UCB001321-12.00-Drawings.pdf

PDF 13 MB Posted

Attached to
CU Boulder-UCB001321-SITE-Lot 548 Reconstruction
Solicitation number
Notice No. 25-47
Issued by
Boulder County, Colorado

About this file

This document is a set of engineering and construction drawings for the University of Colorado Boulder's Lot 548 Reconstruction project, prepared by Harris Kocher Smith, a professional engineering firm. The project involves a complete removal and replacement of parking lot 548, spanning approximately 70,000 square feet on the university's campus in Boulder, Colorado. The drawings, dated February 9, 2023, and issued for bid, include 27 detailed sheets covering various aspects of the project such as existing site plans, removal plans, paving plans, geometric layouts, signing and striping plans, traffic control plans, water quality details, and stormwater management plans.

The project incorporates several technical specifications and environmental considerations, including Buy Clean Colorado requirements for embodied carbon limits in materials like asphalt, concrete, and reinforced steel. The drawings specify construction details such as 12-inch scarified and re-compacted subgrade, 6-inch CDOT Class 6 asphalt base course, and specific stormwater management and erosion control measures. The design includes provisions for reserved parking spaces, with 5 standard reserved parking signs and 1 van accessible parking sign. The project also emphasizes compliance with University of Colorado Boulder facility standards, international building codes, and various environmental and safety regulations.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Fil ep ath : K

:\2

5\E

NG

IN

EE

RI

NG

\C

D\

CD

CO

VE

R

SH

EE

T

LO

T

CO

MB

IN

ED

.D

W G

La yo ut:

LA

YO

UT

3 X

RE

Fs

: e -b as e[U

], e -u til, p-ba se

Pl ott ed : T

HU

/09 /23

3:

:36 P

B y:

Ry an

W alk er

NO

C

HA

NG

ES

A

RE

T O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G

W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

Know what's below.

Call before you dig.

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

ISSUE DATE:

DATE REVISION COMMENTS

PROJECT #: UCB00075102-09-2023

02-09-2023 ISSUED FOR BID

UCB000751-SITE-LOTS 544 & 548 - REBUILD

BOULDER, CO 80303

GENERAL NOTES:

1. ANY WORK PERFORMED OUTSIDE THE LIMITS OF DISTURBANCE SHALL BE AT THE CONTRACTOR'S EXPENSE, UNLESS THE WORK IS SPECIFICALLY AUTHORIZED IN ADVANCE BY THE ENGINEER. ANY PROPERTY

OUTSIDE THE LIMITS OF DISTURBANCE THAT IS DAMAGED BY ANY ACT OR OMISSION OF THE CONTRACTOR SHALL BE RESTORED TO ITS ORIGINAL CONDITION AT THE CONTRACTOR'S EXPENSE.

2. PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ELEVATIONS AND LOCATIONS OF EXISTING UTILITIES DESIGNATED ON THE PLANS. VERIFICATION OF THE ELEVATIONS AND LOCATIONS SHALL BE BY POT

HOLES. REPORT ANY DISCREPANCIES IMMEDIATELY TO THE OWNER PRIOR TO COMMENCING CONSTRUCTION.

3. WHERE THE PLANS CALL FOR MATERIAL TO BE SALVAGED OR RESET, IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT THE MATERIAL FROM DAMAGE THROUGHOUT THE DURATION OF THE

CONTRACT. ANY MATERIAL DESIGNATED TO BE SALVAGED OR RESET THAT IS DAMAGED THROUGH ANY ACT OR OMISSION OF THE CONTRACTOR SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE.

4. THE EXISTING UNDERGROUND UTILITIES SHOWN ON THE PLANS REPRESENT THE BEST INFORMATION AVAILABLE AND ARE SHOWN FOR INFORMATION ONLY. THE CONTRACTOR MUST TAKE SOLE RESPONSIBILITY

FOR DAMAGE TO ANY UTILITY LINE ENCOUNTERED WHETHER OR NOT SHOWN ON THE DRAWINGS AND WHETHER OR NOT ACTUALLY LOCATED IN THE FIELD AS SHOWN ON THE DRAWINGS. THE CONTRACTOR SHALL NOTIFY THE UTILITY COMPANIES FOR FIELD LOCATIONS PRIOR TO THE START OF CONSTRUCTION.

