This document is a pre-solicitation announcement for the Federal Aviation Administration (FAA) seeking sources for tower demolition and tower construction work at two locations in Fredericksburg, Texas (T82) and Plainview, Texas (PVW). The FAA intends to pursue one or two firm-fixed-price contracts using a lowest-price technically acceptable (LPTA) award process. The FAA is considering small business set-asides, including SBA 8(a), Service-Disabled Veteran-Owned Small Business (SDVOSB), and Woman-Owned Small Business (WOSB) concerns, as well as local area vendors. Interested vendors are requested to provide a statement of interest, project-specific information, and a rough order of magnitude cost estimate by October 11, 2024. The FAA reserves the right to cancel the announcement at any time.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Fredericksburg (T82) RCAG Site Detail Specifications_Final.docx | DOCX document | |
| Plainview (PVW) RCAG Site Detail Specifications_Final.docx | DOCX document | |
| Plainview (PVW) RCAG DB Drawings.pdf | ||
| T82_Drawings Tower Design and Manufacturing.pdf | ||
| PVW Scope Of Work.pdf | ||
| T82_DB Drawings.pdf | ||
| T82_Geotech Report.pdf | ||
| T82 Scope Of Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPORT COVER PAGE
Geotechnical Engineering Report
Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group)
Plainview, Texas November 3, 2022
Terracon Project No. AR22P142
Prepared for:
PTSI Managed Services, Inc.
Fort Worth, TX
Prepared by:
Terracon Consultants, Inc.
Lubbock, Texas
Responsive ■ Resourceful ■ Reliable 1
REPORT TOPICS
INTRODUCTION
SITE CONDITIONS
PROJECT DESCRIPTION
GEOTECHNICAL CHARACTERIZATION
GEOTECHNICAL OVERVIEW
EARTHWORK
DEEP FOUNDATIONS
MAT FOUNDATION
SEISMIC CONSIDERATIONS
LATERAL EARTH PRESSURES
CORROSIVITY
GENERAL COMMENTS
FIGURES
Note: This report was originally delivered in a web-based format. Orange Bold text in the report indicates a referenced section heading. The PDF version also includes hyperlinks which direct the reader to that section and clicking on the GeoReport logo will bring you back to this page. For more interactive features, please view your project online at client.terracon.com.
ATTACHMENTS
EXPLORATION AND TESTING PROCEDURES
SITE LOCATION AND EXPLORATION PLANS
EXPLORATION RESULTS
SUPPORTING INFORMATION
Note: Refer to each individual Attachment for a listing of contents.
http://client.terracon.com/
Responsive ■ Resourceful ■ Reliable 1
INTRODUC TION
Geotechnical Engineering Report Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR
Tower Replacement (Pink Group) Site ID: PVW-RCAG
Plainview, Texas Terracon Project No. AR22P142
November 3, 2022
INTRODUCTION
This report presents the results of our subsurface exploration and geotechnical engineering services performed for the proposed communication tower (Site ID: PVW-RCAG) to be located about ½ mile south of SW 3rd Street on the east side of CR V in Plainview, Texas. The purpose of these services is to provide information and geotechnical engineering recommendations relative to:
■ Subsurface soil conditions ■ Foundation design and construction
■ Groundwater conditions ■ Site preparation and earthwork
■ Seismic site classification per IBC ■ Lateral earth pressures
The geotechnical engineering Scope of Services for this project included the advancement of one test boring to a depth of approximately 36 ½ feet below existing site grades.
Maps showing the site and boring locations are shown in the Site Location and Exploration Plan sections, respectively. The results of the laboratory testing performed on soil samples obtained from the site during the field exploration are included on the boring log and/or as separate graphs in the Exploration Results section.
SITE CONDITIONS
Item Description
Parcel Information The tower site is located within an approximate 200 feet by 200 feet fenced enclosure.
See Site Location
Existing Improvements
■ Control building
■ 4 lattice type towers (northeast, northwest, southeast and southwest areas of the site
Current Ground Cover Gravel Existing Topography Relatively flat
Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 2
PROJECT DESCRIPTION
Item Description
Project Description The project includes the construction of a self-supporting steel antenna on concrete foundations. The four corners of the tower will be about 20 feet apart and the overall tower height will range from 40 to 80 feet.
Maximum Loads (provided by PTSI Managed Services, Inc.)
Seismic
■ Axial: 55 kips
■ Shear: 46 kips
■ Moment: 1,550 kip-ft
60 mph Wind and 1.25” Ice
■ Axial: 100 kips
■ Shear: 19 kips
■ Moment: 607 kip-ft
120 mph Wind
■ Axial: 55 kips
■ Shear: 47 kips
■ Moment: 147 kip-ft
Grading/Slopes The proposed tower is anticipated to be placed within 2 feet of existing grade.
GEOTECHNICAL CHARACTERIZATION
We have developed a general characterization of the subsurface conditions based upon our review of the subsurface exploration, laboratory data, geologic setting and our understanding of the project. This characterization, termed GeoModel, forms the basis of our geotechnical calculations and evaluation of site preparation and foundation options. Conditions encountered at the exploration point are indicated on the individual log. The individual log can be found in the Exploration Results section and the GeoModel can be found in the Figures section of this report.
Model Layer Layer Name General Description 1 Surficial Materials Gravel surfacing 2 Lean Clay Medium stiff to hard
Groundwater Conditions
The boring was advanced in the dry using continuous flight augers that allow short term groundwater observations to be made while drilling. Groundwater seepage was not observed within the maximum drilling depth at the time of our field exploration.
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 3
Groundwater conditions may be different at the time of construction. Groundwater conditions may change because of seasonal variations in rainfall, runoff and other conditions not apparent at the time the boring was performed. Therefore, groundwater levels during construction or at other times in the life of the structure may be higher or lower than the levels indicated on the boring log.
The possibility of groundwater level fluctuations should be considered when developing the design and construction plans for the project.
