAGE
6B-1 GENERAL GUIDANCE
6B-2 DUCT BANK
6B-3 MANHOLES
6B-4 HANDHOLES
6B-5 CABLE
6B-6 AIR SWITCHES
6B-7 TRANSFORMERS
6B-8 WALK-IN ENCLOSURES
SECTION 6C LOW VOLTAGE
6C-1 EQUIPMENT SIZES
6C-2 SERVICE VOLTAGE
vii
6C-3 METERING
6C-4 SURGE PROTECTION DEVICES (SPDs)
6C-5 STEP-DOWN (DRY-TYPE) TRANSFORMERS
6C-6 SWITCHBOARDS
6C-7 MOTOR CONTROL CENTERS (MCC)
6C-8 DISTRIBUTION PANELBOARDS 600 AND 800 Amps
6C-9 PANELBOARDS 100 TO 400 Amps
6C-10 FIRE ALARM and MASS NOTIFICATION SYSTEM (MNS)
6C-11 FIRE ALARM CONTROL SYSTEM
6C-12 COMBINED FIRE ALARM AND MASS NOTIFICATION SYSTEM ... 183
SECTION 6D GROUNDING
6D-1 GENERAL GUIDANCE
SECTION 6E LIGHTNING PROTECTION SYSTEMS (LPS)
6E-1 LPS REQUIREMENTS
6E-2 SPECIFIC APPLICATIONS
6E-3 SIMPLE RISK ANALYSIS
SECTION 6F COMMUNICATIONS
6F-1 GENERAL
6F-2 COMMUNICATIONS (COMM) ROOMS / SPACES
6F-3 ELECTRICAL POWER REQUIREMENTS FOR COMMUNICATIONS
ROOMS
6F-4 COMMUNICATIONS FOR MINOR PROJECTS
6F-5 FAMILY HOUSING
SECTION 6G INTRUSION DETECTION SYSTEMS
6G-1 DESIGN AND ACQUISTION
6G-2 SYSTEM REQUIRMENTS
SECTION 6H AUXILIARY POWER
6H-1 GENERATOR PLACEMENT AND SIZE
6H-2 ENVIRONMENTAL REQUIREMENTS
6H-3 COMPONENTS
6H-4 ABOVE GROUND FUEL TANKS
SECTION 6I CORROSION CONTROL
6I-1 SERVICES OF CORROSION ENGINEER
6I-2 PROTECTIVE COATINGS
viii
6I-3 CATHODIC PROTECTION SYSTEMS
6I-4 SYSTEMS REQUIRING PROTECTION
SECTION 6J LIGHTING
6J-1 GENERAL
6J-2 DESIGN REQUIREMENTS
6J-3 MOUNTING LUMINAIRES
6J-4 TYPICAL LIGHTING AREAS
6J-5 RENOVATION AND DEMOLITION
SECTION 6K AIRFIELD NAVAIDS
6K-1 ROBINS AFB INVENTORY
6K-2 POWER SERVICE
SECTION 6L TRAFFIC SIGNAL CONTROL SYSTEMS
6L-1 TRAFFIC SIGNAL COMPONENTS
6L-2 SEQUENCE OF OPERATIONS
APPENDIX A criteria reference DOCUMENTS
APPENDIX B forms
B-1 ROBINS AFB BASE FACILITY STANDARD FORMS
B-1.1 Waiver Request
B-2 ENVIRONMENTAL FORMS
B-2.1 Special Waste Acceptance Application (SWAA)
B-2.2 Waste Management Report (MONTHLY)
B-2.3 Waste Shipment Tracking Document
B-2.4 DD Form 1348-1A Issue Release/ Reciept Document
B-3 RESERVED FOR FUTURE USE
B-4 RESERVED FOR FUTURE USE
B-5 RESERVED FOR FUTURE USE
B-6 ELECTRICAL FORMS
B-6.1 Electrical Safety Documentation
B-6.2 Lightning Protection System (LPS) Data
SPECIAL STANDARDS RAFB BFS 2022
CHAPTER 1 SPECIAL STANDARDS
Aerial Photography of 78 CEG Complex at Robins AFB provided through GeoBase.
SPECIAL STANDARDS GEOBASE PROGRAM
SECTION 1A GEOBASE PROGRAM
1A-1 GENERAL REQUIREMENTS
1A-1.1 The Robins AFB GeoBase Program is the primary repository of utility, planimetric and environmental data on Robins AFB. The goal of the program is to ensure that all design and construction projects make use of the most up-to-date utility and planimetric data, and that post construction updates are properly submitted and integrated to keep the base utility and planimetric data current.
1A-1.2 All project files prepared and modified throughout the construction process, shall be in electronic format red-lines, as-builts and delivered record drawings as specified in the contract documents.
1A-1.2.1 Planimetric and utility features are the primary responsibility of the 78 CEG/CENME office.
Planimetric Data: Airfield, Roads, Sidewalks, Buildings, Geodetic, Hydrography, Landform, Pedestrian and Land Status.