5. ALL EXISTING UTILITIES AND LANDSCAPING ARE TO REMAIN IN PLACE UNLESS OTHERWISE INDICATED ON THE PLANS. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO PROTECT AND SUPPORT EXISTING

UTILITIES AND LANDSCAPING AS NECESSARY TO ACCOMPLISH THE WORK.

6. THE CONTRACTOR SHALL PROVIDE FOR SANITARY AND STORM FLOWS TO BE MAINTAINED AT ALL TIMES DURING CONSTRUCTION.

7. THE CONTRACTOR SHALL FIELD VERIFY THE LOCATION, ELEVATION AND SIZE OF EXISTING PIPES THAT ARE TO BE CONNECTED TO NEW PIPES OR STRUCTURES. REPORT ANY DISCREPANCIES IMMEDIATELY TO THE

OWNER PRIOR TO COMMENCING CONSTRUCTION.

8. ALL MATERIALS AND WORKMANSHIP SHALL CONFORM TO THE SPECIFICATIONS IN THE PROJECT MANUAL.

9. A QUALIFIED LANDSCAPE CONTRACTOR SHALL RESTORE ALL LANDSCAPING AND IRRIGATION TO ORIGINAL CONDITION IN ACCORDANCE WITH THE PROJECT MANUAL. ALL VEGETATED AREAS DISTURBED BY THE

WORK SHALL BE RESTORED WITH SOD UNLESS OTHERWISE NOTED.

10. IF HEAT GUNS, SOLDERING, BRAZING, WELDING, GRINDING, POWDER DRIVEN STUDS, METAL CUTTING, USING POWER TOOLS OR OTHER ACTIVITIES INVOLVING FLAMES OR SPARKS ARE REQUIRED FOR

CONSTRUCTION, THE CONTRACTOR SHALL OBTAIN A REQUIRED HOT WORK PERMIT. HOT WORK PERMIT FORMS ARE AVAILABLE FROM CU PROJECT MANAGERS, FACILITIES MANAGEMENT OFFICE OF PLANNING, DESIGN AND CONSTRUCTION AND THE FLS WEB SITE (HTTP://FM.COLORADO.EDU/FIRESAFETY/).

11. IF ANY UNPLANNED WATER OUTAGES SUCH AS A LEAKING OR RUPTURED PIPE OCCURS DURING CONSTRUCTION, THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE FIRE AND LIFE-SAFETY GROUP AND PIPE

TRADES SHOP OF FACILITIES MANAGEMENT.

12. STAGING AREAS FOR EQUIPMENT AND/OR MATERIALS ARE MINIMAL AND ARE SHOWN ON THE PLANS. CONTRACTOR SHALL ACQUIRE APPROVAL OF ANY ADDITIONAL STAGING AREAS FROM UCB PRIOR TO

CONSTRUCTION.

13. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL LANDSCAPING IN THE AREA OF THE PROJECT. THE CONTRACTOR SHALL KEEP TO A MINIMUM THE DISTURBANCE OF ANY AND ALL LANDSCAPING. ANY LANDSCAPING DAMAGED BY THE CONTRACTOR SHALL BE REPAIRED AND/OR REPLACED TO ITS ORIGINAL CONDITION WITHOUT ADDITIONAL COST TO THE OWNER. TREES SHALL BE PROTECTED AT THE DRIP LINE BY CONSTRUCTING FENCING AND NO VEHICLE, MATERIAL OR EQUIPMENT SHALL BE STORED WITHIN THIS FENCED AREA. (DRIP LINE - AFTER A RAIN STORM, THE SURFACE AREA UNDERNEATH THE

TREE WHERE WATER DRIPS OFF).

