This is a Unified Facilities Guide Specification (UFGS) document for asphalt shingles installation and roofing materials. The specification establishes detailed requirements for mineral granule-surfaced asphalt shingles that must be self-sealing, square tab, strip, fungus-resistant, and comply with ASTM D 3018 Type I and ASTM D 3462 standards, weighing not less than 290 pounds per 100 square feet. Shingles must achieve UL 790 Class A fire resistance and UL 997 wind resistance ratings, and be Energy Star qualified unless otherwise specified. The specification requires a 30-year manufacturer's warranty running directly to the Government and a 5-year contractor workmanship warranty with repairs required within 72 hours of notification. Supporting materials include asphalt-saturated felt underlayment conforming to ASTM D 4869 or ASTM D 226/D 226M Type II number 30, self-adhering leak barrier underlayment per ASTM D 1970, self-adhering rubberized asphaltic membrane at minimum 40 mils thick for eaves flashing, corrosion-resistant nails, asphalt roof cement, and asphalt primer.

The execution section provides comprehensive installation procedures including underlayment application with specific lap requirements based on roof slope (minimum 2-inch head laps for slopes 4 inches per foot and greater; 19-inch head laps for slopes between 2 and 4 inches per foot), starter strip installation at eaves, shingle courses with 5-inch nominal exposure and staggered joints, and detailed specifications for hips, ridges, valleys, and flashing installations. The specification references EPA recycled/recovered materials requirements and incorporates related sections for flashing and sheet metal (Section 07 60 00), rough carpentry (Section 06 10 00), and submittal procedures (Section 01 33 00). Materials must be delivered in manufacturer's unopened bundles and stored according to manufacturer instructions, with roofing felt maintained at minimum 50 degrees Fahrenheit for 24 hours prior to installation.

View the file

Other files

File Type Posted
Bid_Items.pdf PDF
RFI RESPONSES.docx DOCX document
Buildings_REV1.pdf PDF
Buildings.pdf PDF
Other_Roof_Warranties.pdf PDF
UFGS_07_51_13-Built-Up_Asphalt_Roofing.docx DOCX document
25PW018_SOW.pdf PDF
UFGS_07_32_14-Clay_Tile_Roofing_Replacement_or_Repair.docx DOCX document
07_WVA_01-1-Metal_Roofing.docx DOCX document
07_WVA_01-3-Membrane_Roofing_(EPDM).docx DOCX document
07_WVA_01-2-Membrane_Roofing_(TPO).docx DOCX document
Solicitation - W911PT26QA051 Professional Appearance.pdf PDF
Flat_Roof_Warranties.pdf PDF
UFGS_07_60_00-Flashing_and_Sheet_Metal.docx DOCX document
UFGS_07_22_00-Roof_and_Deck_Insulation.docx DOCX document
WVA_SITEPLAN_Flat_Roofs.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION 07 31 13

ASPHALT SHINGLES

05/11

PART 1 GENERAL

1.1 REFERENCES

The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only.

ASTM INTERNATIONAL (ASTM)

ASTM
D
1970

(2009) Self-Adhering Polymer Modified Bituminous Sheet Materials Used as Steep Roofing Underlayment for Ice Dam Protection

ASTM
D
226/D
226M
(2009) Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing
ASTM
D
4586

(2007) Asphalt Roof Cement, Asbestos-Free

ASTM
D
4869

(2005e1) Standard Specification for Asphalt-Saturated Organic Felt Underlayment Used in Steep Slope Roofing

ASTM
D
6380

(2003; R 2009) Standard Specification for Asphalt Roll Roofing (Organic Felt)

ASTM D41/D41M (2011) Asphalt Primer Used in Roofing, Dampproofing, and Waterproofing

1.2 DEFINITIONS

1.2.1 Top Lap

That portion of shingle overlapping shingle in course below.

1.2.2 Head Lap

The triple coverage portion of top lap which is the shortest distance from the butt edge of an overlapping shingle to the upper edge of a shingle in the second course below.

