Tab 1 - DMAFB_EUL_RFLP.pdf
PDF 522 KB Posted
- Attached to
- Request for Lease Proposal (RFLP) Enhanced Use Leasing Project Davis-Monthan Air Force Base, AZ
- Solicitation number
- AFCEC26R0003RFLP
About this file
This is a Request for Lease Proposal (RFLP) issued by the Air Force Civil Engineer Center (AFCEC) for an Enhanced Use Lease (EUL) project at Davis-Monthan Air Force Base in Tucson, Arizona.
The Government seeks proposals to lease approximately 500 acres of property for private commercial (non-Federal government) use, with financing, development, construction, installation, ownership, maintenance, and operations to be performed by the lessee. The Property is subject to a Master Lease with the City of Tucson expiring June 30, 2052, and subleases may not exceed the current Master Lease term unless extended. The RFLP Response Due Date is November 2, 2026, at 5:00 PM Central Time, with proposals submitted via email to jeffrey.blankenship.2@us.af.mil with a courtesy copy to afcec.eul@us.af.mil. Hard copies are not accepted, and submissions must not exceed 10 megabytes in total size with a maximum of 40 pages (excluding financial pro formas, drawings, mandatory clauses, resumes, and specifications).
The Government will evaluate proposals using a two-phase best-value process based on four equally-weighted factors: (1) Project Description addressing market analysis and feasibility; (2) Return to the Government including proposed consideration (rent/revenue sharing) and financial pro forma; (3) Organization, Experience, and Capability; and (4) Integrated Project Plan and Schedule. The Government's preferred consideration structure is guaranteed base cash rent with additional revenue sharing plus in-kind consideration. A mandatory Combat Arms Training and Maintenance (CATM) Effort must be completed at the lessee's sole expense as a pre-condition to development; the Government may grant additional evaluation credit for CATM relocation. The Property will be leased "as-is/where-is" without warranties, and the lessee must assume all property taxes, obtain all permits, provide utilities and emergency services, establish a demolition reserve account, and maintain specified insurance. A $250,000 payment for Government transaction costs is required at lease execution. Lease negotiations will commence with the selected Potential Lessee within 180 days of notification, with Congressional notification and reporting requirements under 10 U.S.C. §2667 and §2662 required prior to final execution.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Lease Proposal No. AFCEC-26-R-0003 Page 1 of 26
Davis-Monthan Air Force Base EUL
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
United States Department of the Air Force
Air Force Civil Engineer Center
Installations Directorate (AFCEC)
Enhanced Use Leasing Project
Davis-Monthan Air Force Base, AZ
Request for Lease Proposal (RFLP) (Used traditional
EUL RFLP template)
RFLP No. AFCEC-26-R-0003
PROPOSALS ARE DUE NO LATER THAN
5:00 P.M. CT on Proposal due date in accordance with Section 4.3, Submission of Responses
Request for Lease Proposal No. AFCEC-26-R-0003 Page 2 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
TABLE OF CONTENTS
1. EXECUTIVE SUMMARY
2. EXISTING CONDITIONS
3. GENERAL LEASE REQUIREMENTS
3.1. STATUTORY REQUIREMENTS – 10 U.S.C. § 2667
3.2. OTHER TERMS AND REQUIREMENTS
3.3. FINANCIAL REQUIREMENTS
3.4. DEVELOPMENT AND USE REQUIREMENTS
4. INSTRUCTIONS TO OFFEROR(S)
4.1. GENERAL
4.2. RESTRICTION ON DISCLOSURE AND USE OF DATA
4.3. SUBMISSION OF RESPONSES
4.4. SECTION A, FACTOR 1 – PROJECT DESCRIPTION SUBMITTAL REQUIREMENTS
4.5. SUBFACTOR 1.1: PROJECT CONCEPT, MARKET ANALYSIS, AND PROJECT FEASIBILITY . 15
4.6. SUBFACTOR 1.2: PROJECT DEVELOPMENT, CONSTRUCTION AND OPERATIONS
4.7. SECTION B, FACTOR 2 – RETURN TO THE GOVERNMENT
4.8. SUBFACTOR 2.1: PROPOSED CONSIDERATION
4.9. SUBFACTOR 2.2: FINANCIAL PRO FORMA
4.10. SECTION C, FACTOR 3 – ORGANIZATION, EXPERIENCE AND CAPABILITY
4.11. SUBFACTOR 3.1: ORGANIZATION AND EXPERIENCE
4.12. SUBFACTOR 3.2: FINANCIAL CAPABILITY
4.13. SECTION D, FACTOR 4 – INTEGRATED PROJECT PLAN AND SCHEDULE
5. BASIS OF POTENTIAL LESSEE SELECTION
5.1. SOURCE SELECTION STRATEGY
5.1.1. BEST VALUE SELECTION
5.1.2. FACTOR 1: PROJECT DESCRIPTION
5.1.3. FACTOR 2: RETURN TO THE GOVERNMENT
5.1.4. FACTOR 3: ORGANIZATION, EXPERIENCE AND CAPABILITY
5.1.5. FACTOR 4: INTEGRATED PROJECT PLAN AND SCHEDULE
5.2. EVALUATION COLOR RATINGS
6. NEGOTIATIONS
6.1. STRATEGY
6.2. LEGAL DOCUMENTATION
7. CONGRESSIONAL NOTIFICATION AND REPORTING REQUIREMENTS
7.1. DOCUMENTATION
7.2. CLARIFICATIONS/QUESTIONS
Request for Lease Proposal No. AFCEC-26-R-0003 Page 3 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
LIST OF APPENDICES
Appendix A-1 Depiction of the Property and Map
Appendix A-2 Existing Improvement(s)
Appendix A-3 CATM Effort General Requirements
Appendix A-3a CATM Range – Administrative Facility Concept
Appendix A-3b CATM Range Baffles Concept
Appendix A-3c CATM Range – Development Concept
Appendix B Existing Encumbrances and Third-Party Property Interests
Appendix C Insurance Requirements
Appendix D Non-Disclosure Provisions
Appendix E Mandatory Clauses
Appendix F Offeror’s Cover Page
Appendix G Pre-Offer Inquiry (“POI”) Form
Appendix H Environmental Baseline Survey
Appendix I General Requirements
Request for Lease Proposal No. AFCEC-26-R-0003 Page 4 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
LIST OF TABLES
Table 1 – Evaluation Factors, Subfactors and Submittal Format Table 2 – Performance Color Ratings Table 3 – Confidence Color Ratings
Request for Lease Proposal No. AFCEC-26-R-0003 Page 5 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
1. EXECUTIVE SUMMARY
a. Executive Order 13327, Federal Real Property Asset Management, establishes “It is the policy of the United States to promote the efficient and economical use of America’s real property assets and to assure management accountability for implementing Federal real property management reforms.” Furthermore, policy from the Deputy Assistant Secretary of the Air Force
(Installations) directs, “The Air Force cannot afford to disregard or discount the value of any asset, and we must optimize the real and potential value of those assets ….”