14. THE CONTRACTOR MUST FOLLOW COLORADO STORM WATER CONSTRUCTION STANDARDS IN PREVENTING/CONTROLLING ANY POTENTIAL SANITARY SEWAGE RELEASE INTO THE ENVIRONMENT INCLUDING PREPARATION OF A STORMWATER MANAGEMENT PLAN AND ALL APPLICABLE LOCAL, STATE, AND FEDERAL PERMITS REQUIRED.

15. THE CONTRACTOR SHALL COMPLY WITH ALL APPLICABLE OSHA PROGRAMS, INCLUDING BUT NOT LIMITED TO: CONFINED SPACE ENTRY, ASBESTOS, LOCKOUT-TAGOUT, HOT WORK, RESPIRATORY PROTECTION, TRENCHING AND SHORING, AND HAZCOM.

16. THE CONTRACTOR MUST PROTECT STORM SEWER DRAINS (INCLUDING FLOOR DRAINS), MANHOLES, INLET, TRENCHES AND SURFACE RUN-OFF DRAINAGES, ROOF DRAINS, ETC. FROM DISCHARGES OF PROCESS WATER, SEDIMENT, PETROLEUM RESIDUES, AND ALL OTHER CONTAMINANTS. DISCHARGES OF CONTAMINATED OF PROCESS WATER MAY ONLY BE PERMITTED INTO THE SANITARY SEWER IF AUTHORIZED BY UCB

EH&S.

17. THE CONTRACTOR MUST COMPLY WITH UCB DUST CONTROL POLICY TO PREVENT ODORS, VAPORS, DUST, ETC. FROM IMPACTING OTHER AREAS (INCLUDING ADJACENT BUILDINGS) THROUGH OPENINGS, HVAC SYSTEMS AND AIR INTAKES. IF CONSTRUCTION GENERATES DUST OR FUMES INSIDE A BUILDING, THE CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PREVENT THE NUISANCE ACTUATION OF ANY

NEARBY SMOKE OR DUCT PROTECTORS AS DIRECTED BY THE UCB FIRE ALARM SHOP.

18. ANY DISRUPTION OF ELECTRICAL SERVICE CAUSED BY THE CONTRACTOR MUST BE RESTORED IMMEDIATELY. THERE ARE ELECTRICAL LINES SERVING OUTSIDE LIGHTING THAT PROVIDE SECURITY AND SAFETY FOR THE CAMPUS THAT MUST NOT HAVE DISRUPTION OF SERVICE. ALL RESTORED WORK MUST BE INSPECTED PRIOR TO BURIAL.

19. A. BACKFILL MATERIAL, ROAD BASE MATERIAL, ASPHALT, AND COMPACTION TO FOLLOW UCB STANDARDS FOR PARKING LOTS B. CONTRACTOR SHALL ERECT DETOURS FOR PEDESTRIANS AND BICYCLIST WHEN CLOSING OR IMPACTING SIDEWALKS AND BIKE PATHS C. STAGING AREAS SHALL BE DEFINED BY TEMPORARY CHAIN LINK FENCE OR CONSTRUCTION FENCE.

22. SAW-CUT SLURRY, SEDIMENT/SOILS, AND ALL OTHER MATERIALS AND PROCESS WATERS MUST BE CAPTURED FOR PROPER DISPOSAL AND NOT ALLOWED TO BE DISCHARGED TO STORM DRAINS, GUTTERS, PARKING LOTS, OR OTHER STORM CONVEYANCES. USE PROPER BEST MANAGEMENT PRACTICES (BMP'S) TO PROTECT FROM CONTAMINATED RUN-OFF THAT COULD END UP IN BOULDER CREEK; THE FOLLOWING WEB SITE HAS EXAMPLES THAT CAN BE REVIEWED AS APPLICABLE; http://pacepartners.com/municipal-operations

23. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE ACCEPTANCE AND CONTROL OF ALL FLOWS INCLUDING DRAINAGE FLOWS, AND GROUNDWATER FLOWS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO TOPSOIL, AND LOSS OF SEED CAUSED BY FLOWS UNTIL THE PROJECT IS ACCEPTED BY THE OWNER.

