TGI_3819P31003A04_c0v0_redact.pdf
PDF 3 MB Posted
- Solicitation number
- N6264925RA041
About this file
This document is a Task Group Instruction (TGI) detailing diesel exhaust system piping work for the USS Blue Ridge (LCC-19) naval vessel. The work involves modifying the Ship Service Diesel Generator (SSDG) exhaust system at multiple ship locations, including the Damage Control Repair Station, Load Center Switchboard Room, Physical Fitness Room, and other compartments. The project includes installing 36 backing rings, a water trap, and globe valves, with specific requirements for welding, piping, and inspection procedures.
The contract is scheduled for execution from January 12, 2026, to August 5, 2027, with work to be performed at various ship locations. The instruction includes detailed technical specifications for welding, joint identification, non-destructive testing, and material requirements. Special requirements include working around fire zone boundaries, potential asbestos and lead hazards, and adherence to specific military standards for welding, pipe bending, and joint design. The Ship Repair Facility Japan Regional Maintenance Center (SRF-JRMC) will provide supporting services such as crane operations, utility services, and quality assurance inspections.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FOUO
FOUO: Public availability to be determined under 5 USC 552
TASK GROUP INSTRUCTION
AIM REV 20.11.4.0 (OCTOBER 2020)
TGI COMPONENT NAME: TYPE: PHASE: REPEAT: CHANGE:
NO.: SSDG EXH MODS AY A 0 0
SHIP/HULL NO.: SHIP/HULL NAME: SYSTEM: PROJ/WO NO: CASREP CAT:
LCC-19 USS BLUE RIDGE 19P
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING WORK SSDG
PREPARING ACTIVITY:
PREPARED BY: CODE PHONE DATE
YUUYA YAJIMA 234. 315-243-0977 15 FEB 2025
APPROVED BY: CODE PHONE DATE
HIDEO HARADA 234. 315-243-5176 15 FEB 2025
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
CONCURRED BY: CODE PHONE DATE
REASON FOR WORK/NEED FOR CHANGE:
CHANGE INSTRUCTIONS:
SPECIAL REQUIREMENTS:
CLASS P-1 PIPING.
CLASS P-2 PIPING.
CLEANLINESS FOR PIPING SYSTEM/EQUIPMENT LEVEL III.
This work affects a fire zone boundary. Fabrication and/or staging of a non-flammable closure is required.
WORK CERTIFICATION SIGNATURES
COMPLETION OF WORK REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
ACCEPTANCE OF COMPLETED WORK
PHYSICAL INSPECTION PHYSICAL INSPECTION COMPLETED: BADGE NO.: SHOP/CODE: PHONE: DATE:
REQUIRED:☐YES ☒NO
RECORDS REVIEW: BADGE NO.: SHOP/CODE: PHONE: DATE:
TGI NO.: SSDG EXH MODS AY A 0
FOUO
SHIP: LCC-19 CHG/VER: 0/0
LIST OF EFFECTIVE PAGES
SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO. SHT NO. CHG NO.
1-5 Map (1-4)
J1-2 Map (1)
M1-2 QA20
(1-92)
Engrg Inst (1)
QA20
(1-4)
1. SCOPE/PURPOSE
1.1 Title: S/A 79243K, Diesel Exhaust System Piping Work of Ship Service Diesel Generator (SSDG); accomplish
1.2 Location of Work:
1.2.1 Damage Control Repair Station 1A Annex (3-133-6-Q)
1.2.2 Load Center Switchboard Room No. 51 (4-133-6-Q)
1.2.3 Physical Fitness Room (5-121-2-L)
1.2.4 SSDG EOS (5-133-1-E)
1.2.5 SSDG No. One (5-121-1-E)
1.2.6 Freeboard Weather, Frames between 135 and 137, Port
1.2.7 Tactical System Maintenance (2-133-4-Q)
1.2.8 CSF Office (2-133-2-Q)
1.2.9 Passage (3-133-4-L)
1.3 Identification:
1.3.1 Quantity (One Lot), Diesel Exhaust System Piping Work for S/A 79243K LCC19 ESLP SSDG GENSET
UPGRADE
Remarks: See 2.3, 2.4, 2.11 and Engrg Inst Enclosure-01 for material and detail.
1.3.1.1 Quantity (36 EA), Backing Ring
Size: 20 Inch IPS, 16 Inch IPS Material: CRES 321 Specification: MIL-STD-22
1.3.1.2 Quantity (One EA), Water Trap
1.3.1.3 Quantity (4 EA), Globe Valve
Remarks: Item number V1 of 2.3
1.4 Security Classification: None.
1.5 Initial Condition:
FOUO
SHIP: LCC-19 CHG/VER: 0/0
1.5.1 Potential Asbestos Hazard.
1.5.2 Potential Lead Hazard.
1.6 Contractor work start date: 1/12/2026
1.7 Contractor work completion date: 8/5/2027
2. REFERENCES:
REF.