1.2.3 Exposure

That portion of a shingle exposed to the weather after installation.

1.3 SUBMITTALS

Government approval is required for submittals with a "G" designation; submittals not having a "G" designation are for information only. When used, a designation following the "G" designation identifies the office that will review the submittal for the Government. The following shall be submitted in accordance with Section 01 33 00 SUBMITTAL PROCEDURES:

SD-03 Product Data

Submit for any roofing material containing fiber composite containing felt or plastic and that is listed in EPA CPG, manufacturer documentation indicating type of recovered material and the percentage of such material that is recovered (based on weight of materials in the insulating core). Alternately, submit a written justification of non-use per Section 01 62 35 RECYCLED/RECOVERED MATERIALS.

Shingles

Submit data including type, weight, class, UL labels, and special types of underlayment and eave flashing.

For Energy Star Shingles, submit documentation demonstrating that the product is Energy Star qualified.

SD-04 Samples

Shingles; G

Full shingle sample and manufacturer's standard size samples of materials and products requiring color or finish selection.

SD-08 Manufacturer's Instructions Application

1.4 DELIVERY AND STORAGE

Deliver materials in the manufacturer's unopened bundles and containers bearing the manufacturer's brand name. Keep materials dry, completely covered, and protected from the weather. Store according to manufacturer's written instructions. Roll goods shall be stored on end in an upright position or in accordance with manufacturer's recommendations. Immediately before laying, roofing felt shall be stored for 24 hours in an area maintained at a temperature not lower than 50 degrees F.

1.5 WARRANTIES

Warranties shall begin on the date of Government acceptance of the work.

1.5.1 Manufacturer's Warranty

Furnish the asphalt shingle manufacturer's standard 30 year warranty for the asphalt shingles. The warranty shall run directly to the Government.

1.5.2 Contractor's Warranty

The Contractor shall warrant for 5 years that the asphalt shingle roofing system, as installed, is free from defects in workmanship. When repairs due to defective workmanship are required during the Contractor's warranty period, the Contractor shall make such repairs within 72 hours of notification. When repairs are not performed within the specified time, emergency repairs performed by others will not void the warranty.

PART 2 PRODUCTS

2.1 MATERIALS

Materials shall conform to EPA requirements in accordance with Section 01 62 35 RECYCLED/RECOVERED MATERIALS.

2.1.1 Shingles

Mineral granule-surfaced asphalt shingles, self-sealing, square tab, strip, fungus-resistant. ASTM D 3018, Type I, and ASTM D 3462, architectural shingles weighing not less than 290 pounds per 100 square feet. Shingles shall meet the fire resistance requirements of UL 790 for Class A and the wind resistance requirements of UL 997. Shingles shall be Energy Star qualified unless non-Energy Star shingles are specified by the designer or as stated in the Delivery or Task Order. Color shall be as selected by the Contracting Officer.

2.1.2 Mineral-Surfaced Asphalt Roll Roofing ASTM D 6380.

2.1.3 Smooth-Surfaced Asphalt Roll Roofing ASTM D 6380, Type II.

2.1.4 Underlayment

Asphalt-saturated felt conforming to ASTM D 4869 or ASTM D 226/D 226M, Type II, number 30, without perforations or other material specified by the shingle manufacturer for use as underlayment.

2.1.4.1 Leak Barrier Underlayment

Self-adhering leak barrier or ice dam underlayment shall comply with ASTM D 1970 for seal ability around nails.

2.1.5 Self-Adhering Membrane

Self-adhering rubberized asphaltic membrane, a minimum of 40 mils thick, and recommended by the shingle manufacturer for use as eaves flashing.