GEOTECHNICAL OVERVIEW
The subsurface soils encountered in our borings consisted of medium stiff to hard lean clays from the top to the boring termination depth of about 35½ feet bgs. The subsurface soils exhibit moderate plasticity and potential vertical movements due to shrink/swell are estimated to be less than 1 inch.
Two foundation alternatives could be considered for foundation support of the tower.
Option A: The tower legs can be supported on drilled shaft foundations. Design recommendations and construction considerations for drilled shaft foundations are provided in the Deep Foundation section.
Option B: The tower could be alternatively supported on a mat foundation system bearing on undisturbed onsite soils at a depth of 3½ feet below existing grade. Recommendations for a mat foundation for the proposed tower are provided in the Mat Foundation section.
The General Comments section provides an understanding of the report limitations.
EARTHWORK
Site Preparation
Earthwork is anticipated to include clearing, over-excavations, and fill placement. The following sections provide recommendations for use in the preparation of specifications for the work.
Recommendations include critical quality criteria, as necessary, to render the site in the state considered in our geotechnical engineering evaluation for foundations.
Structural Fill Material Types
Structural fill should meet the following material property requirements.
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 4
Soil Type 1 USCS Classification Acceptable Location for Placement
Near surface on-site soils and imported
Low plasticity fine-grained 2, 3
CL ■ Backfill above and beside mat foundations
■ General site grading
Coarse-grained (granular) 4
GW, GP, GM, GC,
SW, SP, SM, SC ■ Below mat foundations in over excavations
■ General site grading
1. Structural fill should consist of approved materials that are free of organic matter and debris. Frozen material should not be used, and fill should not be placed on a frozen subgrade. A sample of each material type should be submitted to the Geotechnical Engineer for evaluation prior to use on this site.
2. Fine grained material (e.g., clays) can be difficult to compact in relatively small areas (e.g., excavations for foundations). Moisture conditioning (e.g., wetting or drying) would be necessary to achieve compaction requirements if fine grained material is used as structural fill for this project.
3. By our definition, low plasticity materials should have a liquid limit of 40 or less and a plasticity index of 20 or less (ASTM D4318).
4. Specific material requirements will need to be satisfied based on intended use.
Structural Fill Compaction Requirements
Structural fill should meet the following compaction requirements.
Item Description
Maximum individual lift thickness
■ 9 inches or less in loose thickness when heavy, self-propelled compaction equipment is used
■ 4 inches or less in loose thickness when hand-guided equipment (i.e.
jumping jack or plate compactor) is used
Minimum compaction requirements 1
Fine-grained soils:
■ 95% of maximum Coarse-grained soils:
■ 98% of maximum
■ If the material is a coarse sand or gravel, or of a uniform size, or has a low fines content, compaction comparison to relative density may be more appropriate. In this case, coarse-grained soils should be compacted to at least 70% relative density (ASTM D4253 and D4254).
Water content range 1
Fine-grained soils:
■ 0 to +4% of optimum Coarse-grained soils:
■ Water content should be maintained at levels satisfactory for compaction to be achieved without the coarse-grained material bulking during placement or pumping when proofrolled.
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 5
Item Description
1. Maximum density and optimum water content as determined using standard effort (ASTM D698).
Grading and Drainage
Adequate drainage should be provided at the site to reduce the likelihood of an increase in moisture content of the foundation soils. Final site grading should be away from the tower to reduce the likelihood of water ponding near the structures.
Earthwork Construction Considerations
Although the exposed subgrade is anticipated to be relatively stable upon initial exposure, unstable subgrade conditions could develop during general construction operations, particularly if the soils are wetted and/or subjected to repetitive construction traffic. Should unstable subgrade conditions develop, stabilization measures will need to be employed.
Construction traffic over the completed soil subgrade should be avoided to the extent practical.
The site should also be graded to prevent ponding of surface water on the prepared soil subgrades or in excavations. If the soil subgrade should become frozen, wet, or disturbed, the affected material should be removed or these materials should be scarified, moisture conditioned, and recompacted.
As a minimum, all temporary excavations should be sloped or braced as required by Occupational Safety and Health Administration (OSHA) regulations to provide stability and safe working conditions. Temporary excavations will be required during grading operations and/or installation of utilities and foundations. Contractors, by their contract, are usually responsible for designing and constructing stable, temporary excavations and should shore, slope or bench the sides of the excavations as required, to maintain stability of both the excavation sides and bottom. All excavations should comply with applicable local, state and federal safety regulations, including the current OSHA Excavation and Trench Safety Standards.
Construction Observation and Testing
Terracon’s involvement during the construction phase of the project provides the continuity to maintain the Geotechnical Engineer’s evaluation of subsurface conditions, including assessing variations and associated design changes.
The earthwork efforts should be monitored under the direction of the Geotechnical Engineer, and should include documentation of adequate removal of vegetation, delineation of areas requiring removal or subgrade stabilization, and assessment of existing fill materials.
Each lift of structural fill should be tested, evaluated, and reworked as necessary until approved by the Geotechnical Engineer prior to placement of additional lifts.
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 6
In areas of foundation excavations, the exposed subgrade should be evaluated under the direction of the Geotechnical Engineer. In the event that unanticipated conditions are encountered, the Geotechnical Engineer should be contacted to discuss mitigation options.
DEEP FOUNDATIONS
In our opinion, the legs of the proposed tower can be supported on individual drilled shaft foundations. Design and construction recommendations for drilled shaft foundations are presented in the following sections.
Drilled Shaft Design Recommendations
The side resistance and end bearing values provided in the following table are based on individual drilled shafts or where drilled shafts are spaced at least 3 diameters apart (center-to-center). A reduction in design parameters would be necessary if an adjacent shaft is located with 3 diameters. In designing to resist uplift loading, no more than ⅔ of the allowable side resistance values provided for compressive loading should be used along with the effective weight of the drilled shaft concrete.