Utility Data: Air, Electrical, Fuel, Gas, Heating/Cooling, Industrial, Storm, Wastewater and Water.
1A-1.2.2 The Environmental features are the responsibility of the 78 CEG/CEIE office.
Environmental Data: Air Quality, Groundwater Quality, Pollution Control, Regulated Tanks, Solid Waste, Hazardous Materials (Hazmat), Hazardous Waste (Hazwaste), Remediation, Cultural, Fauna, Flora and Wetlands.
1A-1.2.3 The location and orientation of all elements shall be based on the following:
Table 1A-1
GEOGRAPHIC COORDINATES
Location Station ID Latitude Longitude Country
ROBINS
AFB
KWRB 32.64 -83.59 UNITED STATES -
GA
1A-1.3 All project files prepared and modified throughout the construction process, shall be in electronic format red-lines, as-builts and delivered record drawings as specified in the contract documents.
COORDINATES
COORDINATE SYSTEM
DATUM North American Datum (NAD) of 1983
FORMAT State Plane Coordinates for Georgia West FIPS 1002
SPECIAL STANDARDS SAFETY PROVISIONS
SECTION 1B SAFETY PROVISIONS
1B-1 SAFETY PLAN REQUIREMENTS
The Contractor shall prepare a detailed project-specific Industrial Safety and Health Requirements Plan (Safety Plan) IAW OSHA guidance and AFI 91-202, “The Air Force Mishap Prevention Program,” dated March 2020; AF Directive 91-2, “Safety Programs,” dated April 2021; and as outlined in each Construction Contract or Task Order at Robins AFB. The Safety Plan shall be submitted for review and approval by the 78 ABW Safety Office and used to coordinate and perform work in a manner that does not impact the safety of Government or non- Contractor personnel, or cause damage to government property. The Contractor shall not start any construction activities until the Safety Plan has been approved and all aspects of the Plan are in place.
1B-2 FALL PROTECTION
1B-2.1 System Requirements
Projects shall incorporate certified fall protection systems when noted in the Contract or Task Order.
1B-2.2 Fall Protection Systems for Roof Projects
The fall protection system for roof projects, shall be designed to include perimeter systems for each applicable roof section and roof access penetrations (i.e. access hatches) in order to minimize fall distances, arresting forces, rescue time and the chance for human error.
Additionally, the system shall be designed to provide rescue access to the worker in the event of a fall. These elements shall be engineered to work together to arrest a worker’s fall.
Additionally, fall protection systems shall be designed for access to rescue personnel in the event of a fall.
1B-3 SITE PROTECTION
1B-3.1 Temporary Structures
1B-3.1.1 Plans for the layout of temporary structures such as buildings, facilities, fencing, access routes and anchoring systems for temporary structures shall be submitted for review and approval prior to implementation. The plans shall consider the following loading IAW American Society of Civil Engineers (ASCE) 7-10, Minimum Design Loads for Buildings and Other Structures:
Dead and live loads Soil and hydrostatic pressures Wind loads Rain and snow loads Flood and ice loads Seismic forces
1B-3.1.2 Trailers and other temporary structures used as field offices, personnel housing or for storage shall be anchored with rods and cables or by steel straps to ground anchors. The anchor system shall be designed to withstand winds and meet applicable state or local standards for anchoring mobile trailer homes.
1B-3.2 Temporary Fencing
1B-3.2.1 Temporary project fencing (or an acceptable substitute) shall be provided on all projects located in areas of active use by members of the public, including those areas in close proximity to family housing areas and/or school facilities.
1B-3.3 Temporary Work Camps
1B-3.3.1 All sites used for temporary work camps shall be sized to prevent overcrowding of necessary structures.
1B-3.3.2 All temporary work camp sites shall be adequately drained. They shall not be subject to periodic flooding nor located within 200 feet of wetlands, pools, sink holes or other surface collections of water unless adequate mosquito control methods have been implemented. Sites shall be graded, ditched and rendered free from depressions where water may become a nuisance.
1B-3.3.3 The grounds and open areas surrounding any site shelters shall be maintained free of rubbish, debris, waste paper, garbage or other refuse.
1B-3.4 Signage for Construction Sites
Warning signs shall be posted at each construction site in order to identify the presence of construction hazards and require that unauthorized persons keep out of the designated construction area. Signs shall be posted along each side of the project and spaced no more than 150 feet apart. Provide safety signs as required at job sites, such as MEN WORKING ABOVE, DO NOT WATCH WELDER and NO SMOKING.
1B-3.5 Excavations
Provide protection around all excavations where any personnel may be exposed to danger from moving ground. Trenches less than four (4) feet in depth shall be effectively protected when hazardous ground movement may be expected. All trenches over four (4) feet deep in either hard and compact or soft and unstable soil shall be sloped, shored, sheeted braced or otherwise supported.
