This document is a Scope of Work for the demolition and construction of a Remote Communications Air/Ground (RCAG) site located in Fredericksburg, Texas (T82). The contractor will be responsible for demolishing all old towers, including foundations and old guided cable anchors, and installing a new 30' antenna tower and associated cabling, lightning protection, and foundations. The work must comply with various FAA specifications and be completed within 6 months, with work hours limited to Monday through Friday, 7am to 5:30pm. The FAA requires a safety and security plan from the contractor prior to the start of work. The related federal contract opportunity is a pre-solicitation announcement seeking interested and capable vendors for this project at the T82 site, as well as a separate site in Plainview, TX (PVW). The FAA intends to award one or two firm-fixed price contracts using a lowest price technically acceptable (LPTA) evaluation process. The FAA is considering set-asides for small business, 8(a), service-disabled veteran-owned small business, and woman-owned small business concerns, as well as local vendors, based on the responses received.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK
Fredericksburg, Texas (T82) Remote Communications Air/Ground (RCAG) site.
01/30/2024
1) TABLE OF CONTENTS
a) BACKGROUND
b) SCOPE OF WORK
c) SPECIFICATIONS
d) GENERAL REQUIREMENTS
e) LOCATION
f) CONTACTS
2) BACKGROUND
T82 RCAG (30° 23' 11.004"N, 98° 51' 47.016"W) Contractor must demolish all old towers, including foundations and old guided cable anchors. Additionally, contractor shall install a new 30’ antenna tower and the respective foundations will be constructed in this site as well as the cabling from the towers to the building. The contractor will install lightning protection system for the towers and the building as per FAA specifications. These specifications, along with the accompanying drawings, describe the requirements for the re-cabling of an existing Federal Aviation Administration (FAA) Remote Communications Air/Ground
(RCAG) in Fredericksburg, Texas. Contractor will comply with all procedures, and regulations of the city.
3) SPECIFICATIONS
Contractor shall furnish all plant, labor, equipment material, supplies and transportation required to perform the work, including erection or installation of items, all in strict accordance with the drawings and specifications. (NOT LIMITED TO THIS VERSION, MOST UPDATED VERSION WILL HAVE TO
BE USED)
a) INSTALLATION OF ROOFING MEMBRANE ON OMN VOR ROOF
b) FAA-STD-019F
c) FAA-C-1217G
d) FAA-C-1391D
e) FAA-G-2100G
f) FAA Order 6950.19A
g) FAA-E-2013E
h) NFPA 70
i) ANSI A250.6, A250.8
j) SDI 100
k) ANSI/BHMA A156.1 through A156.21
l) ASTM D118, ASTM C136
4) GENERAL REQUIREMENTS
a) The FAA, before installation, must approve all materials used.
b) Contractor will stage work in a manner that minimizes outage time.
c) All shutdowns and cutovers shall be coordinated with and scheduled by local FAA Air Traffic
Management with 30 days of anticipation.
d) Contractor shall repair any damage done by him to any entity, at his cost. Contractor shall be covered by minimum locally required liability.
e) Contractor must provide FAA with a safety and security plan before work begins. (1) Due to the remote location of this facility, extra precautions shall be established. Plan will include procedures for accident prevention, emergency procedures, phone number & map to nearest emergency medical facility.
f) Contractor's Superintendent shall be present at the work site during all times work is performed. Superintendent shall carry a cell phone and be prepared to make and receive calls to
& from the FAA at all times while on work site.
5) WORK HOURS AND CONDITIONS
Contractor will be subject to all laws and regulations that apply to persons on State of Texas property and landowner regulations.
a) RTR installation work must be complete within (6 months) calendar days.
b) Work will be done between 7:00AM to 5:30PM. Monday through Friday. Unless otherwise noted.
c) Saturday, Sunday, & Overtime work will only be allowed to expedite work in case of schedule setbacks.
d) Contractor will report & coordinate each day’s work in advance with the onsite FAA COR.
e) All work will be inspected and approved by an FAA Resident Engineer.
6) LOCATION
Fredericksburg, Texas
30° 23' 11.004"N
98° 51' 47.016"W
T82 RCAG is a remote site to the north of Fredericksburg, Texas.
7) CONTACTS
Travis Hundl
Austin Enroute SSC travis.s.hundl@faa.gov
(512) 569-2261
Elias Castillo
CSA Engineering Services elias.a.castillo@faa.gov
(817) 889-0605
Devkota Saurav
CSA Engineering Services
Saurav.devkota@faa.gov
(817) 201-7124
***END***