Elev. (ft) (site datum)
Total / Effective
Unit Weight 1, 2 (pcf)
Estimated
Cohesion 2
(psf)
Allowable Compressive
Side Resistance
(psf)
(FS = 2) 3
Allowable End
Bearing (psf)
(FS = 3) 4
LPILE
LPILE Soil Model Type
Static Lateral
Soil Modulus kh (pci)
Soil Strain ε50
3368.5 – 3364 115 Recommend neglecting upper 4 feet due to construction disturbance
3364 – 3355 120 1,600 125 3,200
Stiff Clay w/o Free
Water 540 0.008
3355 - 3350 130 4,000 200 8,000
Stiff Clay w/o Free
Water 1,000 0.005
3350 - 3333 130 4,000 680 12,000
Stiff Clay w/o Free
Water 1,000 0.005
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 7
Elev. (ft) (site datum)
Total / Effective
Unit Weight 1, 2 (pcf)
Estimated
Cohesion 2
(psf)
Allowable Compressive
Side Resistance
(psf)
(FS = 2) 3
Allowable End
Bearing (psf)
(FS = 3) 4
LPILE
LPILE Soil Model Type
Static Lateral
Soil Modulus kh (pci)
Soil Strain ε50
1. Groundwater was not encountered to the termination depth of 31 ½ feet below existing grade.
2. Effective unit weight, estimated cohesion, and friction angle values have no Factor of Safety applied.
3. Site friction and lateral resistance should be ignored within the frost zone of 3½ feet. In designing to resist uplift loading, 2/3 of the side friction values provided could be used along with the effective weight of the drilled shaft.
Terracon should be contacted if permanent casing will be used to allow for a review of casing type and installation procedures and update axial and lateral resistance in the zone of permanent casing.
4. Drilled shafts should penetrate at least one shaft diameter into the bearing stratum when designing for allowable end bearing pressures.
5. NR = Not recommended
Lateral deflections of drilled shafts should be evaluated using an appropriate analysis procedure and would be dependent on the physical characteristics of the drilled shaft, subsurface conditions, applied loading, restraint conditions at the bottom and top of the shaft and ground slope. We can provide analyses of lateral deflections on request.
Group action for lateral resistance of shafts should be taken into account when the center-to-center spacing is less than 8 diameters. For a group of shafts oriented parallel to a lateral load, the allowable lateral resistances provided by the subsurface materials should be reduced in accordance with the following table.
Laterally Loaded Drilled Shafts – Group Reduction Factors Shaft Spacing 1
(Diameters) Leading Row
Reduction Factor Second Row
Reduction Factor Third or Higher Row
Reduction Factor 8D 1.0 1.0 1.0 5D 1.0 0.8 0.7 3D 0.8 0.4 0.3
1. Center-to-center spacing in the direction of loading. If the loading direction for a single row of shafts is perpendicular to the row, a group reduction factor of less than 1.0 should be used if the shaft spacing is less than 5D (i.e., all piles are located in the leading row).
The drilled shafts should have a minimum diameter sufficient to provide adequate cover over steel reinforcement. Drilled shaft diameters should not be less than 30 inches in order to accommodate temporary casing and equipment for removal of water and for concrete placement.
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 8
Drilled shaft foundations designed and constructed as recommended in this report would be expected to experience settlement on the order of ½ inch or less (not including elastic compression of the shaft). Proper reinforcing steel should be included in the drilled shaft designs for the combined axial and lateral loading, as well as internal bending moments.
The tops of the drilled shafts should be formed so the shaft diameter will not increase within 3½ feet of the lowest adjacent finished grade to reduce the potential for uplift loads caused by frost action that could develop beneath broader or “mushroomed” tops of drilled shafts. If pier caps are used, the base of the cap should extend at least 3½ feet below lowest adjacent finished grade.
Drilled Shaft Construction Considerations
The drilling contractor should be experienced in the subsurface conditions observed at the site, and the excavations should be performed with equipment capable of providing a clean bearing surface. The drilled straight-shaft foundation system should be installed in general accordance with the procedures presented in "Standard Specification for the Construction of Drilled Piers", ACI Publication No. 336.1-01.
The contractor is generally expected to use conventional “dry” techniques for installation of the drilled shaft. Subsurface water was not encountered in boring during the drilling activities.
Subsurface water levels are influenced by seasonal and climatic conditions, which result in fluctuations in subsurface water elevations. Additionally, it is common for water to be present after periods of significant rainfall.
The drilling contractor should remove all soft and disturbed soils from the base of the drilled pier prior to placing concrete. The drilled shaft installation process should be performed under the observation of the Geotechnical Engineer. The Geotechnical Engineer should document the shaft installation process including soil/rock and groundwater conditions observed, consistency with expected conditions, and details of the installed shaft.
MAT FOUNDATION
In our opinion, the proposed tower can be supported on a mat foundation. Design and construction recommendations for a mat foundation are presented in the following sections.
Description Value
Required Bearing Materials Undisturbed onsite soil at a minimum depth of 3 ½ feet below existing grade
Net Allowable Bearing Pressure 1 2,000 psf
Minimum Embedment below Finished Grade for Frost Protection 2 18 inches
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 9
Description Value
Approximate Total Settlement 3 1 inch or less
Estimated Differential Settlement 3 2/3 of total settlement
Ultimate Passive Pressure 4, 5
(equivalent fluid density)
For materials placed adjacent to foundation:
n Fine-grained: 285 pcf n Coarse-grained: 360 pcf 6
Ultimate coefficient of sliding friction 5 0.35
1. The recommended net allowable bearing pressure is the pressure in excess of the minimum surrounding overburden pressure at the footing base elevation.
2. For frost protection and to reduce the effects of seasonal moisture variations in the subgrade soils.
3. Foundation settlement will depend upon the variations within the subsurface soil profile, the structural loading conditions, the embedment depth of the mat, the thickness of compacted fill, and the quality of the earthwork operations. Values consider the maximum loads note in the Project Description section.
4. Use of passive earth pressures requires the sides of the excavation for the mat foundation to be nearly vertical and the concrete placed neat against these vertical faces or that the foundation forms be removed and compacted structural fill be placed against the vertical footing face. Passive resistance in the upper 42 inches of the soil profile should be neglected due to frost effects.
5. Horizontal movement of the foundation must occur to mobilize passive and sliding resistance.
6. The backfill zone needs to extend outward from the base of the foundation at 60° with respect to vertical for the granular value to be applicable.
Uplift resistance of mat foundation can be developed from the effective weight of the foundation and overlying soils, and from the weight of the structure itself. The maximum allowable uplift capacity should be taken as a sum of the effective weight of soil plus the effective weight of the foundation, and dead weight of the structure, all divided by an appropriate factor of safety. A maximum total unit weight of 115 pcf could be used for existing soils or compacted backfill at this site.
Mat Foundation Construction Considerations
As noted in Earthwork, the footing excavations should be evaluated under the direction of the Geotechnical Engineer. The base of all foundation excavations should be free of water and loose soil prior to placing concrete. Concrete should be placed soon after excavating to reduce bearing soil disturbance. Care should be taken to prevent wetting or drying of the bearing materials during construction. Excessively wet or dry material or any loose/disturbed material in the bottom of the footing excavations represent unsuitable conditions and should be corrected before foundation concrete is placed.
If unsuitable bearing soils are encountered at the base of the planned footing excavation, the excavation should be extended deeper to suitable soils, and the footings could bear directly on
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 10 these soils at the lower level or on lean concrete backfill placed in the excavations. This is illustrated on the sketch below.
Over-excavation for structural fill placement below footings should be conducted as shown below.
The over-excavation should be backfilled up to the footing base elevation, with approved on-site soils or imported fill, as recommended in the Earthwork section.
SEISMIC CONSIDERATIONS
The seismic design requirements for buildings and other structures are based on Seismic Design Category. Site Classification is required to determine the Seismic Design Category for a structure.
The Site Classification is based on the upper 100 feet of the site profile defined by a weighted average value of either shear wave velocity, standard penetration resistance, or undrained shear strength in accordance with Section 20.4 of ASCE 7 and the International Building Code (IBC).
Based on the soil properties encountered at the site and as described on the exploration logs and results, it is our professional opinion that the Seismic Site Classification is D. Subsurface explorations at this site were extended to a maximum depth of 35½ feet. The site properties below the boring depth to 100 feet were estimated based on our experience and knowledge of geologic
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 11 conditions of the general area. Additional deeper borings or geophysical testing may be performed to confirm the conditions below the current boring depth.
LATERAL EARTH PRESSURES
Design Parameters
Structures with unbalanced backfill levels on opposite sides should be designed for earth pressures at least equal to values indicated in the following table. Earth pressures will be influenced by structural design of the walls, conditions of wall restraint, final grades or sloping of ground adjacent to the walls, surcharges, methods of construction and/or compaction and the strength of the materials being restrained. Two wall restraint conditions are shown in the diagram below. Active earth pressure is commonly used for design of free-standing cantilever retaining walls and assumes wall movement. The “at-rest” condition assumes no wall movement and is commonly used for basement walls, loading dock walls, or other walls restrained at the top. The recommended design lateral earth pressures do not include a factor of safety and do not provide for possible hydrostatic pressure on the walls (unless stated). The recommended design lateral earth pressures provided in this section are for cast-in-place, reinforced concrete walls only, and are not applicable to other wall systems (e.g., segmental block, landscaping walls, etc.).
Lateral Earth Pressure Design Parameters
Earth Pressure Condition 1
Coefficient for Backfill Type 2
Surcharge Pressure 2, 3, 4
(psf)
Effective Fluid Pressures (psf)2, 4, 5, 6
Drained Undrained
Active (Ka) Granular: 0.33
Cohesive: 0.42
(0.33)S
(0.42)S
(40)H
(50)H
(80)H
(85)H
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 12
At-Rest (Ko) Granular: 0.50
Cohesive: 0.59
(0.50)S
(0.59)S
(60)H
(70)H
(90)H
(95)H
Passive (Kp) Granular: 3.0
Cohesive: 2.4
(360)D
(285)D
(235)D
(200)D
Sliding Resistance Ultimate coefficient of sliding friction for granular bearing soils: 0.4
1. For active earth pressure, wall must rotate about base, with top lateral movements 0.002 H to 0.004 H, where H is wall height. For passive earth pressure, wall must move horizontally to mobilize resistance
2. Considers a horizontal ground inclination uphill of the wall, and a horizontal ground inclination downhill of the wall.
3. Uniform surcharge, where S is surcharge pressure.
4. Loading from heavy compaction equipment is not included.
5. No safety factor is included in these values. H value is used for active and at-rest pressure computations from the top of wall. D value (not shown on figure) is used for passive pressure computations and is depth of foundation embedment below lowest grade at base of wall. Passive pressure resistance distribution should consider frost effects as discussed in the Shallow Foundations section.
6. In order to achieve “Drained” conditions, follow guidelines in the Below Grade Walls Subsurface Drainage section. “Undrained” conditions are recommended when drainage behind walls is not incorporated into the design or where walls will be submerged during flooding events.
Backfill placed against structures should consist of granular soils or low plasticity cohesive soils.
For the granular values to be valid, the granular backfill must extend out and up from the base of the wall at an angle of at least 45 and 60 degrees from vertical for the active and passive cases, respectively.
CORROSIVITY
The table below lists the results of laboratory soluble sulfate, soluble chloride, electrical resistivity, and pH testing. The values may be used to estimate potential corrosive characteristics of the on-site soils with respect to contact with the various underground materials which will be used for project construction.
Corrosivity Test Results Summary
Boring Sample Depth (feet) Soil Description
Soluble Sulfate (mg/kg)
Soluble Chloride (mg/kg)
Electrical Resistivity
(Ω-cm) pH
B1 2.5-4 Lean clay, trace sand 112 194 2,788 7.1
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 13
Results of water-soluble sulfate testing indicate that samples of the on-site soils have an exposure class of S0 when classified in accordance with Table 19.3.1.1 of the American Concrete Institute (ACI) Design Manual. Selection of concrete type and mix design are the responsibility of the foundation designer.