b. Title 10 U.S.C. § 2667 (the “Enabling Statute”), as amended, allows the
Government to lease real property to non-Federal entities in exchange for consideration in an amount that is not less than the fair market value of the leasehold interest.
c. Pursuant to the foregoing Executive Order and the Enabling Statute, the
Department of the Air Force (the “Government”) is issuing this Request for Lease Proposal (the
“RFLP”) to solicit proposals from entities (“Offeror(s)”) interested in entering into a long-term ground lease (the “Lease”) to lease all or a portion of that certain real property located at Davis-
Monthan AFB (the “Installation”), which is an active military installation located in Tucson, Arizona comprised of approximately five hundred (500) acres of land (the “Property”) from the
Government for the purposes of financing, permitting, developing, constructing, installing, owning, maintaining and operating improvements upon the Property for the Lessee’s private commercial (non-Federal government) use (collectively, the “Project”). The Government does not own the Property in fee and as such this RFLP is actually an opportunity for sublease(s) from the
Government. The sublease(s) will be subject to all applicable terms, conditions and covenants contained in Lease No. DA-04-353-ENG-4430, between the United States, acting by and through the Secretary of Air Force and the City of Tucson, Arizona, dated March 21, 1955, as amended
(“Master Lease”). The Master Lease is currently set to expire on 30 June 2052. Although the
Government intends to extend the Master Lease to allow for subleases of up to fifty (50) years, with the possibility of a negotiated renewal/extension, unless and until such Master Lease extension is executed, any sublease term may not exceed the current term of the Master Lease. In accordance with and subject to the terms, requirements, and conditions of this RFLP, the
Government will evaluate all proposals received in order to select one or more Offeror(s) as
“Potential Lessees” with whom to enter into lease negotiations. A Potential Lessee with whom the Government actually makes and enters into a written and legally binding lease agreement is hereinafter referred to as a “Lessee.” A Potential Lessee may not actually become a Lessee. As noted above, the Government may elect to negotiate with more than one Potential Lessee to seek maximum value for the Government from the Property. This could potentially result in the
Property being divided into more than one parcel with each portion of the Property being leased to a different Lessee.
d. The Government’s objectives in issuing this RFLP and leasing the Property include, but are not limited to, the following (collectively, the “EUL Objectives”):
1. Selecting a Potential Lessee that will lease and optimize the use of the
Property in accordance with the Enabling Statute and within the constraints and restrictions documented in the RFLP;
2. Selecting a Potential Lessee that will optimize the in-kind consideration to be received by the Government in exchange for granting a leasehold interest in the Property.
Request for Lease Proposal No. AFCEC-26-R-0003 Page 6 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
3. Selecting a Potential Lessee that will lease and use the Property in a manner that minimizes risk to the Government.
4. Selecting a Potential Lessee that will provide an active development commitment, starting at lease signing.
5. Selecting a Potential Lessee that will lease and use the Property in a manner that is compatible with the Government mission and adjacent Government uses;
6. Selecting a Potential Lessee that will lease and use the Property in a manner that minimizes environmental and cultural impacts;
7. Selecting a Potential Lessee that will lease and use the Property consistent with best commercial practices; and
Selecting a Potential Lessee that will lease and use the Property in a manner that supports positive relations with local Governmental authorities and the communities adjacent to the Property.
