T80-11612 Combined_Bid Set.pdf_safe.pdf
PDF 10 MB Posted
- Attached to
- Wheeling AASF#2 Taxiway Repairs (Construction)
- Solicitation number
- CRFQ 0603 ADJ2700000007 3
- Issued by
- Kanawha County, West Virginia
About this file
This is a combined bid set of construction plans for taxiway repairs at Wheeling Army Air Support Facility #2 (AASF #2) in Ohio County, West Virginia, prepared by the West Virginia Army National Guard. The project, designated T80-11612 and issued in July 2026, encompasses comprehensive repairs to the facility's taxiway infrastructure, including concrete slab replacement (available in base bid and two alternative options), crack sealing, asphalt milling with overlay, pavement marking, drainage improvements, and erosion and sediment control measures. The plans specify that concrete work involves full and partial slab replacements with detailed procedures for dowel installation, joint preparation, and finishing requirements. The project requires all work areas to be closed to aircraft and helicopters using low-profile barricades with red lights spaced at maximum 10-foot intervals, and includes static grounding point installation and replacement at specified locations throughout the taxiway. Pavement markings require complete restriping of the apron regardless of concrete replacement scope, with specific dimensions and radii detailed throughout the site plans.
The plans were prepared by The Thrasher Group, with Engineer Nicole M. Price, PE #21372, and are issued for permits, bid, and construction purposes as indicated on individual sheets. All concrete work must meet 4000 PSI specifications and be placed only when ambient temperature is at least 40°F and rising, with concrete temperature not exceeding 90°F. The contractor is responsible for furnishing, installing, and maintaining all barricades and erosion control measures including silt fence and compost filter sock installations throughout project duration. Material disposal procedures require that all concrete removed from the site be stockpiled onsite in areas designated by the owner, with excess materials remaining on-site. The plans contain detailed specifications for underdrain installation, joint sealant materials, and weather and temperature restrictions that must be observed throughout the construction period.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLAN REPRODUCTION WARNING
THESE PLANS ARE INTENDED TO BE PLOTTED ON ANSI D (22" X 34") SHEETS. FOR REDUCTIONS, REFER TO
GRAPHIC SCALE. THESE PLANS HAVE BEEN CREATED FOR FULL COLOR PLOTTING. ANY SET OF THESE PLANS THAT IS NOT PLOTTED IN FULL COLOR SHALL NOT BE CONSIDERED ADEQUATE FOR CONSTRUCTION PURPOSES.
**WARNING**: INFORMATION MAY BE LOST IN COPYING AND/OR GRAY SCALE PLOTTING.
ENGINEER
THE THRASHER GROUP
ATTN: NICOLE M. PRICE, PE
(304) 423-5991
THE INFORMATION CONTAINED HEREIN IS THE SOLE PROPERTY OF THE THRASHER GROUP INC.
REPRODUCTION OF THESE DOCUMENTS IN WHOLE OR IN PART, FOR ANY REASON WITHOUT PRIOR WRITTEN
PERMISSION, IS STRICTLY PROHIBITED.
PHONE: (304) 561-6317
1703 COONSKIN DR.
CHARLESTON, WV 25311-1085
CLIENT'S CONTACT
WV ARMY NATIONAL GUARD
ATTN: JIM SKAGGS
(304)-719-8745
CONTACTS
WEST VIRGINIA ARMY
RESERVE NATIONAL GUARD
FOR
WHEELING AASF #2
TAXIWAY REPAIRS
T80-11612
OHIO COUNTY, WEST VIRGINIA
JULY 2026
APPROXIMATE SITE LOCATION
WEST VIRGINIA ARMY NATIONAL GUARD
APPROXIMATE SITE LOCATION
THIS PLAN SET DEPICTS THE NECESSARY INFORMATION FOR EROSION AND SEDIMENT CONTROL MEASURES AS
REQUIRED BY THE WVDEP FOR STORM WATER PERMITTING PURPOSES.
ISSUED FOR PERMITS BY:
NICOLE M. PRICE, WV P.E. #21372
DATE:
ISSUED FOR BID BY:DATE:
ISSUED FOR CONSTRUCTION BY:DATE:
BRIDGEPORT, WV OFFICE
600 WHITE OAKS BLVD.
BRIDGEPORT, WV 26330
(304) 624-4108
PO BOX 940
CONTRACTOR SHALL NOTIFY THE ONE-CALL SYSTEM OF THE INTENDED EXCAVATION OR DEMOLITION NOT LESS THAN FORTY-EIGHT (48) HOURS, EXCLUDING SATURDAYS, SUNDAYS AND LEGAL FEDERAL OR STATE HOLIDAYS, NOR MORE THAN TEN (10) WORK DAYS PRIOR TO THE BEGINNING OF SUCH WORK.