1B-3.6 Protective Barriers
Contractor is responsible to provide barricades when it is necessary to protect an area due to operations including excavation, open manholes, overhead work, hazardous operations, or moving equipment. Erect barricades before the work begins. If the barricades are in a roadway or walkway, blinking lights must be used during the hours of darkness. Barricades and associated equipment shall be kept neat and orderly at all times. Immediately remove barricades from the job site when the work is complete. Kerosene lamps and open flame pots shall not be used for or with warning signs or devices.
1B-3.7 Protective Equipment
The Contractor is responsible for the use of appropriate personal protective equipment by his and subcontractor employees and guests.
1B-4 OPERATIONS SAFETY
1B-4.1 Tools and Equipment
1B-4.1.1 Use standard ladders that are structurally rigid, sound, equipped with approved safety shoes and free of cracks. Metal ladders shall not be used near or for electric service. All ladders shall be tied off at the top and bottom as necessary. Special purpose job ladders may be constructed if they are properly designed and built IAW 29 CFR 1926. Scaffolds and platforms shall have handrails and toe boards.
1B-4.1.2 The Contractor is responsible for ensuring that all hand tools used by his or subcontractor personnel are used IAW applicable safety standards.
1B-4.1.3 All electrical wiring and equipment shall be a type listed by Underwriter Laboratories (UL) or another recognized listing agent. All temporary electrical wiring shall be adequately installed and placed to avoid physical damage from other operations. Temporary wiring shall be removed immediately upon completion of construction or the purpose for which the wiring was installed. All extension cords shall be of the three-wire type and kept in a good state of repair. Splices shall be avoided. All portable electrical appliances and equipment shall be unplugged at the end of each workday. Only explosion-proof electrical fixtures and appliances shall be used in areas where explosive vapors might be present. All electrical wiring and equipment shall comply with 29 CFR 1926.405.
1B-4.2 Foreign Object Damage (FOD) Prevention for Flightline Projects
1B-4.2.1 In order to prevent damage to aircraft from construction-generated debris, the Contractor shall establish and maintain an effective FOD prevention program as an overall component of project execution.
1B-4.2.2 All vehicles must stop at FOD checkpoints on the Flightline. The vehicle operator will visually inspect all tires treads for rocks and other debris to ensure all trapped items are removed and disposed of properly to prevent the loose objects from being carried onto the Flightline.
1B-4.3 Fire Reporting
Report all fires as soon as discovered. The fire reporting number on or off Base is 911 (RAFB 911: 478-222-2900). The caller should give his or her name and location of the fire and any other information that may be requested by the Fire Department dispatcher. Stay on the telephone until the dispatcher has obtained all necessary information.
1B-4.4 Welding, Cutting, Brazing and Open Flames
1B-4.4.1 Do not start operations involving welding, cutting, brazing and open flames until the Technical Representative of the Contracting Officer has been notified, the site has been inspected and approved by the authorized Fire Inspector.
1B-4.4.2 Complete AF Form 592 (Welding, Cutting, and Brazing Permit).
1B-4.4.3 Perform a fire watch for at least one half hour after the operations are finished.
Sign and return the AF Form 592 to the Fire Department at Building 377 within one hour.
1B-4.4.4 No tar pots or kettles shall be used until checked and approved by the Fire
Department. The pots or kettles shall be positioned at least 25 feet from the building where work is being performed. Maintain constant supervision of these when in use. Adequate fire extinguishers shall be placed within 25 feet and accessible to each pot or kettle. A minimum of two (2) 20-pound multi-purpose dry chemical extinguishers is required at each area of tar application.
1B-4.4.5 Smoking shall not not be permitted on the roof or within the vicinity of a fuel source, or any combustible material.
1B-4.5 Fire Hydrants and Hoses
1B-4.5.1 Fire hydrants shall not be used without prior approval of the RAFB CE Plumbing Shop. If permission is granted for use of a fire hydrant, the Contractor must furnish a gate valve to fit the 2 1/2" outlet and a proper hydrant wrench. Each time a hydrant is to be opened or used, it must be opened slowly to prevent a water surge, and it must be opened to the full "open" position. When closing the hydrant, close it slowly to prevent a water surge. (The Plumbing Shop will advise the Fire Department that the hydrant is being used).
1B-4.5.2 No vehicles or equipment shall be parked or stored within 15 feet of a fire hydrant.
1B-4.5.3 The Fire Department does not loan equipment; e.g., fire hoses, nozzles, or hydrant wrenches
1B-4.6 Fire Protection Alarm Systems
1B-4.6.1 Take extreme care around or near any fire protection or detection alarm systems.
Accidental contact with components of these systems or the production of steam, smoke, vapors or dust could cause activation, damage or false alarms by the Fire Department.
1B-4.6.2 Call the Fire Department at (478) 926-3487 for assistance if a fire protection or detection alarm system hampers the accomplishment of contract work.
1B-4.7 Portable Heaters and Lighting
1B-4.7.1 All portable electric heaters must be approved by Factory Mutual (FM), or Underwriters Laboratory (UL). Keep heaters away from combustible or flammable materials.
1B-4.7.2 All extension cords used must have sufficient gauge to operate heaters and lighting without heating the cord or plug.