2. EXISTING CONDITIONS
a. THE PROPERTY WILL BE LEASED “AS-IS/WHERE-IS” WITHOUT ANY
WARRANTIES, REPRESENTATIONS OR GUARANTEES, EITHER EXPRESSED OR
IMPLIED, OF ANY KIND, NATURE OR TYPE WHATSOEVER, FROM OR ON BEHALF OF
THE GOVERNMENT.
b. The Potential Lessee shall rely solely and exclusively on their own independent investigation and due diligence in determining whether the Property is suitable for their proposed use. The Property is more generally depicted in Appendix A-1 (“Depiction of the Property”) attached hereto and incorporated herein by this reference. The Property contains certain
Government-owned improvements and personal property more expressly described in Appendix
A-2 (the “Existing Improvements”) that will, unless otherwise provided in this RFLP, be leased to the Lessee upon execution of the Lease. The Property shall be deemed to include Existing
Improvements. Any additional improvements and personal property to be constructed or placed on the Property by the Lessee (the “EUL Improvements”) shall be owned, operated, and maintained by the Lessee in accordance with the Lease. Any and all appendices attached hereto are incorporated herein and made a part hereof by reference.
c. Without limiting the foregoing, to the best of the Government's Actual Knowledge
(defined below), the Government is not aware of any existing conditions that would prevent development on the Property, except as is expressly provided in any information disclosed or made available to the Offeror(s). As used in this RFLP, the term "Actual Knowledge" means the information actually known to the Installation's Civil Engineering organization. To the extent possible, the Government will provide the Offeror(s) with access to all relevant and available environmental documentation concerning the Property known, to the best of the Government’s
Actual Knowledge, to be in the Government’s possession Prior to executing the Lease, the
Potential Lessee(s) must prepare an Environmental Baseline Survey (the “EBS”) of the Property, at its own expense and in accordance with Air Force regulations, for certification/approval by an
Installation Environmental Professional. The EBS shall set forth, in a manner consistent with relevant American Society for Testing and Materials (“ASTM”) due diligence standards, those environmental conditions and matters known, to the best of the Government’s Actual Knowledge, Request for Lease Proposal No. AFCEC-26-R-0003 Page 7 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete to be on and affecting the Property as determined from the records and analyses reflected therein, and existing as of the date stated in the EBS.
d. This Project will require altering (baffling) and improving the existing facility and relocation and construction of a new Combat Arms Training and Maintenance (CATM) Range as more specifically described and in accordance with the minimum design and construction standards set forth in Appendix A-3 through Appendix A-3c attached hereto (the “CATM Effort”).
1. The land on which the Qualified Lessee constructs or carries out the CATM
Effort will not be included in the Property but, instead, will be sited within the boundary of the
Installation outside of the Property. The location of the CATM within the Installation will be designated by the Government during negotiations.
2. The Government desires that the CATM be relocated and constructed by
Qualified Lessees, but Offerors may choose to construct baffling or provide additional cash consideration sufficient to allow the Government to construct baffling or relocate the CATM
Range. The Government reserves the right to give additional evaluation credit to Offerors who propose relocating and improving the CATM.
3. The CATM Effort will not be treated as consideration to the Government but is a necessary pre-condition for any development to occur and must be provided at the
Qualified Lessee’s sole cost and expense. While the Government does not intend to consider the
CATM Effort to be consideration for the Lease, the construction authority for the CATM Effort is the Enabling Statute (defined below). In addition, the Government reserves the right to treat the
CATM Effort as in-kind consideration for the Lease if the Government chooses to do so in its sole and absolute discretion.
e. If not previously completed, the Potential Lessee shall be responsible, at its own expense, for preparing an Environmental Analysis (“EA”) or an Environmental Impact Statement
(“EIS”) to the satisfaction of, and to be signed by the Government, of the reasonably foreseeable environmental impacts associated with the Potential Lessee’s proposed use of the Property, as required by the National Environmental Policy Act (“NEPA”). The Potential Lessee must complete its environmental analysis, and the Government must fully comply with NEPA prior to entering into and executing a Lease.
f. The Potential Lessee and Government shall reach an agreement with respect to the physical appearance and condition of the Property, and the parties shall prepare and execute a
Physical Condition Report evidencing their agreement prior to lease execution.
g. The Government is leasing the Property subject to all existing encumbrances
(recorded and unrecorded). To the best of the Government's Actual Knowledge, a list of such encumbrances is attached hereto as Appendix B (the “Existing Encumbrances and Third-Party
Property Interests”).
h. The current legislative jurisdiction of the Property is Proprietary.
i. The Government will not provide fire, law enforcement services, and other emergency services to the Project as it is severable from the remainder of the Installation, and a
State or local government is available to provide such services. The Lessee shall be solely responsible for obtaining said services and for all actual costs and expenses incurred for these services. Notwithstanding the foregoing, while it does not currently intend to do so, the
Government may, in its sole and absolute discretion, elect to provide fire, law enforcement
Request for Lease Proposal No. AFCEC-26-R-0003 Page 8 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete services, and other emergency services to facilities located within the Installation’s boundaries, if a State or local government is not available to provide such services and if it is permitted by law and policy. These costs must be reflected in the operating budget. The Lessee must reimburse the
Government for all actual costs incurred for these services. The Government will invoice for the actual costs when requesting reimbursement. The Government requires payment to be made by electronic funds transfer. In the event the Government chooses to provide any of these services it may furnish to the Lessee.
3. GENERAL LEASE REQUIREMENTS
This Section 3, inclusive of sub-sections, lists general requirements that must be complied with by the Potential Lessee and/or the Government to lease the Property (collectively, the “General Lease
Requirements”). This is not an exhaustive list of requirements; there may be other requirements, which may apply to leasing the Property and/or to the specific use of the Property proposed by the
Offeror(s). The Government has the right to impose any and all requirements necessary or desired to ensure the Lease is in compliance with all applicable Federal (including but not limited to laws and requirements referenced in the Mandatory Clauses – Appendix E (defined below)), State, and local laws, rules, regulations, requirements, orders, permits, ordinances, including but not limited to building codes, policies, directives and instructions, including but not limited to all applicable
Department of Defense and Air Force directives, instructions, manuals, playbooks, and policies, as they may be amended, modified or replaced from time to time (“Applicable Law”).