NO.
DOCUMENT
/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV CHG
NO.
COPY
REQ’D
(Y/N)
SOURCE
DOC
(Y/N)
PARA SEC PG CHP
1 NSI FY-25 NAVSEA Standard Items - ORG N 2 LI FY-25 Local Standard Items - ORG N
3 DWG 300-
8574533
DIESEL EXHAUST SYSTEM
PIPING MODS SHIP SERVICE
DIESEL GENERATOR
A Y AL
L
4 DWG 300-
8574549
SHIPS SERVICE DIESEL
GENERATOR EXHAUST DETAILS
A Y AL
L
5 MIL MIL-
STD-22
Welded Joint Design D Y PG
6 MIL MIL-
STD-1627
BENDING OF PIPE OR TUBE FOR
SHIP PIPING SYSTEMS
C N
7 DWG 104-
2491052
4TH DK PLTG FR 102-1/4 - STERN J Y AL
L
8 DWG 105-
2491055
3RD DK PLTG FR 98 - STERN K Y AL
L
9 DWG 106-
2491058
2ND DK PLTG FR98 - STERN M Y AL
L
10 DWG 100-
2491006
SHELL PLTG & STGR FR 102¼-
STERN - ABV 4TH DK
L Y AL
L
11 PDD 993-
ELM-250137
TEMP ACCESS HOLE FOR
WATER TRAP IN DCRS 1A
ANNEX (3-133-6-Q)
- Y AL
L
3. APPENDICES:
3.1. Appendix “J” TGI Job Summary Information Sheet
3.2. Appendix "M" TGI Material List
3.3. Appendix “D” Deficiency Form
4. GENERAL REQUIREMENTS:
4.1. Not Applicable.
5. PROCEDURE:
5.1 Accomplish the piping work for diesel exhaust system piping listed in 1.3.1 in accordance with 2.3, 2.4, and Enclosure-01, using 2.7 through 2.11 for guidance.
5.1.1 Fabricate each new backing ring listed in 1.3.1.1 in accordance with Figure-63 of 2.5.
5.1.2 Bend each new pipe in accordance with 2.6.
5.1.3 Accomplish the requirements of 009-12 of 2.1, including Table One, Column(s) A, Lines One through 10.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.1.3.1 Accomplish the requirements of 009-09 of 2.1.
5.1.3.2 Accomplish nondestructive testing in accordance with Line 13.
5.1.3.3 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-04-1 through Enclosure-04-
92. Each joint identification number must be in accordance with Mapping Plan Enclosure-02.
5.1.4 Accomplish the requirements of 009-25 of 2.1 for a completion air test of water trap listed 1.3.1.2. Test pressure must be 2 PSIG. Allowable leakage: None.
5.1.5 Cycle each valve listed in 1.3.1.3 from fully closed to fully open to fully closed 4 times. Allowable binding:
None.
(V) "VALVE CYCLING"
5.1.6 Accomplish the requirements of 009-11 of 2.1 to install each new insulation, lagging and reusable cover to diesel exhaust piping with associated fittings, using 2.3 and 2.4 for guidance.
5.1.6.1 Accomplish the requirements of 009-32 of 2.1 for top surface where new insulation and lagging are installed.
5.1.7 Temporary access must be in accordance with 2.11.
5.1.7.1 Accomplish the requirements of 099-911YO of 2.2, using QA Form 20 Enclosure-05-1 through Enclosure-05-
4. Each joint identification number must be in accordance with Mapping Plan Enclosure-03.
5.1.7.2 Accomplish the requirements of 009-09 of 2.1 for welding procedure of each joint shown on Mapping Plan Enclosure-03.
5.1.8 Accomplish the requirements of 009-12 of 2.1, including Table 2, Column(s) A and D, Lines One through 7.
5.1.9 Accomplish the requirements of 009-25 of 2.1 for a local air hose test of each new weld of the watertight/airtight structural boundary. Allowable leakage: None.
5.2 Accomplish the requirements of 009-32 of 2.1 for each new and disturbed surface.
5.3 Notes:
5.3.1 Planner: Code 234 Y. Yajima, 243-0977
Planner: Code 231B Y. Yoshihara, 243-9984 Planner: Code 231B N. Kurokawa, 243-0108 Planner: Code 231B A. Suzuki, 243-0968 Planner: Code 232 M. Fudo, 243-4512 Planner: Code 233 K. Uchimura, 080-9350-1432 Planner: Code 234 T. Shibano, 243-3583 Engineer: Code 250.1 I. Hayasaka, 243-4334 Engineer: Code 260.3 S. Irikura, 243-4336
5.3.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598.