24. THE CONTRACTOR SHALL MAKE ALL NECESSARY PARKING ARRANGEMENTS A MINIMUM OF 10 DAYS IN ADVANCE TO THE START OF CONSTRUCTION.

THE CONTRACTOR'S WORK SHALL BE IN CONFORMANCE WITH THE ABOVE CODESAND CONTRACTOR SHALL

OBTAIN ALL NECESSARY PERMITTING PRIOR TO WORK

GOVERNING CODES FOR THIS PROJECT:

1. UNIVERSITY OF COLORADO BOULDER FACILITY STANDARDS, AS MODIFIED FOR THIS PROJECT.

2. THE 2018 EDITION OF THE INTERNATION BUILDING CODE (IBC)

(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM AS FOLLOWS: CHAPTER 1 AS AMENDED, CHAPTERS 2-35 AND APPENDICES C AND I)

3. THE 2018 EDITION OF THE INTERNATIONAL MECHANICAL CODE (IMC)

(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM AS FOLLOWS: CHAPTERS 2-15 AND APPENDIX A)

4. THE 2018 EDITION OF THE INTERNATIONAL ENERGY CONSERVATION CODE (IECC)

(AS ADOPTED BY THE COLORADO STATE BUILDINGS PROGRAM)

5. THE 2017 EDITION OF THE NATIONAL ELECTRICAL CODE (NEC)

(AS ADOPTED BY THE COLORADO STATE ELECTRICAL BOARD) EFFECTIVE JULY 1, 2017

6. THE NATIONAL FIRE PROTECTION ASSOCIATION STANDARDS (NFPA)

(AS ADOPTED BY THE DEPARTMENT OF PUBLIC SAFETY/DIVISION OF FIRE PREVENTION AND CONTROL AS APPLICABLE)

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

RK

A.

SHEET INDEX

Sheet Number Sheet Title

1 COVER SHEET

2 QUANTITY ESTIMATE

3 LOT 544 - EXISTING SITE PLAN

4 LOT 544 - REMOVAL PLAN

5 LOT 544 - PAVING PLAN

6 LOT 544 - GEOMETRIC LAYOUT

7 LOT 544 - SIGNING & STRIPING PLAN

8 LOT 544 - TRAFFIC CONTROL PLAN 1

9 LOT 544 - TRAFFIC CONTROL PLAN 2

10 LOT 544 - WATER QUALITY

11 LOT 544 - SWMP-INITIAL

12 LOT 544 - SWMP-INTERIM

13 LOT 544 - SWMP-FINAL

14 LOT 548 - EXISITING SITE PLAN

15 LOT 548 - REMOVAL PLAN

16 LOT 548 - PAVING PLAN

17 LOT 548 - GEOMETRIC LAYOUT

18 LOT 548 - SIGNING & STRIPING PLAN

19 LOT 548 - TRAFFIC CONTROL PLAN

20 LOT 548 - WATER QUALITY

21 LOT 548 - SWMP-INITIAL

22 LOT 548 - SWMP-INTERIM

23 LOT 548 - SWMP-FINAL

24 ADS DETAILS

25 TRANSPORTATION DETAILS

26 SWMP DETAILS

27 SWMP DETAILS

ALREADY

COMPLETE

UCB001321-SITE-LOT 548 RECONSTRUCTION

LEGEND

SHEET NUMBER

ISSUE DATE:

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

XH

IB

IT

\E

XI

ST

IN

G

CO

ND

IT

IO

NS

.D W

G

LA

YO

UT

: L

OT

5 X

RE

Fs : e

-b as e, e-uti l, k ey ma p5

, k ey ma p5

, k ey ma p7

PL

OT

TE

D:

T

HU

/09

/23 3:

:55

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - EXISITING SITE PLAN 14

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

NO

C

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

CONTROL POINT TABULATION

POINT# NORTHING EASTING ELEVATION DESCRIPTION

700 247437.88 72055.64 5260.33 CUT X

701 247440.07 72254.63 5256.40 MAG NAIL

702 246981.49 72171.45 5264.51 #5 REBAR W/ GREEN PLASTIC CAP STAMPED "CONTROL POINT"

703 247155.91 71846.45 5263.79 CUT X

704 246989.96 71754.32 5264.63 CUT X

706 247588.56 72349.51 5255.69 X

800 246101.20 71652.33 5271.86 #5 REBAR W/ GREEN PLASTIC CAP STAMPED "CONTROL POINT"

801 246374.41 71647.03 5266.32 MAG NAIL

802 246397.44 71444.78 5268.04 MAG NAIL

803 246140.79 71451.73 5271.40 MAG NAIL

900 252916.26 71893.48 5256.03 MAG NAIL

901 253274.13 71889.76 5257.29 MAG NAIL

902 253271.66 72159.90 5255.31 MAG NAIL

903 252953.86 72177.53 5255.12 BARE #5 REBAR

BENCHMARK 247649.46 70532.97 5264.69 3.5" BRASS DISC - SEE NOTE #3

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

NOTES:

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

RK

A.

ISSUE DATE:

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\54 8 R

EM

OV

AL

P

LA

N.

DW

G

LA

YO

UT

: L

AY

OU

T1 5 X

RE

Fs

: d rco g i ma ge ry ap rro x[U e-ba se , e

-u til, ke ym ap

8, p-ba se

[U

PL

OT

TE

D:

T

HU

/09

/23 3:

:59

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - REMOVAL PLAN 15

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\54 8 P

AV

IN

G

PL

AN

.D

W G

LA

YO

UT

: L

AY

OU

T1 2 X

RE

Fs

: k ey ma p5

, p

-b as e

PL

OT

TE

D:

T

HU

/09 /23

3:

:04 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - PAVING PLAN 16

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

RK

A.

SEE BUY CLEAN COLORADO

REQUIREMENTS IN BCCO TABLE

SEE BUY CLEAN COLORADO

REQUIREMENTS IN BCCO TABLE

Provide a Type III Product-Specific Environmental Product Declaration (EPD) that documents compliance with the following Embodied Carbon Limits:

Asphalt and Asphalt Mixtures: 85 kg CO2 eq / metric ton

Ready Mix Concrete: dependent on concrete strength 4000 PSI: 301 kg CO2 eq / m3

Reinforced Steel: 1030 kg CO2 eq / metric ton

Eligible product-specific EPDs must reference the associated Product Category Rule (PCR), indicate third-party verification (Type III), and reference all ISO Standards (ISO 14025:2006, ISO 14040:2006, and ISO 14044:2006).

BUY CLEAN COLORADO GWP LIMITS PER 2025

OSA UPDATED LIMITS

SEE BUY CLEAN COLORADO

REQUIREMENTS IN BCCO TABLE

SEE BUY CLEAN COLORADO

REQUIREMENTS IN BCCO TABLE

6" CDOT CLASS 6

ASPHALT BASE COURSE, OR

ALTERNATE: CRUSHED CONCRETE

12" SCARIFY, AND

RE-COMPACTED SUBGRADE

12" SCARIFY, AND

RE-COMPACTED SUBGRADE

6" CDOT CLASS 6

ASPHALT BASE COURSE, OR

ALTERNATE: CRUSHED CONCRETE

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\54 8 G

EO

ME

TR

IC

LA

YO

UT

.D

W G

LA

YO

UT

: L

AY

OU

T1 4 X

RE

Fs

: e -b as e[U e-uti l, k ey ma p5

, p -b as e

PL

OT

TE

D:

T

HU

/09

/23 3:

:10

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - GEOMETRIC LAYOUT 17

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

SHEET NUMBER

ISSUE DATE:

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\54 8 S

IG

NI

NG

S

TR

IP

IN

G

PL

AN

.D

W G

LA

YO

UT

: S

IG

NI

NG

S

TR

IP

IN

G

PL

AN

3 X

RE

Fs

: e -b as e, ke ym ap

8, p-ba se

PL

OT

TE

D:

T

HU

/09

/23 3:

:14

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - SIGNING & STRIPING PLAN 18

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

BSL

MEK

BSL

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

SUMMARY OF PAVEMENT MARKING QUANTITIES

MATERIAL COLOR QUANTITY (GALLONS)

LATEX WHITE 25.70

LATEX BLUE 0.51

TABULATION OF SIGNS

SIGN CODE LEGEND SIGN PANEL SIZE (IN.) QUANTITY

R7-8 RESERVED PARKING 12" X 18" 5

R7-8a VAN ACCESSIBLE 12" X 6" 1

RESERVED

PARKING

R7-8 (12"x18")

RESERVED

PARKING

VAN

ACCESSIBLE

R7-8 (12"x18")

R7-8a (12"x6")

1 2

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

RK

A.

TYPICAL PARKING STALL DETAIL

HORIZONTAL SCALE: 1" = 10'

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\54 8 T

RA

FF

IC

C

ON

TR

OL

P

LA

N.

DW

G

LA

YO

UT

: T

RA

FF

IC

C

ON

TR

OL

P

LA

N

3 X

RE

Fs : e

-b as e, ke ym ap

8, p-ba se

PL

OT

TE

D:

T

HU

/09 /23

3:

:19 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - TRAFFIC CONTROL PLAN 19

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

BSL

MEK

BSL

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

STORM LINE HDS PROFILE

SHEET NUMBER

ISSUE DATE:

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\U

TI

LIT

IE

S\

ST

OR

M\

CD

HD

S-

LO

T

8.D

W G

LA

YO

UT

: H

DS

-P

&P 5 X

RE

Fs

: d rco g i ma ge ry ap rro x[U ], e

-b as e, e-uti l, k ey ma p5

, p -b as e

PL

OT

TE

D:

T

HU

/09

/23 3:

:27

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - WATER QUALITY 20

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

KAS

MAW

KAS

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

10 10 20

10'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

RK

A.

LOT 548 HDS WATER QUALITY TREATMENT

SCALE: 1" = 5'

LOT 548 HDS WATER QUALITY TREATMENT PROFILE

HORIZONTAL SCALE: 1" = 10'

VERTICAL SCALE: 1" = 1'

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

RO

SI

ON

\LO

T

8\C

D

- S

W

MP

-IN

IT

IA

L.D

W G

LA

YO

UT

: L

AY

OU

T1 5 X

RE

Fs

: d rco g i ma ge ry ap rro x[U ], e

-b as e, e-uti l, k ey ma p5

, p -b as e[U

PL

OT

TE

D:

T

HU

/09 /23

3:

:34 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - SWMP-INITIAL 21

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

RO

SI

ON

\LO

T

8\C

D

- S

W

MP

-IN

TE

RI

M.

DW

G

LA

YO

UT

: L

AY

OU

T1 6 X

RE

Fs

: c d-sw mp

-fin al[

U] , d rco g i ma ge ry ap rro x[U

], e -b as e[U

], e -u til[ U]

, k ey ma p5

, p

-b as e

PL

OT

TE

D:

T

HU

/09 /23

3:

:39 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - SWMP-INTERIM 22

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

RO

SI

ON

\LO

T

8\C

D

- S

W

MP

-F

IN

AL

.D

W G

LA

YO

UT

: L

AY

OU

T1 6 X

RE

Fs

: c d-sw mp

-in ter im [U

], d rco g i ma ge ry ap rro x[U ], e

-b as e[U ], e

-u til[

U] , k ey ma p5

, p -b as e

PL

OT

TE

D:

T

HU

/09

/23 3:

:44

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

LOT 548 - SWMP-FINAL 23

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

SCALE: 1" =

20 20 40

20'

KEY MAP

SCALE: 1" = 100'

COLORADO AVE.

INNOVATION DR.

