TJ_FY2027 DD_Fire System Inventory_Fixed Semi-Cylinders.pdf
PDF 129 KB Posted
- Attached to
- MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS Federal contract opportunity
- Solicitation number
- 1305M226Q0100REF
About this file
This document is an equipment inventory and maintenance log for fixed and semi-fixed fire suppression cylinders located at various shipboard stations. The inventory tracks 17 line items across multiple operational locations, including the Paint Locker, EDG Rooms (Main and Reserve), Engine Rooms (Main and Reserve), Galley, and Life Boats #1 and #2.
The equipment comprises fire suppression systems utilizing CO2, HALON, FM-200, and APC agents. Each cylinder entry includes specific operational data: cylinder serial numbers, hydro test dates with corresponding due dates, tare weights, gross weights, net weights, and operating pressures ranging from 240 PSI to 1800 PSI. Notable installations include HALON systems in the EDG and Engine Rooms operating at 360 PSI, high-pressure CO2 systems in the Engine Rooms at 1800 PSI, and FM-200 systems in the lifeboats at 240 PSI. The document also identifies two locations marked as "Not Used," indicating deactivated or reserved capacity. Several entries contain notational discrepancies in hydro due dates (such as Feb-30 and Feb-31, which are non-standard calendar dates), suggesting the document may require quality review and correction to ensure accuracy of maintenance scheduling and regulatory compliance for maritime fire suppression system certification.
View the file
Other files for this federal contract opportunity
Show all 50
MO FY27 Thomas Jefferson Drydock REFERENCES and ATTACHMENTS has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Line Equipment Extg. Serial No. Hydro Date Hydro Due Tare Weight Gross Weight Net Weight Operating Pressure Notes
# Location or Number Type Cylinder Serial No. Date Due Wght Wght Wght
1 Paint Locker CO2 53997 Feb-18 Feb-30 43 68 25
2 Not Used
3 EDG Room (Main) 4207672 Feb-19 Feb-31 108 158 50
4 EDG Room (Main) HALON 50555 Feb-18 Feb-30 59 107 48 360 PSI
5 EDG Room (Reserve) HALON 50554 May-18 May-30 59 107 48 360 PSI
6 Not Used HALON
7 Engine Room (Main) CO2 599734 Mar-18 Mar-30 108 158 50 1800 PSI
8 Engine Room (Main) HALON 56383 Feb-18 Feb-30 441 911 470 360 PSI
9 Engine Room (Main) HALON 56384 Feb-18 Feb-30 444 914 470 360 PSI
10 Engine Room (Reserve) CO2 599772 Mar-18 Mar 2030 110 160 50 1800 PSI
11 Engine Room (Reserve) HALON 56424 Feb-18 Feb-30 444 914 470 360 PSI
12 Engine Room (Reserve) HALON 56378 Feb-18 Feb-30 441 911 470 360 PSI
13 Galley APC 11668 Dec-24 Dec-36 2.5 Q
14 Life Boat #1- HSL 2903 FM-200 23916 Jun-16 Jun-28 3 23 13lb 240 PSI
15 Life Boat #1- HSL 2903 FM-200 25821 Nov-16 Nov-28 3 23 13lb 240 PSI
16 Life Boat #2- HSL 2904 FM-200 35554 Oct-16 Oct-28 3 23 13lb 240 PSI
17 Life Boat #2- HSL 2904 FM-200 72786 May-21 May-33 3 23 13lb 240 PSI
Fixed -Semi Fixed Cylinders
File details come from the government source that posted it. Updated .