TE 48 ATEC - Mission Non-Real Property Work Load Data History (1).pdf

PDF 42 KB Posted

Attached to
BASE OPERATION SUPPORT SERVICES (BASOPS) FOR YUMA PROVING GROUND (YPG)
Solicitation number
W5168W23R0004
Issued by

About this file

This document provides a workload data history for non-real property maintenance services at the Army Test and Evaluation Command (ATEC). It details shop service hours, costs, and examples of service requirements for HVAC, plumbing, electrical, carpentry, pest control, and grounds maintenance performed from fiscal year 2022. A total of 985 service hours were completed across all shops at a cost of $210,106. HVAC services accounted for the largest portion at 560 hours and $31,878.97 in costs. The related federal contract opportunity is a solicitation from the Department of the Army for base operation support services at Yuma Proving Ground. The solicitation seeks to acquire services including facilities maintenance, transportation, supply, and other base support functions.

View the file

Other files

File Type Posted
Attachment K - Staffing Matrix-27DEC2023-W5168W-23-R-0004-YPG.xlsx XLSX spreadsheet
TE_50_Landfill_Permit-05JAN2024.pdf PDF
TE_15_Grounds_Inventory_05JAN2024.xlsx XLSX spreadsheet
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical-04JAN2024.pdf PDF
Attachment V-W5168W-23-R-0004-YPG-ServiceContract-WageDetermination.pdf PDF
Attachment_Q_Davis_Bacon_Residential_29NOV2023.pdf PDF
Attachment D - YUMA Annex E CLS 403 Waste Management 05JAN2024.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 05JAN2024.pdf PDF
Attachment J- Yuma Pricing Matrix CLIN Structure-W5168W-23-R-0004-4JAN2024.xlsx XLSX spreadsheet
YUMA Proving Ground Solicitation QA-W5168W-23-R-0004- 05JAN2024-Final.xlsx XLSX spreadsheet
W5168W-23-R-0004-Amendment0002-1NOV2023.pdf PDF
YPG Question and Answer from Draft RFP W5168W 23 R 0004 15JUNE2023.xlsx XLSX spreadsheet
TE 46 Builder Component Catalog.pdf PDF
TE 01 Real Property Inventory.xlsx XLSX spreadsheet
TE 36 Excavation Permit Form.pdf PDF
TE 15 Grounds Inventory.xlsx XLSX spreadsheet
TE 35 Pavement Sweeping Areas.xlsx XLSX spreadsheet
TE 02 Workload History CY20.xlsx XLSX spreadsheet
TE 14 - Ground Water Wells.xlsx XLSX spreadsheet
TE 30 Wash Racks.xlsx XLSX spreadsheet
TE 42 Incidental Property.xlsx XLSX spreadsheet
TE 0 Table of Contents.xlsx XLSX spreadsheet
TE 39 PWO Format.xlsx XLSX spreadsheet
TE 40 GFEBS Transaction Codes.xlsx XLSX spreadsheet
TE 38 Preventative Maintenance Checklist.xlsx XLSX spreadsheet
Attachment I3 - Government Furnished Property Provided Under FAR Clause 52.245-2.xlsx XLSX spreadsheet
Attachment Q - Davis-Bacon Residential.pdf PDF
Attachment F - YUMA Annex G CLS 408 Sand Removal 11-23-21.docx DOCX document
Attachment K - Staffing Matrix.xlsx XLSX spreadsheet
TE 28 Spill Prevention Control and Countermeasures Plan.pdf PDF
TE 24 Septic Tank and locations.xlsx XLSX spreadsheet
TE 31 Disposal of Hazardous Material Combined.pdf PDF
TE 43 Builder Inventory Guide.pdf PDF
TE 02 Workload History CY22.xlsx XLSX spreadsheet
TE 02 Workload History CY21 (1).xlsx XLSX spreadsheet
TE 33 Uninterrupted Power Supply.xlsx XLSX spreadsheet
TE 32 Heavy Equipment List.xlsx XLSX spreadsheet
TE 09 - ICE Monthly Visible Emissions Checklist.xlsx XLSX spreadsheet
TE 21 GSA Fleet Vehicles.xlsx XLSX spreadsheet
TE 10.1 - Boiler Tune-Up Form.xlsx XLSX spreadsheet
TE 08 - ICE Maintenance CK List.xlsx XLSX spreadsheet
TE 04 - Contractor Occupied Facilities.xlsx XLSX spreadsheet
TE 49 ARC Equipment and Containers.xlsx XLSX spreadsheet
TE 37 PWO-IJO History.xlsx XLSX spreadsheet
Attachment M - Collective Bargaining Agreement 2021.2024 fully executed 8.10.2021.pdf PDF
Attachment N - Davis-Bacon Heavy.pdf PDF
Attachment P - Davis-Bacon Highway.pdf PDF
Attachment O - Davis-Bacon Building.pdf PDF
Attachment G - YUMA Annex H CLS 411 Facilities Maintenance Vertical 11-23-21.docx DOCX document
Attachment W - YPG Site Visit Question and Answer W5168W-23-R-0004-15JUNE2023.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATEC

WORK LOAD DATA

TOTAL COST FOR DMO's

Shop SERVICES HOURS TOTAL

HVAC (H) 120 560 $31,878.97

PLUMBING (J) 60 240 $11,608.25

ELECTRICAL (K) 480 1,920 $123,707.50

CARPENTRY (M) 210 520 $24,963.58

PEST CONTROL (P) 95 33 $12,947.86

GROUNDS MAINTENANCE 20 80 $5,000.00

TOTAL 985 3,353 210,106

SPECIALTY SHOP

HVAC

PLUMBING

ELECTRICAL

CARPENTRY

PEST CONTROL

GROUNDS

T.E. 24 - ATEC Miission Non-Real Property Work Load History

Bees, Ants, Snakes, Bugs For Customer and Mission Trailers, GCS, Connex Boxes, Tents

General Grounds Clean-Up Off Cantonment Areas, Landscape at MWD Village, Furniture and Equipment Moves and Removal

HVAC Issues - GCS, Connex Boxes, Mobile Units and SCIF, Hook Up Portable AC Units, Ice Machine Repair

Restroom Trailer(s) and Water Repairs, Irrigation and R/O at MWD Village, Compressor Equipment and Hose Repair

Equipment Cord Repair/Replace, Trailer Power, Grounding Rods, Lightning, Test Power Pedestal Repair

Locksmith Services, General Repair and Carpentry, Install Monitors, Sign Shop

EXAMPLES OF SERVICE REQUIREMENTS PER SHOP

Work Load Data

File details come from the government source that posted it. Updated .