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\U

TI

LIT

IE

S\

ST

OR

M\

CD

HD

S-

LO

T

4.D

W G

LA

YO

UT

: A

DS

D

ET

AI

LS

4 X

RE

Fs

: e -b as e, e-uti l, k ey ma p5

, p

-b as e

PL

OT

TE

D:

T

HU

/09 /23

3:

:54 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

ADS BARRACUDA DETAILS 24

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

KAS

KAS

KAS

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\R

OA

DW

AY

\T

RA

NS

PO

RT

AT

IO

N

DE

TA

ILS

.D

W G

LA

YO

UT

: C

OM

BI

NE

D

1 X

RE

F:

p-ba se

PL

OT

TE

D:

T

HU

/09

/23 3:

:59

P B

Y:

R

YA

N

W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

TRANSPORTATION DETAILS 25

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

RO

SI

ON

\S W

MP

D

ET

AI

LS

.D

W G

LA

YO

UT

: C

OM

BI

NE

D

2 X

RE

Fs

: e -b as e, e-uti l

PL

OT

TE

D:

T

HU

/09 /23

3:

:06 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

SWMP DETAILS 26

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

DATE REVISION COMMENTS

DESIGNED BY:

CHECKED BY:

DRAWN BY:

PROJECT #:

1120 Lincoln Street, Suite 1000 Denver, Colorado 80203

P: 303.623.6300 F: 303.623.6311 HarrisKocherSmith.com

Know what's below.

Call before you dig.

FI

LE

PA

TH

: K :\2

5\E

NG

IN

EE

RI

NG

\E

RO

SI

ON

\S W

MP

D

ET

AI

LS

.D

W G

LA

YO

UT

: C

OM

BI

NE

D

2 X

RE

Fs

: e -b as e, e-uti l

PL

OT

TE

D:

T

HU

/09 /23

3:

:13 P

B Y:

R

YA

N W

AL

KE

R

UCB000751

UCB000751-SITE-LOTS 544 & 548 - REBUILD

SWMP DETAILS 27

UNIVERSITY OF COLORADO AT BOULDER

02-09-2023

TMW

MAW

TMW

02-09-2023 ISSUED FOR BID

HA

NG

ES

A

RE

T

O

BE

M

AD

E

TO

T

HI

S

DR

AW

IN

G W

IT

HO

UT

W

RI

TT

EN

P

ER

MI

SS

IO

N

OF

H

AR

RI

S

KO

CH

ER

S

MI

TH

P R O

FESSIONA L EN

GI

NE

E R

CO

LO

RAD

O LICENSED

38561

WESTMA

Sheets and Views
1 COVER SHEET
2 QUANTITY ESTIMATE
3 LOT 544 - EXISTING SITE PLAN
4 LOT 544 - REMOVAL PLAN
5 LOT 544 - PAVING PLAN
6 LOT 544 - GEOMETRIC LAYOUT
7 LOT 544 - SIGNING & STRIPING PLAN
8 LOT 544 - TRAFFIC CONTROL PLAN 1
9 LOT 544 - TRAFFIC CONTROL PLAN 2
10 LOT 544 - WATER QUALITY
11 LOT 544 - SWMP-INITIAL
12 LOT 544 - SWMP-INTERIM
13 LOT 544 - SWMP-FINAL
14 LOT 548 - EXISITING SITE PLAN
15 LOT 548 - REMOVAL PLAN
16 LOT 548 - PAVING PLAN
17 LOT 548 - GEOMETRIC LAYOUT
18 LOT 548 - SIGNING & STRIPING PLAN
19 LOT 548 - TRAFFIC CONTROL PLAN
20 LOT 548 - WATER QUALITY
21 LOT 548 - SWMP-INITIAL
22 LOT 548 - SWMP-INTERIM
23 LOT 548 - SWMP-FINAL
24 ADS DETAILS
25 TRANSPORTATION DETAILS
26 SWMP DETAILS
27 SWMP DETAILS

File details come from the government source that posted it. Updated .