3.1. STATUTORY REQUIREMENTS – 10 U.S.C. § 2667
a. The Lease shall not be for a term of more than five (5) years unless the Offeror proposes and the Government determines that a longer term promotes national defense or is in the
Government’s interest. The Offeror(s) shall clearly demonstrate (to the satisfaction of the
Government) that the length/term of the proposed Lease is reasonable, necessary, and/or otherwise required. By way of example, the Offeror(s) shall submit facts and information to support its proposed term such as useful life of the improvements (with regular repair and maintenance and without recapitalization) and underlying contracts to be fulfilled directly by the Potential Lessee.
Copies of such underlying contracts or agreements shall be provided to the Government.
Justification for the lease term shall be provided in the financial pro forma required per Section
4.9 of this RFLP.
b. The Government shall have the right to revoke the Lease at any time, unless the
Government determines that the omission of such a right will promote national defense or be in the Government’s interest.
c. The Government shall receive consideration for the Lease in a total amount that is not less than the fair market value of the lease interest in the Property.
d. The consideration shall be paid by the Potential Lessee to the Government. The consideration must be of the type and kind that is permitted by the Enabling Statute. The
Government’s preferred consideration is guaranteed cash rent with additional revenue sharing plus in-kind consideration as more fully explained below. Any percentage rent/revenue sharing in the
Offeror’s proposal must be clearly distinguished from guaranteed base rent amounts. During exclusive negotiations, the Government and the Selected Offeror(s) will agree on the delivery processes of the cash and/or in-kind consideration. The Government reserves the right to request any of the forms of consideration authorized by the Enabling Statute.
Request for Lease Proposal No. AFCEC-26-R-0003 Page 9 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
e. If the proposed use(s) of the Property will, as determined by the Government, provide merchandise or services in direct competition with “covered entities” (as such term is defined in the Enabling Statute), the Potential Lessee must provide covered entities, at the
Government’s election in its sole and absolute discretion, with either (i) the right to operate a community support facility or provide community support services, or (ii) equitable compensation in lieu of the operation of such a facility or the provision of such services.
f. The Potential Lessee’s leasehold interest in the Property and its operations and activities on the Property may be taxed by State and local governments. See Section 3.3.c. below.
g. The Potential Lessee’s use(s) of the Property shall be directly compatible with the mission and plans and programs of the Installation.
3.2. OTHER TERMS AND REQUIREMENTS
a. During negotiations, the Government and the Potential Lessee will negotiate and mutually agree on the consideration, which will be paid by the Potential Lessee to the Government, and the processes by which the Potential Lessee will deliver such consideration to the Government.
b. The Potential Lessee shall ensure that insurance policies are maintained throughout the term of the Lease in accordance with the requirements set forth in Appendix C (the “Insurance
Requirements”) attached hereto and incorporated herein by this reference.
c. Any and all utilities and services necessary for the Project shall be obtained and provided for by the Potential Lessee, at its sole cost and expense.
d. Upon the expiration or earlier termination of the Lease, the Lessee shall, at no cost to the Government and to the reasonable satisfaction of the Government, demolish or remove all or a portion of, as designated by the Government, the Existing Improvements, EUL Improvements, and the structures or improvements located on the Property; abandon, vacate or remove utilities or other infrastructure from the Property; restore the Property and surrender the Property to the
Government in the condition it existed on the date the Lease was executed, unless the Government, at its sole discretion and subject to Applicable Law, elects to retain all or a portion of the Lessee’s improvements located on the Property, without compensation to the Lessee. The Lessee shall establish and maintain a demolition reserve account to fund the demolition of all facilities, Existing
Improvements, and EUL Improvements on the Property and to restore the Property to the reasonable satisfaction of the Government upon the expiration or earlier termination of the Lease.
e. Any Offeror that the Government determines to pose a threat to the security, health, morals, or welfare of the Government or to be inconsistent with the national security objectives of the United States will not be selected as a Potential Lessee. Should the government of a terrorist country have a significant interest in the Offeror (or a parent, affiliate, or subsidiary of the Offeror), then such Offeror shall be disqualified and shall not be selected as a Potential Lessee, unless otherwise approved by the Secretary of Defense. This restriction is in accordance with 10 U.S.C.
§ 2327.
3.3. FINANCIAL REQUIREMENTS
a. The Government requires that all financing be in place on or before the date of
Lease execution. If a Project proposal includes gifts, donations and/or other alternative financing, the Government may require that the Potential Lessee provide evidence, satisfactory to the
Request for Lease Proposal No. AFCEC-26-R-0003 Page 10 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
Government, that the funds have been placed in a third-party escrow account before the date of
Lease execution.
b. The Potential Lessee may not cross collateralize and cross default the Lease, or the assets or revenues of the Project. Moreover, the Potential Lessee will be prohibited from assigning, pledging, hypothecating or otherwise transferring its interest in the net cash flows or ownership of the Project in part, or in its entirety, without prior written approval of the Government.
c. The Potential Lessee shall be solely responsible for the payment of any property taxes, personal property taxes and assessments, including special assessments, utility rents, any charges imposed in lieu of ad valorem taxes, and all other taxes or charges levied against the
Project (including the costs of contesting such taxes), or assessments levied against the Potential
Lessee’s leasehold interest or against its activities or operations on the Property.
d. The Potential Lessee shall be required to make a cash payment to the Government at Lease execution in an amount equal to the Government’s direct costs of each lease transaction, which is estimated not to exceed Two Hundred Fifty Thousand Dollars and No Cents
($250,000.00). The Government shall provide the Potential Lessee notice of the actual amount of this payment, as determined by the Government, prior to Lease execution. This cash payment is separate from and in addition to the fair market lease value of the Property. It is not a part of the consideration for the Lease.
e. The Potential Lessee shall, at its sole expense, (i) obtain all required environmental and non-environmental permits and approvals, (ii) enter into any and all required agreements with third parties, (iii) pay any and all costs, fees and expenses required in connection with its development of the Project and, (iv) comply with all Applicable Law and must not seek to avoid compliance with Applicable Law, including but not limited to regulatory requirements, by claiming federal status or derivative sovereign immunity as EUL developments are primarily private sector endeavors.
3.4. DEVELOPMENT AND USE REQUIREMENTS
a. All uses and development activities shall be in accordance with Applicable Law, including but not limited to building codes such as local and International Building Codes, as they may be amended from time to time, and, in accordance with 10 U.S.C. § 2667(b)(8), any facilities constructed on the Property may be constructed using commercial standards in a manner that provides force protection safeguards appropriate to the activities conducted in, and the location of, such facilities. All uses and development activities for facilities to be owned and operated by the
Government, such as the CATM Effort and any in-kind consideration, must also comply with the
Unified Facilities Criteria (UFC).
b. All development and construction on the Property shall be directly compatible with the plans, programs and missions of the Installation.
c. Development and construction on the Property may be subject to Department of
Defense and/or Air Force Anti-Terrorism and Force Protection requirements, including but not limited to offsets from roadways and adjacent Department of Defense or other federal agency facilities.
d. A proposal, if any, to relocate existing improvements on the Property, if any, shall be at the Potential Lessee’s sole cost and expense and will be subject to Government’s consent and
Request for Lease Proposal No. AFCEC-26-R-0003 Page 11 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete approval, which may be conditioned or denied.
e. Prior to the commencement of any phase of construction, the Potential Lessee shall deliver to the Government payment and performance bonds in amounts and subject to conditions deemed acceptable to the Government.
f. Prior to the commencement of construction, the Potential Lessee must retain, or cause the retention, at no cost to the Government, an independent construction consultant
(“Construction Consultant”) to be approved by the Government, and who will provide certain professional consulting services including, but not limited to, construction supervision and quality assurance, for the benefit of the Government. The Construction Consultant must, among other things, conduct reviews of construction plans and specifications, conduct basic and engineering site reviews, independently verify all processes, procedures, cover up inspections and material tests that are carried out under the Lessee’s quality control program, review as-built plans, and certify to the Government that each phase of the project has been completed in accordance with the requirements of the final project documents and applicable Federal, State and city codes, standards and regulations. In the event that the Potential Lessee is able to provide written evidence satisfactory to the Government that construction will be inspected by, and the certificate(s) of occupancy will be issued by, state or local code enforcement office(s), then the requirement to retain a Construction Consultant shall apply only to any construction of in-kind consideration. All reports prepared by the Construction Consultant shall be delivered simultaneously to Potential
Lessee and the Government. The Government shall have the right, at its election, to participate in any of Potential Lessee’s meetings with the Construction Consultant.
g. The Property shall not be used or permitted to be used in any way or for any purpose except as expressly permitted by the Government and set forth in the Lease.
h. The following uses and activities are prohibited on the Property due to security and operational incompatibility:
1. Any use or activity that adversely affects the health, safety, morals, welfare, morale, or discipline of the Armed Forces.
2. Structures, activities, and operations that adversely affect flight operations, air traffic control, Installation security and/or force protection.
3. Any ultra-hazardous uses or activities involving the storage, treatment, transportation, disposal or manufacture of hazardous materials, hazardous substances or hazardous wastes.
4. Residential use conflicting or otherwise competing with the Military
Housing Privatization Initiative at the Installation. Any housing development concept must explain how it does not compete with Military Housing Privatization Initiatives at or for the
Installation.
5. Any use or activity that is incompatible with environmental, operational or land use constraints.
Request for Lease Proposal No. AFCEC-26-R-0003 Page 12 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
4. INSTRUCTIONS TO OFFEROR(S)
4.1. GENERAL
a. This RFLP is not for an acquisition of goods, services or facilities for Air Force consumption/use and as such, is not governed by the Federal Acquisition Regulation (“FAR”).
This RFLP supports a non-FAR real estate transaction (the Lease) granting temporary use of
Government controlled property, which employs a competitive process to identify a Lessee as required by the Enabling Statute. While no evaluation credit will be provided for small business participation, small business concerns are encouraged to participate and compete in this Air Force
Enhanced Use Lease Program competitive solicitation processes.
b. The sale of any services or products resulting from operations on the Property or arising directly or indirectly from the Lease shall be entirely the responsibility of the Offeror and shall be pursuant to agreement(s) separate and apart from this RFLP. In no event shall this RFLP or any agreement resulting from this RFLP require or otherwise obligate the Government to purchase any service or product. The Government makes no representations regarding the
Offeror(s)’s ability to secure an agreement(s) for sale and purchase of the services or products arising directly or indirectly from the Lease or the Property. The responses to this RFLP should demonstrate a viable commercial (non-Federal government) need for the Offeror(s)’s operations on the Property.
c. Any information concerning the RFLP given to any Offeror will be furnished promptly to all other prospective Offerors. If the information is necessary in submitting offers, or if the lack of it would be prejudicial to any other prospective Offerors, the information will be furnished as an amendment to the RFLP.
d. After the receipt and evaluation of acceptable responses to this RFLP, the Potential
Lessee and the Government will negotiate the terms, conditions, agreements, plans, and schedules, etc., to effectively implement the Potential Lessee’s proposed development, use, management and operation of the Property in a manner that is acceptable to the Government. Unselected Offerors may ask for a debriefing from the Government source selection team.
e. While the Government intends to enter into a Lease with the Potential Lessee, it is under no obligation to do so and reserves the right to cancel this RFLP and reject all submissions at its sole discretion. The Government reserves the right to suspend and/or amend all provisions of the RFLP and to waive informalities and minor irregularities in offers received where it is in the Government’s best interest to do so.
f. By participating in the RFLP process, Offeror(s) agree to indemnify and hold harmless the Government, its officers, employees, and consultants from all claims, liabilities, and costs related to this RFLP. Under no circumstances will the Government be liable for any real estate brokerage commissions, finder’s fees, or other forms of compensation related in any way to activities undertaken by any person as a result of this RFLP. This includes any and all activities related to negotiations with the Potential Lessee.
g. This RFLP may be amended at any time by the Government by formal amendment, document, letter, facsimile, or electronic mail. If this RFLP is amended, then all terms and conditions that are not amended remain unchanged.
h. The RFLP response/proposal shall contain the Offeror’s best terms and be complete
Request for Lease Proposal No. AFCEC-26-R-0003 Page 13 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete in accordance with this RFLP. However, the Government reserves the right to require Offeror(s) to provide an oral presentation of their proposal. The Government does not intend to but may, at its sole discretion, conduct discussions with Offeror(s), typically through evaluation notices (ENs) any time after Offeror(s) submissions and prior to selection of a Potential Lessee. Any EN responses become part of the Offeror’s submission and will be considered by the Government in making its Potential Lessee selection.
i. The Government Real Estate Support Service ("RESS") and Privatization Real
Estate Support Service (“PRESS”) contractors, their successors, and their respective team members, subcontractors, and subcontractors’ successors are all precluded from proposing on any
Government EUL projects, and from acting as subcontractors, consultants or team members to a development phase contractor for a period of up to ten (10) years from the expiration of their most recent contract with the Government in accordance with the terms of their contract(s).
Accordingly, Offeror(s) shall not include these firms as part of their teams or request their assistance with proposal preparation. It is incumbent upon each Offeror to ensure that its team does not include any of the RESS or PRESS contractors or their respective team members and subcontractors. The RESS and PRESS Contractors are as follows: EMAX Financial and Real
Estate Advisory Services; MC Fuhrman and Associates, LLC; Alvarez and Marsal Real Estate
Advisory Services, LLC; Jones Lang LaSalle; MWH Americas Inc.; and FPS Advisory Group, LLC. Proposals including a prohibited team member or subcontractor will be rejected. RESS and
PRESS contractors have signed Non-Disclosure Agreements.
j. Offeror(s) shall submit a statement acknowledging receipt of the Mandatory
Clauses Required by Federal law attached hereto as Appendix E (the “Mandatory Clauses”) and incorporated herein by this reference and indicating their compliance with these requirements during the preparation of their proposals and, if the proposal includes In-Kind Payment, the statement shall also indicate their compliance with the additional requirements clauses which apply to in-kind consideration. Compliance with these clauses shall be required during the term of the
Lease.
k. Proposals that fail to furnish required information or that fail to fulfill any of the required terms and conditions of this RFLP may be rejected by the Government. Any Offeror whose proposal is rejected for being incomplete will be notified by the Government of the material deficiencies in its proposal. Proposals that are rejected will not be evaluated by the Government in its assessment of the proposals received.
l. Offeror(s) shall submit a signed cover letter as shown in Appendix F (the
“Offeror’s Cover Page”). Each proposal must contain the name and mailing address of the
Offeror and be properly executed. A proposal executed by an attorney or agent on behalf of the
Offeror shall be accompanied by two authenticated copies of the power of attorney or other evidence of agency or authority to act on behalf of the Offeror. If the Offeror is a corporation, a corporate officer authorized to legally bind the corporation, must execute the Offeror’s Cover Page and provide a corporate certificate or resolution evidencing that corporate officer’s authority to submit a proposal to lease the Property in response to this RFLP. If the Offeror is a Partnership, Limited Liability Company or any other entity, the Offeror must provide evidence that the party signing the Offeror’s Cover page has the authority to sign or bind the entity.
Request for Lease Proposal No. AFCEC-26-R-0003 Page 14 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
4.2. RESTRICTION ON DISCLOSURE AND USE OF DATA
a. Offerors who include in their proposals data that they do not want disclosed to the public for any purpose or used by the Government except for evaluation purposes, shall mark the title page with the following legend: “This proposal includes data that shall not be disclosed outside the Government and its representatives and shall not be duplicated, used, or disclosed in whole or in part for any purpose other than to evaluate this proposal.” Mark each page of restricted data with the following legend “Use or disclosure of data contained on this page is subject to the restriction on the title page of this proposal.” Over-marking of a proposal (for example, marking the entire proposal or all or nearly all pages of the proposal) may result in the outright rejection of the proposal by the Government.
b. If, however, a Lease is signed with this Offeror as a result of or in connection with the submission of this data, the Government shall have the right to duplicate, use, or disclose the data to the extent provided in the resulting Lease or as needed for Environmental Documentation or the Freedom of Information Act. This restriction does not limit the Government’s right to use information contained in this data if it is obtained from another source without restriction.
Offeror(s) should be aware; however, that the Government may share financial information with
Congressional committees, if requested by the committees as part of their oversight function. The terms and conditions of the Non-Disclosure Provisions in Appendix D, attached hereto and incorporated herein by this reference, apply to each Offeror following the receipt of their proposal for the Project.
4.3. SUBMISSION OF RESPONSES
a. Offeror(s) shall submit responses, proposals, and information in response to the
RFLP via e-mail sent directly to jeffrey.blankenship.2@us.af.mil with a courtesy copy to afcec.eul@us.af.mil. Proposals are due no later than 5:00 PM Central Time on November 2, 2026
(the “RFLP Response Due Date”). Hard copy submissions will not be accepted. The collective documents (narrative, attachments, illustrations, etc.) shall not exceed Ten (10) Megabyte in size.
Submitted responses, proposals and information shall correspond with the Sections, Factors, and
Subfactors listed in Table 1 and further described in Sections 4.4 through 5.2 of this RFLP.
Submitted responses (narrative, exhibits, illustrations, etc.) are limited to 40 total pages (single side, 8.5 x 11-inch page and standard font) using Microsoft Word and/or not to exceed 10 megabytes Adobe Systems Portable Document Format (PDF). Page limits as specified in the
RFLP do not include drawings, cost estimates, mandatory clauses, legal documents, resumes, financial statements, pro formas, engineering calculations, catalog cuts, or specifications. Pages exceeding this limit will not be accepted, reviewed or evaluated. The financial pro forma shall be a stand-alone Microsoft Excel file and not count towards the total page or PDF limit.
Table 1 – Evaluation Factors, Subfactors and Submittal Format
SECTION EVALUATION FACTORS
A
Factor 1 – Project Description
Subfactor 1.1 – Project Concept, Market Analysis, and Project Feasibility
Subfactor 1.2 – Project Development, Construction and Operations
B
Factor 2 – Return to the Government
Subfactor 2.1 – Proposed Rental and/or Additional Consideration
Subfactor 2.2 – Financial Pro Forma
Request for Lease Proposal No. AFCEC-26-R-0003 Page 15 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
Table 1 – Evaluation Factors, Subfactors and Submittal Format
SECTION EVALUATION FACTORS
C
Factor 3 – Organization, Experience and Capability
Subfactor 3.1 – Organization and Experience
Subfactor 3.2 – Financial Capability
D Factor 4 – Integrated Project Plan and Schedule
4.4. SECTION A, FACTOR 1 – PROJECT DESCRIPTION SUBMITTAL
REQUIREMENTS
4.5. SUBFACTOR 1.1: PROJECT CONCEPT, MARKET ANALYSIS, AND PROJECT
FEASIBILITY
The Offeror(s) shall explicitly document the market demand and market feasibility analysis for its proposed Project; explicitly demonstrating that the proposed Project is viable and represents the highest and best use of the Property. The submitted narrative shall include at least the following:
1. Substantive data and facts, which clearly demonstrate the current and anticipated market demand for the proposed Project;
2. Facts and data describing the current market availability of commercial activities/services that will compete with the market demand for the proposed Project;
3. Facts and data detailing projected target market consumption/use of the Project;
and
4. A narrative detailing the marketing strategy for the proposed Project.
4.6. SUBFACTOR 1.2: PROJECT DEVELOPMENT, CONSTRUCTION AND
OPERATIONS
Offeror(s) shall submit a narrative describing their proposed Project including a plan for the development, construction and operation of the Project. This narrative shall demonstrate compliance with EUL Objectives described in the Executive Summary in Section 1 and with the
General Lease Requirements outlined in Section 3, and shall also include at least the following:
1. Description of the proposed development, size, type, performance or capacity, site considerations, engineering and construction work to be performed;
2. Description of the anticipated leases, easements, agreements, etc., needed to develop and operate the proposed development;
3. A Project development and construction (including any phases if applicable) plan and milestone schedule;
4. A conceptual site plan depicting, identifying, and describing all proposed improvements, including but not limited to proposed facilities, fences, infrastructure, areas of ingress/egress, and storm water management areas;
5. A conceptual utility plan for the Property and proposed Project;
Request for Lease Proposal No. AFCEC-26-R-0003 Page 16 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
6. A conceptual environmental management plan;
7. Description of the quality control processes and corporate systems employed to maintain quality control of the design, permitting, financing, construction and operation of the
Project;
8. Description of the Project impact(s), if any, on surrounding communities, local government, and governmental authorities to include “covered entities” as described in the
Enabling Statute and Section 3.1(e) of this RFLP;
9. A Property management and facilities maintenance plan, to include capital repair and replacement, and grounds maintenance;
10. Proposed emergency services plan; and
11. A Property security and access management plan.
4.7. SECTION B, FACTOR 2 – RETURN TO THE GOVERNMENT
4.8. SUBFACTOR 2.1: PROPOSED CONSIDERATION
a. Offerors shall explicitly document their proposed consideration to be provided to the Government, in exchange for the leasehold interest in the Property. Costs associated with the
CATM Effort should not be included as proposed In-Kind consideration to the Government, but it is a necessary pre-condition (at the Potential Lessee’s sole cost and expense) for any development to occur. Unless the Government decides otherwise in accordance with Section 2 above, the
CATM Effort will be evaluated separately from in-kind consideration. The proposed consideration shall be substantiated with relevant empirical and quantitative data and analysis to include:
1. Current real estate market conditions for similarly situated property;
2. Consideration of all relevant facts and circumstances that may influence the rent or other consideration;
3. Net present value of all proposed consideration to be provided to the
Government; and
4. Offeror(s) shall demonstrate how the consideration proposed to be paid to the Government is at least equal to the fair market rent value of the leasehold interest in the
Property using quantifiable data such as an appraisal and/or commercial real estate analytics.