1B-4.7.3 All unnecessary electrical appliances shall be unplugged at the end of the workday.
1B-4.7.4 Use only explosion proof electrical fixtures and appliances in areas where flammable vapors are present.
1B-4.8 Flammable and Combustible Liquids
1B-4.8.1 Store flammable liquids in suitable metal containers only. Store other flammable materials properly.
1B-4.8.2 Do not use gasoline or any other low flash point flammable liquid, for cleaning purposes or to start fires.
1B-4.8.3 Properly attach static bonding wires before combustible or flammable liquid is transferred from one vessel to another.
1B-4.8.4 Do not smoke or use spark or flame producing equipment in areas where flammable liquids are being used or stored.
1B-4.9 Personal Protective Clothing (PPE)
Use the protective clothing and apparatus appropriate for the task, including such items as the following:
Hard Hats Safety Glasses/ Goggles Hearing Protection Steel Toed Shoes Leather Gloves Hazard Rated Arc Flash Suit
1B-5 ELECTRICAL SAFETY
Electrical safety shall be an integral component of the Safety Plan.
1B-5.1 Safety Meeting and Briefings
1B-5.1.1 Host Responsibilities
The host (i.e. Robins AFB/78 CEG personnel dealing with AEs and Contractors) will inform the contract employees of known hazards covered by NFPA 70E that are related to the work to be accomplished when conducting preliminary surveys, inspections, etc.
Together, host and contract personnel shall complete Electrical Safety Form (See Appendix B). This form shall be included as one element of the Project Safety Plan and be reviewed at the prescribed meetings and briefings.
Meetings and briefings may be on-site and shall be documented. AE and/or Contractor shall prepare the written report (hand written is acceptable) and 78 CEG will be given copy at the conclusion of the inspection, survey, etc.
before the parties leave for the day.
1B-5.1.2 Contractor Responsibilities
1B-5.1.2.1 All projects (regardless of project cost) should have job briefings/on-site meetings at least daily or as conditions change. These briefings shall be documented and take place when any new type of work is started, including (but not limited to) the following:
First day on project for any personnel and first day after more than two days off the job.
Work in immediate area of energized wiring.
Work on transformers exterior or interior
Renovations of areas where “all” electrical circuits have not been de-energized.
Work near rotating equipment that may become energized.
1B-5.1.2.2 In addition to job briefings, the Contractor shall schedule weekly safety meetings for projects over $200,000 in total project cost. These meeting should include all contractors, Sub-Contractors, and 78 CEG/CEN construction inspection personnel. Supervisory personnel are to facilitate meeting with knowledgeable individuals to conduct training on specialized topics, including (but not limited to) the following:
All aspects of planned work
Site hazards
Safety precautions to be followed
Special precautions
Energy source controls (especially with multiple sources of energy in one area)
Personnel protective equipment (PPE)
Planned exits free from obstructions from work area to a safe distance from construction site.
Figure 1B-1 ARC FLASH
1B-5.1.3 Arc Flash
Arc Flash is a phenomena that occurs in high and low voltage electrical systems; it can occur regardless of the age or condition of the equipment.
Determine the level where work is being done and prepare for the expected (and the unexpected), especially near a substations where 20 kA is available or on the load side of 2500 kVA transformers where over 53 kA may be available
1B-5.2 Medium and Low Voltage Safety
1B-5.2.1 Warning Devices
Locate warning devices such as barriers, warning signs, traffic cones and lights at approaches to clearly define work areas, excavations, open manholes, parked equipment and other hazards.
Take special precautions for any areas where reduced visibility occurs, such as night operations or in fog. Immediately remove warning devices after removal of hazards and equipment.
1B-5.2.1.1 Ensure that Government personnel are kept at least ten (10) feet from any construction inside a building.
1B-5.2.1.2 Keep warning barricades such as cones and tape, five (5) feet from excavation areas and dirt piles. Note that a protective barricade may be placed closer than this since it provides both a warning and physical protection.
1B-5.2.1.3 Protection barricades must have a withstand rating of at least 200 pounds in any direction with minimal deflection.
1B-5.2.1.4 Never enter an excavation deeper than four (4) feet that does not have a safe access-way. A safe access-way is one that has been inspected by a competent person before allowing entrance and does not have equipment working next to the edge.
1B-5.2.1.5 Do not disrupt utility lines that may be present, marked or unmarked. Determine whether the line is in use or abandoned before demolition. If marked, any needed repairs should be assessed; the Contractor shall be responsible to repair damages created as a consequence of the work activity at no additional cost to the Government.
1B-5.2.2 Flagmen
1B-5.2.2.1 Provide flagmen if there is any doubt about whether the warning devices being used provide adequate controls, such as in areas with obstructed view by vehicular traffic or during high traffic hours such as mornings, lunchtime and quitting time.
1B-5.2.2.2 Flagmen must wear brightly colored and highly reflective vests.
