This document is a Table of Contents for the Construction Task Catalog published by The Gordian Group, Inc., for San Mateo County's Electrical division, effective 2026. The catalog serves as the technical specifications guide for the County's Electrical Job Order Contracts (JOC 2716 and 2717) under Class C10 license. The document outlines comprehensive construction task categories and subcategories organized by division numbers, including General Requirements (01), Existing Conditions (02), Metals (05), Wood and Composites (06), Thermal and Moisture Protection (07), Finishes (09), Special Construction (13), Electrical (26), Communications (27), Electronic Safety and Security (28), and Earthwork (31). Within the Electrical division (26), the catalog details specifications for operations and maintenance of electrical systems, medium and low-voltage electrical distribution, transformers, switchgear, circuit protection devices, power generating and storing equipment, and comprehensive lighting systems. The catalog also covers communications systems (27), including structured cabling, data communications, voice communications, and audio-video systems, as well as electronic safety and security systems (28), encompassing access control, video surveillance, and fire detection and alarm systems.

The Table of Contents provides detailed page references for each task specification, establishing the technical standards and requirements that contractors must follow when executing work under the electrical job order contracts with San Mateo County. Bids for JOC 2716 and 2717 are due December 10, 2026, with the County intending to award up to two contracts, each with an aggregate fiscal obligation not to exceed $2 million and a maximum individual term of one year. The apparent lowest, responsive, and responsible bidder selected for each JOC is excluded from consideration for each successive contract. There are no stated set-asides, preferences, or local-vendor requirements for this solicitation. The document does not identify specific project quantities, site visits, or bidder's conferences within the Table of Contents itself, as these details are contained in the related solicitation documents referenced in the contract opportunity summary.

View the file

Other files

File Type Posted
Electrical_Job_Order_Contracts_(JOC_2716_and_2717)_-_Class_C10_License.pdf PDF
_G_EEO_Certification_of_Compliance.pdf PDF
Using_The_Construction_Task_Catalog®_-_Distribution.pdf PDF
_I_Equal_Benefits_Compliance_Ordinance.pdf PDF
_D_EEO_Program_Supplemental_General_Conditions.pdf PDF
Construction_Task_Catalog®_-_Distribution.pdf PDF
Technical_Specifications_-_Distribution.pdf PDF
EEO_Questionnaire_for_JOC_2716_and_2717_-_Electrical.pdf PDF
EEO_Contractor_Report_Form_JOC_2716_and_2717_-_Electrical.pdf PDF
Anti-Trust_Laws_Questionnaire_JOC_2716_and_2717_-_Electrical.pdf PDF
Contractor's_Declaration_Form_JOC_2716_and_2717_-_Electrical.pdf PDF
Bid_Bond_JOC_2716_and_2717_-_Electrical.pdf PDF
San_Mateo_County_PLA_(executed)_2025.pdf PDF
JOC_2027_Sample_Agreement.pdf PDF
JOC_2027_Contract_Documents_General_Conditions_Special_Provisions_final.pdf PDF
Payment_and_Performance_Bonds_Sample.pdf PDF
JOC_2027_Bid_Form_final.xlsx XLSX spreadsheet
_K_Contractor_Employee_Jury_Service_Ordinance_No.4324_Chapter_2.85.pdf PDF
PLA_Resolution.pdf PDF
_O_JOC_System_License_and_Fee_Agreement_Sample.pdf PDF
Standard_Contract_Template_-_Under_$200K_DRAFT.docx DOCX document
Standard_Contract_Template_-_Over_$200K_DRAFT.docx DOCX document
_L_Recycling_and_Diversion_of_Debris_from_Construction_and_Demolition_Ordinance_No._4099_Chapter_4.105.pdf PDF
Show all 23

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table of Contents

2026 copyright © 2026 The Gordian Group, Inc.

