TE-N Baseline Staffing.pdf

PDF 111 KB Posted

Attached to
Fort Hood Solid Waste Services
Solicitation number
W91151-26-R-A003
Issued by

About this file

This is a Technical Exhibit establishing baseline staffing requirements for a Solid Waste Management contract with an 84-month performance period. The exhibit provides a general estimate of necessary personnel and associated hours required to execute the solid waste management requirement, totaling 297,857 hours across 22.80 full-time equivalent positions.

The staffing plan comprises 11 position categories with corresponding estimated quantities and total personnel allocations. Key positions include Truck Driver Heavy (6.32 FTE, 82,068 hours), the largest staffing requirement; Heavy Equipment Operator (3.20 FTE, 41,608 hours); Laborer (3.22 FTE, 41,881 hours); and Secretary II/Scale Operator (2.11 FTE, 27,384 hours). Administrative and supervisory roles include Project Manager (1.16 FTE), Landfill Manager (1.12 FTE), and Secretary III (1.72 FTE). Technical and maintenance positions include QC Inspector (1.78 FTE), Heavy Equipment Mechanic (1.04 FTE), and truck drivers for light and medium vehicles. The exhibit explicitly states that these staffing levels serve as a general estimate and that offerors retain responsibility for accurately assessing and determining the actual number of personnel required to perform the solid waste management requirement.

View the file

Other files

File Type Posted
Questions and Answers Solid Waste W9112126RA0030001.pdf PDF
Solicitation Conform Copy W9115126-R-A003-0001.pdf PDF
TE-L Wage Determination 2015-5237 Rev_30 Dated 5_13_2026.pdf PDF
Solicitation Amendment - W9115126-R-A003-0001 Solid Waste Follow-on.pdf PDF
Attachment 1 PWS - Fort Hood Solid Waste Service 24 June 2026.pdf PDF
Attachment 1 PWS - Fort Hood Solid Waste Services.pdf PDF
TE-C Cantonment Roll Off-Compactor Container Locations.xlsx XLSX spreadsheet
TE-H Landfill Image.pdf PDF
TE-K Org Chart.pdf PDF
TE-L Wage Determination 2015-5237 Rev. 29_3 Dec 2025.pdf PDF
TE-P Container Placement Maps.pdf PDF
TE-T North Fort Hood Cantonment Map.pdf PDF
TE-X SPILL PREVENTION CONTROL AND.pdf PDF
TE-Y FRP Facility Response Plan.pdf PDF
TE-U BLORA (Belton Lake Outdoor Recreation Area) Map.pdf PDF
Solicitation - W9115126RA003 Solid Waste Follow-On.pdf PDF
TE-AA 2024-2029_Hood_INRMP_Final.pdf PDF
TE-D Bid Schedule_10APR26.xlsx XLSX spreadsheet
TE-E Customer ID.xlsx XLSX spreadsheet
TE-F Grease Trap Inventory.xlsx XLSX spreadsheet
TE-G Landfill Disposal Data.xlsx XLSX spreadsheet
TE-J Sample Report Form.xlsx XLSX spreadsheet
TE-O Equipment Listing.pdf PDF
TE-Q Fort Hood Landfill Site Plan.pdf PDF
TE-S West Fort Hood Cantonment Map.pdf PDF
TE-Z Government Furnished Property.xlsx XLSX spreadsheet
TE-A Landfill Permit.pdf PDF
TE-B Cantonment Refuse Container Locations 05 Jan 2026 1.xlsx XLSX spreadsheet
TE-I Hazardous Material Authorization Request.pdf PDF
TE-M WD Pricing Spreadsheet.xlsx XLSX spreadsheet
TE-R Fort Hood Main Cantonment Map.pdf PDF
TE-V Solid Waste Performance Standards.xlsx XLSX spreadsheet
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL EXHIBIT N

BASELINE STAFFING

84 Month

ITEM

NAME

ESTIMATED

QUANTITY

Total Personnel

1 Project Manager 84 Month 14,973 HRs 1.16

2 QC Inspector 84 Month 25,137 HRs 1.78

3 Landfill Manager 84 Month 14,280 HRs 1.12

4 Secretary III 84 Month 22,295 HRs 1.72

5 Truck Driver Light 84 Month 1,512 HRs .12

6 Truck Driver Medium Steam Cleaner/Container Maintenance

84 Month 13,195 HRs 1.02

7 Truck Driver Heavy 84 Month 82,068 HRs 6.32

8 Secretary II (Scale Operator) 84 Month 27,384 HRs 2.11

9 Heavy Equipment Mechanic 84 Month 13,524 HRs 1.04

10 Heavy Equipment Operator 84 Month 41,608 HRs 3.20

11 Laborer 84 Month 41,881 HRs 3.22

Total 297,857 HRs 22.80

Note** The purpose of TE-N, Baseline Staffing, is to provide a general estimate of the necessary personnel to perform the Solid Waste Management requirement. It is the Offeror's responsibility to accurately assess and determine the number of personnel for the Offeror to perform the Solid Waste Management requirement.

ITEM

File details come from the government source that posted it. Updated .