1B-5.2.3 Number of Workers Required
1B-5.2.3.1 Jobs requiring only one electrical worker include the following:
Work on systems in an electrically safe work condition with nominal voltages of 600 volts or less.
Routine electrical measurements on energized systems with nominal system voltages of 600 volts or less.
Routine operation of switchboard and panel breakers if the Contractor can demonstrate that conditions at the site allow this work to be performed safely.
Routine electrical measurements or switching using gloves and live-line tools if the worker is positioned out of reach or possible contact with energized parts.
1B-5.2.3.2 Jobs requiring two electrical workers include the following:
All medium voltage work requires two workers minimum, including installation, removal or repair work when working on or near lines or parts energized at 600 volts or more.
Any work where the covers of equipment are removed.
Any work within the interior of equipment where live parts may be energized.
1B-5.2.3.3 Jobs requiring three electrical workers include the following:
All activities within confined spaces require at least three workers; including one worker in the confined space; one on the surface providing assistance or operating certain equipment, such as air moving equipment; and one with first-aid and CPR training in the immediate vicinity of the activity. All three people shall have confined space training and each shall have the authority to stop/recall the person in the confined space. If any danger or perceived danger is present, then no worker shall enter the confined space until a plan has been developed
1B-5.2.4 Pumping a Manhole or Handhole
1B-5.2.4.1 Manholes are considered confined spaces.
1B-5.2.4.2 If manhole/handhole contains water, it shall be pumped out before entering.
Water must not be allowed to enter storm drains. Pumping onto the ground adjacent to the manhole is allowable.
1B-5.2.4.3 Before entering any confined space such as a manhole/handhole, test to make sure that the oxygen level is between 19.5% and 23.5%. If the oxygen level is below this level or other types of gas, such as methane, carbon-dioxide, etc. are present, ventilate the hole before entering.
1B-5.2.4.4 Removal of water or removal of duct plug may allow gases (dangerous or non-dangerous) to enter the manhole/handhole and deplete the oxygen level. Once water is removed, retest oxygen level.
1B-5.2.5 Minimum Illumination
Ensure the working area has adequate illumination.
Areas above suspended ceilings may be illuminated by handheld or body mounted lighting.
Provide temporary lighting where natural or installed artificial illumination is not sufficient.
When using existing lighting or part of existing lighting, make sure that it is not controlled by motion sensors or timed devices. Disconnect if found to be controlled.
1B-5.2.6 Elevated Spaces
Ensure that ladders are installed with a slope of four to one (4:1) per OSHA 1926.1053
Ensure that ladders are solidly placed and have a level footing
Ensure that the proper weight class of ladder is used for personnel
Always provide necessary bags, etc. for lifting tools to work site. Do not carry heavy objects up the ladder
1B-5.3 Control of Hazardous Energy (Lockout/Tagout)
1B-5.3.1 Contractors are required to turn off all circuits before working on them. To make sure that these circuits remain off, place lockout/tagout devices on the upstream overcurrent device/disconnecting means.
1B-5.3.2 In the event a normally open switch is closed to provide alternate power to a part of the exterior electrical system or building system, provide a lockout/tagout device
1B-5.3.3 Provide a caution tag with any lockout device. This tag shall include the project number, point-of-contact and phone number of the individual who completed the device lockout.
Typically this is an electrician will place a lock that only he/she has a key to open.
1B-5.4 Stray Electric Voltage Testing
1B-5.4.1 Always test for live electrical currents before working on distribution equipment of any type. A device that changes color or gives an audio tone upon detection is sufficient.
1B-5.4.2 After the device has been placed, verify that voltage is not present on the load side of the device locked out.
1B-5.4.3 Before providing temporary grounding of conductors/equipment, test to make sure there is no voltage present.
1B-5.4.4 Before entering into a manhole (or reaching into a handhole), make sure that there are no stray voltages present. Mount the testing device on a line tool and move it around close to the cables on all four sides of the manhole/handhole.
1B-5.5 Temporary Protective Grounding
Use temporary grounding to protect workers engaged with de-energized electrical lines maintenance and to protect lines and equipment during maintenance.
1B-6 OVERHEAD DOOR OPERATIONS
All overhead doors shall be wired for momentary operation i.e., constant pressure must be applied to the manual controls to operation in either direction. The only exception will be for Fire Department and DLA infrastructure requiring remote control doors. Any door with remote control operation capability will require a safety edge at the bottom of the door. Any exception shall require written approval from 78 CES.
1B-7 GUIDANCE FOR CLEAN WORK AREAS
Wipe samples are routinely collected in industrial areas at Robins AFB by the Bioenvironmental Office. The Contractor shall review posted Bio Survey Assessments at individual work areas to determine special procedures or requirements associated with doing construction activities in that facility.
SPECIAL STANDARDS PRE-ENGINEERED METAL BUILDINGS
SECTION 1C PRE-ENGINEERED METAL BUILDINGS
1C-1 SYSTEM COMPONENTS AND DESIGN REQUIREMENTS
1C-1.1 Metal Building Manufacturer Accreditation
Manufacturer shall be accredited by the International Accreditation Service Inspection (IAS) Programs for the Manufacturers of Metal Building Systems, AC472. Provide copy of the current accreditation.
1C-1.2 Structural Frame Configuration
Buildings not containing finished spaces: Tapered Columns
Buildings containing finished spaces: Straight Columns
1C-1.3 Roof Panel Configuration
Roof panel configuration shall meet the requirements of Table 1C-1 below for new industrial and simple commercial roofs with no valleys; or new commercial Architectural roofs, which may contain valleys.
Table 1C-1
ROOF PANEL CONFIGURATION
New Industrial & Simple Commercial Roofs (No Valleys)
New Commercial Architectural Roofs (May Contain Valleys)
3” min. height trapezoidal mechanically seamed standing seam roof panels
2” min. height vertical leg mechanically seamed standing seam roof panels
360° seam (90°/180° seams not allowed) 360° seam (90°/180° seams not allowed)
24” max. width panels shall have intermediate low profile ribs (flat pans not allowed)
16” max. width panels shall have intermediate low profile ribs (flat pans not allowed)
1C-1.4 Insulation
1C-1.4.1 Minimum Thickness for Walls, Fascia (if applicable) and Roof
3.5 inches (R = 13) in unconditioned buildings.
1C-1.4.2 Scrim or Facing on Insulation (also referred to as Vapor Retarder)
Factory applied white polypropylene film, fiberglass and polyester scrim, 30# natural kraft and metalized polyester (PSKP)
Tensile strength MD - 65 pounds per inch (lbs/in) / XD - 60 lbs/inch minimum
Water Vapor Transmission Rate (WVTR) - 0.02 perm (unit of permeance) or less
Basis of Design – Lamtec® WMP-50
SPECIAL STANDARDS PRE-ENGINEERED METAL BUILDINGS
1C-1.4.3 Configuration
Insulation/scrim system shall be installed as a 100% vapor barrier with a six (6) inch single side tab. Tabs shall be sealed as required to maintain the barrier.
1C-1.5 Finishes
Structural Steel Frames and Columns/Posts - Preferred Finish: Hot-dipped galvanized.
Alternate Finish: Primed and painted for exposed conditions, shop primed only for concealed locations.
1C-1.6 Girts and Purlins
Primed and painted for exposed conditions, primed only for concealed locations. As an alternate for primed and painted, hot-dipped galvanized finish may be substituted.
1C-1.7 Panels
Coated with Kynar 500® Polyvinylidene Fluoride (PVDF) or Hylar® 5000 PVDF meets the required finish warranty requirements.
1C-2 WARRANTIES
All warranties shall be from a single source manufacturer.
1C-2.1 Weather-Tightness System – Labor and Materials
20-Year No Dollar Limit (NDL) Warranty Required - The warranty shall cover roof weather tightness up to the required design wind speed. Repairs that become necessary because of defective materials and workmanship while roof panel system is under warranty are to be performed within 48 hours after notification. Failure to perform repairs within 48 hours of notification will constitute grounds for having emergency repairs performed by others and will not void the warranty. Follow-up and completion of repairs must be performed within 14 calendar days from date of notification.
1C-2.2 Roof and Wall Panel Finish System – Labor and Materials
20-Year No Dollar Limit (NDL) Warranty Required - The warranty shall cover repairs that become necessary because of defective materials and workmanship while the roof and wall panel system is under warranty are to be performed within 48 hours after notification, unless additional time is approved by the Contracting Officer. Failure to perform repairs within 48 hours of notification will constitute grounds for having emergency repairs performed by others and will not void the warranty. Follow-up and completion of repairs must be performed within 14 calendar days from date of notification.
SPECIAL STANDARDS GREEN PROCUREMENT PLAN
SECTION 1D GREEN PROCUREMENT PLAN
1D-1 GENERAL
The Green Procurement Plan (GPP) is a mandatory federal acquisition program that focuses on the purchase and use of environmentally preferable and bio-based products and services. Air Force GPP Policy includes the purchasing of Energy and Water Efficient Products; Alternative Fuels and Fuel Efficiency; Bio-based Products; Non-Ozone Depleting Substances; Priority Chemicals; and Environmentally Preferable Products.
GPP requirements apply to all acquisitions including services and new requirements. Federal Acquisition Requirement 23.404(b) applies and requires 100% of US EPA designated product purchases to contain recovered materials, unless the item cannot be acquired competitively within a reasonable timeframe; meeting reasonable performance standards; or at a reasonable price.
SPECIAL STANDARDS FLIGHTLINE PHOTOGRAPHY
SECTION 1E FLIGHTLINE PHOTOGRAPHY
1E-1 GENERAL GUIDANCE
Photographs of facilities or assets within the industrial flightline area of Robins AFB may be taken only with prior authorization. Any such photographs shall be taken FOR OFFICIAL USE ONLY and may include but not be limited to the following:
Recording of existing conditions associated with specific building construction and repair projects; or
Providing documentation of progress, details or issues associated with specific building construction and repair projects.
1E-2 PROHIBITED PHOTOGRAPHY
Photography of classified assets or activities is strictly prohibited.
1E-3 PHOTOGRAPHIC DEVICES
Official photographs shall be taken with a government owned camera or other approved devices with photo-taking capabilities. Use of personal cameras, cell phones or other devices is prohibited.
ENVIRONMENTAL REQUIREMENTS RAFB BFS 2022
CHAPTER 2 ENVIRONMENTAL REQUIREMENTS
SECTION 1560
Protected Wetland Area
ENVIRONMENTAL REQUIREMENTS GENERAL GUIDANCE
SECTION 2A GENERAL GUIDANCE
2A-1 REGULATORY COMPLIANCE MANDATE
All contracts performed on Robins AFB are bound by requirements established by the Federal Government, State of Georgia, Houston County and Department of Defense (DoD); as well as Air Force laws, regulations and policies specific to Robins AFB. Work is coordinated through regulatory permits and management plans to ensure that hazardous work conditions are minimized, personnel are protected, accidental damage to Base assets is prevented, and disturbed sites are fully restored when excavation has been completed. Environmental compliance is required for the following programs: solid and hazardous wastes, toxics, water quality, air quality, natural resources, storage tanks, cultural resources, pollution prevention, hazardous materials, and fuels. Environmental Management, 78 CEG/CEIE, is the organization responsible for management of base environmental concerns. Contact program managers in 78 CEG/CEIE at (478) 926-9645, or via email: 78ceg.cev.FrontOfc@us.af.mil.
2A-2 ENVIRONMENTAL TRAINING
All contractor personnel working on Robins AFB who perform activities on the installation are required to complete training applicable to their job duties in accordance with all federal, state, local and DoD requirements. It is the responsibility of the Prime Contractor to ensure that all Sub-Contractors, vendors, and employees complete this training prior to beginning work on Robins AFB. Notification of training completion shall be sent to the Contracting Officer (CO) to be maintained in the contract file for tracking purposes. Failure to provide documentation of Environmental Management System (EMS) Training may result in termination of the contract. The following table identifies regulatory requirements and the associated training requirements. All training can be acquired via Environmental Management, 78 CEG/CEIE, at (478) 926-9645, or via email: 78ceg.cev.FrontOfc@us.af.mil.
Table 2A-1
Required Environmental Training (for Contractors) Media Title Applicability
Air Quality
Air Compliance Paint Boot Supervisor/ Operator
Paint/De-paint operations associated with Title V Permit
Environmental Management System (EMS)
General EMS Awareness Training
All Contractors
Contractors can register for an account through The Environmental Awareness Course Hub (TEACH), the Air Force training database:
https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f Search for Course ID: EMS110UHHZ00293
Directions:
1. Hover your mouse over the Courses and Transcripts tab.
2. Click on Transcripts
3. Click into the TEACH Course Completion Log by clicking the orange Continue or Begin button.
4. When you are on the transcript, click on the blue “Search for Course” button.
5. When the pop up appears enter the course name or course number and press search.
6. Once you find the course you want to add, click on the
+Select button to add the course to your transcript.
https://usaf.learningbuilder.com/account/login/?ReturnUrl=%2f
Required Environmental Training (for Contractors) Media Title Applicability
(Note: TEACH may not supported by Internet Explorer;
recommend using Chrome.)
No Computer Access Card: Request slides from the Environmental Management front office at:
78ceg.cev.FrontOfc@us.af.mil.
Edible Oils Edible Oil Training (Restaurant) Managers of edible oil storage containers
Hazardous Waste
Level 1 Level 1: Expert level; Has the ability to train others (Unit Environmental Coordinator (UEC), 90 day-Hazardous Waste Accumulation Sites (HWAS), Transportation, Storage, and Disposal Facility (TSDF) Employees
Hazardous Waste
Level 2 Level 2: General awareness; Anyone handling hazardous waste/placing into drums Workers and Initial Accumulation Pont (IAP) Managers
POL, Fuels and Storage Tanks
Spill Prevention Control & Counter-measures (SPCC)
Managers of fuel storage tanks, mobile refuelers and those who are involved with dispensing, transferring, or handling any bulk* POL products
Stormwater Stormwater Pollution Prevention Workshop/Training
Personnel who design, install, maintain, and/or repair stormwater controls Personnel who store and handle chemicals/materials that could become contaminants in stormwater discharges; Personnel who conduct and document Permit-required monitoring, inspections, and corrective actions.
* The term “bulk” is used to identify containers that can hold equal to or greater than 55 gallons of liquid.
2A-3 NO NOTICE INSPECTIONS
All contracts performed on Robins AFB are subject to no-notice inspections by the associated regulators and officials. 78 CEG/CEIE will conduct no-notice inspections to ensure compliance with all Environmental Requirements; no-notice inspections are also conducted by federal and state regulators. Any findings from such inspections will be documented in writing and forwarded to the Contracting Officer (CO) by the inspector. The CO will follow-up with the Contractor on all findings of non-compliance reported by the inspector. A finding may result in the issuance of a work stoppage by the CO until documentation of compliance is submitted and accepted by both 78 CEG/CEIE and the CO. Self-inspections are required for processes with environmental impacts.
2A-4 SUBMITTALS AND REGULATORY COORDINATION
The Contractor and Project Designer shall work together to identify submittals that apply to each project and to provide additional submittals, notifications and approval documents as required or as directed by the Contracting Officer. Additional details are provided in subsequent sections.
Table 2A-2
SUBMITTALS CHECKLIST (CHRONOLOGICAL)
Inspector Para #
Description Submittal Timeframe Check Mark
1 Air Permit Data 9 months prior to construction start date
SUBMITTALS CHECKLIST (CHRONOLOGICAL)
2 Underground Storage Tank Removal 45 days after NTP ☐
Erosion, Sediment, and Pollution Control Plan
60 percent design package
Post Construction Stormwater Management Plan and Calculations
60 percent design package
Post Construction Operation and Maintenance Plan
60 percent design package
6 Landscaping Plan 60 percent design package
7 Solid Waste Disposal Plan 10 days prior pre-con.
conf.
8 Hazardous Waste/Hazardous Material List
Prior to starting work ☐
GA EPD Asbestos Abatement or Demolition Project Notification Form
15 days prior to starting work
10 Asbestos Removal Info As required ☐
11 Lead Compliance/Training/Sampling Prior to starting work
(At the end of the project)
12 Use of fire hydrant/penetrate water mains
Prior to start of work ☐
13 Notice of Intent – NPDES Permit 14 days prior to site work
14 Permits/Fees Copies – NPDES Permit 14 days prior to site work
Notify 78 CEG/CEIE of Digging, “Dig Permit”
Beginning of project, before digging
Special Waste Acceptance Application (SWAA)
5 days prior to dumping ☐
17 Backflow Device Location (BFD) Prior to installation ☐
18 Backflow Prevention Device Test Report
After BPD installation ☐
19 Commencement Notice Prior to dumping ☐
20 Landfill License Prior to dumping ☐
21 Waste Shipment Tracking Monthly by the 5th
Waste Management Report Landfill Receipts
Monthly by the 5th and prior to final payment
23 Refrigerant Technician Certification Prior to starting work ☐
24 Refrigerant Appliance List Within 7 days ☐
25 Refrigerant Maintenance Repair Log Within 7 days ☐
26 Refrigerant Equipment Certification Within 7 days ☐
SUBMITTALS CHECKLIST (CHRONOLOGICAL)
27 Refrigerant Purchase Documentation Within 7 days ☐
28 Generators Prior to order ☐
29 Pest Control License Prior to pest control ☐
30 Lead Compliance/Training/Sampling (Prior to starting work) At the end of the project
31 Pesticide List At end of project ☐
32 Notice of Termination – NPDES Permit After final stabilization at site
ENVIRONMENTAL REQUIREMENTS WASTE AND HAZARDOUS
MATERIAL MANAGEMENT
SECTION 2B WASTE AND HAZARDOUS MATERIAL
MANAGEMENT
2B-1 DISPOSAL OF WASTE AND EXCESS MATERIAL
The Contractor shall manage, dispose of and recycle all waste and excess materials in compliance with all Federal, State of Georgia and local laws; and follow all special methods and procedures as they apply to the different waste streams, including non-hazardous and hazardous waste materials and the full range of special waste materials and products. The Contractor shall take a proactive, responsible management role and require all Sub-Contractors, vendors, and suppliers to participate in this effort.
2B-2 DEPARTMENT OF DEFENSE ACTIVITY ADDRESS CODE (DODAAC)
ACCOUNT
Payment for regulated waste turned in to 78 CEG/CEIER for disposal will be made through either the property/building organization’s Department of Defense Activity Address Code (DODAAC) account or the Contractor’s DODAAC account (if it exists and is active/valid). Since all hazardous wastes must be disposed of through DLA-DS, a valid DODAAC is essential to prevent contract operation delays. This step must be completed prior to requesting waste containers and labels. Authorization to use the organizations DODAAC also indicates there are sufficient funds available to pay for waste disposal generated from the project.
2B-3 NON-HAZARDOUS SOLID WASTE DISPOSAL METHODS
Non-hazardous solid waste that is dispositioned for disposal shall be removed from the Base in accordance with applicable Federal, State of Georgia and local codes and requirements. It shall be broken down into individual types, i.e., asphalt, concrete, wood, brick, etc. to facilitate recycling of recovered materials. Every effort shall be made to divert waste from any landfill by reusing or recycling materials. For construction and demolition wastes, a minimum of sixty (60) percent by weight of the total project solid waste shall be diverted away from a landfill. See the Code of Federal Regulations (CFR) 261.2 for the complete legal definition non-hazardous solid waste. Direct all non-hazardous solid waste inquiries to 78 CEG/CEIEC Solid Waste Program Manager.