5.3.3 Work per this instruction involves cutting an access (or removal of a door) through a fire zone bulkhead, through the hull of the ship above the turn of the bilge, through ventilation components (ducting, plenums, etc.), or through any air-tight, fume-tight or watertight bulkheads normally used to control air flow in the event of a shipboard fire. A nonflammable closure is required in accordance with COMNAVSEASYSCOM MSG R 261400Z JUL 12. The closure, if not continuously in use, shall be staged near the access, readily visible and accessible, so that any emergency responder can install the closure to affect proper air flow onboard the ship.
FOUO
SHIP: LCC-19 CHG/VER: 0/0
5.3.4 Preservation work for new and disturbed exterior surfaces of freeboard will be covered by ICN 3819P11001
(KTR TGI).
5.3.5 Item No. F18 (Boss Outlet) of 2.3 is acceptable to change to Boss Pilot from direction by Code 260 per e-mail discussion between Code 260 and Code 234 on 14 FEB 2025.
5.3.6 JCN EE01-L107 is related to this TGI.
5.4 Government Furnished Material (GFM):
5.4.1 All GFM listed in each S/A drawing will be provided as kitted material and listed in Appendix “M” by SRF-
JRMC.
5.5 SRF-JRMC will provide the following service work: (TGI No. 3819P31003S02)
5.5.1 [C740] Crane and crane rigging service.
5.5.2 [X99E] Utility service, electrical.
5.5.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.
5.5.4 [C106.1] Safety inspection for SRF-JRMC employees.
5.5.5 [C106.2] Gas free inspection for SRF-JRMC employees.
5.5.6 [C133] QA inspection for (G) symbol(s).
5.5.7 [C135] QA inspection for (G) symbol(s).
FOUO
J-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX "J"
TGI JOB SUMMARY INFORMATION SHEET
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SSDG EXH MODS AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING WORK SSDG
PRIMARY COMPONENT:
COMPONENT UNIT LIST (FOR ASSEMBLIES):
1D SSDG EX 3-133-6-Q PP 1D SSDG EX 4-133-6-Q PP 1D SSDG EX 5-121-2-L PP 1D SSDG EX 5-121-1-
E PP 1D SSDG EX 5-133-1-E PP CMPT 5-121-1-E MS CMPT 5-121-2-L MS FB FR 98-153
PORT FB CMPT 5-133-1-E MS CMPT 4-133-6-Q MS CMPT 3-133-6-Q MS
ATTACHMENT LIST:
1. ENCLOSURE-01 (3819P31003A04-Engrg Inst.pdf) saved on 10-FEB-2025 0000.
2. ENCLOSURE-02 (3819P31003A04-Map-01.pdf) saved on 10-FEB-2025 0000.
3. ENCLOSURE-03 (3819P31003A04-Map-02.pdf) saved on 10-FEB-2025 0000.
4. ENCLOSURE-04 (3819P31003A04-QA20-01.docx) saved on 14-FEB-2025 0000.
5. ENCLOSURE-05 (3819P31003A04-QA20-02.docx) saved on 11-FEB-2025 0000.
ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:
YAGINUMA ,TAKEHIDE
JO: KO: TOTAL MAN HRS: PLANNING ACCEPTANCE:
3819P31003 A04
TOTAL MAT’L COST TOTAL DURATION:
CU PHASE DESCRIPTION:
The purpose of this TGI is to accomplish S/A 79243K diesel exhaust system piping work of Ship Service Diesel Generator (SSDG).
Location of Work:
Damage Control Repair Station 1A Annex (3-133-6-Q) Load Center Switchboard Room No. 51 (4-133-6-Q) Physical Fitness Room (5-121-2-L)
SSDG EOS (5-133-1-E)
SSDG No. One (5-121-1-E) Freeboard Weather, Frames between 135 and 137, Port Tactical System Maintenance (2-133-4-Q) CSF Office (2-133-2-Q) Passage (3-133-4-L)
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
5.1 BLRM , SFTR , PFTR , INSL , WELD , SMTL , IMCH ,
CARP , RGRS , LBR , OMCH , PNTR , ELEC , QA
22 KE PC
5.2 PNTR , QA 22 KE PC
Boiler/Lagging Work CFM:for marine chemist cost, firewatch cost, asbestos sampler and analysis cost, PT inspection cost, covering material, tyvek suit, welding rod, gas, and MISC such as other consumable material.
22 MQ CS
FOUO
J-2
SHIP: LCC-19 CHG/VER: 0/0
TASK NAME
SHOP TSD/WC TS CREW# MHRS
HIGH RAD
HOURS
RC
GRID#
Structural Work CFM: or all paints, thinner, grits including disposal cost, fire watch, confined space watch, UT inspection cost, air compressor rental cost and fuel oil cost for air hose test, sampler/analyze asbestos and lead, paints and thinners for deck covering and insulation work, deck covering, welding thread, ---continue to below--
22 MQ CS
---continued to from above--- adhesive, anchor pin, and misc such as electrode, gases, temporary closure/covering material, tyvex suit, masking tape, plastic bag, and etc.