2.1.6 Nails for Applying Shingles and Asphalt-Saturated Felt

Aluminum or hot-dipped galvanized steel or equivalent corrosion resistant with sharp points and flat heads 3/8 to 7/16 inch in diameter. Shank diameter of nails shall be a minimum of 0.105 inch and a maximum of 0.135 inch with garb or otherwise deformed for added pull-out resistance. Nails shall be long enough to penetrate completely through or extend a minimum of 3/4 inch into roof deck, whichever is less, when driven through materials to be fastened.

2.1.7 Asphalt Roof Cement ASTM D 4586, Type II.

2.1.8 Asphalt Primer ASTM D41/D41M.

2.1.9 Ventilators

2.1.9.1 Nailable Plastic Shingle Over Type Ridge Vents

Ridge vents shall be constructed of UV stabilized nailable rigid polypropylene material, approximately 1 foot wide and 1 inch thick, and shall be in 4 foot long interlocking sections with self-aligning ends or corrugated polyethylene rigid roll or rigid strip ridge vent with aluminum wind deflectors on each side. Vents shall be designed to prevent infiltration of insects, rain, and snow.

2.1.9.2 Nailable Mesh Shingle Over Type Ridge Vents

Ridge vents shall be constructed of UV stabilized nailable polyester mesh material, approximately one foot wide. Vents shall be designed to prevent infiltration of insects, rain, and snow.

PART 3 EXECUTION

3.1 VERIFICATION OF CONDITIONS

Ensure that roof deck is smooth, clean, dry, and without loose knots. Roof surfaces shall be firm and free from loose boards, large cracks, and projecting ends that might damage the roofing. Vents and other projections through roofs shall be properly flashed and secured in position, and projecting nails shall be driven flush with the deck.

3.2 SURFACE PREPARATION

Cover knotholes and cracks with sheet metal nailed securely to sheathing. Flash and secure vents and other roof projections, and drive projecting nails firmly home.

3.3 APPLICATION

Apply roofing materials as specified herein unless specified or recommended otherwise by shingle manufacturer's written instructions.

3.3.1 Underlayment

Provide for roof slopes 4 inches per foot and greater. Apply one layer of shingle underlayment to roof deck. Lay underlayment parallel to roof eaves, starting at eaves. Provide minimum 2 inch head laps, 4 inch end laps, and 6 inch laps from both sides over hips and ridges. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches.

Provide for roof slopes between 2 inches per foot and 4 inches per foot. Apply two layers to roof deck. Provide a 19 inch wide strip as starter sheet to maintain specified number of layers throughout roof. Lay parallel to eaves, starting at eaves. Provide minimum 19 inch head laps, 6 inch laps from both sides over hips and ridges, and 12 inch end laps in the field of the roof. Nail sufficiently to hold until shingles are applied. Turn up vertical surfaces a minimum of 4 inches. When a self-adhering membrane is used for eave flashing, start underlayment from upper edge of eave flashing.

3.3.2 Drip Edges

Provide metal drip edges as specified in Section 07 60 00 FLASHING AND SHEET METAL applied directly on the wood deck at eaves and over the underlayment at rakes. Extend back from edge of deck a minimum of 3 inches, and secure with nails spaced a maximum of 10 inches o.c. along inner edge.

3.3.3 Starter Strip

Apply starter strip at eaves, using 9 inch wide strip of mineral-surfaced roll roofing of a color to match shingles. Optionally, use a row of shingles with tabs removed and trimmed to ensure that joints are not exposed at shingle cutouts. Apply starter strip along eaves, overlaying and finishing even with lower edge of eave flashing strip; fasten in a line parallel to and 3 to 4 inches above eave edge. Place nails so top of nail is not exposed in cutouts of first course of shingles. When roll roofing is provided, seal tabs of first course of shingles with asphalt roof cement.

Fasten with 6 nails per strip of shingles or space nails at 6 inches o.c. for roll roofing. Seal tabs of first course of shingles with asphalt roof cement as specified below.

