TE 06 Deliverables.docx

DOCX document 31 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document outlines deliverables and submission timelines for a base operations support services contract with the Department of the Army. The contractor must submit a phase-in plan within 10 days of contract start and designate project and alternate managers in writing within 10 working days. Various plans such as for operations security, pest control, quality control, safety, hazardous materials, physical security, and integrated pest management must be provided between 30-45 days after start, with some requiring annual updates or updates within 5 days of changes. The contractor must also conduct joint inventories of government furnished equipment and property within 45 days and submit status reports on security and surveillance systems within 30 days. Monthly reports on sanitary landfill waste and recycling collection schedules are also required.

View the file

Other files

File Type Posted
W5168W-23-R-0004-Amendment 0006.pdf PDF
TE_02_Workload_History_CY19_Revised.xlsx XLSX spreadsheet
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-24JAN2024.xlsx XLSX spreadsheet
Attachment Y - CROSS REFERENCE MATRIX-W5168W-23-R-0004.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers-05JAN2024.xlsx XLSX spreadsheet
TE_38_Preventative_Maintenance_Checklist-05JAN2024.pdf PDF
TE_02_Workload_History_CY19_05JAN2024.xlsx XLSX spreadsheet
TE_05_Installed_Building_Equipment_and_Equipment In Place-05JAN2024.xlsx XLSX spreadsheet
Attachment B - YUMA Annex B CLS 400 Facilities Maintenance Instructions-04JAN2024.pdf PDF
Attachment A- Annex A-W5168W-23-R-0004-YPG BASOPS-04JAN2024.pdf PDF
Attachment_N_Davis_Bacon_Heavy_29NOV2023.pdf PDF
Attachment_O_Davis_Bacon_Building_29NOV2023.pdf PDF
YPG Attachment List-05JAN2024.xlsx XLSX spreadsheet
Amendment 0004-YPG-W5168W-23-R-0004-5JAN2024.pdf PDF
Amendment 18 OCT 2023 W5168W 23 R 0004 YPG.pdf PDF
Yuma Pricing Matrix CLIN Structure as of 21 Jun 23.xlsx XLSX spreadsheet
TE 27 YPG Installation Design Guide.pdf PDF
TE 47 ATEC - Mission Non-Real Property.pdf PDF
TE 26 ArMA Field Requirments.pdf PDF
TE 34 - Control Devices and Meters.xlsx XLSX spreadsheet
TE 02 Workload History CY19.xlsx XLSX spreadsheet
TE 23 WaterLess Urinals.xlsx XLSX spreadsheet
TE 16 - Roads and Test Courses.xlsx XLSX spreadsheet
TE 13 - Water Pumping Booster Stataion.xlsx XLSX spreadsheet
TE 11 - Boiler Size.xlsx XLSX spreadsheet
TE 07 - Electrical Substations.xlsx XLSX spreadsheet
TE 03 Performance Requirement Summary.docx DOCX document
Attachment I2 - Government Furnished Property Provided Under FAR Clause 52.245-1.xlsx XLSX spreadsheet
Attachment B - YUMA Annex B CLS 400 Facilities Maintenance Instructions.docx DOCX document
Attachment A-YUMA PWS Annex A 08 AUG 2023.docx DOCX document
Attachment T - Past Performance Questionnaire.docx DOCX document
Attachment H - YUMA Annex J CLS 420 Facilities Maintenance Horizontal 11-23-21.docx DOCX document
Attachment C - YUMA Annex C CLS 200 Unaccompanied Management 11-23-21.docx DOCX document
YPG Attachment List-8-8-2023.xlsx XLSX spreadsheet
W5168W23R0004-23 AUG 2023-Solicitation-YPG.pdf PDF
TE 31 Disposal of Hazardous Material Combined.pdf PDF
TE 43 Builder Inventory Guide.pdf PDF
TE 02 Workload History CY22.xlsx XLSX spreadsheet
TE 02 Workload History CY21 (1).xlsx XLSX spreadsheet
TE 33 Uninterrupted Power Supply.xlsx XLSX spreadsheet
TE 32 Heavy Equipment List.xlsx XLSX spreadsheet
TE 09 - ICE Monthly Visible Emissions Checklist.xlsx XLSX spreadsheet
TE 21 GSA Fleet Vehicles.xlsx XLSX spreadsheet
TE 10.1 - Boiler Tune-Up Form.xlsx XLSX spreadsheet
TE 08 - ICE Maintenance CK List.xlsx XLSX spreadsheet
TE 04 - Contractor Occupied Facilities.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers.xlsx XLSX spreadsheet
TE 37 PWO-IJO History.xlsx XLSX spreadsheet
Attachment M - Collective Bargaining Agreement 2021.2024 fully executed 8.10.2021.pdf PDF
Attachment N - Davis-Bacon Heavy.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical Exhibit 6 Deliverables