The pH, sulfates, sulfides, total dissolved salts, oxidation-reduction potential, and chlorides can affect the aggressiveness of corrosion to buried metal structures. These test results are provided to assist in determining the type and degree of corrosion protection that may be required. We recommend that a certified corrosion engineer be employed to determine the need for corrosion protection and to design appropriate protective measures.
GENERAL COMMENTS
Our analysis and opinions are based on our understanding of the project, the geotechnical conditions in the area, and the data obtained from our site exploration. Natural variations will occur between exploration point locations or due to the modifying effects of construction or weather.
The nature and extent of such variations may not become evident until during or after construction.
Terracon should be retained to review the final design plans and specifications so comments can be made regarding interpretation and implementation of our geotechnical recommendations in the design and specifications. Terracon should be retained to provide observation and testing services during grading, excavation, foundation construction, and other earth-related construction phases of the project. If variations appear, we can provide further evaluation and supplemental recommendations. If variations are noted in the absence of our observation and testing services on-site, we should be immediately notified so that we can provide evaluation and supplemental recommendations.
Our Scope of Services does not include either specifically or by implication any environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or prevention of pollutants, hazardous materials or conditions. If the Owner is concerned about the potential for such contamination or pollution, other studies should be undertaken.
Our services and any correspondence or collaboration through this system are intended for the sole benefit and exclusive use of our client for specific application to the project discussed and are accomplished in accordance with generally accepted geotechnical engineering practices with no third party beneficiaries intended. Any third-party access to services or correspondence is solely for information purposes to support the services provided by Terracon to our client.
Reliance on the services and any work product is limited to our client, and is not intended for third parties. Any use or reliance of the provided information by third parties is done solely at their own risk. No warranties, either express or implied, are intended or made.
Site characteristics as provided are for design purposes and not to estimate excavation cost. Any use of our report in that regard is done at the sole risk of the excavating cost estimator as there may be variations on the site that are not apparent in the data that could significantly impact
Plainview, Texas ■ November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable 14 excavation cost. Any parties charged with estimating excavation costs should seek their own site characterization for specific purposes to obtain the specific level of detail necessary for costing.
Site safety, and cost estimating including, excavation support, and dewatering requirements/design are the responsibility of others. If changes in the nature, design, or location of the project are planned, our conclusions and recommendations shall not be considered valid unless we review the changes and either verify or modify our conclusions in writing.
Responsive ■ Resourceful ■ Reliable
FIGURES
Contents:
GeoModel
3,330
3,335
3,340
3,345
3,350
3,355
3,360
3,365
3,370
E L
E V
A T
IO
N
M
S L
(f ee t)
Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) Plainview, TX Terracon Project No. AR22P142
Layering shown on this figure has been developed by the geotechnical engineer for purposes of modeling the subsurface conditions as required for the subsequent geotechnical engineering for this project.
Numbers adjacent to soil column indicate depth below ground surface.
NOTES:
B1
GEOMODEL
This is not a cross section. This is intended to display the Geotechnical Model only. See individual logs for more detailed conditions.
LEGEND
Aggregate Base Course
Lean Clay with Sand
Sandy Lean Clay
Model Layer General DescriptionLayer Name
Medium stiff to hard1 Lean Clay
36.5
ATTACHMENTS
Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) ■ Plainview, Texas November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable EXPLORATION AND TESTING PROCEDURES 1 of 2
EXPLORATION AND TESTING PROCEDURES
Field Exploration
Number of Borings Boring Depth (feet) Planned Location
1 35½ Antenna tower
Boring Layout and Elevations: Terracon used a handheld GPS unit to locate the field exploration point based on the provided boring coordinates. The ground surface elevation at the boring location was obtained by Terracon personnel using a surveyor’s level and rod referencing the finished floor elevation of the building north of the boring. An elevation of 100 feet (Terracon project datum) was assigned to this benchmark. The boring elevation on the boring log was rounded to the nearest ½ foot. The location and elevation of the boring should be considered approximate and accurate only to the degree implied by the means and methods used to define them.
Subsurface Exploration Procedures: The borings were drilled with a truck-mounted drilling rig using continuous flight solid-stem augers. Soil sampling was performed using thin-walled tube and split-barrel sampling procedures. In the thin-walled tube sampling procedure, a thin-walled, seamless steel tube with a sharp cutting edge is pushed hydraulically into the soil to obtain a relatively undisturbed sample. In the split-barrel sampling procedure, a standard 2-inch outer diameter split-barrel sampling spoon is driven into the ground by a 140-pound automatic hammer falling a distance of 30 inches. The number of blows required to advance the sampling spoon the last 12 inches of a normal 18-inch penetration is recorded as the Standard Penetration Test (SPT) resistance value. The SPT resistance values, also referred to as N-values, are indicated on the boring logs at the test depths. The samples were placed in appropriate containers and taken to our laboratory for testing. We observed and recorded groundwater levels during, and shortly after drilling and sampling. The borings were backfilled with auger cuttings after drilling.
The drill crew prepared a field log of each boring to record field data including visual descriptions of the materials encountered during drilling as well as the driller’s interpretation of the subsurface conditions between samples. The boring logs included with this report represent an interpretation of the subsurface conditions at each boring location based on field and laboratory data, and observation of the samples.
Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) ■ Plainview, Texas November 3, 2022 ■ Terracon Project No. AR22P142
Responsive ■ Resourceful ■ Reliable EXPLORATION AND TESTING PROCEDURES 2 of 2
Laboratory Testing
In the laboratory, water content tests were performed on portions of the recovered samples. The dry unit weight of intact, thin-walled tube samples was determined. Unconfined compressive strength and hand penetrometer tests were performed to estimate the consistency of select samples of fine-grained soils. Atterberg Limits, particle size analysis, and one-dimensional consolidation tests were performed on Sample 3. The results of the laboratory tests are shown on the boring logs at their corresponding sample depths and/or as separate graphs in Exploration Results.
