TO 2 PWS Attch 2 Williams Base Spec Req Southwest BECOS vf2.docx
DOCX document 51 KB Posted
- Attached to
- Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) Southwest Region Federal contract opportunity
- Solicitation number
- FA8903-20-R-0013
About this file
This document provides the performance work statement (PWS) for Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) at the former Williams Air Force Base in the Southwest Region. The scope of work includes long-term monitoring, operation and maintenance, and completion of cleanup activities at closed Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) sites as well as non-CERCLA sites. Key requirements involve annual well inspections and maintenance, additional monitoring well installation if needed, and completion of the partial deletion from the National Priorities List. The contractor will also support five-year review activities and confirm implementation of land use controls through annual inspection reporting. Relevant agencies involved include the U.S. Air Force, Arizona Department of Environmental Quality, and the City of Mesa.
View the file
Other files for this federal contract opportunity
Show all 50
Base Realignment and Closure (BRAC) Environmental Construction and Optimization Services (BECOS) Southwest Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final –
FA8903-20-R-0013 TO 2
ATTACHMENT 2
SOUTHwest REGION - williams 5 December 2019
1.1 Scope
The former Williams Air Force Base (AFB) is listed on the National Priorities List (NPL) and has a federal facility agreement (FFA) in place. The sites included in this scope are being addressed under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) process unless otherwise indicated. The closed CERCLA sites included in this scope are closed with restrictions and are included in the Five-Year Review for the former base. Institutional Controls (Declarations of Environmental Use Restrictions [DEURs] and Voluntary Environmental Mitigation Use Restrictions [VEMURs]) at the closed sites are monitored by the Arizona Department of Environmental Quality (ADEQ) and the landowner. Copies of the annual DEUR verification letters from the landowner are provided to the Air Force.
In addition to the requirements presented in this PWS, this scope includes the following:
· Well inspection and maintenance for existing wells including wells installed by others under the PFAS program. Provide an annual well inventory/inspection report.
· Installation of additional monitoring wells, if required to fully delineate plume extent.
· Completion of the partial NPL deletion process if not completed under the current contract.
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Federal Facilities Agreement |
| AR 103 |
| July 1, 1989 |
| 2. |
| Final ROD Operable Unit 1 (OU-1) |
| AR 480 |
| 5-18-94 |
| 3. |
| Final ROD OU-1 ESD |
| AR 699 |
| July 31, 2006 |
| 4. |
| Final ROD Amendment, OU-1 |
| AR 301070 |
| May 13, 2014 |
| 5. |
| Final ROD Operable Unit 2 (OU-2) |
| AR 316 |
| September 1, 2002 |
| 6. |
| Final ROD Amendment, Deep Soil Operable Unit 2 |
| AR 819.1 & 819.2 |
| May 1, 2003 |
| 7. |
| Final ROD Amendment 2, Groundwater, Operable Unit 2 |
| AR 1633 |
| September 9, 2013 |
| 8. |
| Final Record of Decision Operable Unit 3 |
| AR 808 |
| September 16, 2005 |
| 9. |
| Final Record of Decision Operable Unit 4 |
| AR 1215 |
| April 14, 2000 |
| 10. |
| Final Record of Decision Operable Unit 5 |
| AR 902 |
| September 1997 (final signature March 5 1998) |
| 11. |
| Final Record of Decision Operable Unit 6 |
| AR 570543 |
| March 2, 2018 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| FA8903-09-D-8572-0002 |
| Former Williams AFB PBR |
| 9/24/2020 |
| 9/24/2020 |
2.6.1 Meeting/Teleconference Support
· BCT teleconferences are currently held monthly to update the technical team and regulators on site status and coordinate document review efforts.
· Currently, twice a year, face-to-face BCT meetings are held to allow for on-site status updates to the technical team and regulators, and to review past field efforts and present future efforts for consideration by the team.
2.6.2 Public Meetings and Hearings
· It is anticipated that RAB will be adjourned prior to the start of the period of performance.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· City of Mesa sewer permit for Class II industrial wastewater discharge from ST012 as needed (City of Mesa Discharge Permit M-5863-0122). Note semiannual reporting requirements specified by permit Part 7A.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· Institutional Controls (Declarations of Environmental Use Restrictions [DEURs] and Voluntary Environmental Mitigation Use Restrictions [VEMURs]) at the closed sites are monitored by the Arizona Department of Environmental Quality (ADEQ) and the landowner.
· Copies of the annual DEUR verification letters from the landowner are provided to the Air Force. The Air Force will provide copies of landowner annual reports to the Contractor. The reports are required by state covenants for applicable sites by respective property owners. The annual inspection report shall be provided or otherwise included in site reports by the Contractor to confirm implementation of environmental restrictions.
· When required, the Contractor shall provide supporting information and technical support to the Air Force for property owner requests to remove restrictive covenants and close out state DEURs and VEMURs.
6.15 Five-Year Reviews
· The most recent CERCLA Five-Year Review was completed in 2017. This TO includes the next two reviews due by 29 September 2021 and 29 September 2026.
· A parallel abbreviated five-year review for non-CERCLA sites will be provided to the Air Force documenting compliance with any monitoring requirements and any land-use restrictions.