This document appears to be a pre-solicitation announcement from the Federal Aviation Administration (FAA) seeking sources for tower demolition and tower construction services located at Fredericksburg, Texas (T82) and Plainview, Texas (PVW).
The FAA intends to pursue one or two firm-fixed-price (FFP) contracts based on a lowest-price technically acceptable (LPTA) award process, potentially with set-asides for small business, service-disabled veteran-owned small business, or woman-owned small business concerns. The FAA is requesting responses from interested and capable vendors to include a statement of interest, project-specific information, and a rough order of magnitude estimate. Responses are due by 4:00 p.m. Central Time on October 11, 2024. The FAA reserves the right to cancel the announcement at any time.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHRISTOPHER C
KEIL
Digitally signed by
CHRISTOPHER C KEIL
Date: 2021.09.01 08:15:09 -05'00'
TIMOTHY MARK
JOHNSON
Digitally signed by TIMOTHY
MARK JOHNSON
Date: 2021.08.12 15:00:26 -05'00'
ENGINEERING SERVICES
OPERATIONS
RCAG
DRAWING INDEX AND ABBREVIATIONS
UIS PROGRAM TOWER REPLACEMENT PROJECT
SW CENTRAL SERVICE AREA
L J
PROJECT ENGINEER MGR: ENGINEERING
08/11/2021
CSA-D-RCAG-G002
THIS DRAWING PRODUCED ON ASW REGION MICROSTATION SYSTEM
ATO - TECHNICAL OPERATIONS CENTRAL SERVICE AREA
C O
N S
T R
U C
T
IO
N c s a -d -r c a g -g
.d g n c s a -d -r c a g -g
.d g n
/1
/2
:2
:2
P
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
E D
M
IS
S
U E
D F
O R
DRAWING NO. REV. DATE DESCRIPTION
CONSTRUCTION DRAWING INDEX
ABBREVIATIONS
CONTINUOUS
CONTINUE, CONTINUATION,
TECHNICIAN
CONSTRUCTION ENGINEERING
ARP AIRPORT REFERENCE POINT
ABV
ADJ
APPROX
AVG
AF
ABOVE
AIRWAY FACILITY
ADJACENT, ADJUSTABLE
AVERAGE
APPROXIMATELY
ALSF HIGH INTENSITY APPROACH
LIGHTING SYSTEM WITH
AMBIENT LIGHT SENSOR ALS
AMPERES
SEQUENCED FLASHING LIGHTS
BLDG BUILDING
BJ BONDING JUMPER
C
CAP
CL
CONC
CONN
CONSTR
CONT
CONTR
CP
CTR
CJ
COMM
CENTERLINE
CONCRETE
COMMUNICATIONS
CONNECTION
CONSTRUCTION
CONTRACTOR
CENTER
CONTROL PANEL
CABINET
CCM
CET
CAB
CAPACITY
CONCRETE CABLE MARKER
CONTROL JOINT
CND CONDUIT
COMMUNICATION DUCT OR LINE
DIAMETER
DIMENSION
DIAGONAL
DISTRIBUTION
DOWN
DRAWING
DISTANCE MEASUREMENT
EQUIPMENT
DIA
DIAG
DIM
DISTR
DN
DWG
DME
DIRECT EARTH BURIALDEB
DS1 DIGITAL SIGNAL 1
CHANNEL BANK
HANDHOLE
HIGH VOLTAGE
MATERIALS
GOVERNMENT FURNISHED
PRECISION APPROACH PATH
INDICATOR LIGHTS
LIGHTING SYSTEM W/
INDICATOR LIGHTS
KV
KVA
KW
NORTH AMERICAN VERTICAL DATUM
SEQUENCED FLASHING LIGHTS
SA SURGE ARRESTOR
POB
TXWY POS
GEC
GL
GS
GA
GALV
GND
GFCI
GFM
CONDUCTOR
GLASS
GLIDE SLOPE
GROUNDING ELECTRODE
GAUGE
GALVANIZED
GROUND
G.P.S.
HORIZ
HT
HD
H
HC
HH
HV
IM
ILS
ICC
MALSF
LOC
LOM
MALSR
LF
LHA
LDIN
J
HORIZONTAL
HEIGHT
HEAVY DUTY
HIGH
INNER MARKER
INSTRUMENT LANDING SYSTEM
INDIVIDUAL CONTROL CABINET
MEDIUM INTENSITY APPROACH
LOCALIZER
LOCATOR - OUTER MARKER
LIGHTING SYSTEM W/
MEDIUM INTENSITY APPROACH
ALIGNMENT INDICATOR LIGHTS
LIGHTING SYSTEM W/ RUNWAY
LINEAR FEET
LEAD-IN LIGHTS
JOULES
KILO-VOLT
KILO-VOLT AMPERES
KILO-WATT
OA
OC
OD
OPNG
OPP
PCF
PL
PLBG
PNL
PSF
PSI
PVC
QTY
PVMT
OH
PT
NIC
RCP
OM
RAIL
RCVR
PAPI
RE
NDB
NGVD
NAD
NAVD
REINF
REV
REQD
REF
REIL
PP
NOT IN CONTRACT
NON-DIRECTIONAL BEACON
NORTH AMERICAN DATUM
NATIONAL GEODETIC
VERTICAL DATUM
OVERALL
ON CENTER
OPENING
OPPOSITE
OPPOSITE HAND
OUTER MARKER
OUTSIDE DIAMETER/
OVERFLOW DRAIN
POWER
POUNDS PER CUBIC FOOT
PROPERTY LINE, PLATE
PLUMBING
PANEL
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PAVEMENT
PRESSURE TREATED, PAINT
POINT OF BEGINNING
POINT OF START
POWER POLE
QUANTITY
REINFORCED CONCRETE PIPE
RECEIVER
RESIDENT ENGINEER
REFERENCE
REINFORCEMENT, REINFORCED
REQUIRED
REVISION
LIGHTS
RUNWAY END IDENTIFICATION
SSALR
SHT
SIM
SPEC
SQ
TOC
TOD
UON
UPS
VIF
W/
W/O
WH
WR
WT
TOS
UTIL
TS
SS
XMTR
VERT
SP
STO
ST
WWF
TD
TYP
XFMR
UP
SCHED
SW
VS
SHEET
SQUARE
STAINLESS STEEL
STORAGE
STAIN
SCHEDULE
SWITCH
THICK/THICKNESS
TOP OF CONCRETE
TOP OF STEEL
TUBE STEEL
TOUCHDOWN
TAXIWAY
TYPICAL
UTILITY
UNINTERRUPTABLE POWER