The samples were described in the laboratory based on visual observation, texture and plasticity, and the laboratory testing described above. The descriptions of the soils indicated on the boring logs are in general accordance with the General Notes, Unified Soil Classification System (USCS) summarized and included in Supporting Information.
SITE LOCATION AND EXPLORATION PLAN
Contents:
Site Location Exploration Plan Utility Map
Note: All attachments are one page unless noted above.
SITE LOCATION
Plainview, TX ■ November 3, 2022 ■ Terracon Project No. AR22P142
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page.
1.0 SITE LOCATION AND EXPLORATION PLA NS
2.0 SITE LOCATION P ORTR AIT
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS
EXPLORATION PLAN
Plainview, TX ■ November 3, 2022 ■ Terracon Project No. AR22P142
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
The line at the bottom about the general location is a separate table line. You can edit it as desired but try to keep to a single line of text to avoid reformatting the page.
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS
UTILITY MAP
Plainview, TX ■ November 3, 2022 ■ Terracon Project No. AR22P142
Note to Preparer: This is a large table with outside borders. Just click inside the table above this text box, then paste your GIS Toolbox image.
When paragraph markers are turned on you may notice a line of hidden text above and outside the table – please leave that alone. Limit editing to inside the table.
The line at the bottom about the general location is a separate table line. You can edit it as desired, but try to keep to a single line of text to avoid reformatting the page.
3.0 SITE LOCATION AND EXPLORATION PLA NS
4.0 SITE LOCATION P ORTR AIT
DIAGRAM IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES MAP PROVIDED BY MICROSOFT BING MAPS
EXPLORATION RESULTS
Contents:
Boring Log Atterberg Limits Grain Size Distribution Corrosivity
3-2-3 N=5
4-5-7 N=12
3-4-5 N=9
6-9-12 N=21
4-5-5 N=10
12-14-19 N=33
9-13-22 N=35
13-18-25 N=43
20-24-27 N=51
7-8-23 N=31
19.7
15.3
13.6
16.1
8.1
29-15-14
34-14-20
42-15-27
45-17-28
36-15-21
GRAVEL SURFACE, Approximately 4" thickness LEAN CLAY WITH SAND (CL), dark brown to brown, medium stiff to hard
SANDY LEAN CLAY (CL), brown, hard
Boring Terminated at 36.5 Feet
0.3
25.0
36.5
3368.3
3343.6
3332.1
Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual.
T H
IS
B
O R
IN
G
L O
G I
S N
O T
V A
L
ID
I F
S E
P A
R A
T E
D F
R O
M O
R
IG
IN
A
L R
E P
O R
T
G E
O S
M A
R T
L O
G -N
O W
E L
L
A R
P
P
LA
IN
V
IE
W
T
X
A
.G P
J T
E R
R A
C O
N
D A
T A
T E
M P
L A
T E
.G D
T
/2 8/
D E
P T
H
F t.)
W A
T E
R L
E V
E L
O B
S E
R V
A T
IO
N
S STRENGTH TEST
F
IE
LD
T
E S
T R
E S
U
LT
S
W A
T E
R C
O N
T E
N T
ATTERBERG
LIMITS
LL-PL-PI
LOCATION See Exploration Plan
Latitude: 34.1692° Longitude: -101.7228°
G R
A P
H
IC
L O
G
M O
D E
L
LA
Y E
R
DEPTH
Surface Elev.: 3368.5
(Ft.) ELEVATION (Ft.)
Advancement Method:
Continuous Flight Auger
Abandonment Method:
Boring backfilled with auger cuttings upon completion.
Notes:
Project No.: AR22P142
Drill Rig: Mobile B-48
BORING LOG NO. B1
PTSI Managed Services Inc. (Parsons)CLIENT:
Washington, DC
Driller: Alex
Boring Completed: 09-21-2022
PROJECT: Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group)
Elevations were measured in the field using a gps
See Exploration and Testing Procedures for a description of field and laboratory procedures used and additional data (If any).
See Supporting Information for explanation of symbols and abbreviations.
County Road V Plainview, TX
SITE:
Boring Started: 09-21-2022
5847 50th St Lubbock, TX
No free water observed
WATER LEVEL OBSERVATIONS
D R
Y U
N
IT
W E
IG
H
T pc f)
S T
R A
IN
C O
M P
R E
S S
IV
E
S T
R E
N G
T H
(t sf
T E
S T
T Y
P E
P E
R C
E N
T F
IN
E
S
S A
M P
LE
T
Y P
E
0 20 40 60 80 100
CH
o r
OH
CL
o r
OL
ML or OL
MH or OH
"U " L ine
"A " L ine
ATTERBERG LIMITS RESULTS
ASTM D4318
P L A S T I C I T Y
I N D E X
LIQUID LIMIT
PROJECT NUMBER: AR22P142
SITE: 34-1691, -101.7227
Plainview, TX
PROJECT: Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) CLIENT: PTSI Managed Services Inc.
(Parsons) Washington, DC
5847 50th St Lubbock, TX
L A
B O
R A
T O
R Y
T E
S T
S A
R E
N O
T V
A L
ID
I
F S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
T E
R B
E R
G L
IM
IT
S
P
P L
A
IN
V
IE
W
T X
A
.G
P J
T E
R R
A C
O N
D
A T
A T
E M
P L
A T
E .G
/2
/2
PIPLLL
B1
B1
B1
B1
B1
74.6
77.5
81.2
80.5
56.3
Fines
0.3 - 1.8
5 - 6.5
10 - 11.5
15 - 16.5
25 - 26.5
CL
CL
CL
CL
CL
LEAN CLAY with SAND
LEAN CLAY with SAND
LEAN CLAY with SAND
LEAN CLAY with SAND
SANDY LEAN CLAY
DescriptionUSCSBoring ID Depth (Ft)
CL-ML
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: AR22P142
SITE: 34-1691, -101.7227
Plainview, TX
PROJECT: Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) CLIENT: PTSI Managed Services Inc.
(Parsons) Washington, DC
5847 50th St Lubbock, TX
L A
B O
R A
T O
R Y
T E
S T
S A
R E
N O
T V
A L
ID
I
F S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
G
A
IN
S
IZ
E
U S
C
P
P
LA
IN
V
IE
W
T
X
A
.G P
J T
E R
R A
C O
N
D A
T A
T E
M P
L A
T E
.G
/2 8/
B1
B1 fine coarse finemedium
COBBLES
GRAVEL SAND
SILT OR CLAY
D30
D60
BORING ID
#4 #10 #40 #200
100.0 99.91 99.55 74.6
3/8" #4 #10 #40 #200
100.0 97.29 96.74 96.15 77.46
100.0 99.41 99.11 98.3 81.18
3/8" #4 #10 #40 #200
CC
CU
coarse
D10
25.4
19.8
18.2
74.6
77.5
81.2
0.0
0.0
0.0
0.3 - 1.8
5 - 6.5
10 - 11.5
CL
CL
CL
LEAN CLAY with SAND (CL)
LEAN CLAY with SAND (CL)
0.0
2.7
0.6
Sieve
REMARKS
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
0.0010.010.1110100
3/4 1/23/8 30 403 60
HYDROMETERU.S. SIEVE OPENING IN INCHES
16 20
U.S. SIEVE NUMBERS
44 10063 2 10 14 506 2001.5 81 140
P E
R C
E N
T F
IN
E
R B
Y W
E
IG
H T
P E
R C
E N
T C
O A
R S
E R
B Y
W E
IG
H
T
GRAIN SIZE DISTRIBUTION
ASTM D422 / ASTM C136
PROJECT NUMBER: AR22P142
SITE: 34-1691, -101.7227
Plainview, TX
PROJECT: Plainview, TX - ACE-3091, ACE-3285 and ACE 3319 RCAG & RTR Tower Replacement (Pink Group) CLIENT: PTSI Managed Services Inc.
(Parsons) Washington, DC
5847 50th St Lubbock, TX
L A
B O
R A
T O
R Y
T E
S T
S A
R E
N O
T V
A L
ID
I
F S
E P
A R
A T
E D
F R
O M
O R
IG
IN
A L
R E
P O
R
G
A
IN
S
IZ
E
U S
C
P
P
LA
IN
V
IE
W
T
X
A
.G P
J T
E R
R A
C O
N
D A
T A
T E
M P
L A
T E
.G
/2 8/ fine coarse finemedium
COBBLES
GRAVEL SAND
SILT OR CLAY
D30
D60
BORING ID
3/8" #4 #10 #40 #200
100.0 99.36 98.83 96.83 80.47
1/2" 3/8" #4 #10 #40 #200
100.0 96.6 93.0 91.47 89.64 56.32
CC
CU
coarse
D10
18.9
36.7
80.5
56.3
0.0
0.0
15 - 16.5
25 - 26.5
CL
CL
0.091
SANDY LEAN CLAY (CL)
0.6
7.0
Sieve
REMARKS
SOIL DESCRIPTION
% Finer% Finer SieveSieve% Finer
USCS% CLAY% FINES% SILT% SAND% GRAVEL% COBBLESDEPTH
COEFFICIENTS
GRAIN SIZE
Project Number:
Service Date:
Report Date:
Client
B-1
2.5
7.1 nil
+527
2,788
Analyzed By:
CHEMICAL LABORATORY TEST REPORT
Zach Robertson pH Analysis, ASTM - G51-18
Water Soluble Sulfate (SO4), ASTM C 1580
(mg/kg)
Sulfides, ASTM - D4658-15, (mg/kg)
Chlorides, ASTM D 512 , (mg/kg)
RedOx, ASTM D-1498, (mV)
Total Salts, ASTM D1125-14, (mg/kg)
Resistivity, ASTM G187, (ohm-cm)
955 L'enfant Plaza SW Suite 8400
Plainview, TX - ACE-3091, ACE-3285 and
10/18/22
10400 State Highway 191
Midland, Texas 79707
432-684-9600
ACE 3319 RCAG & RTR Tower Replacement (Pink Group)
Project PTSI Managed Services Inc. (Parsons)
Washington, DC 20024
Sample Location
Sample Depth (ft.)
Plainview, TX
34-1691, -101.7227
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
AR22P142
Engineering Technician III
10/13/22
SUPPORTING INFORMATION
Contents:
General Notes to Log Terms Unified Soil Classification System
UNIFIED SOIL CLASSIFICATION SYSTEM
UNIFIED SOI L CLASSI FICATI ON SYSTEM
Criteria for Assigning Group Symbols and Group Names Using Laboratory Tests A Soil Classification
Group Symbol Group Name B
Coarse-Grained Soils:
More than 50% retained on No. 200 sieve
Gravels:
More than 50% of coarse fraction retained on No. 4 sieve
Clean Gravels:
Less than 5% fines C
Cu ³ 4 and 1 £ Cc £ 3 E GW Well-graded gravel F
Cu < 4 and/or [Cc<1 or Cc>3.0] E GP Poorly graded gravel F
Gravels with Fines:
More than 12% fines C
Fines classify as ML or MH GM Silty gravel F, G, H
Fines classify as CL or CH GC Clayey gravel F, G, H
Sands:
50% or more of coarse fraction passes No. 4 sieve
Clean Sands:
Less than 5% fines D
Cu ³ 6 and 1 £ Cc £ 3 E SW Well-graded sand I
Cu < 6 and/or [Cc<1 or Cc>3.0] E SP Poorly graded sand I
Sands with Fines:
More than 12% fines D
Fines classify as ML or MH SM Silty sand G, H, I
Fines classify as CL or CH SC Clayey sand G, H, I
Fine-Grained Soils:
50% or more passes the No. 200 sieve
Silts and Clays:
Liquid limit less than 50
Inorganic:
PI > 7 and plots on or above “A” line J
CL Lean clay K, L, M
PI < 4 or plots below “A” line J ML Silt K, L, M
Organic:
Liquid limit - oven dried
< 0.75 OL Organic clay K, L, M, N
Liquid limit - not dried Organic silt K, L, M, O
Silts and Clays:
Liquid limit 50 or more
Inorganic:
PI plots on or above “A” line CH Fat clay K, L, M
PI plots below “A” line MH Elastic Silt K, L, M
Organic:
Liquid limit - oven dried
< 0.75 OH Organic clay K, L, M, P
Liquid limit - not dried Organic silt K, L, M, Q
Highly organic soils: Primarily organic matter, dark in color, and organic odor PT Peat A Based on the material passing the 3-inch (75-mm) sieve.