County of San Mateo, Electrical Page TOC - 1

00 Using The Construction Task Catalog® 1

01 General Requirements 1 01 10 Summary

01 11 Summary Of Work 01 20 Price and Payment Procedures

01 22 Unit Prices 01 30 Administrative Requirements

01 31 Project Management and Coordination 01 35 Special Procedures

01 40 Quality Requirements 01 41 Regulatory Requirements 01 42 References 01 45 Quality Control

01 50 Temporary Facilities and Controls 01 51 Temporary Utilities 01 52 Construction Facilities 01 53 Temporary Construction 01 54 Construction Aids 01 55 Vehicular Access and Parking 01 56 Temporary Barriers and Enclosures 01 57 Temporary Controls 01 58 Project Identification

01 60 Product Requirements 01 66 Product Storage and Handling Requirements

01 70 Execution and Closeout Requirements 01 71 Examination and Preparation 01 74 Cleaning and Waste Management

02 Existing Conditions 1 02 20 Assessment

02 25 Existing Material Assessment 02 40 Demolition and Structure Moving

02 41 Demolition 02 60 Contaminated Site Material Removal

02 61 Removal and Disposal of Contaminated Soils 02 80 Facility Remediation

02 81 Transportation and Disposal of Hazardous Materials 02 82 Asbestos Remediation 02 83 Lead Remediation 02 84 Polychlorinated Biphenyl Remediation 02 87 Bio-Hazard Material Remediation 02 89 Hazmat Ancillary Tasks and Support

02 90 Disaster Recovery 02 90 50 Cleaning and Disaster Cleanup 02 90 55 Emergency Clean-up

05 Metals 1 05 01 Maintenance of Metals

05 01 50 Maintenance of Metal Fabrications 05 01 70 Maintenance of Decorative Metal

05 05 Common Work Results for Metals 05 05 19 Post-Installed Concrete Anchors 05 05 21 Fastening Methods for Metal 05 05 23 Metal Fastenings

05 10 Structural Metal Framing 05 12 Structural Steel Framing 05 13 Structural Stainless-Steel Framing 05 14 Structural Aluminum Framing

05 20 Metal Joists 05 21 Steel Joist Framing

05 30 Metal Decking 05 31 Steel Decking copyright © 2026 The Gordian Group, Inc. 2026 Page TOC - 2 County of San Mateo, Electrical

05 36 Composite Metal Decking 05 40 Cold-Formed Metal Framing

05 41 Structural Metal Stud Framing 05 42 Cold-Formed Metal Joist Framing 05 43 Slotted Channel Framing 05 45 Metal Support Assemblies

05 70 Decorative Metal 05 71 Decorative Metal Stairs 05 73 Decorative Metal Railings 05 75 Decorative Formed Metal

06 Wood, Plastics, and Composites 1 06 01 Maintenance of Wood, Plastics, and Composites

06 01 20 Maintenance of Finish Carpentry 06 05 Common Work Results for Wood, Plastics, and Composites

06 05 23 Wood, Plastic, and Composite Fastenings 06 05 73 Wood Treatment

06 10 Rough Carpentry 06 11 Wood Framing 06 13 Heavy Timber Construction 06 15 Wood Decking 06 16 Sheathing

07 Thermal And Moisture Protection 1 07 60 Flashing and Sheet Metal

07 62 Sheet Metal Flashing and Trim 07 63 Sheet Metal Roofing Specialties 07 64 Sheet Metal Wall Cladding 07 65 Flexible Flashing

07 90 Joint Protection 07 91 Preformed Joint Seals 07 92 Joint Sealants 07 95 Expansion Control

09 Finishes 1 09 01 Maintenance of Finishes

09 01 20 Maintenance of Plaster and Gypsum Board 09 01 30 Maintenance of Tiling 09 01 50 Maintenance of Ceilings 09 01 60 Maintenance of Flooring 09 01 80 Maintenance of Acoustic Treatment 09 01 90 Maintenance of Painting and Coating

09 05 Common Work Results for Finishes 09 05 61 Common Work Results for Flooring Preparation 09 05 71 Acoustic Underlayment

09 20 Plaster and Gypsum Board 09 22 Supports for Plaster and Gypsum Board 09 23 Gypsum Plastering 09 24 Cement Plastering 09 28 Backing Boards and Underlayments 09 29 Gypsum Board

09 50 Ceilings 09 51 Acoustical Ceilings 09 53 Acoustical Ceiling Suspension Assemblies 09 54 Specialty Ceilings 09 57 Special Function Ceilings

09 80 Acoustic Treatment 09 81 Acoustic Insulation 09 84 Acoustic Room Components

09 90 Painting and Coating 09 91 Painting 09 93 Staining and Transparent Finishing 09 96 High-Performance Coatings 09 97 Special Coatings

2026 copyright © 2026 The Gordian Group, Inc.