SUPPLY
UNLESS OTHERWISE NOTED
VERIFY IN FIELD
VERTICAL
VISUAL SENSOR
WITH
WITHOUT
WATER RESISTANT
WEIGHT
WATER HEATER
WELDED WIRE FABRIC
TRANSMITTER
TRANSFORMER
VOLTSV
GLOBAL POSITIONING SYSTEM
UTILITY POLE
POI POINT OF INTERCEPT
ENGINE-GENERATOR
EL, ELEV
EACH
ELECTRIC
EXPANSION JOINT
METAL
MIN
MSL
MAX
MH
MTL
MECH MECHANICAL
MINIMUM
MAXIMUM
MANHOLE
MEAN SEA LEVEL
MUX MULTIPLEXER
E/G
EA
ELEC
EJ
R/W RIGHT-OF-WAY
RO
RVR
RWY
RSC/RGS
RSA
ROLLOUT
RUNWAY VISUAL RANGE
RUNWAY
RUNWAY SAFETY AREA
RUNWAY OBJECT FREE AREAROFA
TEL TELEPHONE
TCH THRESHOLD CROSSING HEIGHT
EMERGENCY EMERG
ADMINISTRATION
FEDERAL AVIATION
EQUIP
EXP
EXT
EMT
FAA
EXIST
FF
FFM
EQUIPMENT
EXISTING
EXPOSED, EXPANSION
EXTERIOR, EXTERNAL
FINISH FLOOR
FAR FIELD MONITOR
FL
FT
FVC
FRANG
FLOOR, FLOW LINE
FOOT, FEET
FIRE VALVE CABINET
FRANGIBLE
FDP FIBER DISTRIBUTION PANEL
F/O FIBER OPTIC
SIMILAR
SPACE
SPECIFICATIONS
ATCT
TOWER
AIRPORT TRAFFIC CONTROL
TOFA TAXIWAY OBJECT FREE AREA
TSA TAXIWAY SAFETY AREA
SSC SYSTEM SUPPORT CENTER
ELECTRICAL METALLIC TUBING
VASI
SLOPE INDICATOR
VISUAL APPROACH
CBA
A
B
H
C I
J
K
L
D
E
F
M
Q
P
O
S
T
V
W
X
BOC BOTTOM OF CONDUIT
BOT BOTTOM
HANDICAPPED ACCESSIBLE
LAMP HOUSING ASSEMBLY
N
RUNWAY ALIGNMENT
PCU POWER AND CONTROL UNIT
EES
UT UNDERGROUND TELEPHONE
UE UNDERGROUND ELECTRICAL CABLE
THK
TO
TOP OF DUCT
TELEPHONE OVERHEAD LINE
OVERHEAD ELECTRICAL CABLE OE
AMP
PWR
BSC BARE STRANDED COPPER
LP LIGHTNING PROTECTION
PF PLATFORM
RUNWAY ALIGNMENT INDICATOR LIGHTS
RCAG REMOTE COMMUNICATIONS AIR TO
GROUND FACILITY
BHMA
MANUFACTURER'S ASSOCIATION
BUILDING HARDWARE
PERSONAL FALL ARREST SYSTEM PFAS
RTR RADIO TRANSMIT & RECEIVER FACILITY
J-BOX JUNCTION BOX
R
U
SIMPLIFIED SHORT APPROACH
RIGID GALVANIZED STEEL
RIGID STEEL CONDUIT/
G
GND FAULT CIRCUIT INTERUPTOR
ELEVATION (HEIGHT)
(COUNTERPOISE)
EARTH ELECTRODE SYSTEM
POLYVINYL CHLORIDE
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A
T
(913)-233-3100
Kansas City, KS 66103
104 Greystone Ave
PTSI Managed Services Inc.
CONSTRUCTION
DRAWINGS TO BE USED.
EACH SITE FOR THE LIST OF CONSTRUCTION
REFER TO THE PROJECT SPECIFICATIONS FOR
TOWER DESIGN AND CONSTRUCT GENERAL NOTES
CHRISTOPHER C KEILTIMOTHY M JOHNSON
CSA-D-RCAG-S001 A
TMJ 18065560UPDATE STANDARD COMM TOWER07/25/2022A
N S
T R
U C
T
IO
N c s a -d -r c a g -s
.d g n c s a -d -r c a g -s
.d g n
/2
/2
:4
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
MINIMUM COMPACTED UNIT WEIGHT OF 100 POUNDS PER CUBIC FOOT.
WITH ASTM D698. ADDITIONALLY, STRUCTURAL BACKFILL MUST HAVE A
MAXIMUM DRY DENSITY AT OPTIMUM MOISTURE CONTENT IN ACCORDANCE
THE BACKFILL TO BE PLACED IN 8" LAYERS AND COMPACTED TO 95% OF
WILL NOT BE USED OR MAINTAINED.
A P.E. TO BE SUBMITTED TO THE RE FOR APPROVAL IF BENCHING OF SIDES
THE WORK. DETAILED DESIGN PLANS OF SOIL RETENTION SYSTEM PREPARED BY
"BENCHING" OF EXCAVATED SIDES ARE ESTABLISHED AND MAINTAINED DURING
QUALIFIED PERSON TO BE PROVIDED ON SITE WHO SHALL ENSURE PROPER
OSHA SAFETY MANUALS, WHEN DEPTHS EXCEED 4 FEET. AN OSHA EXCAVATION
TRENCHING, EXCAVATION AND BACKFILL ACTIVITIES IN ACCORDANCE WITH
COORDINATE, MAINTAIN AND PROVIDE A SAFE ENVIRONMENT DURING
UNDERGROUND UTILITIES, LINES OR OBSTRUCTIONS.
PRIOR TO ANY EXCAVATION AND IDENTIFY AND PROTECT ANY EXISTING
ESTABLISH BENCHMARKS ON SURROUNDING STRUCTURES AND PAVEMENT
WHICH MAY DECREASE THE STRENGTH OR DURABILITY OF THE FOUNDATION.
PREVENT SEGREGATION OF CONCRETE MATERIALS AND OTHER OCCURRENCES
CONCRETE PLACEMENT. CONCRETE TO BE PLACED IN A MANNER THAT WILL
LOOSE MATERIAL TO BE REMOVED FROM BOTTOM OF EXCAVATION PRIOR TO
A FLOATED FINISH.
CENTER TO THE OUTSIDE EDGE A MINIMUM OF 1/4" PER FOOT AND PROVIDED
TOP OF FOUNDATION EXPOSED TO WEATHER TO BE SLOPED FROM THE
EXPOSED EDGES OF CONCRETE TO BE CHAMFERED 3/4"x 3/4" MINIMUM.
B. FORMED CONCRETE IN CONTACT WITH GROUND OR EXPOSED TO WEATHER - 2".
A. CONCRETE CAST AGAINST GROUND - 3".
AS FOLLOWS:
CONCRETE COVER-CONCRETE CLEAR COVER FOR REINFORCING BARS IS
EMBEDMENTS.
WELDING IS PROHIBITED ON REINFORCING STEEL AND OTHER STRUCTURAL
UNLESS OTHERWISE INDICATED AND APPROVED IN SUBMITTAL'S.