B If field sample contained cobbles or boulders, or both, add “with cobbles or boulders, or both” to group name.
C Gravels with 5 to 12% fines require dual symbols: GW-GM well-graded gravel with silt, GW-GC well-graded gravel with clay, GP-GM poorly graded gravel with silt, GP-GC poorly graded gravel with clay.
D Sands with 5 to 12% fines require dual symbols: SW-SM well-graded sand with silt, SW-SC well-graded sand with clay, SP-SM poorly graded sand with silt, SP-SC poorly graded sand with clay.
E Cu = D60/D10 Cc =
DxD
)(D
F If soil contains ³ 15% sand, add “with sand” to group name.
G If fines classify as CL-ML, use dual symbol GC-GM, or SC-SM.
H If fines are organic, add “with organic fines” to group name.
I If soil contains ³ 15% gravel, add “with gravel” to group name.
J If Atterberg limits plot in shaded area, soil is a CL-ML, silty clay.
K If soil contains 15 to 29% plus No. 200, add “with sand” or “with gravel,” whichever is predominant.
L If soil contains ³ 30% plus No. 200 predominantly sand, add
“sandy” to group name.
MIf soil contains ³ 30% plus No. 200, predominantly gravel, add
“gravelly” to group name.
NPI ³ 4 and plots on or above “A” line.
OPI < 4 or plots below “A” line.
P PI plots on or above “A” line.
QPI plots below “A” line.
GENERAL NOTES TO LOG TERMS
SAMPLING WATER LEVEL FIELD TESTS
CA Ring Sampler
Water levels indicated on the soil boring logs are the levels measured in the borehole at the times indicated.
Groundwater level variations will occur over time. In low permeability soils, accurate determination for groundwater levels is not possible with short term water level observations.
N Standard Penetration Test Resistance (Blows/Ft)
(HP) Hand Penetrometer
(T) Torvane
(DCP) Dynamic Cone Penetrometer
UC Unconfined Compressive Strength
(PID) Photo-Ionization Detector
(OVA) Organic Vapor Analyzer
DESCRIPTIVE SOIL CLASSIFICATION
Soil classification is based on the Unified Soil Classification System. Coarse Grained Soils have more than 50% of their dry weight retained on a #200 sieve; their principal descriptors are: boulders, cobbles, gravel, or sand. Fine Grained Soils have less than 50% of their dry weight retained on a #200 sieve; they are principally described as clays if they are plastic, and silts if they are slightly plastic or non-plastic. Major constituents may be added as modifiers and minor constituents may be added according to the relative proportions based on grain size. In addition to gradation, coarse-grained soils are defined on the basis of their in-place relative density and fine-grained soils on the basis of their consistency.
LOCATION AND ELEVATION NOTES
Unless otherwise noted, Latitude and Longitude are approximately determined using a hand-held GPS device. The accuracy of such devices is variable. Surface elevation data annotated with +/- indicates that no actual topographical survey was conducted to confirm the surface elevation.
Instead, the surface elevation was approximately determined from topographic maps of the area.
STRENGTH TERMS
RELATIVE DENSITY OF COARSE-GRAINED SOILS
(More than 50% retained on No. 200 sieve.)
Density determined by Standard Penetration Resistance
CONSISTENCY OF FINE-GRAINED SOILS
(50% or more passing the No. 200 sieve.)
Consistency determined by laboratory shear strength testing, field visual-manual procedures or standard penetration resistance
Descriptive Term (Density)
Standard Penetration or N-value
Blows/Ft.
Descriptive Term (Consistency)
Unconfined Compressive Strength Qu, (tsf)
Standard Penetration or N-value
Blows/Ft.
Very Loose 0 - 3 Very Soft Less than 0.25 0 – 1
Loose 4 - 9 Soft 0.25 to 0.5 2 – 4 Medium Dense 10 – 29 Medium Stiff 0.5 to 1.00 4 – 8
Dense 30 – 50 Stiff 1.00 to 2.00 8 – 15 Very Dense >50 Very Stiff 2.00 to 4.00 15 – 30
Hard >4.00 >30
RELATIVE PROPORTIONS OF SAND AND GRAVEL RELATIVE PROPORTIONS OF FINES
Descriptive Term(s) of other constituents
Percent of Dry Weight
Descriptive Term(s) of other constituents
Percent of Dry Weight
Trace <15 Trace <5 With 15 – 29 With 5 – 12
Modifier >30 Modifier >12
GRAIN SIZE TERMINOLOGY PLASTICITY DESCRIPTION
Major Component of Sample Particle Size Term Plasticity Index Boulders Over 12 in. (300 mm) Non-plastic 0 Cobbles 12 in. to 3 in. (300 mm to 75 mm) Low 1 – 10 Gravel 3 in. to #4 sieve (75mm to 4.75mm) Medium 11 – 30 Sand #4 to #200 sieve (4.75mm to 0.075mm) High >30
Silt or Clay Passing #200 sieve (0.075mm)
| REPORT COVER PAGE |
| REPORT COVER LETTER TO SIGN |
| REPORT TOPICS |
| INTRODUCTION |
| SITE CONDITIONS |
| PROJECT DESCRIPTION |
| GEOTECHNICAL CHARACTERIZATION |
| GEOTECHNICAL OVERVIEW |
| EARTHWORK |
| Site Preparation |
| Structural Fill Material Types |
| Structural Fill Compaction Requirements |
| Grading and Drainage |
| Earthwork Construction Considerations |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .