This technical exhibit table of contents outlines 49 technical exhibits required for the BASE OPERATION SUPPORT SERVICES contract at Yuma Proving Ground. The solicitation seeks to provide base operations support including real property management, facilities maintenance, utilities operations, environmental services, and equipment and vehicle operations. Technical areas addressed in the exhibits include real property, workload history, performance requirements, contractor facilities, installed equipment, deliverables, electrical substations, emissions inspection checklists, boiler information, water storage tanks, booster stations, groundwater wells, grounds maintenance, roads, petroleum storage and handling, cathodic protection systems, vehicles, labor categories, waterless urinals, septic systems, financial system requirements, installation guides, spill prevention plans, wash racks, hazardous waste disposal, heavy equipment, uninterrupt power supplies, meters, pavement sweeping, excavation permitting, work order history, preventative maintenance checklists, work order formats, transaction codes, recurring work orders, temporary buildings, building inventories, equipment, and containers. The solicitation is issued by the Department of the Army for base operations support services at Yuma Proving Ground.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| TECHNICAL EXHIBIT - Table of Contents | |
| Subject | |
| TE# 1 | Real Property ……………………………………………………………………................................... |
| TE# 2 | Work Load History ………………………………………………………………............................... |
| TE# 3 | Performance Requirement Summary ………………………………………..................... |
| TE# 4 | Contractor Occupied Facilities ………………………………………………......................... |
| TE# 5 | Installed Building Equipment and Equipment In Place …………………............. |
| TE# 6 | Deliverables ……………………………………………………………………..................................... |
| TE# 7 | Electrical Substations …………………………………………………………............................... |
| TE# 8 | ICE PM Checklist ………………………………………………………………................................ |
| TE# 9 | ICE Monthly Visible Emission Checklist …………………………………….................. |
| TE# 10 | Boiler-Heater Visible Emission Inspection Checklist ………………………......... |
| TE# 10.1 | Boiler Tune Up Form …………………………………………………………….............................. |
| TE# 11 | Boiler Size …………………………………………………………….……………................................... |
| TE# 12 | Water Storage Tank ……………………………………………………………................................ |
| TE# 13 | Booster Stations …………………………………………………………………............................... |
| TE# 14 | Ground Water Wells ……………………………………………………………................................ |
| TE# 15 | Grounds Inventory ……………………………………………………………................................... |
| TE# 16 | Roads and Test Courses ………………………………………………………........................... |
| TE# 17 | Petroleum, Oil, Lubricant Facitly Locations and Equipment ………………...... |
| TE# 18 | Petroleum, Oil, Lubricant Facility BI-Monthly Checklist …………………........... |
| TE# 19 | Cathodic Protection System Locations ……………………...……………................... |
| TE# 20 | CPS Preventive Maintenance Checklist …………………………………..................... |
| TE# 21 | GSA Fleet Vehicles ……………………………………………..................................................... |
| TE# 22 | Labor Category per Functional Area ………………………………………....................... |
| TE# 23 | WaterLess Urinals…..........................………………………………………………....................... |
| TE# 24 | Septic Tanks and Locations ..........................................…………………….................. |
| TE# 25 | GFEBS Field Requirements ……………………………………………………......................... |
| TE# 26 | ArMA Field Requirements ……………………………………………………............................ |
| TE# 27 | YPG Installation Guide …............................................................................................ |
| TE# 28 | Spill Prevention Control and Countermeasures ….......................................... |
| TE# 29 | Stormwater Pollution and Prevention Plan ….................................................. |
| TE# 30 | Wash Racks …................................................................................................................ |
| TE #31 | Disposal of Hazardous Material …......................................................................... |
| TE #32 | Heavy Equipment List ….............................................................................................. |
| TE #33 | Uninterrupted Power Supply ….................................................................................. |
| TE #34 | Control Devices and Meters …................................................................................. |
| TE #35 | Pavement Sweeping Area …..................................................................................... |
| TE #36 | Excavation Permit Form …........................................................................................ |
| TE #37 | PWO/IJO History…....................................................................................................... |
| TE #38 | Preventative Maintenance Checklist …............................................................... |
| TE #39 | PWO Format…................................................................................................................ |
| TE #40 | GFEBS Transaction Codes ….................................................................................. |
| TE #41 | Recurring OWO ….......................................................................................................... |
| TE #42 | Incidental Property |
| TE #43 | Builder Inventory Guide …........................................................................................... |
| TE #44 | Builder Condition Manual for Components ….................................................. |
| TE #45 | Builder Inventory and Assessment …................................................................... |
| TE #46 | Builder Component Catalog …................................................................................. |
| TE #47 | ATEC Mission Non-Real Property …................................................................... |
| TE #48 | ATEC Mission Non-Real Property Work Load History …............................ |
| TE #49 | ARC Equipment and Containers…............................................................... |