OF FY=60000 PSI. SPLICES IN REINFORCEMENT ARE NOT ALLOWED
CONFORMING TO ASTM A615, GRADE 60 WITH A MINIMUM YIELD STRENGTH
ALL REINFORCEMENT TO BE NEW BILLET STEEL, DEFORMED BARS,
CONCRETE STRUCTURES (ACI315), LATEST EDITION.
WITH THE MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED
REINFORCING BARS, UNLESS NOTED OTHERWISE, TO BE IN ACCORDANCE
REINFORCING STEEL - ALL DETAILING FABRICATION AND ERECTION OF
AGGREGATE SIZE SHALL NOT EXCEED ONE INCH.
STRENGTH OF F'C-4500 PSI AT 28 DAYS (NORMAL WEIGHT). MAXIMUM
BE IN ACCORDANCE WITH ACI AND TO HAVE A MINIMUM COMPREHENSIVE
ACI 301 AND ACI 318. ALL CAST-IN-PLACE STRUCTURAL CONCRETE TO
CONCRETE CONSTRUCTION TO CONFORM TO THE LATEST EDITION OF
DO NOT USE SLIP CRITICAL CONNECTIONS IN THE TOWER DESIGN.
CONCENTRATED: 500 LBS/ONE SQ FT
UNIFORM: 100 LBS/SF
PLATFORM LIVE LOAD REQUIREMENT
OR AS STATED IN ATTACHMENTS TO THE BID DOCUMENTS, WHICHEVER IS GREATER.
FOR DESIGN CRITERIA OF TOWERS TO BE PER TIA-222 FOR THE TOWER LOCATION
THE BASIC WIND SPEED AND ICE THICKNESS WITH CONCURRENT WIND SPEED USED
MINIMUM OR D IF APPLICABLE. ADJUSTMENT SHALL BE MADE FOR TOPOGRAPHY.
ALL TOWERS TO BE CLASSIFIED AS HIGHEST RISK, AND EXPOSURE CATEGORY C
FACTOR =1.5, FV=1.5,FA=1.0. (OR PER TIA-222, WHICH EVER IS GREATER)
EQUIVALENT LATERAL FORCE PROCEDURE (METHOD 1). SITE CLASS D. IMPORTANCE
THE MINIMUM SEISMIC ANALYSIS PROCEDURE METHOD TO BE IN ACCORDANCE WITH
INPUTS AS NOTED BELOW.
ACCORDANCE WITH NONLINEAR (P-LARGE DELTA) METHOD AND OTHER ANALYSIS
ALL TOWERS TO BE ANALYZED USING TOWER NUMERICS (TNX) SOFTWARE IN
LP MASTS AND OTHER APPURTENANCES ATTACHED TO THE TOWER.
LATERAL LOADS SHALL INCLUDE THE EFFECTS OF THE CABLES, ANTENNAS,
ALL TOWERS TO BE SELF SUPPORTING. THE DESIGN VERTICAL AND
DRAWINGS AND SPECIFICATION REQUIREMENTS THAT EXCEED THE STANDARDS.
ANTENNA TOWERS AND ANTENNA SUPPORTING STRUCTURES" AND ANY
MOST RECENT TIA STANDARDS, "STRUCTURAL STANDARDS FOR STEEL
TO BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS OF THE
ALL WORK INCLUDING BUT NOT LIMITED TO STRUCTURAL AND GROUNDING
AND THE GOVERNING INDUSTRY STANDARDS.
TO BE: THE PROJECT DRAWINGS AND SPECIFICATIONS, THESE STANDARDS
OMISSIONS OF INFORMATION, THE GOVERNING ORDER OF PRECEDENCE
GENERAL DESIGN AND CONSTRUCTION NOTES - IN CASES OF CONFLICTS OR
PAYMENT DUE.
SUBMITTAL'S, IF USED. NO COMPACTION TESTING IS REQUIRED AND NO ADDITIONAL
IN LIEU OF ABOVE REQUIREMENTS AT CONTRACTOR OPTION AND APPROVED
FLOWABLE FILL CONCRETE SLURRY MAY BE USED FOR STRUCTURAL BACKFILL
INSTRUCTIONS FOR PRICING WORK FOR FOUNDATION TYPES.
IF DRILLED PIERS ARE NOT SPECIFIED AS A REQUIREMENT.FOLLOW SOLICITATION
FROST ZONE MUST BE FORMED.
PLACEMENTS. ALL FOUNDATION CONCRETE FOR PLACEMENTS LOCATED WITHIN THE
DO NOT REMAIN VERTICAL, THE SIDES MUST BE FORMED FOR ALL CONCRETE
FREE OF LOOSE CUTTINGS PRIOR TO PLACEMENT. IN THE EVENT EXCAVATED SIDES
PLACED DIRECTLY AGAINST UNDISTURBED SOIL. SIDES OF EXCAVATION MUST BE
ZONE WITH PIERS SUPPORTING TOWER LEGS MAY HAVE THE MAT CONCRETE
WITH FOUNDATION TYPES THAT CONSIST OF MATS LOCATED BELOW THE FROST
FOUNDATION TYPES THAT CONSIST OF MATS LOCATED BELOW THE FROST ZONE
REQUIRED FOR FOUNDATION STRENGTH MUST BE ENCASED IN THE CONCRETE.
AND UPLIFT STRENGTH OF THE FOUNDATION. OTHER REINFORCING STEEL AS
TO BE IGNORED IN THE CALCULATIONS FOR COMPRESSIVE, TENSILE, LATERAL
SOILS WILL BE PERMITTED, HOWEVER, OTHER THAN SKIN FRICTION, THAT STEEL
ONLY STEEL USED FOR CONCRETE CONTAINMENT FOR CAISSONS IN VERY SOFT
WITH EARTH. PIERS, PILES, ETC. IF USED, MUST BE OF REINFORCED CONCRETE.
FOUNDATION DESIGNS MUST NOT INCLUDE STEEL MATERIAL IN DIRECT CONTACT
ABOVE, REVISE THE FOUNDATION PER TOWER AND FOUNDATION DESIGN ENGINEER.
IF SOLID ROCK IS ENCOUNTERED PRIOR TO REACHING MINIMUM STATED
WHICHEVER IS GREATER.
FROST DEPTH FOR THE PROJECT LOCATION OR AS REQUIRED FOR TOWER STABILITY,
THE FOUNDATION DEPTH TO BE 3'-0" MINIMUM FROM FINISH GRADE, TWICE THE TIA-222
FROM THE TOWER DESIGN ANALYSIS.
ATTACHED TO THE SPECIFICATIONS TO SUPPORT THE MAXIMUM FORCES RESULTING
RECOMMENDATION AND INFORMATION CONTAINED IN THE GEOTECHNICAL REPORT
FOUNDATION FOR THE TOWER TO BE DESIGNED IN ACCORDANCE WITH THE
INSTALLED TO PIERS ABOVE FINISH GRADE.
