ec201-Silt Fence.pdf

PDF 618 KB Posted

Attached to
Davenport Tile Boring Replacement
Solicitation number
645-RFB-1746-2025
Issued by
Scott County, Iowa

About this file

This is a Standard Road Plan specification document issued by the Iowa Department of Transportation detailing silt fence installation requirements for erosion control in construction projects. The document provides comprehensive technical specifications and installation guidelines for silt fence systems across multiple application scenarios, including standard fence installations, ditch checks, inlet protection, shallow ditch sections, areas without ditches, and trenchless construction applications. Key project elements include 544 linear feet of subdrain pipe replacement, 325 cubic yards of topsoil management, 50 linear feet of steel encasement, and 0.20 acres of mulching and seeding for the Davenport Tile Boring Replacement project. The specification requires silt fence to be installed continuously up to a maximum of 200 feet per segment, with humps or flares extending 20 feet up slopes to contain runoff. All posts must be embedded 28 inches below ground line, with 4-foot minimum to 4-foot maximum post spacing depending on installation type. The document specifies two installation options: machine installation using a silt fence machine with compaction via rubber-tired vehicle, or manual installation with mechanical or pneumatic tamper compaction. Engineering fabric must be secured to steel posts using 50-pound cable ties or wire, with a minimum 10-inch trench and 4-inch offset to contain runoff.

The specification references contract item codes 100-18 and 100-17 for machine and manual installation respectively, with detailed attachment specifications and post positioning requirements varying by application type. The document, Revision 6 dated April 20, 2021, provides technical drawings and cross-sectional views for six distinct silt fence configurations to address different topographical and construction scenarios. Bidders must demonstrate understanding of these technical requirements, including proper trench dimensions, post embedment depths, fabric attachment methods, and compaction procedures. The comprehensive nature of these specifications indicates that silt fence installation is a significant erosion control component of the larger Davenport Tile Boring Replacement project, with bid opening scheduled for May 7, 2025, and project completion anticipated by November 15, 2025.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

100-18

100-17

A

Silt Fence

Flo w

A

Flow

Contour Lines

Flow

Silt Fence

Fabric

Engineering

Fabric

Engineering

Post 4'-0" min.

'T' Steel Fence

Fabric

Engineering required on slope.

to the ground contour when

Install Silt Fence parallel

Post 4'-0" min.

'T' Steel Fence

ROW

Existing or Proposed Right of Way

Flo w

Flow

B

Typical Installation

Toe of Foreslope

Flow

Flow B

SECTION B-B

FRONT VIEW

SECTION A-A

SILT FENCE - MACHINE AND MANUAL INSTALLATION

1 1

Ground Line

PLAN FOR SILT FENCE

10' min.

8' max. Post Spacing

Possible Tabulations:

Silt Fence for Ditch Checks

Silt Fence

Possible Contract Items:

100-18

100-17

(Manual Installation)

Bottom of Trench

19'' min.

INFO

DESIGNER

Belt

Steel Post

Fabric

ATTACHMENT TO POST

BACK VIEW

From Ground

Approx 4" or Cable Tie

Tie Bottom Wire

(evenly spaced)

Cable Ties

Wire or

Steel Post

Belt

Fabric

ATTACHMENT TO POST

PROFILE VIEW

(manual installation)

4'' x 10'' trench

(manual installation)

4'' x 10'' trench

EC-201

REVISION

6 04-20-21

SHEET 1 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

pneumatic tamper.

For manual installation, compact with a mechanical or of silt fence at least two times with a rubber-tired vehicle.

For machine installation, compact by driving over each side installation.

(trench) installation if phyical conditions prohibit machine

Install all silt fence using a silt fence machine. Use manual

10" min.

4" Offset to contain runoff as shown.

flare up the slope on both ends 20 feet of the segment

200 feet. For every segment of silt fence that is placed, Place silt fence continuously up to a maximum length of as shown.

hump that extends 20 feet up the slope to contain runoff

- Place silt fence continuously. Every 200 feet, place a contain runoff as shown, or up the slope on both ends 20 feet of the segment to feet. For every 200 foot segment of fence placed, flare

- Place silt fence continuously up to a maximum of 200

The contractor has two installation options:

Refer to Tab. 100-17

Embed all posts 28 inches below the ground line.

along bottom of trench.

For manual installation only, fold engineering fabric encompassing the belt. See attachment to post.

cable ties (50 lb.) or wire passing through or

Secure top of engineering fabric to steel posts using

4" Offset

(evenly spaced)

Cable Ties

Wire or http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0100-18.PDF http://www.iowadot.gov/design/tnt/PDFsandWebFiles/IndividualPDFs/e0100-17.PDF http://www.iowadot.gov/design/dmanual/01e-06.pdf

Flow FlowDitch

Silt Fence Ditch Check

Foreslope

Flow Flow

Backslope

Fabric

Engineering

SECTION C-C

C C

SECTION C-C

Trench

4" x 12"

DITCH CHECK - MACHINE INSTALLATION DITCH CHECK - MANUAL INSTALLATION

FRONT VIEW

Flow

Fabric

Engineering

Flow

4' max. Post Spacing

Post 4' min.

'T' Steel Fence Post 4' min.

'T' Steel Fence

Bac kslo pe

(Manual Installation)

Bottom of Trench

19" min.

PLAN FOR DITCH CHECK (TYPE 1)

LOCATION STATION

Foreslope

19" min.

Refer to Tab. 100-18

Minimum end span (in feet) = 2 X Backslope (H:V).

Minimum end span (in feet) = 2 X Foreslope (H:V).

and space remaining posts equally.

Locate posts at toe of foreslope and toe of backslope

Embed all posts 28 inches below the ground line.

along bottom of trench.

For manual installation only, fold engineering fabric encompassing the belt. See attachment to post.

cable ties (50 lb.) or wire passing through or

Secure top of engineering fabric to steel posts using

EC-201

REVISION

6 04-20-21

SHEET 2 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

10" min.

4" Offset 4" Offset

Ditch

Foreslope

Flow

Backslope

C C

Silt Fence

Inlet

Silt Fence A

A

Flow

FlowFlow

Flow

Intake

Contour Lines

LOCATION STATION

PLAN FOR SILT FENCE AT INTAKE (TYPE 2)

Refer to Tab. 100-1812

LOCATION STATION

PLAN FOR SILT FENCE DITCH CHECK AT INLET (TYPE 3)

EC-201

REVISION

6 04-20-21

SHEET 3 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

FRONT VIEW

4' max. Post Spacing

5 8

19" min.

19" min.

Bottom of Trench

PLAN FOR SILT DITCH (SHALLOW DITCH SECTION-TYPE 4)

Ba cks lop e

Ditch FlowA A

Foreslope

Backslope

Silt Fence Ditch Check

FlowFlow

6'

6'

6'

6'

See Detail 'A'

Detail 'A'

Foreslope

ROW Line

LOCATION STATION

Refer to Tab. 100-18 back slope intercept and the other beyone the intercept.

transverse to parallel installation. Place one post at the

Place posts shown in Detail 'A' to transition from

Minimum end span (in feet) = 2 X Foreslope (H:V).

and space remaining posts equally.

Locate posts at toe of foreslope and toe of backslope

Embed all posts 28 inches below the ground line.

encompassing the belt. See attachment to post..

cable ties (50 lb.) or wire passing through or

Secure top of engineering fabric to steel posts using

EC-201

REVISION

6 04-20-21

SHEET 4 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

Perimeter Silt Fence (see EC-201 page 1)

4' max. Post Spacing

5 97

Bottom of Trench

FRONT VIEW

19" min.

PLAN FOR SILT FENCE (NO DITCH SECTION-TYPE 5)

19" min.

Flow

Flow

A AFlow Flow

Silt Fence Ditch Check

Flow Flow

6'

6'

6'6'

Detail 'B'

See Detail 'B'

Flow

Foreslope

ROW Line

LOCATION STATION

Silt Fence

Refer to Tab. 100-18 intercept of the foreslope.

the installation should approximately parallel the transverse to parallel installation. The parallel portion of

Place posts as shown in Detail 'B' to transition from spacing

Locate posts at toe of foreslope. Locate posts at 4 foot

Minimum end span (in feet) = 2 X Foreslope (H:V).

Embed all posts 28 inches below the ground line.

encompassing the belt. See attachment to post..

cable ties (50 lb.) or wire passing through or

Secure top of engineering fabric to steel posts using

EC-201

REVISION

6 04-20-21

SHEET 5 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

Perimeter Silt Fence (see EC-201 page 1)

LAUNCHING PIT

RECEIVING PIT

Excavated Material

Silt Fence

15' min

15' min

Boring, Jacking, or Tunneling

11 Refer to Tab. 100-17

Silt Fence

PLAN FOR SILT FENCE FOR TRENCHLESS CONSTRUCTION

Excavated Material

EC-201

REVISION

6 04-20-21

SHEET 6 of 6

REVISIONS:Modified trench to 10". Added circle notes 13 & 14.

APPROVED BY DESIGN METHODS ENGINEER

STANDARD ROAD PLAN

SILT FENCE

eec201
eec201
eec201
eec201
eec201
eec201

File details come from the government source that posted it. Updated .