Phase In Plan
The Phase-In Plan shall be submitted for acceptance by the KO 10 calendar days after the beginning of the Period of Performance.
Annex A 2.1.2.1

PM & Alternate

PM

The PM and Alternate PM(s) shall be delegated, in writing, to the KO and the COR 10 working days after the beginning of the Period of Performance and notify the KO immediately of any change.
Annex A 2.1.11.1.1
OPSEC SOP
Contractor shall submit an OPSEC Standing Operating Procedure (SOP) or Plan within 30 calendar days from the beginning of the Period of Performance to the COR and KO. The Contractor shall furnish all changes to the COR and the KO within 5 working days when changes are made.
Annex A 2.5.2.3
Pesticide Applicators Certification
Contractor shall submit certification IAW the State of Arizona Structural Pest Control Commission to the COR and KO 45 calendar days after the beginning of the Period of Performance, and as required thereafter.
Annex M 1.4.1
Pest Control Business License
The Contractor shall provide its business license and pest management specialist’s names, certification numbers (DoD or State), certification categories, and expiration dates within forty-five (45) calendar days of start of contract, and annually by end of the performance period.
Annex M 1.4.2
Disaster Contingency Plan (ECP)
The plan shall be submitted to the KO and COR no later than 30 calendar days after the beginning of the Period of Performance.
Annex A 2.5.6.3

Dispute Contingency Plan

The Contractor shall submit a Strike Contingency Plan and update this plan as changes occur and shall submit a copy of the proposed plan to the KO and COR no later than no later than 45 calendar days after the beginning of the Period of Performance.
Annex A 2.5.6.4
Quality Control Plan (QCP)
The Contractor shall prepare and submit a QCP to the KO and COR no later than 30 calendar days after the beginning of the Period of Performance and annually 30 calendar days after option period start. A comprehensive

written QCP shall be submitted to the KO and COR within five (5) working days when changes are made.

Annex A 3.3

PMO Program Plan (PMP)
The Contractor shall prepare an automated Preventive Maintenance Plan (PMP) for annual maintenance of buildings, structures, and equipment and submit to the KO and COR for approval no later than 30 calendar days after the beginning of the Period of Performance.
Annex A 2.2.4.1
Safety Plan
The Contractor shall submit the Safety Plan no later than 30 calendar days after the beginning of the Period of Performance to the COR and KO for acceptance and within 5 working days after any update to the Safety Plan.
Annex A

2.5.3.1

Accident Report
Shall provide a verbal report to the COR within 30 minutes of occurrence and an accident report within 3 working days.
Annex A

2.1.6.2

Hazardous Material Spill Plan
The hazardous material spill plan shall be submitted to the KO and COR no later than 30 calendar days after the beginning of the Period of Performance and 10 calendar days prior to changes.
Annex A

2.5.5.4

Physical Security Plan (PSP)
The PSP shall be submitted to the COR and KO for review and acceptance no later than 45 calendar days after the beginning of the Period of Performance and 10

calendar days prior to changes.

Annex A 2.5.1.12

Key Control Plan (KCP)
The Contractor shall develop a Key Control Plan (KCP) and make it available to the KO and COR no later than 45 calendar days after the beginning of the Period of Performance and within 5 working days when changes are made.
Annex A

2.5.1.15

100% Joint Inventory of All GFE and GFP
A joint inventory of 100% of all GFE and GFP shall be scheduled with the COR and the outgoing Contractor and will be completed no later than 45 calendar days after the beginning of the Period of Performance. Inventory will also be provided to the COR annually thereafter IAW with Contractor GFP management plan.
Annex A

7.4

Integrated Pest Management Plan
The updated IPMP shall be submitted during the month of July and resubmitted to the IPMC and COR for annual review approval during the month of July every year thereafter.
Annex M

1.1

CPS Status Report
The Contractor and the COR shall review the current status of all installed CPS included in this contract, no later than 45 calendar days after the beginning of the Period of Performance. The Contractor shall submit a written report to the COR on all installed CPS’s noting discrepancies, system impairments and recommendations, within 30 calendar days after inspection.

Annex H 2.30.4.2

Sanitary Landfill Report
The Contractor shall prepare a monthly sanitary landfill report containing total quantities of refuse received and the estimated total cubic yards of refuse disposed of at the landfill during the period. The report shall be submitted to the COR within five (5) working days after the end of each month.
Annex E

2.1.4.3

Recycle Collection Schedule
The Contractor shall submit the monthly collection schedule to the COR for approval NLT forty-five (45) days after the beginning of the Period of Performance or change in schedule.
Annex E

2.2.1