22 MQ CS
Elec Work:for banding material, fasteners, insulation tape, plastic bags, rope, and other consumable.
22 MQ CS
Piping Work CFM: fire watch cost, lead analysis cost, NDT cost, welding rod, MISC such as pipe hanger, saw blades, painting material, plastic bag/sheet and etc.
22 MQ CS
Process Funding Document. 10 CT OM
FOUO
M-1
SHIP: LCC-19 CHG/VER: 0/0
APPENDIX “M”
TGI MATERIAL LIST
SYSTEM: PLANT NO.: COMPONENT NAME: TYPE: PHASE: REPEAT: CU PH
VERSION:
CASREP
CAT:
SSDG EXH MODS AY A 0 0
CU PHASE TITLE:
(RE) F/O - S/A 79243K, ACCOMPLISH DIESEL EXHAUST SYSTEM PIPING WORK SSDG
MATERIAL REFERENCES
REF
NO.
DOCUMENT/DRAWING
NUMBER
DOCUMENT/DRAWING TITLE REV
JOB ORDER: KEY OP:
3819P31003 A04
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
001 M CLOTH,PLAIN WEAVE,
ORDERED FOR KTR
ORIG: C234 Y.YAJIMA, 243-
H/W GLASS CLOTH (NATURAL)
9B 8305 001487364 NA 4 N 50455346 11/RO
002 M CEMENT,INSULATION,H,
INSUL CEMENT FINISH
ORDERED FOR KTR
ORIG: C234 Y.YAJIMA, 243-
9Q 5640 002264540 NA 4 Y 50455348 8/BG
003 M ADHESIVE, ORDERED FOR
KTR
ORIG: C234 Y.YAJIMA, 243-
ADHESIVE
9B 8040 002738708 NA 4 Y 50455095 10/GL
100 M PLATE,ME, SIZE: 2 FT X 3 FT,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 001533223 NA 4 N 50455234 6/SF
101 M PLATE,ME, SIZE: 2 FT X 3 FT,
ORDER FOR KTR
ORIG: C226 H.SHIMIZU, 080-
9350-1431
9B 9515 002375333 NA 4 N 50455236 6/SF
NOTES:
FOUO
M-2
SHIP: LCC-19 CHG/VER: 0/0
MATERIAL LIST
ITEM
NO.
PC
NO.
REF
NO.
M
C DESCRIPTION
STOCK
NUMBER
GENERIC
MATL
TYPE LVL QA
HAZ
MAT
DOC
NO.
QTY
REQD/
UNIT
QTY
USED/
UNIT
150 M INSULATI, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 008096312 NA 4 N 50455351 30/EA
151 M INSULATI, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 LL4823204 NA 4 N 50457405 3/SH
152 M INSULATI, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Q 5640 LL4941456 NA 4 N 50457406 3/SH
153 M TAPE,TEX, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8315 002671632 NA 4 N 50455352 2/RO
154 M CAP, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9Z 5340 LL4601470 NA 4 N 50457407
100/EA
155 M ADHESIVE, ORIG C231B N.
KUROKAWA 243-0108
ORDER FOR KTR
9B 8040 002738708 NA 4 Y 50455101 1/GL
156 M MATTING,FLOOR, ORIG C231B
N. KUROKAWA 243-0108
ORDER FOR KTR
9Q 7220 010249040 NA 4 N 50455239 1/RO
400 M PLATE,METAL, PLATE, METAL,
SPEC: ASTM A240,
THICKNESS: 3/16",
SIZE: 6 FT X 8 FT,
MATL: CRES 321,
ORDER FOR KTR
ORIG: C226 T.YAMAGUCHI,
070-7787-2060
NA 4 N 48/SF
500 M BOSS, PILOT, 1/2", BOSS,
PILOT, 1/2", SW, CRES321,
3000PSI
ORDERED FOR KTR, ORG:
C234,T. SHIBANO, TEL: 243-
LL9005341 NA 4 N 3/EA
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR APPENDIX "D"
DEFICIENCY FORM
☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One)
2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SSDG EXH MODS AY A 0
4a. ICN: 4b. KEY OP: 5. LOC SPACE/LVL: FRAME: P/S/C: 6. CAUSED BY:
3819P31003 A04
7. DESCRIPTION:
8. ORIGINATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
9. CORRECTIVE ACTION:
10. EVALUATOR: NAME: BADGE: SHOP/CODE: DATE: PHONE NO.:
FOR NON-NUCLEAR USE ONLY
11. RFD/RFW REQ’D ☐ LAR REQ'D ☐
ILS MOD REQ’D ☐
SRD/PLAN REV REQ'D ☐
DWG NO.: _____________________ S/A NO.: ___________________
12. ISOLATION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.:
SATISFACTORY:
13. SUBSAFE OQE RECORD? SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
YES ☐ NO ☐
14. CORRECTIVE ACTION SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE:
15. INSPECTION REQ’D? INSPECTION COMPLETE/SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
_________:YES ☐ NO ☐
16. RECORDS REVIEW SIGN: BADGE: SHOP/CODE: DATE: PHONE NO.
COMPLETE (DR ONLY)
DL’s ISSUED
(DR ONLY)
FOUO: Public availability to be determined under 5 USC 552 SHEET_____OF_____
☐ NUCLEAR Deficiency Form Continuation Sheet ☐ NON-NUCLEAR
1. SHIP/HULL NO.: 2a. DL or DR No.
(Circle One) 2b. REVISION: 3a. COMPONENT NAME: 3b. TYPE: 3c. PHASE: 3d. REPEAT:
LCC-19 SSDG EXH MODS AY A 0
3819P31003A04 ENCLOSURE-01 Sheet 1 of 4
AutoCAD SHX Text SUBJECT: PATCH FOR REMOVAL OF DIESEL EXHAUST PP PATCH FOR REMOVAL OF DIESEL EXHAUST PP ICN; 3819P31003 ; 3819P31003 3819P31003 JCN; EE01-L107 ; EE01-L107 EE01-L107 ORIGINATOR; C250 I.HAYASAKA GINATOR; C250 I.HAYASAKA INATOR; C250 I.HAYASAKA ; C250 I.HAYASAKA C250 I.HAYASAKA I.HAYASAKA DATE; 1/28/2025 1/28/2025 /28/2025 28/2025 /2025 2025 REFERENCES: (a) LCC19-300-8574533 "A", SCD 9243 DIESEL EXH SYS PIPING MODS SHIPS SERVICE DIESEL GEN LCC19-300-8574533 "A", SCD 9243 DIESEL EXH SYS PIPING MODS SHIPS SERVICE DIESEL GEN SCD 9243 DIESEL EXH SYS PIPING MODS SHIPS SERVICE DIESEL GEN (b) LCC19-114-7542706 "A", S/A 1276K STRL BHDS 5TH DECK INCDTL SSDG LCC19-114-7542706 "A", S/A 1276K STRL BHDS 5TH DECK INCDTL SSDG S/A 1276K STRL BHDS 5TH DECK INCDTL SSDG (c) NAVSEA S9AA0-AB-GOS-010, GENL SPEC FOR OVERHAUL OF SURFACE SHIPS NAVSEA S9AA0-AB-GOS-010, GENL SPEC FOR OVERHAUL OF SURFACE SHIPS GENL SPEC FOR OVERHAUL OF SURFACE SHIPS NOTES: 1. THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS INSTALLATION OF PATCH FOR REMOVAL OF DIESEL THE PURPOSE OF THIS ENGINEERING INSTRUCTION IS INSTALLATION OF PATCH FOR REMOVAL OF DIESEL INSTALLATION OF PATCH FOR REMOVAL OF DIESEL OF PATCH FOR REMOVAL OF DIESEL PATCH FOR REMOVAL OF DIESEL EXHAUST PIPING OF USS BLUE RIDGE (LCC 19) INCIDENTAL TO SCD 9243, REF (a). OF USS BLUE RIDGE (LCC 19) INCIDENTAL TO SCD 9243, REF (a). BLUE RIDGE (LCC 19) INCIDENTAL TO SCD 9243, REF (a). (LCC 19) INCIDENTAL TO SCD 9243, REF (a). LCC 19) INCIDENTAL TO SCD 9243, REF (a). ) INCIDENTAL TO SCD 9243, REF (a). INCIDENTAL TO SCD 9243, REF (a). . 2. REMOVAL NOTE: EXISTING STRUCTURE MEMBERS WHICH ARE RENEWED SHALL BE REMOVED WITH SAME REMOVAL NOTE: EXISTING STRUCTURE MEMBERS WHICH ARE RENEWED SHALL BE REMOVED WITH SAME NEWED SHALL BE REMOVED WITH SAME SHALL BE REMOVED WITH SAME DIMENSIONS SHOWN ON INSTALLATION PLANS. . 3. ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH ALL WELDING AND INSPECTION FOR STEEL MATERIALS SHALL BE CONDUCTED IN ACCORDANCE WITH SRF-JRMC PROCESS INSTRUCTION NO. 100-2 OR TABLE 2 OF NAVSEA STD ITEM NO. 009-12 RESPECTIVELY. VT INSPECTION SHALL BE REQUIRED IN ACCORDANCE WITH PARAGRAPH 6.4 OF ELY. VT INSPECTION SHALL BE REQUIRED IN ACCORDANCE WITH PARAGRAPH 6.4 OF IN ACCORDANCE WITH PARAGRAPH 6.4 OF MIL-STD-1689. . 4. SCALLOPS IN STRUCTURE IN WAY OF CONTINUOUS WELDS SHALL BE OPENED AS 1/2 RADIUS OR SCALLOPS IN STRUCTURE IN WAY OF CONTINUOUS WELDS SHALL BE OPENED AS 1/2 RADIUS OR GREATER (MINIMUM NECESSARY SIZE) AND KEPT OPEN FOR NON TIGHT STRUCTURE. THE SCALLOP STOP WELDS SHALL BE ONE SIDE FILLET WELD, PT1S.1, SIZE; 3/16. 5. THE DIMENSIONS SHOWN ON THIS ENCLOSURE MAY BE SLIGHTLY CHANGED TO SUIT THE VIABILITY. THE DIMENSIONS SHOWN ON THIS ENCLOSURE MAY BE SLIGHTLY CHANGED TO SUIT THE VIABILITY. NCLOSURE MAY BE SLIGHTLY CHANGED TO SUIT THE VIABILITY. MAY BE SLIGHTLY CHANGED TO SUIT THE VIABILITY. 6. FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (b). FOR INFORMATION OF HULL STRUCTURE NOT SHOWN ON THIS INSTRUCTION, SEE REF (b). b). ). TEST NOTE: 1. AFTER ALL WELDING WHICH INTEGRATE COMPARTMENT TIGHTNESS, AIR HOSE TEST SHALL BE AFTER ALL WELDING WHICH INTEGRATE COMPARTMENT TIGHTNESS, AIR HOSE TEST SHALL BE CONDUCTED PER 192f OF REF (c).c).).