TIED TOGETHER, SUCH MUST BE DONE WITH STRUCTURAL ITEMS
FROST ZONE. IF FOUNDATION DESIGN REQUIRES PIERS TO BE
NO CAPS PERMITTED AT TOPS OF PIERS WITHIN THE
A. GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
TO BE "UP"
BOLTS AT PF END CONNECTIONS OF OUTER ANTENNA MOUNTS USED FOR MAINTENANCE
ONES "IN" TOWARDS WORKER PF ACCESS ROUTE AS MUCH AS PRACTICAL. VERTICAL
ALL VERTICALLY ORIENTED BOLTS TO BE INSTALLED "DOWN" AND HORIZONTAL
BY THE FAA.
AS DIRECTED IF CONTRACTOR'S CORRECTION SUBMITTAL IS NOT APPROVED
ERECTION "FIT-UP" ISSUES MAY REQUIRE REMAKING THE COMPONENTS
WILL BE ALLOWED EXCEPT APPROVED IN WRITING. FABRICATION ERRORS AND
AND ERECTION TO BE BY BOLTED CONNECTIONS ONLY. NO FIELD WELDING
TOWERS TO BE DESIGNED FOR SHOP WELDING ONLY. ALL FIELD ASSEMBLY
TIGHTENING (PAL-NUTS, ANCO AND OTHER TYPES ARE NOT PERMITTED).
SPUD WRENCHES) AND HAVE LOCKING/JAM NUTS INSTALLED AFTER THE FINAL
TO THE SNUG TIGHT CONDITION (THE FULL EFFORT OF A MAN USING ORDINARY
ALL STRUCTURAL BOLTS, INCLUDING ANCHOR BOLTS, TO BE TIGHTENED
BOLT DIAMETER SHALL BE 3/8".
ASTM A153 HIGH STRENGTH BOLTS UNLESS OTHERWISE NOTED. THE MINIMUM
ALL BOLTS TO BE ASTM A325 HOT DIP GALVANIZED IN ACCORDANCE WITH
CONCRETE PLACEMENT.
AND HOLDING ANCHOR BOLT GROUPS FOR EMBEDMENT IN FOUNDATION DURING
BELOW. STEEL TEMPLATES TO BE PROVIDED FOR PROPERLY POSITIONING
ABOVE THE BASE PLATE AND ONE LEVELING NUT AND HARDENED WASHER FOR
ANCHOR BOLTS TO INCLUDE TWO NUTS AND ONE HARDENED WASHER FOR
S5 GRADE 105 AND BE HOT DIP GALVANIZED IN ACCORDANCE WITH ASTM A153.
ANCHOR BOLTS TO MEET OR EXCEED THE REQUIREMENTS OF ASTM F1554-S2,
STIFFENER PLATES TO BE WELDED ALL AROUND.
COLUMN BASE PLATES, CAP PLATES, BEARING PLATES. CONNECTION PLATES, AND
TO HAVE FLANGES AND WEBS OF 3/8" MINIMUM THICKNESS.
STRUCTURAL COMPONENTS USED FOR THE TOWER LEGS (SA, C, H, ETC. SHAPES)
TO ASTM A36, EXCEPT AS OTHERWISE NOTED.
STRUCTURAL STEEL FOR WIDE FLANGE, PLATES, ANGELS, CHANNELS TO CONFORM
USING ZINC-BASED ALLOYS WITH SURFACE PREPARATION PER ANNEX A1.
APPLIED GALVANIZING FOR REPAIRS TO MEET THE REQUIREMENTS OF ASTM A-780
WELDING IS NOT PERMITTED AFTER THE APPLICATION OF THE GALVANIZING. FIELD
ASTM STANDARD A123. THE GALVANIZING TO BE APPLIED AFTER FABRICATION.
ALL STRUCTURAL STEEL TO BE HOT DIP GALVANIZED IN ACCORDANCE WITH
CONSTRUCTION THEN THE PROVISIONS OF AISC WILL GOVERN.
INCLUDE PROVISIONS OR REQUIREMENTS THAT WILL FACILITATE THE STEEL
ARISE BETWEEN THE AISC AND TIA-222. IF HOWEVER THE TIA-222 DOES NOT
THE PROVISIONS OF TIA-222 TO GOVERN IN THE EVENT THAT CONFLICTS
REQUIRED PROPERTIES AND ACTUAL MODULUS OF ELASTICITY.
KIND IS NOT ALLOWED. SUBMIT CERTIFIED MILL TEST REPORTS TO SUBSTANTIATE
AND ERECTION OF STRUCTURAL STEEL FOR BUILDINGS". STEEL TUBING OF ANY
THE MOST RECENT EDITION OF AISC "SPECIFICATIONS FOR DESIGN, FABRICATION
ALL STRUCTURAL STEEL DETAILED, FABRICATED AND ERECTED IN ACCORDANCE WITH1.
B. STRUCTURAL STEEL
3.
4.
5.
6.
7.
8.
9.
10.
11.
1.
2.
3.
4.
5.5.
6.
C. REINFORCED CONCRETE
D. EXCAVATION
1.
2.
3.
E. FOUNDATION
NOTE:
1.
2.
3.
4.
REQUIRED.
RISKS MAY BE DEEMED HIGH ENOUGH AT SOME SITES THAT DRILLED PIERS MAY BE
INCREASES RISKS COMPARED WITH EQUIPMENT USED FOR DRILLED PIERS. THOSE
REQUIRED TO STOCKPILE AND RETRIEVE EXCAVATED MATERIALS FOR BACK FILLING
SITES IS VERY LIMITED SO, ADDITIONAL HEAVY EQUIPMENT TRAFFIC AND SPACE
REDUCE RISKS IF PRACTICAL (I.E., BEDROCK NOT NEAR SURFACE). SPACE AT SOME
TO CONSTRUCT A DRILLED CIP REINFORCED CONCRETE PIER TYPE FOUNDATION TO
DURING THE PROJECT. IT IS "STRONGLY RECOMMENDED" THE CONTRACTOR CHOOSE
SHELTERS AND OTHER SITE COMPONENTS CRITICAL TO MAINTAINING SERVICES
DUE TO FOUNDATION CONSTRUCTION OCCURRING VERY NEAR EXISTING EQUIPMENT
NOTE:
REFER SPECIFICATIONS
NOTE FOR DRILLED PIERS FOUNDATION:
8.
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A
104 Greystone Ave
PTSI Managed Services Inc.
