Tab 09 Att 2 - OET Overview.pdf

PDF 1 MB Posted

Attached to
Rocky Mountain/West Coast/Offshore (RMW) Program Federal contract opportunity
Solicitation number
SPE602-24-R-0701
Issued by
Defense Logistics Agency Energy

About this file

This document provides an overview of the Bulk Offer Entry Tool (OET) used by the Defense Logistics Agency Energy (DLA Energy) for electronic bid submissions, as well as details of solicitation SPE602-24-R-0701 for bulk fuel procurement covering the Rocky Mountain/West Coast/Offshore region. DLA Energy seeks to procure a total estimated quantity of 919,172,000 USG of various aviation and naval distillate fuels for delivery between October 1, 2024 and September 30, 2025 via tanker, barge, truck and pipeline on both FOB origin and destination terms. Responses are due by March 28, 2024 at 3:00 PM Fort Belvoir, VA time. Approximately 30.81% of fuel quantities are set aside for small businesses. Offerors must use the mandatory Bulk OET system to submit electronic bids by the response deadline.

View the file

Other files for this federal contract opportunity

Other files attached to Rocky Mountain/West Coast/Offshore (RMW) Program, newest first.
File Type Posted
Tab 04 JA signed_redacted_11DEC2024.pdf PDF
FFR_MCBAS.pdf PDF
FFR_Summary of Awards.pdf PDF
FFR_MCBEW.pdf PDF
SPE60224R0701 AMD 0010 Conformed RFP.pdf PDF
SF30_SPE60224R07010010.PDF PDF
SPE60224R0701_AMD 0009.pdf PDF
SPE60224R0701 AMD 0009 Conformed RFP.pdf PDF
SPE60224R0701_AMD 0007.pdf PDF
SPE60224R0701 AMD 0008 Conformed RFP.pdf PDF
SPE60224R0701_AMD 0008.pdf PDF
SPE60224R0701_AMD 0006-Revised FPRs response due date.pdf PDF
SPE60224R0701 AMD 0005 Conformed RFP.pdf PDF
SPE60224R0701_AMD 0005.pdf PDF
SPE60224R0701 AMD 0004 Conformed RFP.pdf PDF
SPE60224R0701_AMD 0004.pdf PDF
SPE60224R0701_AMD 0003.pdf PDF
SPE60224R0701 AMD 0003 Conformed RFP.pdf PDF
SPE60224R0701 AMD 0002 Conformed Copy.pdf PDF
SPE60224R0701_AMD 0002.pdf PDF
SPE60224R0701 AMD 0001 Conformed RFP.pdf PDF
SPE60224R0701 AMD 0001 SF30.pdf PDF
Tab 09 Att 7 - C and E QAPs Portfolio.pdf PDF
Tab 09 Att 1 - Offer Submission.pdf PDF
Tab 09 Att 3 - OET Guidance.pdf PDF
Tab 09 Att 5 - OET OSP Crosswalk.pdf PDF
Tab 09 Att 10 - BEM Overview.pdf PDF
Tab 09 Att 12 - ADDENDA TO FAR 52.pdf PDF
Tab 09 RFP SPE60224R0701_DC.pdf PDF
Tab 09 Att 4 - Map Coordinates Desk Guide.pdf PDF
Tab 09 Att 6 - Solicitation Fill-In.pdf PDF
Tab 09 Att 9 - Equal Value Exchanges of Fuel.pdf PDF
Tab 09 Att 11 - F76 Trace Sig Page.pdf PDF
Tab 09 Att 8 - Small Business Subcontracting Plan.pdf PDF
Show all 34

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WARFIGHTER ALWAYS

The Nation’s Combat Logistics Support Agency E s t a b l i s h e d 1 9 6 1

DEFENSE LOGISTICS AGENCY

DLA

Bulk Offer Entry Tool (OET)

Sean Lucas Bulk Petroleum Purchase Analyst

July 5, 2023

WARFIGHTER ALWAYSWARFIGHTER ALWAYS

AGENDA

• What is the Offer Entry Tool (OET)

• Solicitation/OET Sequence

• Getting Access

• Parts of an OET Offer

• Best Business Practices

• Getting Help with OET

OFFER ENTRY TOOL (OET)

• OET

– A web-based tool for use in submitting offers

– Replaces the hard copy offer submission package

– URL: https://oet.energy.dla.mil/epst_oet/oet.html

– Bulk vs PC&S/Into-Plane sections of OET

– Three Different business units to choose from once logged in

• Is OET required?

– Solicitation will state if OET is mandatory

– IEG, RMW, AEM, WPC and Deep Freeze use OET

– OET offers must comply with solicitation closing date/time https://oet.energy.dla.mil/epst_oet/oet.html

Solicitation/OET Sequence

• Solicitation posted to SAM.gov | Home

• OET is opened

• Vendors receive automated email notification

• Vendor inputs offer in OET, and submits

• OET round closes

• Offers are imported into the Bulk Bid Evaluation Model

(BEM)

• Review/evaluation https://sam.gov/content/home

OET Rounds

INITIAL OFFERS /

OET ROUND 1

OPEN

NEGOTIATIONS

INTERIM OFFERS /

OET ROUND 2

CLOSE

NEGOTIATIONS

FINAL OFFERS /

OET ROUND 3

PRICE REDUCTION

ROUND (Optional)

OET Rounds

• Initial

– Required for all OET solicitations

– Initial offer must be submitted prior to the closing date/time to be eligible for later rounds

