tc001-Traffic Control.pdf

PDF 77 KB Posted

Attached to
Davenport Tile Boring Replacement
Solicitation number
645-RFB-1746-2025
Issued by
Scott County, Iowa

About this file

This is a Traffic Control Standard Road Plan document issued by the Iowa Department of Transportation (Iowa DOT) as a design standard for work not affecting traffic on two-lane or multi-lane roads. The document provides specifications for slow-moving operation vehicles stopped on shoulders for less than one hour, requiring placement of 48" x 48" traffic signs (W21-6 for survey crews and W20-1 for road work ahead) positioned 1,000 feet in the direction of traffic. All vehicles must be equipped with amber revolving lights or amber strobe lights, which should be used whenever appropriate. The standard emphasizes that work vehicles should be located as far from the open traffic lane as possible when parked, entrances and driveways should not be blocked, and work must not interfere with traffic flow. For operations lasting longer than one hour, contractors are directed to reference alternative traffic control plans TC-202 or TC-402. This standard applies to the Davenport Tile Boring Replacement project (RFB #645-RFB-1746-2025), which includes subdrain pipe replacement, steel encasement, topsoil management, mulching, seeding, and silt fence installation.

The traffic control specifications outlined in this document serve as mandatory requirements for bidders responding to the Davenport project, with a bid opening scheduled for May 7, 2025, at 5:25 PM CDT and closing on May 29, 2025, at 1:00 PM CDT. Site visits are permitted Monday through Thursday between 10:00 AM and 2:00 PM, with specific safety protocols required for interstate shoulder access. The document does not contain pricing information, set-asides, incumbent vendor details, or funding sources, as it functions as a technical standard rather than a procurement notice. Bidders must comply with these traffic control standards as part of their overall project execution plan to ensure worker and public safety during construction activities scheduled for completion by November 15, 2025.

View the file

Other files

File Type Posted
Google Earth with Map.pdf PDF
Seeding in Rural Areas.pdf PDF
Estimated Project Quantities.pdf PDF
I-80 PCC pave I-280 to US Hwy 61 9.pdf PDF
ec201-Silt Fence.pdf PDF
Amendment 1.pdf PDF
AIA Sample Form.pdf PDF
1311041-event.pdf PDF
dr302-Subdrains.pdf PDF
ec204-Perimeter, slope and ditch check sediment control devices.pdf PDF
tc402-Traffic Control.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Traffic Control

Possible Contract Item:

SLOW-MOVING OPERATION

VEHICLE STOPPED ON SHOULDER FOR LESS THAN ONE HOUR

1000'

Direction of Traffic

Traffic Sign

Or

LEGEND

Pickup

PickupPickup

48" x 48"

W21-6

SURVEY

CREW

48" x 48"

W20-1

ROAD

WORK

AHEAD

TC-202 or TC-402.

For work lasting longer than one hour, refer to amber strobe light.

Equip all vehicles with an amber revolving light or should be used whenever appropriate.

traffic lane as possible. Entrances and driveways

When parked, locate vehicles as far from the open

Do not allow work to interfere with the flow of traffic.

TC-1

REVISION

10-15-19

SHEET 1 of 1

REVISIONS: New logo.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

(TWO-LANE OR MULTI-LANE)

WORK NOT AFFECTING TRAFFIC

DOT

tc001

File details come from the government source that posted it. Updated .