AutoCAD SHX Text_1
ENGRG INST
3819P31003A04 ENCLOSURE-01 Sheet 2 of 4
AutoCAD SHX Text_2
LIST OF MATERIAL
AutoCAD SHX Text_3
PC NOC NO
AutoCAD SHX Text_4
DESCRIPTIONESCRIPTION
AutoCAD SHX Text_5
QTYTY
AutoCAD SHX Text_6
MATERIAL
AutoCAD SHX Text_7
SPECPEC
AutoCAD SHX Text_8
REMARKSEMARKS
AutoCAD SHX Text_9
AutoCAD SHX Text_10
PLATE, 15.3#LATE, 15.3#
AutoCAD SHX Text_11
5 SF SF
AutoCAD SHX Text_12
STEEL (OS)
AutoCAD SHX Text_13
MIL-S-22698 GR A
AutoCAD SHX Text_14
AutoCAD SHX Text_15
PLATE, 7.65#
AutoCAD SHX Text_16
6 SF
AutoCAD SHX Text_17
STEEL (OS)
AutoCAD SHX Text_18
MIL-S-22698 GR A
AutoCAD SHX Text_19
ENGRG INST
AutoCAD SHX Text_20
AutoCAD SHX Text_21
AutoCAD SHX Text_22
AutoCAD SHX Text_23
AutoCAD SHX Text_24
AutoCAD SHX Text_25
AutoCAD SHX Text_26
AutoCAD SHX Text_27
AutoCAD SHX Text_28
AutoCAD SHX Text_29
AutoCAD SHX Text_30
AutoCAD SHX Text_31
AutoCAD SHX Text_32
AutoCAD SHX Text_33
AutoCAD SHX Text_34
AutoCAD SHX Text_35
AutoCAD SHX Text_36
AutoCAD SHX Text_37
5TH DK
AutoCAD SHX Text_38
KEY PLAN
AutoCAD SHX Text_39 C
AutoCAD SHX Text_40
FWD
AutoCAD SHX Text_41
SHIP
AutoCAD SHX Text_42
PHYSICAL FITNESS RM 5-121-2-L
AutoCAD SHX Text_43
SSDG NO. 1 5-121-1-E
AutoCAD SHX Text_44
SSDG EOS 5-133-1-E
AutoCAD SHX Text_45
SEE SECT 4-A
AutoCAD SHX Text_46
SEE EL 3-A
AutoCAD SHX Text_47
SHELL LINE AT 5TH DK (P/S)
AutoCAD SHX Text_48
SHELL LINE AT 4TH DK (P/S)
3819P31003A04 ENCLOSURE-01 Sheet 3 of 4
AutoCAD SHX Text_49 FAB & INSTL & INSTL INSTL CL LONG BHD STBD SIDE, LKG INBD SIDE, LKG INBD, LKG INBD
AutoCAD SHX Text_50
EL 3-A 3-A3-A-AA
AutoCAD SHX Text_51
ENGRG INST
AutoCAD SHX Text_52
AutoCAD SHX Text_53
AutoCAD SHX Text_54
FWD
AutoCAD SHX Text_55
4TH DK
AutoCAD SHX Text_56
15.3# OS
AutoCAD SHX Text_57
AutoCAD SHX Text_58
REF LINE
AutoCAD SHX Text_59
CL L-1
AutoCAD SHX Text_60
13 TO SUIT EXST OPNG
AutoCAD SHX Text_61 32 1/4
AutoCAD SHX Text_62
AutoCAD SHX Text_63
AutoCAD SHX Text_64
6 R (TYP)
AutoCAD SHX Text_65 G
AutoCAD SHX Text_66 VERT STIF 10 x 4 x 11.5# I-T, OS
AutoCAD SHX Text_67 3/16
AutoCAD SHX Text_68 3 R R
AutoCAD SHX Text_69
ABT 19 1/4
AutoCAD SHX Text_70
ABT 3333
3819P31003A04 ENCLOSURE-01 Sheet 4 of 4
AutoCAD SHX Text_71
FAB & INSTL & INSTL INSTL AT TRANSV BHD FR 133 LKG AFTAFT
AutoCAD SHX Text_72
SECT 4-A4-A-AA
AutoCAD SHX Text_73 C