3.3.4 Shingle Courses

Start first course with full shingle, and apply succeeding courses with joints staggered at thirds or halves. Butt-end joints of shingles shall not align vertically more often than every fourth course. Apply shingle courses as follows:

a. Fastening: Do not drive fasteners into or above the factory-applied adhesive unless adhesive is located 5/8 inch or closer to top of cutouts. Place fasteners so they are concealed by shingle top lap and penetrate the head lap.

b. Shingles applied with nails: Nominal 5 inch exposure. Apply each shingle with minimum of four nails. Place one nail one inch from each end, and evenly space nails on a horizontal line a minimum of 5/8 inch above top of cutouts. Cement each tab with one spot of asphalt roof cement placed one to 2 inches from bottom edge of shingle.

c. Nailing: Apply shingles with nominal 5 inch exposure. Apply each shingle with minimum of six nails. Place one nail one inch from each end and one nail on each side of each cutout, on a horizontal line 5/8 inch above cutouts.

3.3.5 Hips and Ridges

Form with 9 by 12 inch individual shingles or with 12 by 12 inch shingles cut from 12 by 36 inch strip shingles. Bend shingles lengthwise down center with equal exposure on each side of hip or ridge. Lap shingles to provide a maximum 5 inch exposure, and nail each side in unexposed area 5-1/2 inches from butt and one inch in from edge.

3.3.6 Valleys

3.3.6.1 Closed Cut Valleys

Provide 36 inch wide valley lining of single layer of smooth-surfaced or mineral-surfaced roll roofing, with mineral-surface facing down, for full length of valley as follows:

a. Center lining in valley over underlayment. Provide minimum 12 inch end laps in the lining and seal laps with asphalt roof cement. Fasten lining to hold it in place until shingles are applied.

b. Apply first regular course of shingles along eaves of one of the intersecting roof planes and across valley. Extend course at least 12 inches onto adjoining roof.

c. Apply succeeding courses in same manner as first course, extending across valley and onto adjoining roof.

d. Press shingles tightly into valley and nail in normal manner, except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of each shingle crossing valley.

e. Apply shingles on the adjoining roof plane, starting along eaves and across valley onto previously applied shingles. Trim overlapping courses back to a line parallel to and a minimum of 2 inches back from valley centerline.

f. Trim one inch on a 45 degree angle from upper corner of each end shingle. Embed end shingles in a 3 inch wide band of asphalt roof cement.

3.3.6.2 Woven Valleys

Provide valley lining as specified for closed cut valley. Lay valley shingles over lining by either of the following methods:

a. Method I: Apply regular shingles on both roofs simultaneously. Weave each course in turn over the valley. Lay the first regular course of shingles along eaves of roof up to and over valley. Extend course along adjoining roof deck at least 12 inches. Carry first regular course of shingles of adjoining roof over valley on top of previously applied shingles. Lay succeeding courses alternately, weaving valley shingles over each other for full length of valley.

b. Method II: Apply regular shingles on each roof surface separately to a line about 3 feet from center of valley, and weave valley shingles in place later, as specified for Method I.

In following either method, press shingles tightly into valley, and fasten in normal manner; except apply nails not closer than 6 inches to valley centerline, and apply additional nail in top corner of terminal shingle on both sides of valley.

3.3.6.3 Open Roll Roofing Valleys

Provide 18 inch wide strip of mineral-surfaced asphalt roll roofing, of a color to blend with asphalt shingles, and with granular surface facing down, for the full length of valley as follows:

a. Center roll roofing strip in valley over underlayment. Lay centered in valley over felt underlayment and with granular face down. Nail strip only enough to hold in place. Apply nails in rows one inch from each edge. As fastening along second side proceeds, press strip firmly into valley.

b. Center second strip 36 inches wide in valley and lay it over first strip with granular face exposed and nail as specified for 18 inch strip.

c. Before applying roofing shingles, snap two chalk lines for full length of valley. Locate each line 3 inches from centerline of valley at top, and increase width between lines by one inch for each 8 feet of valley length, continuing to eaves.

d. Apply a 2 inch band of asphalt roof cement along each edge of 36 inch strip from edge to chalk line. Cut regular shingle courses true along valley chalk lines, and nail in normal manner.

3.3.6.4 Open Sheet Metal Valleys

Sheet metal flashing for valleys is specified in Section 07 60 00 FLASHING AND SHEET METAL. Before installing and fastening flashing in place with metal cleats:

a. Install single layer of 36 inch wide, asphalt-saturated felt, centered on valley and extending entire length of valley over felt underlayment.

b. Cut regular shingle courses on each roof on true line 2 inches from valley centerline at top of valley, and increase width between lines by one inch for each 8 feet of valley length, continuing to eaves.

c. Apply 2 inch band of asphalt roof cement over flashing, along and underside of shingles adjoining valley.

d. Press shingles tightly into cement, and nail in normal manner, except apply nails not closer than 5 inches to valley centerline. Do not drive nails through valley flashing.

e. Provide a 4 inch band of asphalt roof cement for fastening shingle tabs down along open metal gutters.

3.3.7 Flashing

3.3.7.1 Eave Flashing

Provide for roof slopes 4 inches per foot and greater. Provide eave flashing strips consisting of smooth-surfaced roll roofing. Flashing strips shall overhang metal drip edge 1/4 inch to 3/8 inch and extend up the slope far enough to cover a point 12 inches inside interior face of exterior wall.

Where overhangs require flashings wider than 36 inches, locate laps outside exterior wall face. Laps shall be at least 2 inches wide and cemented with asphalt roof cement over entire length of lap. Lap end 12 inches and cement.

Provide for roof slopes between 2 inches per foot and 4 inches per foot. Provide either of the following types of eave flashing:

a. From the eaves to a point 24 inches inside interior wall line, apply solid coating of asphalt roof cement between overlapping layers of underlayment. Spread cement to a uniform thickness at rate of 2 gallons per 100 square feet of cemented roof area.

b. From the eaves to a point 24 inches inside interior wall line, apply one layer of self-adhering membrane. Follow membrane manufacturers printed installation instructions.

3.3.7.2 Stepped Flashing

For sloping roofs which abut vertical surfaces, provide stepped metal flashing as specified in Section 07 60 00 FLASHING AND SHEET METAL.

3.3.7.3 Vent and Stack Flashing

Apply shingles up to point where vent or stack pipe projects through roof, and cut nearest shingle to fit around pipe. Before applying shingles beyond pipe, prepare flange of metal pipe vent flashing as specified in Section 07 60 00 FLASHING AND SHEET METAL, by applying a 1/8 inch thick coating of asphalt roof cement on bottom side of flashing flange. Slip flashing collar and flange over pipe, and set coated flange in 1/16 inch coating of asphalt roof cement. After applying flashing flange, continue shingling up roof. Lap lower part of flange over shingles. Overlap flange with side and upper shingles. Fit shingles around pipe, and embed in 1/16 inch thick coating of asphalt roof cement where shingles overlay flange.

3.3.7.4 Chimney Flashing

Provide treated wood crickets as specified in Section 06 10 00 ROUGH CARPENTRY. Provide metal base and counter flashing as specified in Section 07 60 00 FLASHING AND SHEET METAL. Uniformly coat masonry surfaces which are to receive flashing with asphalt primer applied at rate of one gallon per 100 square feet. Apply shingles over underlayment up to front face of chimney. Apply metal front base flashing with lower section extending at least 4 inches over shingles. Set base flashing in a 1/16 inch coating of asphalt roof cement on shingles and chimney face. Apply metal step flashing at sides in a coating of asphalt roof cement. Embed end shingles in each course that overlaps step flashing with asphalt roof cement. Apply metal rear base flashing over cricket and back of chimney in coating of asphalt roof cement. Apply end shingles in each course up to cricket, and cement in place. Lap base flashing minimum of 3 inches with metal counter flashing.

-- End of Section --