CONSTRUCTION
CHRISTOPHER C
KEIL
Digitally signed by
CHRISTOPHER C KEIL
Date: 2021.09.01 08:20:23 -05'00'
TIMOTHY MARK
JOHNSON
Digitally signed by TIMOTHY
MARK JOHNSON
Date: 2021.08.12 15:06:35 -05'00'
CONDUCTOR RADIUS
TO MAINTAIN 8" MIN LP
LOCATE BOTTOM CLAMP
SHOWN FOR CLARITY
"UP" LEG/TOEBOARD NOT
(TYP 4 PER DETAILS)
AIR TERMINAL ASSEMBLY
WITH NICKEL PLATED TIP
1/2" x 3'-0" AIR TERMINAL
PIPE CAP (WELD)
PIPE BONDING CLAMP
CAST BRONZE
STRAND NO. 14 AWG COPPER CABLE
DOWN CONDUCTOR 28
PIPE REDUCER (WELD)
PF TO EES (TYP ALL LEGS)
DOWN CONDUCTOR FROM
1/2" U-BOLT
1/2" U-BOLT
(MIN SIZE)
L3 X 3 X 3/16
(TYP)
GROUND ROD
GALVANIZED PIPE
STANDARD
1-1/2" x 5'
AT 36" (MAX) SPACING
BONDING CLAMP
CAST BRONZE PIPE
(APPLY COLD GALV OVER AREA)
CONDUCTOR
AIR TERMINAL TO DOWN
EXOTHERMICALLY WELD
GALVANIZED PIPE
2" x 10' HEAVY WALL
REST NOT SHOWN FOR CLARITY)
TO LP HALO (TYP ALL MOUNTS,
GROUND - PARALLEL CLAMP
NO. 6 BSC COPPER ANTENNA
L3 X 3 X 3/16 (MIN SIZE)
BURIED 4/0 BSC
TO GROUND RODS (TYP 7)
EXOTHERMICALLY WELD EES
STAIRS, CABLE LADDER BASE, ETC.)
(TYP AT ALL GROUNDS FOR
GUARD, DUCT SEAL TOP
1" SCHED 80 PVC EES CABLE
SEE NOTE 6
TO LEGS (BRONZE OR S.S.),
FOR LP CONDUCTORS
CLAMP TYPE CONNECTORS
(TYP 7 PLACES AS SHOWN)
STEEL GROUND RODS
3/4" x 10' COPPER PLATED
GRADE FOR EES
2' (MIN) BELOW
4/0 BSC BURIED
TOWER DOWN CONDUCTOR
CONDUIT AT TOWER FACE AND TO
BARE COPPER TO GRSC POWER
EXOTHERMICALLY WELD NO. 2 AWG
SURFACE
WALKING
BUILDING EES
TO TOWER EES GROUND ROD AND
4/0 BSC EXOTHERMICALLY WELDED
DETAILS DRAWING FOR GROUNDING
TOWER, REFER TO SITE ELECTRICAL
GROUND FROM BUILDING TO
RGS POWER CONDUIT ABOVE
TOWER PIER AND LEG (TYP)
(TYP ALL LEGS)
DOWN CONDUCTOR
EES TO TOWER
AND LEG GROUNDROD (TYP ALL LEGS)
CONDUCTOR, LEG NEAR BASE
4/0 EES CABLE TO DOWN
EXOTHERMICALLY WELD
WITH WELDED COUPLER
GALVANIZED PIPE
2" x 5' STANDARD
(TYP 4 PLACES)
MAST DOWN CONDUCTOR AT CONERS
EXOTHERMICALLY BOND HALO TO
(MOST NOT SHOWN FOR CLARITY)
STRUCTURE STEEL AT 3 FT INTERVALS
SECURE PERIMETER CABLE TO PF
COPPER CABLE (SEE NOTE 8)
CONDUCTOR 28 STRAND NO. 14 AWG
PF PERIMETER LP HALO AND DOWN
EES TO GROUND RODS (TYP 7)
EXOTHERMICALLY WELD
(REFER TO SPECIFICATIONS FOR TOWER PF SIZE)
2'-0"
(P R
E F E
R T
O S
P E
C
IF
IC
A T
IO
N S F
O R T
O W
E R H
E
IG
H
12 AND 16 ANTENNA TOWER EES AND LP DETAILS
CSA-D-RCAG-E001 A
TMJ 18065560UPDATE STANDARD COMM TOWER07/25/2025A
N S
T R
U C
T
IO
N c s a -d -r c a g -e
.d g n
12 AND 16 ANTENNA TOWER EES AND LP DETAILS
CSA-D-RCAG-E001 A
TMJ 18065560UPDATE STANDARD COMM TOWER07/25/2025A
c s a -d -r c a g -e
.d g n
N S
T R
U C
T
IO
N
0 1/8" c s a -d -r c a g -e
.d g n
/2
/2
:4
:2
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
TO BUILDING
(TOP AND MID RAILS)
(BOTH SIDES)
ROD AND BUILDING EES
TO TOWER EES GROUND
EXOTHERMICALLY WELDED
4/0 AWG BARE COPPER
(PF) LP DETAILS
PLATFORM
TOWER EES PLAN
SOLID SUPPORT
REQUIRED AND PIPE MUST REST ON
DESIGN INDICATED IS MINIMUM
LP MAST DESIGNS FOR APPROVAL
CONTRACTOR MAY SUBMIT OTHER
NOTE:
(SEE NOTE 7 FOR BONDING)
TOWER LEG TO EES
FROM MASTS DOWN EACH
RUN LP DOWN CONDUCTORS
ALL TOWER LEG CONCRETE
2' (MIN) - 6' (MAX) EES FROM
10' (MIN) BETWEEN GROUND RODS)
(ADJUST PERIMETER TO MAINTAIN
CROSSINGS WITH 4/0 BSC
WELDED TO THE NEAREST GROUND ROD OR TO EES CABLE AT POINT OF
METAL CONDUITS OUTSIDE OF BUILDING EES LOOP TO BE EXOTHERMICALLY
(EXISTING EES BETWEEN TOWER CONNECTIONS MAY REMAIN). ALL BURIED
LOOP ON BOTH SIDES OF TOWER AND AROUND TOWER/BUILDING
CONNECT TOWER EES TO BUILDING EES FOR CONTINUOUS PERIMETER
NOT TO SCALE
OR LEG DOWN CONDUCTOR
J-BOX GROUND TO PF LP HALO
EXOTHERMICALLY WELD 4/0
(M
IN
(MIN)
DOWN LEG (SEE NOTE 7)
STEEL NEAR CORNER AND CONTINUE RUN
TO PF HALO AND PF PERIMETER FRAMING
CADWELD MAST DOWN CONDUCTOR
NOT TO SCALE
B
E001
C
E001
SECTION - LP AIR TERMINAL ASSEMBLY
NOT TO SCALE
A E001
SECTION
NOT TO SCALE
(AT TOP AND MID GUARDRAIL)
B E001
SECTION
NOT TO SCALE
(AT FLOOR LEVEL)
C E001
A
E001
TOWER EES AND LP DETAILS
NOT TO SCALE
E001
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A
104 Greystone Ave
PTSI Managed Services Inc.
CONSTRUCTION
OR GRADE. (APPLIES TO ALL OTHER METAL OBJECTS ATTACHED TO TOWER AND TO GROUND OR FOUNDATION).
9. 4/0 BSC EXOTHERMICALLY WELDED TO BASE OF STAIRS AND CABLE SUPPORTS WITHIN 1 FOOT OF FOUNDATION
8. ALL LP MATERIALS USED ARE TO BE RATED FOR NFPA 780, CLASS II.
AS SOON AS POSSIBLE. MAINTAIN MINIMUM BEND RADIUS AROUND FLANGES AND OTHER OBSTACLES.
STRUCTURAL SPLICES (TOP SIDE PREFERRED) AND APPLY "COLD GALV" TO STEEL OVER ENTIRE BONDED AREA
7. EXOTHERMICALLY WELD LEG LP CONDUCTORS TO PF HALO, PF FRAMING STEEL, AND LEGS AT ALL BOLTED
MAXIMUM INTERVALS.
SECURE LP CONDUCTOR CABLES TO TOWER LEGS AND PF STEEL WITH EVENLY SPACED CLAMPS AT 3 FT 6.
CABLE. ROUTE INTERIOR ANTENNA AND J-BOX GROUND WIRES UNDER GRATE IN WALK AREAS.
USE COPPER PARALLEL GROUNDING CLAMP TO CONNECT NO. 6 BSC ANTENNA GROUND TO PF LP PERIMETER 5.
EXOTHERMIC WELDS UNLESS NOTED OTHERWISE.
ALL CABLE SPLICES, CONNECTIONS TO GROUND RODS AND OTHER ELECTRICAL CONNECTIONS ARE TO BE 4.
SPLICES. ALL LP & EES CABLES ABOVE GRADE TO BE PAINTED GRAY AFTER INSTALLATION PER SPECIFICATIONS.
INSTALL ALL LP AND EES CABLES IN CONTINUOUS RUNS AS MUCH AS POSSIBLE WITH A MINIMUM NUMBER OF 3.
MINIMUM BEND RADIUS AND 90 DEGREE MAXIMUM BEND ANGLE.
ROUTE ALL CONDUCTOR RUNS AS STRAIGHT AS POSSIBLE (HORIZONTALLY AND VERTICALLY). MAINTAIN 8" 2.
THE TOWER GROUNDING AND LP REQUIREMENTS.
TOWER STRUCTURES AND FOUNDATIONS USED MAY VARY FROM AS DEPICTED. VIEWS SHOWN ARE TO DEPICT 1.
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
GENERAL NOTES:
WITH 1-3/8" HEIGHT (TOP PLATE)
1-3/8" FACE DIAMETER
2"-2.5" HEIGHT, (BOTTOM PLATE)
WITH 1-1/2" FACE DIAMETER AND
600V STANDOFF INSULATOR 27" X 3" X 1/4" (2-REQ'D)
COPPER BULKHEAD PLATE
16 TOTAL REQ'D EACH J-BOX
SIDE CONNECTOR (FOR PLATFORM J-BOX)
1.5MHZ TO 700MHZ - N MALE PROTECTED
POLYPHASER DC BLOCKED PROTECTOR
SIDE CONNECTOR (FOR BUILDING/BASE J-BOX)
1.5MHZ TO 700MHZ - N FEMALE PROTECTED
POLYPHASER DC BLOCKED PROTECTOR
BRACKET (BOTTOM PLATE ONLY)
STAINLESS STEEL MOUNTING
TOP, RUN TOP CABLES BEHIND BOTTOM PLATE
BULKHEAD PLATE POLYPHASERS AND (8) TO
CONNECT (8) HELIAX CABLES TO BOTTOM
ANY PENETRATIONS NOT USED)
WASHER FOR COAX CABLES (16 REQ'D - PLUG
RANGE .375 - .500 NM "BLUE COLOR" SEALING
RESISTANT NYLON CORD CONNECTOR, CORD
1" LIQUID TIGHT STRAIN RELIEF CORROSION
SEE DETAILS
BULKHEAD PLATES,
4/0 BOLTS AND HOLES
BEHIND PLATES-USES SAME LOWER
PLATE TO PLATE 4/0 INSTALLED
FOR DOUBLE BOLT LUGS)
BULKHEAD PLATES (DRILL AND TAP
WIRES W/RED TRACER LUGGED TO
4/0 AWG INSULATED GREEN GROUND
BUSHING FOR 1/2" HELIAX CABLES (TYP 16) (SAME FOR 4/0 GROUND CABLE)
.625 - .750 NM "YELLOW COLOR" SEALING WASHER AND "OZ TYPE GRE" SEALING
1" LIQUID TIGHT CORROSION RESISTANT NYLON CORD CONNECTOR, CORD RANGE
PERIMETER LP CONDUCTOR
APPROVED TO NOT CREATE TRIP HAZARD) AND CONNECT TO PLATFORM
EXTEND 4/0 GROUND CABLE (ROUTING UNDER GRATE OR OTHER AS
(USE SAME SEALER AS FOR LMR'S)
END HOLE FOR 4/0 CABLE
GROUND LUGS, SEE BOX DETAILS
DRILL AND TAP FOR
SEE DETAIL (TYP 4)
INSULATORS,
END HOLES FOR
SEE DETAILS
BULKHEAD PLATES
4/0 BOLTS AND HOLES
BEHIND PLATES-USES SAME LOWER
PLATE TO PLATE 4/0 INSTALLED
FOR DOUBLE BOLT LUGS)
BULKHEAD PLATES (DRILL AND TAP
WIRES W/RED TRACER LUGGED TO
4/0 AWG INSULATED GREEN GROUND
12" MIN BELOW GRADE
1" PVC CONDUIT TO
TO TWR/BLDG EES
EXOTHERMIC WELD 4/0
BUSHING, BOX AND DOOR TO LOWER BULKHEAD
NO. 2 BSC CONNECTING CONDUIT GROUNDING
1-1/2" 30"
2"2.5"
5.25" 3.75"7 SPACES AT 3"
5.25"7 SPACES AT 3"3.75"
30"
1.5"2"7 SPCS. AT 2-3/4"2.75"1.5"
.5
.5
16 HELIAX / 12 LMR JUNCTION BOX DETAILS
CSA-D-RCAG-E003 A
N S
T R
U C
T
IO
N c s a -d -r c a g -e
.d g n c s a -d -r c a g -e
.d g n
/2
/2
:4
:3
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
R E
A R
F R
O N
T
SIDE VIEW
INSULATOR BRACKET ASSEMBLY DETAIL
(2-REQUIRED FOR EACH BULKHEAD PLATE)
TYPICAL BULKHEAD PLATE DETAILS
(SEE GENERAL NOTE 1)
POLYPHASER, ANY BULKHEAD PLATE.
TO ENABLE CONNECTION TO ANY
INSTALLING END CONNECTORS
TRIM CABLE LENGTHS PRIOR TO
12 COAX CABLES TO ANTENNAS.
NO. 2 TO DOOR
30"
(CABLE CONNECTIONS NOT SHOWN FOR CLARITY)
(REFER TO PLATFORM J-BOX DETAILS FOR MORE INFO)
16 HELIAX CABLES TO TOWER
DIRECTED BY FAA (INCLUDING ANY SPARES)
RUN COAX CABLES TO RADIO RACKS AS
TYPICAL BOTTOM VIEW
2" (BOTTOM PL)
1-3/8" (TOP PL)
TOWER BASE J-BOX
TOWER PLATFORM J-BOX
(DRILL/TAP HOLES FOR 8 POLYPHASERS)
DOOR AND LOWER BULKHEAD
CONNECT NO. 2 BARE COPPER TO BOX,
ANY POLYPHASER, EITHER BULKHEAD.
INSTALLED TO ALLOW CONNECTION TO
RGS. CABLE LENGTHS TRIMMED AND ENDS
12 COAX CABLES TO RADIO RACKS THRU 4"
9"
DOOR AND LOWER BULKHEAD
CONNECT NO. 2 BARE COPPER TO BOX,
FRONT VIEW
NOT TO SCALE
NOT TO SCALE
BACK PANEL INSERT, SS HARDWARE AND PADLOCKABLE HINGED DOOR)
(30" x 30" x 9" STAINLESS STEEL NEMA TYPE 4X J-BOX W/12GA
BACK PANEL INSERT, SS HARDWARE AND PADLOCKABLE HINGED DOOR)
(30" x 30" x 9" STAINLESS STEEL NEMA TYPE 4X J-BOX W/12GA
NOT TO SCALE
NOT TO SCALE NOT TO SCALE
FRONT VIEW
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A
104 Greystone Ave
PTSI Managed Services Inc.
CONSTRUCTION
TYPE REQ'D FOR 23 ANTENNA TOWERS.
8. ONE PLATFORM & ONE BASE J-BOX REQ'D FOR 12 ANTENNA TOWERS -TWO EACH
DRESSED W/FILE TO RESULT IN NO SHARP EDGES/"SNAGS".
DRILLING OF HOLES MAY BE DONE IF APPROVED BY RE AND ALL HOLES
NOTE
W/ DIFFERENT COLOR CORD STRAIN RELIEF INSERTS.
CORD CONNECTORS. CONNECTORS FOR HELIAX AND COAX CABLES ARE 1" NPT
7. PUNCH OR LASER CUT ALL HOLES IN JBs (NO DRILLING) FOR 1" LIQUID TIGHT
END CONNECTORS FOR ALL CABLES (MALE FOR LMR -FEMALE FOR HELIAX).
6. USE LDF4-50A FOR ALL HELIAX AND LMR-400 FOR ALL COAX. USE 50 OHM TYPE "N"
OF COAX CABLES TO HELIAX AND SPARES.
5. REFER TO THE PF FREQUENCY AND ANTENNA LAYOUT FOR CONNECTIONS
J-BOX NEAR END CONNECTORS TO MATCH FREQUENCY/SERVICE END.
4. TAG/LABEL EACH END OF ALL COAX CABLES IN TOWER BASE/BUILDING
TO MATCH ANTENNA MOUNT ID NO. (REFER TO PF LAYOUT NOTES).
3. TAG/LABEL ALL COAX CABLES IN TOWER PF J-BOX NEAR END CONNECTORS
TO MATCH POSITION LOCATIONS INSIDE PF AND LOWER BOXES.
CONNECTORS IN J-BOXES. INCREASING FROM LEFT TO RIGHT. ROUTE CABLES
2. NUMERICALLY TAG/LABEL EACH END OF ALL HELIAX CABLES NEAR END
AND (8) TO TOP. RUN TOP CABLES BEHIND BOTTOM PLATE.
1. CONNECT (8) HELIAX CABLES TO BOTTOM BULKHEAD PLATE POLYPHASERS
GENERAL NOTES:
CONDUIT TO PLATFORM
HELIAX CABLES AND POWER
TOWER STAIR RUNS
BREAKER IN BUILDING POWER PANEL)
IN CONDUIT TO 20A SPARE
(NIPPLE THRU WALL, CONDUCTORS
STAIR RUN AND UP TO TOWER PF
CONDUCTORS UNDER LOWER
3/4" RGS W/3, NO. 12 AWG
WELD TO LEGLP CONDUCTOR
DIAG.S AND EXOTHERMICALLY
HORIZONTALS AND/OR DOWN
RUN CABLE ALONG
NO. 2 AWG BSC TO CONDUIT,
EXOTHERMICALLY WELD
MUST BE USED OUTSIDE SHELTER
FROM NIPPLE TO POWER PANEL - RGS
EMT MAY BE USED INSIDE SHELTER
SURFACES)
EXISTING INTERIOR AND EXTERIOR WALL
REQUIRED. (PATCH PENETRATIONS TO MATCH
RACKS - ADDITIONS TO EXISTING MAY BE
FROM GRSC END TO CABLE SUPPORTS TO
BUSHING - 2 FT (MAX) UNSUPPORTED CABLE
GRSC ENDS 3" FROM WALL WITH PLASTIC
J-BOX(ES) IN TO CABLE TRAY AND RACKS.
NEW LMR-400 CABLING IN 4" RGS FROM
SITE SPECIFIC WALL INFO
REFER SPECIFICATION ATTACHMENTS FOR
(M
IN
(M
IN
(M
A X
(M
IN
5' (MIN) - 10' (MAX) BETWEEN STRUCTURES
J-BOX DOOR AND BUILDING ITEMS
4' (MIN) CLEARANCE REQ'D BETWEEN
(ANTENNAS MAY OVERHANG ROOF)
FROM TOWER OR PLATFORM STRUCTURE
2' (MIN) CLEARANCE TO ROOF ITEMS
4'-0"
1' (MIN)
INDICATED
AND J-BOX(ES) MOUNTED TO HORIZONTAL SAs AS
(DOWN LEG) OUT, TOP LEG INTO TOWER UNISTRUT
J-BOX SUPPORT SAs INSTALLED WITH "FLAT" FACE
CANOPY SUPPORT KICKERS (2 MIN)
(OR HIGHER AS NEEDED TO CLEAR GRSC FROM SHELTER)
CANOPY SUPPORTS TO REST ON TOWER HORIZONTAL
OR OTHER DAMAGES DURING TOWER CONSTRUCTION
PROTECT BUILDING FOUNDATION FROM UNDERMINING
SEE
(M
IN
DETAILS FOR MORE INFO)
PF LAYOUT AND J-BOX
TOWER FACE (REFER TO
J-BOX(ES) MOUNTED TO
GALV'D ICE SHIELD OVER CABLE
STAIR RUN WITH 9-11 GA
CABLE TRAY UNDER LOWER
TO CABLE TRAY TRANSITION
BEND RADIUS WITH J-BOX
DO NOT EXCEED HELIAX MAX.