CALL811.COM/811-IN-YOUR-STATE
SHEET INDEX
SHEET DESCRIPTION
C1.00 GENERAL NOTES AND QUANTITIES
C2.00 OVERALL SITE PLAN
C2.01-C2.05 SITE PLAN
C3.00 PAVEMENT MARKING PLAN
C4.00-C4.03 DETAILS
EXISTING STATIC
GROUNDING POINT TO
BE REMOVED AND REPLACED
EXISTING STATIC
GROUNDING POINT TO
BE REMOVED AND REPLACED
SF
SF
g g g g g g g g g ggggggg g g g
EXISTING STATIC
GROUNDING POINT
NOT TO BE DISTURBED (TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 2(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 1(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT BASE BID (TYP)
PROPOSED
CRACK SEALING (TYP)
PROPOSED
DITCH LINE
PROPOSED
DITCH LINE
REGRADE FROM EDGE OF CONCRETE
APRON TO INLET.
EDGE OF APRON SHOULD HAVE
APPROXIMATELY 2" REMOVED TO ALLOW
WATER SHEET FLOW OFF OF CONCRETE.
A
B
C
D
E
F
G
H
J
K
L
M
N
O
P
Q
R
S
T
U
I
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
33 34 35 36 37 38
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
MATCH LINE SEE SHEET C2.03
M A
T C
H
LIN
E S
E E
S H
E E
T C
2.02
SITE PLAN
NOTE:
1. CONCRETE SLABS THAT HAVE AN GROUNDING POINT THAT ARE TO BE REMOVED SHOULD BE
REPLACED. ANY SLABS THAT HAVE TIE-DOWNS, THESE SHOULD REMAIN IN AND PLACE AND NEW
CONCRETE POURED AROUND.
2. CONCRETE SHOWN FOR REMOVAL INCLUDES 2' BEYOND JOINT TO GET PAST EXISTING DOWEL BARS.
3. ALL CONCRETE CAN BE REMOVED OFFSITE. ANY EXCESS MATERIAL SHOULD REMAIN ONSITE AND
STOCKPILED IN AREAS DESIGNATED BY OWNER.
4. WORK AREAS SHOULD BE CLOSED TO AIRCRAFT/HELICOPTERS AND SHOULD BE DELINEATED CLOSED
WITH LOW PROFILE BARRICADES.
BE REMOVED AND REPLACED
SF
SFg g g g g g g ggggg
EXISTING STATIC
GROUNDING POINT
TO REMAIN IN PLACE (TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 2(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 1(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT (BASE BID) (TYP)
REGRADE FROM EDGE OF CONCRETE APRON TO INLET.
EDGE OF APRON SHOULD HAVE APPROXIMATELY 2"
REMOVED TO ALLOW WATER SHEET FLOW OFF OF
CONCRETE. EXCESS MATERIAL SHOULD REMAIN
ONSITE AND BE STOCKPILED.
LOWER EXISTING INLET
RIM ELEVATION: 1180.76'
PROPOSED INLET
PROTECTION (TYP)
J
K
L
M
N
O
P
Q
R
S
T
U
I
41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
39 40 41 42 43 44 45 46 47 48
EXISTING ASPHALT SURFACE
TO BE MILLED 2" WITH
OVERLAY
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
MATCH LINE SEE SHEET C2.04
M A
T C
H L
IN
E
S E
E S
H E
E T
C 2.
SITE PLAN
NOTE:
1. CONCRETE SLABS THAT HAVE AN GROUNDING POINT THAT ARE TO BE REMOVED SHOULD BE
REPLACED. ANY SLABS THAT HAVE TIE-DOWNS, THESE SHOULD REMAIN IN AND PLACE AND NEW
CONCRETE POURED AROUND.
2. CONCRETE SHOWN FOR REMOVAL INCLUDES 2' BEYOND JOINT TO GET PAST EXISTING DOWEL BARS.
3. ALL CONCRETE CAN BE REMOVED OFFSITE. ANY EXCESS MATERIAL SHOULD REMAIN ONSITE AND
STOCKPILED IN AREAS DESIGNATED BY OWNER.
SF SF SF SF SF SF SF
SF
SF
SF SF SF SF SF
SF
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 2(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT BASE BID (TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 1(TYP)
PROPOSED
CRACK SEALING (TYP)
PROPOSED
4" PERFORATED
UNDERDRAIN
(TYP)
PROPOSED 4" SOLID PVC
PIPE WITH SLOPE
PROTECTION ON OUTLET
END (TYP)
INV OUT 1181.01'
N: 611432.8082 E: 1649344.9249
N 611411.2002 E 1649450.3668
N 611529.0187 E 1649521.8717
PROPOSED SILT
FENCE (TYP)
REGRADE FROM EDGE OF CONCRETE APRON .
EDGE OF APRON SHOULD HAVE APPROXIMATELY 2"
REMOVED TO ALLOW WATER TO SHEET FLOW OFF OF
CONCRETE.
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
MATCH LINE SEE SHEET C2.01
M A
T C
H
LIN
E S
E E
S H
E E
T C
2.04
SITE PLAN
NOTE:
1. CONCRETE SLABS THAT HAVE AN GROUNDING POINT THAT ARE TO BE REMOVED SHOULD BE
REPLACED. ANY SLABS THAT HAVE TIE-DOWNS, THESE SHOULD REMAIN IN AND PLACE AND NEW
CONCRETE POURED AROUND.
2. CONCRETE SHOWN FOR REMOVAL INCLUDES 2' BEYOND JOINT TO GET PAST EXISTING DOWEL BARS.
3. ALL CONCRETE CAN BE REMOVED OFFSITE. ANY EXCESS MATERIAL SHOULD REMAIN ONSITE AND
STOCKPILED IN AREAS DESIGNATED BY OWNER.
BE REMOVED AND REPLACED
EXISTING STATIC
GROUNDING POINT (TYP)
SF SF SF SF SF SF SF SF
SF
SF
SF
SF
SF
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 2(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT ALT 1(TYP)
PROPOSED
CONCRETE FULL SLAB
REPLACEMENT (BASE BID) (TYP)
PROPOSED
CRACK SEALING (TYP)
REGRADE FROM EDGE OF
CONCRETE APRON.
EDGE OF APRON SHOULD HAVE
APPROXIMATELY 2" REMOVED TO
ALLOW WATER SHEET FLOW OFF
OF CONCRETE.
EXISTING STATIC
GROUNDING POINT TO
BE REMOVED AND REPLACED (TYP)
PROPOSED
4" PERFORATED
UNDERDRAIN
(TYP)
PROPOSED 4" SOLID PVC
PIPE WITH SLOPE
PROTECTION ON OUTLET
END (TYP)
INV OUT 1180.0'
N: 611166.9072 E: 1649470.2284
39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
MATCH LINE SEE SHEET C2.02
M A
T C
H L
IN
E
S E
E S
H E
E T
C 2.
SITE PLAN
NOTE:
1. CONCRETE SLABS THAT HAVE AN GROUNDING POINT THAT ARE TO BE REMOVED SHOULD BE
REPLACED. ANY SLABS THAT HAVE TIE-DOWNS, THESE SHOULD REMAIN IN AND PLACE AND NEW
CONCRETE POURED AROUND.
2. CONCRETE SHOWN FOR REMOVAL INCLUDES 2' BEYOND JOINT TO GET PAST EXISTING DOWEL BARS.
3. ALL CONCRETE CAN BE REMOVED OFFSITE. ANY EXCESS MATERIAL SHOULD REMAIN ONSITE AND
STOCKPILED IN AREAS DESIGNATED BY OWNER.
SF SF
SF
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
X
Y
Z
AA
AB
AC
AD
AE
AF
AG
AH
AI
AJ
I
56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72
EXISTING ASPHALT SURFACE
TO BE MILLED 2" WITH
OVERLAY
PROPOSED CONCRETE SLAB
REPLACEMENT (BASE BID)
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
SITE PLAN
SF SF SF
SF SF SF
SF SF SF SF
SF
SF
g g g g gggg g g g g gg
R50.0' R50.0'
149.4' 150.0' 120.8'
39.4'
61.6' 88.8' 90.9' 61.6'
112.2' 112.6'
61.8'
121.1'
40.0'
19.9'19.9'
19.9'
39.8' 40.5'
116.7'
39.8'
40.0' 41.1'
39.7'
61.8'
40.5'
201.0'
R50.0' (TYP)
ALL GROUNDING POLE
MARKINGS TO BE REPAINTED (TYP)
R50.0' R50.0' R27.0'R27.0'
R20.0' (TYP)
6" CENTERLINE MARKINGS
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
PAVEMENT MARKING
PLAN
NOTE: ENTIRE APRON TO BE RESTRIPED IN BASE BID
REGARDLESS OF CONCRETE THAT IS REPLACED.
4"
4"
SILT FENCE
NOT TO SCALE
PERSPECTIVE VIEW
FLOW
FLOW
M
IN
M
IN
SECTION VIEW
10' MAX. CC
M
IN
H
E
IG
H T
O F
F
IL
T E
R A
B O
V E
G R
O U
N D
1. SET SILT FENCE PARALLEL TO THE CONTOURS
AT ALL POINTS ALONG ITS LENGTH
NOTE:
BUILDING SILT FENCE - STEP BY STEP PROCEDURE
NOT TO SCALE
1.
2. 3.
ATTACH FILTER FABRIC
ALLOWING EXTENSION
INTO TRENCH AS SHOWN
BACKFILL AND COMPACT
EXCAVATED SOIL
SET POSTS AND EXCAVATE TRENCH
FLOW
LOW PROFILE AIRCRAFT BARRICADES
NOT TO SCALE
1. THE CONTRACTOR SHALL FURNISH, INSTALL, SECURE AND MAINTAIN THE
BARRICADES FOR THE DURATION OF THE PROJECTS COMPLETION.
2. THE CONTRACTOR SHALL ENSURE THE LIGHTS, BATTERY, AND PHOTOCELL ARE IN
WORKING ORDER PRIOR TO LEAVING THE SITE EVERY NIGHT. CONTRACTOR SHALL
ENSURE THAT BARRICADES CONFORM TO THE LATEST ADVISORY CIRCULAR AND
ARE FILLED WITH WATER OR SAND PRIOR TO MOVEMENT.
3. BARRICADES SHALL BE LOCATED AS DEFINED IN THE CONSTRUCTION SAFETY AND
PHASING PLAN (CSPP) WITH A MAXIMUM SPACING OF 16' O.C. OR AS DIRECTED BY
THE ENGINEER.
4. CONTRACTOR SHALL REPLACE ANY DAMAGED LOW PROFILE BARRICADES AT NO
ADDITIONAL COST TO THE OWNER.
5. LIGHTS MUST BE RED, EITHER BY STEADY BURNING OR FLASHING, AND MUST MEET
THE LUMINANCE REQUIREMENT OF THE DIVISION OF HIGHWAYS. LIGHTS MUST BE
MOUNTED ON BARRICADES AND SPACED AT NO MORE THAN 10 FT. LIGHTS MUST BE
OPERATED BETWEEN SUNSET AND SUNRISE AND DURING PERIODS OF
LOW-VISIBILITY WHENEVER THE AIRPORT IS OPEN TO OPERATIONS. THE LIGHTS
MAY BE BATTERY POWERED OR OPERATED BY PHOTOCELL, THE CONTRACTOR MAY
BE REQUIRED TO RUN THEM ON MANUALLY DURING LOW-VISIBILITY SITUATIONS.
NOTES:
8'
12'
17" MAX HEIGHT
EMBED FILTER CLOTH IN GROUND 4" MIN.
SILT STOP SEDIMENT CONTROL FABRIC
SILT STOP SEDIMENT CONTROL FABRIC
48" MIN. FENCE POST DRIVEN MIN. 14" IN GROUND
48" MIN. FENCE POST
10" x 10" x 96" HIGH IMPACT, UV RESISTANT POLYETHYLENE BARRICADE ORANGE
AND/OR WHITE IN COLOR AS MANUFACTURED BY YODOC OR EQUIVALENT.
SOLAR POWERED FLASHER WITH RED LENSES AND PHOTOCELL CONTROL (TYP.)
ALTERNATING 20" x 20"
ORANGE AND WHITE FLAGS
REFLECTIVE ORANGE AND WHITE STRIPES @ 45 DEGREE SLANT
SURFACE
FLOW (TYP.)2" x 2" x 3'-0" WOODEN STAKES 3' O.C. (TYP.)
WHEN CONDITIONS ALLOW. TIE SOCK AT
OVERLAP TO PREVENT SOCK MOVMENT
WHEN NOT STAKED (PAVEMENT
APPLICATED)
COMPOST
FILTER SOCK
DRAINAGE
GRATE
PLACE A SANDBAG AT
EACH END OF SOCK TO
HOLD IN PLACE
FLOW
FLOW
FLOW
COMPOST
FILTER SOCK
COMPOST FILTER
SOCK
SECURE WITH ZIP-TIE
WHEN STAKING IS NOT
FEASIBLE OR DESIRED
WIRE TIED (TYP.)
SURFACE
FLOW
(TYP.)
DRAINAGE
GRATE
COMPOST
FILTER SOCK
SIZE VARIES.
SEE PLANS AND
NOTES.
DROP INLET PLAN
CURB INLET PERSPECTIVE VIEW
DROP INLET PERSPECTIVE VIEW
COMPOST FILTER SOCK INLET PROTECTION
NOT TO SCALE
X'
INSIDE DIAMETER
1. ANCHORING STAKES SHALL BE SIZED, SPACED, AND BE OF A
MATERIAL THAT EFFECTIVELY SECURES THE FILTER SOCK.
STAKE SPACING SHALL BE A MAXIMUM OF THREE FEET.
2. OVERLAP ENDS OF SOCK PER MANUFACTURERS
RECOMMENDATIONS. (1' MIN. 3' MAX.)
3. USE 8" - 12" DIA. SOCK ON CURBSIDE IN TRAFFIC AREAS.
4. USE 12" - 18" DIA. SOCK IN NON-TRAFFIC AREAS WHERE SAFETY
IS NOT A CONCERN.
5. INSPECT COMPOST FILTER SOCK(S) AT LEAST ONCE A WEEK AND
AFTER EACH RAIN EVENT GREATER THAN 0.5 INCHES.
6. REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING
COMPOST FILTER SOCKS.
7. REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING 1/2 THE
HEIGHT BETWEEN THE TOP OF THE COMPOST FILTER SOCK AND
THE GROUND SURFACE.
8. REPAIR ANY RILLS OR GULLIES PROMPTLY.
9. RESEED OR REPLANT VEGETATION IF NECESSARY UNTIL THE
SLOPE IS STABILIZED.
NOTES:
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
DETAILS
TYPICAL UNDERDRAIN
NOT TO SCALE
6" M
IN
9" MIN.
CONCRETE SURFACE
4" PERFORATED PIPE
#57 CLEAN STONE
67.5°
.5
.5
4" Ø SDR35 PVC
PERFORATED PIPE
1.0 FT., TYP.
6"
SECTION VIEW
PEFORATED UNDERDRAIN
NOT TO SCALE
MIN. 2% SLOPE TO
OUTLET PIPE
4" Ø SDR-35 PVC
PERFORATED PIPE
1" Ø HOLES, TYP.
PROFILE VIEW
67.5°
PROVIDE 4 EACH 1" Ø HOLES
SPACED AS SHOWN
B B
T O
P O
F S
LO
P
E
T O
E O
F S
LO
P
E
PLAN
1' -0
1'
-0
2' -0
4'-10''2'-5''
2'-5''
6''
6'
6'
SLOPE VARIES
UNDERDRAIN PIPE
CONCRETE
SECTION B-B
SLOPEWALL FOR UNDERDRAIN
1' -0
NOT TO SCALE
NOT TO SCALE
TYPICAL STATIC GROUND CONNECTION PAINTING DETAIL
NOT TO SCALE
3" (76 mm)
6" (152 mm)
TOP VIEW
ELEVATION VIEW
FORMED DEPRESSION
IN CONCRETE
3/4" (19mm) RADIUS
COMPRESSED COPPER
SLEEVE
EXOTHERMIC WELD
GROUND ROD (10' LENGTH),
ONE PIECE OR WITH
THREADED ON
SHEPHERD'S
HOOK
STATIC GROUNDING ROD
NOT TO SCALE
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
DETAILS
STATIC
GROUND
CONNECTION
X
4" BLACK BORDER
NUMBER PER CORRESPONDING
STATIC CONNECTION
YELLOW INTERIOR WITH BLACK TEXT
PROPOSED GROUNDING ROD (SEE DETAIL)
FULL SLAB REPLACEMENT PARTIAL SLAB REPLACEMENT
RIGID PAVEMENT REPAIR - PLAN VIEW
NOT TO SCALE
BBAA
C L
JO
IN
T
TRANSVERSSE CONTROL JOINT (T.C.J.)
LOCATE CONSTRUCTION JOINTS AT CONTROL JOINTS
NOT TO SCALE
C L
JO
IN
T
LONGITUDINAL CONTROL JOINT (L.C.J.)
LOCATE CONSTRUCTION JOINTS AT CONTROL JOINTS
NOT TO SCALE
0' - 6" 0' - 6"
0' - 6" 0' - 6"
0'
4000 PSI CONCRETE
1/2" x 2.5" SAWCUT
JOINT FILLED WITH
JOINT SEALANT (TYP)
3" SURFACE CLEARANCE (TYP)
#4 @ 12" OC EACH WAY, STOP
TRANSVERSE BARS AT JOINT (TYP) #4 x 30" LONG DOWELS AT 2'-6"
OC SPACING. GREASE ONE END AT
CONSTRUCTION JOINTS ONLY (TYP)
4000 PSI CONCRETE
6" COMPACTED
P-209 CRUSHED AGGREGATE
6" COMPACTED
P-209 CRUSHED AGGREGATE
1/2" x 2.5" SAWCUT
JOINT FILLED WITH
JOINT SEALANT (TYP)
3" SURFACE CLEARANCE (TYP)
#4 @ 12" OC EACH WAY, DO NOT
STOP REINFORCING AT JOINT (TYP)
0'
0'
#4 SMOOTH REBAR
GREASED ON 1 SIDE
PROPOSED SAW CUT
CROSS SECTION ON
SHEET C4.03CROSS SECTION ON
SHEET C4.03
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
2' MINIMUM TO LESS
THAN 1/2 PANEL WIDTH
FULL DEPTH REPAIR IN RIGID PAVEMENT - PARTIAL SLAB REPLACEMENT
(SECTION B-B)
NOT TO SCALE
FULL DEPTH REPAIR IN RIGID PAVEMENT - FULL SLAB REPLACEMENT
(SECTION A-A)
NOT TO SCALE
REPAIR PROCEDURE FOR FULL SLAB REPLACEMENT NOTES
1. ENSURE ALL PAVEMENT CLOSURES HAVE ALL REQUIRED ITEMS IN
PLACE, SUCH AS BARRICADES, ETC..
2. MARK THE LIMITS OF THE AREA TO BE REPAIRED.
3. MAKE A FULL-DEPTH SAW CUT ALONG THE CONSTRUCTED JOINTS AT
LEAST 2 FEET BEYOND THE LIMITS OF THE DAMAGED PAVEMENT AND
MAKE A SAW CUT PERPENDICULAR TO THE CONSTRUCTED JOINTS FROM
THESE POINTS ACROSS THE WIDTH OF THE PAVEMENT PANEL.
4. IF DOWELS OR TIE BARS ARE PRESENT ALONG ANY EDGES, EITHER OF
THE FOLLOWING OPTIONS IS ACCEPTABLE:
· IF DOWEL OR TIE BARS WILL BE EXPOSED AND SAVED, EDGES WILL BE
SAWED FULL DEPTH JUST BEYOND THE END OF THE DOWELS OR TIE
BARS. CAREFULLY SAW JOINTS ON THE JOINT LINE TO WITHIN 1 INCH (2.5
CM) OF THE DEPTH OF THE DOWEL OR TIE BAR. CAREFULLY BREAK UP
THE NARROW STRIPS OF CONCRETE ALONG DOWELED EDGES USING
LIGHT 30 POUND (14 KG) OR LESS JACKHAMMERS, OR OTHER APPROVED
EQUIPMENT.
· IF DOWELS OR TIE BARS ARE TO BE CUT AND REPLACED, MAKE A FULL
DEPTH SAW CUT ALONG THE CONSTRUCTED JOINT CUTTING THE
DOWELS AND TIE BARS.
5. TAKE CARE TO PREVENT DAMAGE TO THE DOWELS, TIE BARS, OR TO
CONCRETE THAT REMAINS IN PLACE.
6. MAKE ADDITIONAL SAW CUTS WITHIN THE LIMITS OF THE REPAIR AREA
DIVIDING THE REPAIR AREA INTO QUARTERS.
7. USE LIGHT WEIGHT EQUIPMENT, I.E., JACKHAMMERS LESS THAN 30
POUNDS (14 KG), HAND TOOLS, ETC., TO REMOVE THE DAMAGED PCC
PAVEMENT. WORK FROM INSIDE THE SAW CUT TOWARD THE INTERIOR
OF THE AREA BEING REMOVED TO PREVENT DAMAGE TO THE PAVEMENT
REMAINING.
8. REMOVE BY HAND ALL LOOSE MATERIAL AND VACUUM TO MINIMIZE ANY
DISTURBANCE TO THE SUBGRADE OR BASE MATERIALS.
9. EXCAVATE TO INSTALL 6" OF P-209 CRUSHED AGGREGATE STONE BASE.
10. INSTALL DOWELS BY DRILLING AND EPOXYING INTO THE PCC PAVEMENT
AT LEAST 3 INCHES (8 CM) FROM THE LOCATION OF THE EXISTING
DOWELS WHICH WERE CUT OFF. SPACE DOWEL BARS AT LEAST 3
INCHES (8 CM) FROM THE EDGE OF THE REPAIR AREA AND AT LEAST
ONE BAR SPACING APART AT CORNERS OF INTERSECTING JOINTS.
11. OIL THE EXPOSED ENDS OF DOWEL BARS PRIOR TO BACKFILLING
REPAIR AREA WITH CONCRETE.
12. INSTALL NONABSORBENT BOARD OR OTHER APPROVED MATERIAL
WITHIN THE LIMITS OF THE JOINT SEAL RESERVOIR. THE
NONABSORBENT BOARD WILL BE A STANDARD ½ INCH (13 MM) ASPHALT
IMPREGNATED FIBER-BOARD. FOR JOINTS WIDER THAN ½ INCH (13 MM),
ADJUST THE WIDTH OF THE NONABSORBENT BOARD TO FIT THE JOINT
WIDTH.
13. FILL THE REPAIR AREA WITH CONCRETE AND CONSOLIDATE WITH A
VIBRATOR. USE CONCRETE MEETING THE REQUIREMENTS OF P-501.
14. FINISH THE SURFACE TO MATCH THE EXISTING SURFACE.
15. SPRAY WITH CURING COMPOUND PER ASTM C309.
16. REMOVE THE NONABSORBENT BOARD OR OTHER APPROVED MATERIAL
AND PLACE JOINT SEALANT PER ASTM D6690.
17. THOROUGHLY CLEAN THE WORK AREA BEFORE OPENING THE
PAVEMENT TO AIRCRAFT TRAFFIC.
18. DO NOT ALLOW TRAFFIC UNTIL THE CONCRETE HAS CURED.
19. AFTER ALL CONCRETE HAS BEEN REPLACED TAXIWAY CENTERLINES
AND PAVEMENT MARKINGS SHOULD BE RESTRIPED.
WEATHER AND TEMPERATURE REQUIREMENTS
· DO NOT BEGIN REPAIRS DURING INCLEMENT WEATHER.
· DO NOT PLACE CONCRETE UNLESS THE AMBIENT TEMPERATURE IS AT
LEAST 40°F (4°C) AND RISING AND THE CONCRETE TEMPERATURE IS
GREATER THAN OR EQUAL TO 50°F (10°C).
· DO NOT PLACE CONCRETE ON FROZEN BASE, ICE, OR SNOW.
· WHEN THE AMBIENT TEMPERATURE EXCEEDS 85°F (29°C), SPRINKLE THE
ADJACENT CONCRETE AND BASE WITH WATER IMMEDIATELY BEFORE
PLACING CONCRETE.
· PLACE CONCRETE AT THE COOLEST TEMPERATURE PRACTICABLE, AND
NEVER ALLOW THE PLACED CONCRETE TEMPERATURE TO EXCEED 90°F
(32°C).
REPAIR PROCEDURE FOR PARTIAL SLAB REPLACEMENT NOTES
1. ENSURE ALL PAVEMENT CLOSURES HAVE ALL REQUIRED ITEMS IN PLACE,
SUCH AS BARRICADES, ETC..
2. MARK THE LIMITS OF THE AREA TO BE REPAIRED.
3. MAKE A FULL-DEPTH SAW CUT ALONG THE CONSTRUCTED JOINTS AT
LEAST 2 FEET (0.6 M) BEYOND THE LIMITS OF THE DAMAGED PAVEMENT
AND MAKE A SAW CUT PERPENDICULAR TO THE CONSTRUCTED JOINTS
FROM THESE POINTS ACROSS THE WIDTH OF THE PAVEMENT PANEL.
SEE FIGURE B-B.
4. IF DOWELS OR TIE BARS ARE PRESENT ALONG ANY EDGES, EITHER OF
THE FOLLOWING OPTIONS IS ACCEPTABLE:
· IF DOWELS OR TIE BARS WILL BE EXPOSED AND SAVED, SAW EDGES FULL
DEPTH JUST BEYOND THE END OF THE DOWELS OR TIE BARS.
CAREFULLY SAW JOINTS ON THE JOINT LINE TO WITHIN 1 INCH (2.5 CM) OF
THE DEPTH OF THE DOWEL OR TIE BAR. CAREFULLY BREAK UP AND
REMOVE THE NARROW STRIPS OF CONCRETE ALONG DOWELED EDGES
USING LIGHT 30 POUND (14 KG) OR LESS JACKHAMMERS, OR OTHER
APPROVED EQUIPMENT.
· IF DOWELS OR TIE BARS ARE TO BE CUT AND REPLACED, MAKE A FULL
DEPTH SAW CUT ALONG THE CONSTRUCTED JOINT CUTTING THE
DOWELS AND TIE BARS.
5. TAKE CARE TO PREVENT DAMAGE TO THE DOWELS, TIE BARS, OR TO
CONCRETE THAT REMAINS IN PLACE.
6. MAKE ADDITIONAL SAW CUTS WITHIN THE LIMITS OF THE REPAIR AREA,
DIVIDING THE REPAIR AREA INTO QUARTERS.
7. USE LIGHT WEIGHT EQUIPMENT, I.E., JACKHAMMERS LESS THAN 30
POUNDS (14 KG), HAND TOOLS, ETC., TO REMOVE THE DAMAGED PCC
PAVEMENT. WORK FROM INSIDE THE SAW CUT TOWARD THE INTERIOR
OF THE AREA BEING REMOVED TO PREVENT DAMAGE TO THE PAVEMENT
REMAINING.
8. REMOVE BY HAND ALL LOOSE MATERIAL AND VACUUM TO MINIMIZE ANY
DISTURBANCE TO THE SUBGRADE OR BASE MATERIALS.
9. EXCAVATE AND INSTALL 6" OF P-209 CRUSHED AGGREGATE BASE
COURSE.
10. INSTALL DOWEL BARS IN THE FACE OF THE PARENT PANEL BY DRILLING
HORIZONTAL HOLES IN TO THE FACE AND USING AN EPOXY BONDING
AGENT.
11. IF EXISTING DOWEL BARS HAVE BEEN CUT AND REMOVED, INSTALL
DOWEL BARS OF THE TYPE AND SIZE OF THE EXISTING DOWEL BARS IN
THE JOINTS THAT ARE PARALLEL TO THE DIRECTION OF TRAFFIC. ON
APRONS AND AREAS WHERE TRAFFIC MAY BE OBLIQUE TO JOINTS,
INSTALL DOWELS IN BOTH JOINT FACES.
12. INSTALL DOWELS BY DRILLING AND EPOXYING INTO THE PCC PAVEMENT
AT LEAST 3 INCHES (8 CM) FROM THE LOCATION OF THE EXISTING CUT
DOWELS. SPACE DOWEL BARS AT LEAST 3 INCHES (8 CM) FROM THE
EDGE OF THE REPAIR AREA AND AT LEAST ONE BAR SPACING APART AT
CORNERS OF INTERSECTING JOINTS.
13. OIL THE EXPOSED ENDS OF DOWEL BARS PRIOR TO BACKFILLING REPAIR
AREA WITH CONCRETE.
14. INSTALL NONABSORBENT BOARD OR OTHER APPROVED MATERIAL
WITHIN THE LIMITS OF THE JOINT SEAL RESERVOIR (STEP 1). THE
NONABSORBENT BOARD WILL BE A STANDARD ½ INCH (13 MM) ASPHALT
IMPREGNATED FIBER-BOARD. FOR JOINTS WIDER THAN ½ INCH (13 MM),
ADJUST THE WIDTH OF THE NONABSORBENT BOARD TO FIT THE JOINT
WIDTH.
15. FILL THE REPAIR AREA WITH CONCRETE AND CONSOLIDATE WITH A
VIBRATOR. USE CONCRETE MEETING THE REQUIREMENTS OF P-501.
16. FINISH THE SURFACE TO MATCH THE EXISTING SURFACE.
17. SPRAY WITH CURING COMPOUND PER ASTM C309.
18. REMOVE THE NONABSORBENT BOARD OR OTHER APPROVED MATERIAL )
AND PLACE JOINT SEALANT PER ASTM D6690.
19. THOROUGHLY CLEAN THE WORK AREA BEFORE OPENING THE PAVEMENT
TO AIRCRAFT TRAFFIC.
20. DO NOT ALLOW TRAFFIC UNTIL THE CONCRETE HAS CURED.
WEATHER AND TEMPERATURE REQUIREMENTS
· DO NOT BEGIN REPAIRS DURING INCLEMENT WEATHER.
· DO NOT PLACE CONCRETE UNLESS THE AMBIENT TEMPERATURE IS AT
LEAST 40°F (4°C) AND RISING AND THE CONCRETE TEMPERATURE IS
GREATER THAN OR EQUAL TO 50°F (10°C).
· DO NOT PLACE CONCRETE ON FROZEN BASE, ICE, OR SNOW.
· WHEN THE AMBIENT TEMPERATURE EXCEEDS 85°F (29°C), SPRINKLE THE
ADJACENT CONCRETE AND BASE WITH WATER IMMEDIATELY BEFORE
PLACING CONCRETE.
· PLACE CONCRETE AT THE COOLEST TEMPERATURE PRACTICABLE, AND
NEVER ALLOW THE PLACED CONCRETE TEMPERATURE TO EXCEED 90°F
(32°C).
STEP 3: JOINT SEALANT PLACED
SAW CUT FULL DEPTH
REMAINING PCC
JOINT SEALANT
RESERVOIR
EXISTING PCC
EXISTING DOWEL
EXISTING JOINT
STEP 1: JOINT FILLER NON-ABSORBENT
MATERIAL INSTALLED TO TOP OF EXISTING
SLAB BEFORE PLACING PATCH MATERIAL
STEP 2: PLACE REBAR AND CONCRETE
STEP 3: INSTALL JOINT SEALANT
EXISTING JOINT
PROPOSED DOWEL
BAR INTO EXISTING
CONCRETE
STEP 1: JOINT FILLER NON-ABSORBENT
MATERIAL INSTALLED TO TOP OF EXISTING
SLAB BEFORE PLACING PATCH MATERIAL
STEP 2: JOINT FILLER NON-ABSORBENT
MATERIAL IS REMOVED TO FORM JOINT
SEALANT RESERVOIR BEFORE SEALANT
IS PLACED (STEP 3)
EXISTING JOINT
PROPOSED DOWEL INTO
EX. CONCRETE
FULL SLAB WIDTH
DIMENSION VARIES
6" OF P-209 CRUSHED
AGGREGATE
P (304) 624-4108
600 WHITE OAKS BLVD,
P.O. BOX 940
BRIDGEPORT, WV 26330
www.thethrashergroup.com
F (304) 624-7831
T80-11612
W H
E E
L
IN
G
A A
S F
O H
IO
C
O U
N T
Y , W
E S
T V
IR
IG
N
IA
W E
S T
V
IR
IG
N
IA
A
R M
Y N
A T
IO
N
A L
G U
A R
D
T A
X
IW
A Y
R E
P A
IR
S
File details come from the government source that posted it. Updated .