b. If In-Kind Payment is proposed to be paid to the Government in the preferred form, Offeror(s) shall also submit the following:
1. A description of the proposed In-Kind Payment development, size, type, performance or capacity, site considerations, and engineering and construction work to be performed;
2. A development and construction (including any phases if applicable) plan and milestone schedule;
3. A conceptual site plan depicting, identifying, and describing all proposed improvements, including but not limited to proposed facilities, infrastructure, areas of ingress/egress, and storm water management areas;
Request for Lease Proposal No. AFCEC-26-R-0003 Page 17 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete
4. A description of the quality control processes and corporate systems employed to maintain quality control of the design, permitting, financing, and construction of the
In-Kind Payment; and
5. A narrative of up to five (5) most recent and relevant projects completed or in progress by the Offeror (or entity to be contracted by Offeror) in design, permitting, financing, and construction of projects similar to the In-Kind Payment. The submittal shall include information describing cost, schedule, and performance. Relevant work or projects are those for which the magnitude of the effort and the complexity of the past work or project(s) are similar to the In-Kind Payment.
4.9. SUBFACTOR 2.2: FINANCIAL PRO FORMA
Offeror(s) shall submit a FINANCIAL PRO FORMA, developed using Microsoft Excel software illustrating the economic viability of the proposed Project and containing the following elements:
1. Assumptions Worksheet – which shall be linked to all other worksheets within the pro forma, and wherein all financial assumptions (i.e., square footage, rental rates, interest rates, internal rate of return, discount rates, weighted average cost of capital, etc.) can be manipulated to produce varying results during the evaluation of submittals.
2. Project Construction Budget – A line-item construction budget that reflects all expected construction costs, by major trades/milestones, and that are detailed for each month of the construction period through completion. This budget should also reflect drawdowns on the construction loan(s) and equity contributions as they occur and shall be linked to the Assumptions
Worksheet and shall contain formulae so that cell references and calculations can be verified.
3. Project Sources and Uses Statement – A statement that reflects all expected transaction costs (i.e., construction, lender and closing fees, etc.), and the sources to fund these costs (i.e., loan proceeds, equity contributions, etc.). The proposed debt to equity ratio shall be explicitly defined. This statement shall be linked to the Assumptions Worksheet and shall contain formulae so that cell references and calculations can be verified.
4. Project Annual Cash Flow Statement (for each year of the lease term) – A statement that reflects line-item Project revenues and expenses for each year of the proposed Lease term.
This statement shall be linked to the Assumptions Worksheet and shall contain formulae so that cell references and calculations can be verified. Specifically, the statement provided shall include the following on an annual basis:
i. A description and dollar amount for each source of revenue.
ii. A description and dollar amount for each charge/expense other than the items identified in (iv), (v), (vi), and (vii) below.
iii. Net operating income based on items (i) and (ii) above.
iv. A description and dollar amount of all debt service payments.
v. A description and dollar amount of all deposits to reserve accounts to include the demolition reserve account.
vi. A description and dollar amount of each capital cost, including but not limited to 1) capital repairs and replacements; 2) tenant improvement allowances, if
Request for Lease Proposal No. AFCEC-26-R-0003 Page 18 of 26
Form approved by SAF/GCN Aug 2020
Previous versions obsolete applicable; 3) leasing commissions; and 4) demolition; and a description and proposed total consideration to be paid to the Government
5. Consideration Worksheet, which shall be linked to the Project Annual Cash Flow
Statement and shall contain formulae so that cell references and calculations can be verified. This worksheet should include the proposed consideration to be paid to the Government over the proposed term of the Lease. If the Offeror proposes to provide the Government with percentage rent, this worksheet shall provide an explicit description and delineation of proposed base rent versus any proposed percentage rent. If the Offeror is proposing that, some portion or all of the consideration to be paid to the Government will be from percentage rent or some other form of revenue sharing arrangement: this worksheet shall also include calculations and a narrative detailing the proposed participation percentages, and the priority of payments to the Government.
4.10. SECTION C, FACTOR 3 – ORGANIZATION, EXPERIENCE AND CAPABILITY
4.11. SUBFACTOR 3.1: ORGANIZATION AND EXPERIENCE
a. All Offeror(s) shall provide a narrative detailing its corporate organizational structure, including legal form of ownership and management. If the Offeror is teaming with one or more business organizations for any portion of the Project, then it shall provide a narrative detailing the responsibilities of each team member, the extent to which the team has worked together in the past, the legal form of ownership and management of each and team member, and
(if other than the Offeror) expressly identify the team member organization that will be financially accountable for Project performance. The Offeror shall submit copies of legally binding contracts or agreement(s) it has in place with each member for the Project, or otherwise state that no such contracts or agreement(s) exist.
b. As a condition to being selected as the Potential Lessee, the Offeror(s) shall provide the Government with documentation evidencing its legality, authority, ownership, control, and management. Such documentation should include, without limitation, certificates of good standing, formation agreements, by-laws, operating and management agreements, organizational charts, and a certificate of disclosure of ownership interests.
c. Provide an explanation of its ability to field a qualified, experienced Project team with the experience and workload capacity necessary to manage all the disciplines required to develop and manage the Property.
d. Identify the key personnel and legal counsel designated and authorized to represent the Offeror in all negotiations with the Government, and throughout the transaction execution and financial closing process.
e. Provide a narrative describing up to five (5) of the most…