CABLE TRAY AND POWER CONDUIT
LOWEST STAIR RUN OVER
FINISH GRADE
TO BE EXOTHERMIC WELDS)
(ALL NEW CONNECTIONS
EES AROUND NEW TOWER
EXTEND EXISTING BUILDING
VERTICAL RUN UP TOWER
BETWEEN J-BOX AND
HELIAX IN CABLE TRAY
ENTRANCE (SEE NOTES)
BOTTOM STAIR RUN
(M
IN
3/4" RGS POWER CONDUIT TO PF
LIGHT MAY BE FROM THIS)
(POWER RUN FOR STAIR BOTTOM
RUN UP TO PF FOR DRAIN
BOTTOM OF VERTICAL CONDUIT
INSTALL BLANK OUTLET BOX AT
SITE ELECTRICAL WORK DETAILS
CSA-D-RCAG-E005 A
N S
T R
U C
T
IO
N c s a -d -r c a g -e
.d g n c s a -d -r c a g -e
.d g n
/2
/2
:2
:4
A
M P lo tt e d b y S
R V
C -C
A E
G -E
D M
S -C
O O
R D
A
B
C
D
E
F
G
H
8 7 6 5 4 3 2 1
H
G
F
E
D
C
12345678
REVDRAWING NO
DATE JCN
APPROVED BY
ISSUED BY
CHECKED
DRAWN
DESIGNED
SUBMITTED BY
REVIEWED BY
FEDERAL AVIATION ADMINISTRATION
DEPARTMENT OF TRANSPORTATION
REV
DATE
APPROVED
DESCRIPTION JCN
DATE
REDLINE
APVD
A
ROOF
FINISH GRADE
BETWEEN J-BOXES
ONE CABLE TRAY LOCATED
MAY RUN ALL CABLES IN
DOUBLE J-BOX TOWERS
LAYOUT FOR MORE INFO)
INTERVALS (REFER PF
TOWER FASTENED AT 30"
HELIAX CABLES RUN UP
COMM AND POWER CABLES/CONDUITS
MAINTAIN 15" (MIN) CLEAR SPACE BETWEEN
MAY BE USED FOR CABLE SUPPORT UP LADDER
DOUBLE OR OTHER MULTI HELIAX CONNECTIONS
CABLING NEAR THE AREA.
TO REDUCE RISK TO SHELTER AND ANY BURIED
TOWER FOUNDATION IS "STRONGLY" SUGGESTED
USE OF DRILLED CIP CONCRETE PIERS FOR
NOTE:
SHEETING - AS USED FOR OVER CABLES OR PF GRATING.
FOR SUPPORT MEMBERS. TOP TO INCLUDE ICE SHIELD OVER
FOR TOP AND BACK PIECES. USE 3" x 3" x 1/4" SA (MIN)
PAST TOP OF BOX. USE 26GA CORRUGATED GALV'D STEEL
BACK PIECE IS SAME WIDTH AS TOP AND EXTENDS 3" (MIN)
1/4"/FT TOWARDS TOWER AND OVERLAPS BACK PIECE.
SIDES AND 4 FT (MIN) FROM TOWER. TOP PIECE SLOPES
J-BOX RAIN/ICE CANOPY EXTENDS 1 FT (MIN) PAST BOX INSTALLS TO TOWER FRAMING)
STRUCTURAL COMPONENTS (BACKSHIELD
INSTALLED AS APPROVED W/OTHER TOWER
J-BOX(ES) TO BE OF 3' x 3" x 1/4" (MIN) SAs
HORIZONTAL SUPPORTS INDICATED FOR
CANOPY FRAMING, SUPPORTS FOR IT AND
NOTE:
TO TOWER, NOT SEPARATELY FOUNDED ITEM.
AS SHOWN). REQUIRES PIPE HANGER SUPPORT ATTACHED
PARALLEL TO TOWER FACE RATHER THAN PERPENDICULAR
J-BOX AT DIFFERENT ANGLE THAN SHOWN (COULD BE
TOWER SITING MAY RESULT IN CABLE CONDUIT ENTERING
TO TOWER, NOT SEPARATELY FOUNDED ITEM.
AS SHOWN). REQUIRES PIPE HANGER SUPPORT ATTACHED
PARALLEL TO TOWER FACE RATHER THAN PERPENDICULAR
J-BOX AT DIFFERENT ANGLE THAN SHOWN (COULD BE
TOWER SITING MAY RESULT IN CABLE CONDUIT ENTERING
C
E005
SECTION - CANOPY SUPPORT DETAIL
NOT TO SCALE
C E005
RUN
ORIENTED IN LINE WITH CONDUIT
FOR SITES HAVING J-BOX
TOWER STRUCTURE REQUIRED
CONDUIT(S) ATTACHED TO
PIPE HANGER SUPPORT FOR
SECTION - NEW SIGNAL AND POWER CABLING DETAILS
NOT TO SCALE
A E005
B
E005
SECTION - CONDUITS AND CABLES AT TOWER DETAIL
NOT TO SCALE
B E005
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
DO
NOT
SI
GN
E D
M
IS
S
U E
D F
O R
RELEASED FOR:
S A
F E
T Y
Q
U A
L
IT
Y
INTEGRITY
IN
N
O V
A T I
O N
T E
C H
N I C
A
L S
U P
PORT SERVIC
E
S C
O N
T R
A
104 Greystone Ave
PTSI Managed Services Inc.
CONSTRUCTION
SITING & ORIENTATION PRIOR TO BEGINNING EXCAVATION WORK.
FOLLOWING FIELD UTILITY LOCATIONS. RE TO APPROVE TOWER
SPECIFICATIONS FOR TOWER SITING. SITINGS MAY BE ADJUSTED
2. REFER THE FOUNDATION DRAWINGS AND SITE DETAIL IN
STAINLESS STEEL OR GALVANIZED (NOT PLATED).
POWER AND SIGNAL CABLING INSTALLATION WORK TO BE
1. ALL HARDWARE (CLIPS, BOLTS, NUTS, ETC.) USED FOR
NOTES:
| csa-d-rcag-g002.pdf |
| csa-d-rcag-g002 |
| csa-d-rcag-s001.pdf |
| csa-d-rcag-s001 |
| csa-d-rcag-e005.pdf |
| csa-d-rcag-e005 |
| csa-d-rcag-e003.pdf |
| csa-d-rcag-e003 |
| csa-d-rcag-e001.pdf |
| csa-d-rcag-e001 |
File details come from the government source that posted it. Updated .