• Interim

– Used at the Contracting Officer’s discretion

– There may be more than one interim round

– Participation is optional

– - If no offer is submitted during an interim round, previously offered data is retained

• Final Proposal Revision

– Last round before Price Reduction

– Data fields may be locked (product, mode, shipping point)

• Price Reduction Round (Optional)

– Use at the Contracting Officer’s discretion

– Only price can be changed

OET Access

• First, obtain a CAGE CODE for your company

– Register at SAM.gov | Home for a CAGE code

– Your OET account is linked to your CAGE code(s)

– Multiple users per CAGE code allowed

• Create an account in the Account Management And Provisioning System (AMPS) to apply for OET access

– https://amps.dla.mil https://sam.gov/content/home https://amps.dla.mil/

• Next, Log into your AMPS account to request the OET role

– Click ‘Energy Applications’ on the Browse Roles by Application Tab

– Select ‘Energy OET’

– Select ‘Energy OET Prod – PC&S Ground Vendor Role OET -

100’

– Complete all information and submit request

• OET Username and password will be sent to you via email from the EPST Provisioner

– User ID and Password for AMPS are NOT the same as for OET

• Access

– Allow 3-5 business days after submission for OET access

– Log in every 30 days per DoD policy

– Account tied to your CAGE code

– Do not share your username or password

– Only the Account holder can submit for reset of account/password

– Passwords expire every 60 days (users will be prompted to change)

– Revalidate your PC&S OET-100 AMPS role annually

• Account Settings (Drop Down Arrow-top right)

– Use the same company name as the one linked to your CAGE

– Select the purchase programs you’re interested in

– Use personal email, no group accounts

– If you are not receiving emails, check your Junk mail and internal firewall setting

Do not share your OET username or password with anyone!

OET accounts are individual accounts, not group accounts!

If you do not log in for 30 days your account will be de-activated!

Revalidate your PC&S OET-100 AMPS role annually or your OET account will be archived by the DLA J6

Initial Log In to OET

• OET URL

– https://oet.energy.dla.mil/epst_oet/oet.html

• Change Password (required every 60 days per DoD policy)

– Minimum 15 characters

– At least 1 Upper case, 1 lower case, 1 number, 1 special character

• Update ‘Settings’ information (Drop Down Arrow-top right)

– Use the exact Company Name as depicted in SAM (25 characters max)

– E-mail address for notifications

– Company size status

– Select your purchase program under Buy Selection https://oet.energy.dla.mil/epst_oet/oet.html

Parts of an OET Offer

Three Primary Sections to OET Offer data:

1. Settings/Frequently Asked Questions (FAQs) (Drop Down Arrow-top right)

- Update contact information

- Change password

- Access OET/OSP Crosswalk, How to Submit Bulk OET

Offer Guide and FAQs

2. Offer Details

- Shipping points (complete addresses/phone numbers), products, quantity and price

- Offer conditions

- This is the data that is sent to the BEM

3. Offer Submission Package (OSP) -‘Fill in’ clauses

- Exceptions

- Replaces the paper OSP

OET Main Menu

Offer Details

Origin and Destination Offers

Conditional Statements

• You can use conditional statements in your offer

– Make sure your conditions don’t conflict

• You can offer overall max/min quantities, or by

– Product

– Mode

– Shipping Point

• You cannot tie two shipping points, or two different products together:

– Read Section M of the solicitation

Offer Submission Package

Offer Submission Data

Offer Submission Data

Refinery Shutdown Info

If you have no refinery shutdown information, leave this chart BLANK

User Account Info

Frequently Asked Questions (FAQs)

Best Practices

• Submitting Offers

– Real time and auto-saved

– Review Offer Submission Package

– Review Bid Package Report

– Select “Submit Offer Package” to submit offer

– You will get an error message if critical info is missing

– Price escalators mandatory for each bid line

– Enter password again and submit

– Watch for a confirmation email

– Enter OET after submission... VIEW/EDIT

– VIEW allows you to view the offer, not make changes

– EDIT will un-submit your offer! You will be able to make changes, but you must submit your offer

– Do not submit a “place-holder” offer/submit best offers in the initial round

– Do not wait until the last minute to submit

– Keep your OET account current (log in once every 30 days)

– Read the solicitation and familiarize yourself with the clauses and schedule

Getting Help

• OET User Manual

– Available on the OET main page

– https://oet.energy.dla.mil/epst_oet/oet.html

• For questions specific to the offer, please contact the Contracting Officer listed on the solicitation

• If you are unable to access OET or your OET account is locked, please email the DLA Energy Bulk Technical Team:

– DESC-BTechTeam@dla.mil

• For questions concerning the functionality of OET, please contact:

– Sean Lucas, Sean.Lucas,@dla.mil, (571) 767-8407 https://oet.energy.dla.mil/epst_oet/oet.html mailto:DESC-BTechTeam@dla.mil mailto:Shanice.Whitfield@dla.mil

WARFIGHTER ALWAYSWARFIGHTER ALWAYS 25

Bulk Offer Entry Tool (OET)
AGENDA
OFFER ENTRY TOOL (OET)
Solicitation/OET Sequence
OET Rounds
OET Rounds
OET Access
OET Access
OET Access
OET Access
Initial Log In to OET
Parts of an OET Offer
OET Main Menu
Offer Details
Origin and Destination Offers
Conditional Statements
Offer Submission Package
Offer Submission Data
Offer Submission Data
Refinery Shutdown Info
User Account Info
Frequently Asked Questions (FAQs)
Best Practices
Getting Help
Slide Number 25

File details come from the government source that posted it. Updated .