The file is an Excel spreadsheet titled "TE C - Historical_Projects.xlsx" documenting Intrusion Detection System (IDS) installation and maintenance projects from August 2015 to August 2024. The historical project log demonstrates a comprehensive record of security system installations across various facilities, including arms rooms, visitor centers, child development centers, open storage areas, and department of public safety locations. Projects consistently involved installing control panels, duress switches, badge readers, electronic door strikes, and other security system components.
The associated federal contract opportunity (Solicitation W91151-25-Q-A018) is for Electronic Security Systems (ESS) Maintenance at Fort Cavazos, Texas. The non-personnel services contract requires a DAQ ICIDS Certified Value Added Reseller (VAR) to provide maintenance, repairs, installations, system designs, and cyber security information assurance. The ICIDS-V system uses DAQ Electronics StarWatch Security Management Software and interfaces with Intrusion Detection protection and Entry Control Equipment for controlled facility access. The contract is issued by the Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Historical Projects
| Attachment 7 Historical Projects | ||||||||||||||
| 28 August 2015 - 27 August 2016 | ||||||||||||||
| Project Title | Description | IDS Control panel | Duress switch | PIMS 360 | BMS switch | Tamper switch | Sharp shooter motion | Remote Keypad | Badge readers | Fixed exterior cameras analog | fixed interior dome cameras analog | Digital Video Recorder | Electronic door strike with puhs button control | low voltage power supply |
| IDS | Install control panel for duress only configuration | 1 | 1 | |||||||||||
| IDS | Install control panel for duress only configuration | 1 | 1 | |||||||||||
| IDS | Install IDS to open storage | 1 | 1 | 2 | 2 | |||||||||
| IDS | Install IDS for arms vault (mobil) | 1 | 1 | 3 | 1 | 1 | ||||||||
| IDS | IDS open storage | 1 | 10 | 5 | 2 | 1 | ||||||||
| EECS | 2 badge readers readers relocated | 2 | ||||||||||||
| 28 August 2016 - 27 August 2017 | ||||||||||||||
| IDS | IDS for arms room | 1 | 1 | 2 | 1 | |||||||||
| IDS | IDS doe open storage | 1 | 6 | 4 | ||||||||||
| IDS | 1 | 2 | 3 | 2 | 4 | 5 | 1 | 1 | ||||||
| IDS | IDS for Visitor welcome center | 1 | 1 | 2 | 1 | |||||||||
| IDS | IDS for department of public safety | 1 | 4 | 2 | 1 | |||||||||
| IDS | Install duress for GO | 1 | 1 | |||||||||||
| IDS | IDS open storage | 1 | 1 | 1 | ||||||||||
| 28 August 2017 - 27 August 2018 | ||||||||||||||
| IDS | Duress in child development center | 1 | 1 | |||||||||||
| IDS | Duress in child development center | 1 | 1 | |||||||||||
| IDS | Duress in child development center | 1 | 2 | |||||||||||
| Door control | install electronic door strike with push button release at CPAC facility | 1 | 1 | |||||||||||
| IDS | IDS for weapons warehouse | 1 | 6 | 3 | 4 | |||||||||
| IDS | IDS for open storage | 1 | 1 | 1 | ||||||||||
| IDS | IDS for open storage | 1 | 2 | 3 | 1 | |||||||||
| IDS | IDS portable arms vault | 1 | 2 | 2 | 2 | 1 | ||||||||
| 28 Aug 2018 - 31 August 2019 contract extensions and break in service, no projects |
| 1 September 2019- 17 August 2020 | |||||
| IDS | IDS for EEU (open strorage type vehicle) | 1 | 1 | 2 | 1 |
| IDS | IDS Visitor Welcome Center | 1 | 4 | 5 | |
| 18 August 2020 - 17 August 2021 | |||||
| Projects not required prior to and during the ICIDS upgrade | |||||
| 18 August 2021 - 17 August 2022 | |||||
| Projects were not required during the ICIDS upgrade. | |||||
| 18 August 2022 - 17 August 2023 | |||||
| Projects were not required during the ICIDS upgrade. | |||||
| 18 August 2023 - 17 August 2024 | |||||
| Projects were not required during the ICIDS upgrade. |