AutoCAD SHX Text_74 C
AutoCAD SHX Text_75 C
AutoCAD SHX Text_76 L-6 (S)
AutoCAD SHX Text_77 L-7 (S)
AutoCAD SHX Text_78 L-8 (S)
AutoCAD SHX Text_79
4TH DK
AutoCAD SHX Text_80
7.65# OS
AutoCAD SHX Text_81
AutoCAD SHX Text_82
WEB FR 133
AutoCAD SHX Text_83
ENGRG INST
AutoCAD SHX Text_84 27 1/4
AutoCAD SHX Text_85
AutoCAD SHX Text_86
AutoCAD SHX Text_87
6 R (TYP)
AutoCAD SHX Text_88 G
AutoCAD SHX Text_89
ABT 20 3/4
AutoCAD SHX Text_90
ABT 3636
(.,,I
(.,,I
I
20• IPS,
DSL EXH SYS PP
l
PHYS FITNESS RM
5-121-2-L
PJ-441
PJ-435
PJ-434 �
PJ-433
PJ-432
PJ-431
CONTD UP ON SHEET 3
PJ-441
PJ-437
CL P-1 PJ-438t PJ-440
PJ-430
SSDG EOS
5-133-1-E
SSDG MCHRY RM
5-121-1-E i IPS, BACKPRESSURE SNSR CONN PPPJ-429
PJ-428
I
JOINT ID MAPPING PLAN 1-A
PJ-446
PJ-444
PJ-445
i IPS, DR PP
PJ-409
PJ-408
PJ-407
PJ-411
15• IPS,
DSL EXH SYS PP
SSDG
--7
I A
__ _JJ
Yuuya.Yajima.ja Text Box 3819P31003A04
Yuuya.Yajima.ja_1 Text Box
MAPPING PLAN
ENCLOSURE-02
Yuuya.Yajima.ja_2 Line
Yuuya.Yajima.ja_3 Text Box 3819P31003A04
Yuuya.Yajima.ja_4 Text Box
MAPPING PLAN
ENCLOSURE-02
Yuuya.Yajima.ja_5
Yuuya.Yajima.ja_6
3819P31003A04
Yuuya.Yajima.ja_7 Text Box
MAPPING PLAN
ENCLOSURE-02
Yuuya.Yajima.ja_8
Yuuya.Yajima.ja_9
3819P31003A04
Yuuya.Yajima.ja_10 Text Box
MAPPING PLAN
ENCLOSURE-02
Yuuya.Yajima.ja_11
3819P31003A04 ENCLOSURE-03 Sheet 1 OF 1
AutoCAD SHX Text_91
AutoCAD SHX Text_92
AutoCAD SHX Text_93
REF LINE
AutoCAD SHX Text_94
STGR-23
AutoCAD SHX Text_95 STGR-24 12 x 4 x 22# I-T MS (TYP)
AutoCAD SHX Text_96 STGR-25 12 x 4 x 22# I-T MS (TYP)
AutoCAD SHX Text_97
STGR-26
AutoCAD SHX Text_98
3RD DK
AutoCAD SHX Text_99
2ND DK
AutoCAD SHX Text_100 15.3#
AutoCAD SHX Text_101
FWD
AutoCAD SHX Text_102
SHELL PLTG (EXPANDED) EXPANDED) ) PORT SIDE, LKG OUTBD, LKG OUTBDOUTBDBD
AutoCAD SHX Text_103
EL 1-A 1-A1-A-AA
AutoCAD SHX Text_104
ACCESS PATCH, REUSED
AutoCAD SHX Text_105
MAPPING PLAN
AutoCAD SHX Text_106
HJ-2-11
AutoCAD SHX Text_107
HJ-2-33
AutoCAD SHX Text_108
HJ-2-22
AutoCAD SHX Text_109
HJ-2-44
AutoCAD SHX Text_110
WEB FR 137
COMUSFLTFORCOMINST 4790.3 REV D CHG 3
07 Nov 2023
3819P31003A04 ENCLOSURE-04-1 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-400
12. JOINT DESIGN
P-16
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
THE ACTION HAS BEEN PERFORMED IN ACCORDANCE WITH THE SPECIFIED
REQUIREMENTS.