County of San Mateo, Electrical Page TOC - 3

13 Special Construction 1 13 40 Integrated Construction

13 46 Lightning Protection Systems

26 Electrical 1 26 01 Operation and Maintenance of Electrical Systems

26 01 10 Operation and Maintenance of Medium-Voltage Electrical Distribution 26 01 20 Operation and Maintenance of Low-Voltage Electrical Distribution 26 01 26 Maintenance Testing of Electrical Systems 26 01 30 Operation and Maintenance of Facility Electrical Power Generating and Storing Equipment 26 01 50 Operation and Maintenance of Lighting

26 05 Common Work Results for Electrical 26 05 13 Medium-Voltage Cables 26 05 19 Low-Voltage Electrical Power Conductors and Cables 26 05 23 Control-Voltage Electrical Power Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 33 Raceway and Boxes for Electrical Systems 26 05 36 Cable Trays for Electrical Systems 26 05 39 Underfloor Raceways for Electrical Systems 26 05 43 Underground Ducts and Raceways for Electrical Systems 26 05 46 Utility Poles for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 83 Wiring Connections

26 09 Instrumentation and Control for Electrical Systems 26 09 23 Lighting Control Devices

26 10 Medium-Voltage Electrical Distribution 26 11 Substations 26 12 Medium-Voltage Transformers 26 13 Medium-Voltage Switchgear 26 18 Medium-Voltage Circuit Protection Devices 26 19 High-Voltage Circuit Protection

26 20 Low-Voltage Electrical Distribution 26 21 Low-Voltage Electrical Service Entrance 26 22 Low-Voltage Transformers 26 24 Switchboards and Panelboards 26 25 Enclosed Bus Assemblies 26 27 Low-Voltage Distribution Equipment 26 28 Low-Voltage Circuit Protective Devices 26 29 Low-Voltage Controllers

26 30 Facility Electrical Power Generating and Storing Equipment 26 31 Photovoltaic Collectors 26 32 Packaged Generator Assemblies 26 33 Battery Equipment 26 35 Power Filters and Conditioners 26 36 Transfer Switches

26 40 Electrical And Cathodic Protection 26 43 Surge Protective Devices

26 50 Lighting 26 51 Interior Lighting 26 52 Safety Lighting 26 54 Classified Location Lighting 26 55 Special Purpose Lighting 26 56 Exterior Lighting

27 Communications 1 27 05 Common Work Results for Communications

27 05 26 Grounding and Bonding for Communications Systems 27 05 29 Hangers and Supports for Communications Systems 27 05 33 Conduits and Back Boxes for Communications Systems 27 05 36 Cable Trays for Communications Systems 27 05 39 Surface Raceways for Communications Systems 27 05 43 Underground Ducts and Raceways for Communications Systems 27 05 46 Utility Poles for Communications Systems 27 05 53 Identification for Communications Systems

27 10 Structured Cabling copyright © 2026 The Gordian Group, Inc. 2026 Page TOC - 4 County of San Mateo, Electrical

27 11 Communications Equipment Room Fittings 27 13 Communications Backbone Cabling 27 15 Communications Horizontal Cabling 27 16 Communications Connecting Cords, Devices, and Adapters

27 20 Data Communications 27 21 Data Communications Network Equipment

27 30 Voice Communications 27 32 Voice Communications Terminal Equipment

27 40 Audio-Video Communications 27 41 Audio-Video Systems

27 50 Distributed Communications and Monitoring Systems 27 51 Distributed Audio-Video Communications Systems 27 52 Healthcare Communications and Monitoring Systems 27 53 Distributed Systems

28 Electronic Safety and Security 1 28 05 Common Work Results for Electronic Safety and Security

28 05 26 Grounding and Bonding for Electronic Safety and Security 28 05 53 Identification for Electronic Safety and Security

28 10 Access Control 28 15 Integrated Access Control Hardware Devices 28 16 Access Control Interfaces 28 18 Security Access Detection Equipment

28 20 Video Surveillance 28 21 Surveillance Cameras

28 40 Life Safety 28 41 Radiation Detection and Alarm 28 42 Gas Detection and Alarm 28 43 Fuel Oil Detection and Alarm 28 46 Fire Detection and Alarm 28 47 Mass Notification 28 49 Electronic Personal Protection Systems

31 Earthwork 1 31 01 Maintenance of Earthwork

31 01 20 Maintenance of Earth Moving 31 05 Common Work Results for Earthwork

31 05 13 Soils for Earthwork 31 05 16 Aggregates for Earthwork 31 05 36 Equipment Delivery, Pickup, Mobilization and Demobilization

31 20 Earth Moving 31 22 Grading 31 23 Excavation and Fill

Table of Contents