3819P31003A04 ENCLOSURE-04-1 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-2 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-401
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-2 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-3 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-402
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-3 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-4 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-403
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-4 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-5 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-404
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-5 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-6 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-405
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-6 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-7 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-406
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-7 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-8 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-407
12. JOINT DESIGN
P-3
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-8 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-9 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4. CWP/REC SER. NO.
N/A
5. LWC
KTR
6. DATE
10 Feb 2025
7. SYSTEM
SSDG Exhaust System
8. COMPONENT
SSDG Exhaust Piping
9. DWG NO.
Mapping Plan Enclosure-02
10. CWP STEP NO.
5.1.3.3
11. JOINT ID
PJ-408
12. JOINT DESIGN
P-70
13. INST LOCATION: [ ] STBD
COMPT: [ ] C/L
FR: [ ] PORT
14. WELDED LOCATION:
[ ] SHOP
[ ] FIELD
BASE MATERIAL DATA
15. COMP DATA 16. MATERIAL 17. SIZE 18. THICKNESS 19. MATL SPEC 20. MIC NO.
COMPONENT A:
COMPONENT B:
21. [ ] SEAL RING
[ ] BACK RING/STRIP
22. MATERIAL 23. SIZE 24. THICKNESS 25. MATL SPEC 26. MIC NO.
WELDING MATERIAL SPECIFICATIONS AND DATA
27. TYPE OF FILLER(S) 28. SIZE 29. MATL 30. MIL-SPEC 31. MIC NO.
WELD HISTORY
32. WELDING
STANDARD:
S9074-AR-GIB-
010A/278
33. WELDING
PROCEDURE:
34. DATA SHEET 35. POSITION: [ ] VERT [ ] FLAT [ ] FIXED [ ] 45 DEG
[ ] HORZ [ ] OVHD [ ] ROLLED
36. ACCESSIBILITY:
[ ] 12”OR LESS
[ ] UNRESTRICTED
37. PREHEAT TEMP 38. PREHEAT METHOD 39. POST HEAT. START TIME:
TEMP REQD: STOP TIME:
40. PURGE
GAS:
41. FLOW RATE 42. SHIELD GAS 43. FLOW RATE 44. CUP SIZE 45. TUNGSTEN SIZE
46. WELD LAYER 47. PROCESS 48. QUAL EXP DATE 49. AMPS 50. INTERPASS TEMP 51. WELDER SIGNATURE 52. DATE
53. INSPECTION DATA CONTAINED ON REVERSE OF THIS PAGE
REMARKS:
94. FINAL DISPOSITION:
[ ] ACCEPT
[ ] REJECT
95. NDT SUPERVISOR DATE
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-9 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (BACK) PAGE 2 OF 2
NDT INSPECTION DATA
54. INSPECTION STANDARD 55. WELD CLASS 56. ACCEPTANCE STANDARD 57. ACCEPT CLASS
58. WELD PREP 59. INSP METHOD 60. ACCEPT/REJECT 61. NDT INSPECTOR SIGNATURE 62. DATE
COMPONENT A [ ] ACCEPT [ ] REJECT
COMPONENT B [ ] ACCEPT [ ] REJECT
63. JOINT FITUP [ ] ACCEPT [ ] REJECT
64. INSP LAYER 65. INSP METHOD 66. INSP PROC NO 67. ACCEPT/REJECT 68. NDT INSPECTOR SIGNATURE 69. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
70. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
71. Repair Method: Excavation: L W D
72. INSP LAYER 73. INSP METHOD 74. INSP PROC NO. 75. ACCEPT/REJECT 76. NDT INSPECTOR SIGNATURE 77. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
78. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
79. Repair Method: Excavation: L W D
80. INSP LAYER 81. INSP METHOD 82. INSP PROC NO. 83. ACCEPT/REJECT 84. NDT INSPECTOR SIGNATURE 85. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
86. NDT INSPECTION DATA REPAIR NO._____ Defect: L W D
87. Repair Method: Excavation: L W D
88. INSP LAYER 89. INSP METHOD 90. INSP PROC NO. 91. ACCEPT/REJECT 92. NDT INSPECTOR SIGNATURE 93. DATE
[ ] ACCEPT [ ] REJECT
[ ] ACCEPT [ ] REJECT
53. REMARKS (Continued):
THE PERSON DESIGNATED TO SIGN FOR AN ACTION VERIFIES, BASED ON PERSONAL
OBSERVATION OR CERTIFIED RECORDS, AND CERTIFIES BY THEIR SIGNATURE THAT
3819P31003A04 ENCLOSURE-04-10 TOTAL 92
WELDING IN PROCESS CONTROL/NONDESTRUCTIVE TEST RECORD
QA FORM 20 (FRONT)
When the form is used for production welding, the blocks marked with a must be completed by the planner. 1. PAGE 1 OF 2
2. SHIP USS BLUE RIDGE
HULL NO. LCC19
3. JCN
EE01-L107
4.…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .