T2658 State-Supplied Price Sheet 2.23.24~6.xlsx
XLSX spreadsheet 34 KB Posted
- Solicitation number
- 24DPP00939
- Issued by
- New Jersey
About this file
This document is a price sheet for a Non-Emergency Remedial Action Services (NERAS) contract solicitation issued by the New Jersey Department of Environmental Protection (NJDEP). The contract requires the provision of various labor, equipment, and materials for remedial action services across Mercer County and the city of Trenton, New Jersey. The price sheet includes estimated quantities and unit prices for over 130 line items covering project plans, labor rates, heavy equipment, trucks, generators, and other miscellaneous equipment and materials. The contract term is for 3 years, with the option to renew.
The price sheet specifies that the State makes no guarantee of work volume. Bidders must submit pricing for all line items, and the total quote price for all 3 years will be used to rank the quotes. The price sheet also includes provisions for mark-ups of up to 10% on non-scheduled items and up to 15% on waste disposal costs.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| T2658 - Appendix E Analytical Services - Laboratory Requirements and Deliverables~1.docx | DOCX document | |
| T2658 Bid Solicitation 2.23.24~1.docx | DOCX document | |
| T2658 Attachment 2 Standard Procurement Forms Packet 2.23.24.pdf | ||
| T2658 Bid Amendment #2 4.24.24 Answers to Questions~2.docx | DOCX document | |
| T2658 - Appendix C Electronic Invoices~1.docx | DOCX document | |
| T2658 REVISED Bid Solicitation 4.24.24~1.docx | DOCX document | |
| State of New Jersey Standard Terms and Conditions 2.8.2024~1.pdf | ||
| T2658 - Appendix D Fair Share Goal Requirements DBE - SBE~1.doc | DOC document | |
| T2658 - Appendix B HASP Minimum Requirements~1.doc | DOC document | |
| T2658 - Appendix A QAPP Minimum Requirements~1.doc | DOC document | |
| T2658 Amendment 1 Update Quote Submission~1.docx | DOCX document | |
| T2658 Optional Pre-Quote Conference 2.23.24.pptx | PPTX presentation | |
| T2658 REVISED State-Supplied Price Sheet 4.24.24~1.xlsx | XLSX spreadsheet | |
| T2658 - Appendix F DEP 024 Forms~1.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Main Price Sch Price Sheet Bid Solicitation #24DPP00939 - T2658 Non- Emergency Remedial Action Services (NERAS), NJDEP
| Bidder Name: | |||||||
| Instructions: | Refer to Bid Solicitation Section 3.25 for Bidder Instructions. The Bidder must record its pricing in the YELLOW highlighted cells. The Total Price for each price line and the Total Quote Price will be automatically calculated. | ||||||
| Project Plans | |||||||
| Price line | Description - Plans and Reporting - Fixed Price -(Bid Solicitation Section 4.2, Post Contract Award Work Plans) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 1 | Master Quality Assurance Project Plan (QAPP) *Not to exceed $5000.00 | each | 1 | $0.00 | N/A | N/A | $0.00 |
| 2 | Programmatic Health and Safety Plan, Spill Contingency Plan *Not to exceed $5000.00 | each | 1 | $0.00 | N/A | N/A | $0.00 |
| 3 | Site- Specific Quality Assurance Project Plan *Per engagement if requested. Not to exceed $500 | each | 12 | $0.00 | $0.00 | $0.00 | $0.00 |
| 4 | Site-Specific Health and Safety Plan *Per engagement if requested. Not to exceed $500 | each | 14 | $0.00 | $0.00 | $0.00 | $0.00 |
| 5 | Bi-Yearly Financial Reports- See Bid Solicitation, Section 4.22 | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Labor Rates | |||||||
| Price line | Description - Labor Rates - All Inclusive Hourly Rates (Bid Solicitation Sections 4.10.1.1, Labor Requirements and 4.10.1.2, Personnel Requirements) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 6 | Project Manager | hour | 0 | N/A | N/A | N/A | $0.00 |
| 7 | Supervisor, Level D Protection | hour | 2,400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 8 | Chemist, Level D Protection | hour | 160 | $0.00 | $0.00 | $0.00 | $0.00 |
| 9 | Health and Safety Officer, Level D Protection | hour | 800 | $0.00 | $0.00 | $0.00 | $0.00 |
| 10 | Licensed Site Remediation Professional (LSRP), Level D Protection | hour | 400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 11 | Licensed Surveyor, Level D Protection | hour | 160 | $0.00 | $0.00 | $0.00 | $0.00 |
| 12 | Licensed Professional Engineer, Level D Protection | hour | 160 | $0.00 | $0.00 | $0.00 | $0.00 |
| 13 | Licensed Electrician/Licensed Electrical Contractor, Level D Protection | hour | 400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 14 | Foreman, Level D Protection | hour | 400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 15 | Heavy Equipment Operator, Level D Protection | hour | 6,400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 16 | Laborer, Level D Protection | hour | 8,000 | $0.00 | $0.00 | $0.00 | $0.00 |
| 17 | Truck Driver, Level D Protection | hour | 2,400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 18 | Surveyor Assistant, Level D Protection | hour | 160 | $0.00 | $0.00 | $0.00 | $0.00 |
| 19 | Supervisor, Level C Protection | hour | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 20 | Chemist, Level C Protection | hour | 40 | $0.00 | $0.00 | $0.00 | $0.00 |
| 21 | Foreman, Level C Protection | hour | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 22 | Heavy Equipment Operator, Level C Protection | hour | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 23 | Laborer, Level C Protection | hour | 300 | $0.00 | $0.00 | $0.00 | $0.00 |
| 24 | Health and Safety Officer, Level C Protection | hour | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| *In the event that Contractor personnel are required to work in Level B personal protective gear, the State will pay one and a quarter (1.25) times the rate of the labor category of Level C personal protective gear. See Bid Solicitation Section 4.6, Health Safety and Section 4.10.1.1, Labor Requirements | |||||||
| Turf Tractor and Equipment | |||||||
| Price line | Description - Turf Tractor and Equipment Rates (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 25 | All-Purpose Tractor-50-60 HP 4 WD, 40 HP PTO 3 point hitch and Turf Tires with Front Bucket | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 26 | All-Purpose Tractor-50-60 HP 4 WD, 40 HP PTO 3 point hitch and Turf Tires with Front Bucket Mobilization/Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 27 | Soil Pulvirizer- 60" wide 3 pt. linkage with spiked roller for use with All-Purpose tractor | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 28 | Soil Pulvirizer- 60" wide 3 pt. linkage with spiked roller for use with All-Purpose tractor Mobilization/Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 29 | Landscape Rake- 6' wide, 3 pt. hitch manual angle for use with All-Purpose tractor | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 30 | Landscape Rake- 6' wide, 3 pt. hitch manual angle for use with All-Purpose tractor Mobilization/Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 31 | Fertilizer Spreader- PTO driven, 3 point hitch, for use with All-Purpose tractor | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 32 | Fertilizer Spreader- PTO driven, 3 point hitch, for use with All-Purpose tractor Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 33 | Landscape Seeder- 8' wide, 3 pt hitch, 8 bushel capacity with rollers, for use with All-Purpose tractor | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 34 | Landscape Seeder- 8' wide, 3 pt hitch, 8 bushel capacity with rollers, for use with All-Purpose tractor Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 35 | Straw Crimper-8' wide, 12 blades for use with All-Purpose tractor | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 36 | Straw Crimper-8' wide, 12 blades for use with All-Purpose tractor Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| Heavy Equipment | |||||||
| Price line | Description - Heavy Equipment (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 37 | Loader Backhoe | day | 150 | $0.00 | $0.00 | $0.00 | $0.00 |
| 38 | Loader Backhoe, Mobilization / Demobilization | each | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 39 | Wheel Loader- Caterpillar 930G or Approved Equal w/2 cy bucket | day | 75 | $0.00 | $0.00 | $0.00 | $0.00 |
| 40 | Wheel Loader- Caterpillar 930G or Approved Equal w/2 cy bucket, Mobilization / Demobilization | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 41 | Wheel Loader- Caterpillar 966G or equal w/5 cy bucket | day | 75 | $0.00 | $0.00 | $0.00 | $0.00 |
| 42 | Wheel Loader- Caterpillar 966G or equal w/5 cy bucket, Mobilization / Demobilization | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 43 | Trackhoe- Caterpillar 315D L or Approved Equal w/1 cy bucket | day | 300 | $0.00 | $0.00 | $0.00 | $0.00 |
| 44 | Trackhoe- Caterpillar 315D L or Approved Equal w/1 cy bucket, Mobilization / Demobilization | each | 75 | $0.00 | $0.00 | $0.00 | $0.00 |
| 45 | Grapple Bucket Attachment for 315D or Approved Equal | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 46 | Grapple Bucket Attachment for 315D or Approved Equal, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 47 | Ditch Bucket Attachment-(no teeth) for 315D or Approved Equal | day | 25 | $0.00 | $0.00 | $0.00 | $0.00 |
| 48 | Ditch Bucket Attachment-(no teeth) for 315D or Approved Equal, Mobilization / Demobilization | each | 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| 49 | Trackhoe- Caterpillar 330DL or Approved Equal w/2.5 cy bucket | day | 600 | $0.00 | $0.00 | $0.00 | $0.00 |
| 50 | Trackhoe- Caterpillar 330DL or Approved Equal w/2.5 cy bucket, Mobilization / Demobilization | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 51 | Tracked Dozer- Caterpillar D3C LGP or Approved Equal | day | 25 | $0.00 | $0.00 | $0.00 | $0.00 |
| 52 | Tracked Dozer- Caterpillar D3C LGP or Approved Equal, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 53 | Tracked Dozer- Caterpillar D6H LGP or Approved Equal | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 54 | Tracked Dozer- Caterpillar D6H LGP or Approved Equal, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 55 | Roller Compactor - Caterpillar CB 224E or Approved Equal | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 56 | Roller Compactor - Caterpillar CB 224E or Approved Equal, Mobilization / Demobilization | each | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 57 | Roller Compactor - Caterpillar CS 434 or Approved Equal | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 58 | Roller Compactor - Caterpillar CS 434 or Approved Equal, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Skid Steer Loader and Attachments | |||||||
| Price line | Description - Skid Steer Loader and Attachments (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 59 | Skid Steer Loader-60-70 HP, w/ 68" front utility bucket | day | 400 | $0.00 | $0.00 | $0.00 | $0.00 |
| 60 | Skid Steer Loader-60-70 HP, w/ 68" front utility bucket, Mobilization / Demobilization | each | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 61 | Sweeper Attachement- for use with Skid Steer Loader | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 62 | Sweeper Attachement- for use with Skid Steer Loader, Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 63 | Drop Hammer Attachment for use with Skid Steer Loader | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 64 | Drop Hammer Attachment for use with Skid Steer Loader, Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 65 | Compact Track Loader-85-100 HP, w/ 68" Bucket Combination Loader/Telehandler | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 66 | Compact Track Loader-85-100 HP, w/ 68" Bucket Combination Loader/Telehandler, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Vacuum and Tank Trucks | |||||||
| Price line | Description - Vacuum and Tank Trucks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 67 | Waste Hauling Vacuum Truck- 3,000 to 4,000 gallon capacity | day | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 68 | Waste Hauling Vacuum Truck- 3,000 to 4,000 gallon capacity, Mobilization / Demobilization | each | 75 | $0.00 | $0.00 | $0.00 | $0.00 |
| 69 | Waste Hauling Tank Truck- 3,000 to 4,000 gallon capacity | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 70 | Waste Hauling Tank Truck- 3,000 to 4,000 gallon capacity, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 71 | Non- Waste Hauling Water Truck- 2,000-or greater gallon capacity with min. 3 valve spray system and hoses-for dust control | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 72 | Non- Waste Hauling Water Truck- 2,000-or greater gallon capacity with min. 3 valve spray system and hoses-for dust control, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Bulking Chambers and Tanks | |||||||
| Price line | Description - Bulking Chambers and tanks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 73 | Horizontal Polyethylene Storage Tank - 500 gallon capacity | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 74 | Horizontal Polyethylene Storage Tank - 500 gallon capacity, Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 75 | Vertical Polyethylene Industrial Holding Tank - 4,000-6,000 gallon capacity | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 76 | Vertical Polyethylene Industrial Holding Tank - 4,000-6,000 gallon capacity, Mobilization / Demobilization | each | 3 | $0.00 | $0.00 | $0.00 | $0.00 |
| 77 | 20 CY Rolloff Container- without disposal | day | 300 | $0.00 | $0.00 | $0.00 | $0.00 |
| 78 | 20 CY Rolloff Container- without disposal, Mobilization / Demobilization | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| Trucks | |||||||
| Price line | Description - Trucks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 79 | Waste Hauling Dump Truck-10-20 cy capacity | day | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 80 | Waste Hauling Dump Truck-10-20 cy capacity, Mobilization / Demobilization | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 81 | Waste Hauling Tractor Truck w/ 40 cy dump trailer | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 82 | Waste Hauling Tractor Truck w/ 40 cy dump trailer, Mobilization / Demobilization | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 83 | Waste Hauling Box Truck- , min. 600 cu.ft. capacity w/lift gate | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 84 | Waste Hauling Flat Bed Stake Body truck- min. 1 ton cap. w/ 12 ft. bed & hydraulic rear gate | day | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 85 | Non- Waste Hauling Tractor Truck w/ 30-40 ton Lowboy trailer | day | 8 | $0.00 | $0.00 | $0.00 | $0.00 |
| 86 | Non- Waste Hauling Tractor Truck w/ 30-40 ton Lowboy trailer, Mobilization / Demobilization | each | 8 | $0.00 | $0.00 | $0.00 | $0.00 |
| 87 | Non- Waste Hauling Pickup Truck-3/4 ton capacity, 4wd | day | 300 | $0.00 | $0.00 | $0.00 | $0.00 |
| Floodlights ,Trailer and Accessories | |||||||
| Price line | Description - Floodlights ,Trailer and Accessories (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 88 | Floodlights- towable light towers with diesel generator, 4 - 1000w Metal Halide Spring Mounted Floodlights per week | week | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 89 | Floodlights- towable light towers with diesel generator, 4 - 1000w Metal Halide Spring Mounted Floodlights per week , Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 90 | Generator Whisperwatt or Approved Equal - 36kW 60 Hz for powering Office Trailer per week | week | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 91 | Generator Whisperwatt or Approved Equal - 36kW 60 Hz for powering Office Trailer per week, Mobilization / Demobilization | each | 15 | $0.00 | $0.00 | $0.00 | $0.00 |
| 92 | Office Trailer for NJDEP- 8' X 28' Double Office w/ restroom- per week | week | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 93 | Office Trailer for NJDEP- 8' X 28' Double Office w/ restroom- per week, Mobilization / Demobilization | each | 15 | $0.00 | $0.00 | $0.00 | $0.00 |
| 94 | Portable Handicapped Sanitation Unit- ADA compliant h90" X w77" X d77" per week | week | 300 | $0.00 | $0.00 | $0.00 | $0.00 |
| 95 | Portable Handicapped Sanitation Unit- ADA compliant h90" X w77" X d77" per week, Mobilization / Demobilization | each | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| Generators & Pressure Washers | |||||||
| Price line | Description - Generators & Pressure Washers (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 96 | Generator Portable- 2.5 Kilowatts | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 97 | Generator, Portable- 6.5 Kilowatts | day | 25 | $0.00 | $0.00 | $0.00 | $0.00 |
| 98 | Cold Pressure Washer- 2,000 psi. with wand, 100' hose and tips | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| Compressors & Power Tools | |||||||
| Price line | Description - Compressors & Power Tools (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 99 | Compressor- 185 cfm diesel with 80 lb. Air Hammer | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 100 | Compressor- 185 cfm diesel with 80 lb. Air Hammer, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 101 | Compressor with Air Driver Rivet Buster- Min 100 cfs compressor | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 102 | Compressor with Air Driver Rivet Buster- Min 100 cfs compressor, Mobilization / Demobilization | each | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 103 | Oxy-Acetylene Cutting Torch-with gas bottles included | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 104 | Oxy-Acetylene Cutting Torch-with gas bottles included, Mobilization / Demobilization | each | 2 | $0.00 | $0.00 | $0.00 | $0.00 |
| 105 | Nitrogen High Pressure Cylinder for UST work- Size 250 | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 106 | Nitrogen High Pressure Cylinder for UST work- Size 250, Mobilization / Demobilization | each | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 107 | Gas Powered Cutoff Saw -60-70 cc with Abbrasive Blades | day | 35 | $0.00 | $0.00 | $0.00 | $0.00 |
| 108 | Gas Powered Chainsaw- 50-60 cc with 18"-20" blade | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 109 | Sawsall- with metal cutting blades | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 110 | Walk Behind Saw-with concrete or asphalt cutting blades | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 111 | Walk Behind Saw-with concrete or asphalt cutting blades, Mobilization / Demobilization | each | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| Pumps | |||||||
| Price line | Description - Pumps (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 112 | Trash-Sewage Pump- 2" gas powered trash pump 170 gpm | day | 25 | $0.00 | $0.00 | $0.00 | $0.00 |
| 113 | Submersible Pump- 2" 70 gpm | day | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| Drums | |||||||
| Price line | Description - Drums (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 114 | 55 Gallon Drum- New, Open Head, UN 1A2/Y/1.5/150 | each | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 115 | 55 Gallon Drum-New, Closed Head, Rolled Steel UN 1A1/Y/1.4/300 | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 116 | 85 Gallon Salvage Overpack- New, Yellow Open Head, UN1A2/X440/S | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 117 | 95 Gallon Polythylene Overpack- UN 1H2/X345/S | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| Revegetation/ Clearing | |||||||
| Price line | Description - Revegetation/ Clearing (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 118 | Weed-Whacker Trimmer- with metal brush blades- (Min 33cc.) | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 119 | Hay Mulcher- 35-50 HP Trailer Unit | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 120 | Hay Mulcher- 35-50 HP Trailer Unit, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| 121 | Wood/Brush Chipper-Engine driven 35-50 HP Trailer Unit with 10" capacity | day | 10 | $0.00 | $0.00 | $0.00 | $0.00 |
| 122 | Wood/Brush Chipper-Engine driven 35-50 HP Trailer Unit with 10" capacity, Mobilization / Demobilization | each | 5 | $0.00 | $0.00 | $0.00 | $0.00 |
| Field Monitoring Instruments | |||||||
| Price line | Description - Field Monitoring Instruments (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 123 | TVA 1000 or equal- combo FID/PID | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 124 | Combustible Gas Meter | day | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 125 | MIE RAM-1 or DataRAM- Monitors or equivalent | day | 125 | $0.00 | $0.00 | $0.00 | $0.00 |
| 126 | Portable Mini-RAM | day | 60 | $0.00 | $0.00 | $0.00 | $0.00 |
| Material and Site Control | |||||||
| Price line | Description - Material and Site Control (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 127 | Plastic Sheeting- 20' wide 6 mil.plastic, 200 sq.yd./ roll | each | 200 | $0.00 | $0.00 | $0.00 | $0.00 |
| 128 | Vermiculite- Environmentally safe, 50 lb bag | each | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 129 | Spill Pads, Polyproylene, Bale | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 130 | Sorbent Booms, 5" Diameter Polyproylene, 4/per Bale | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 131 | Caution Tape- 200 ft. roll | each | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 132 | Flashing Barricades-Polyethylene frame,reflective tape w/light | each | 30 | $0.00 | $0.00 | $0.00 | $0.00 |
| 133 | Spill Absorvent - Clay/Cellulose Mixture Speedy Dry or Bone Dri, per bag | each | 50 | $0.00 | $0.00 | $0.00 | $0.00 |
| 134 | Geotextile Fabric- Woven non-biodegradable polypropylene, per sq. yd. | sq. yd | 100 | $0.00 | $0.00 | $0.00 | $0.00 |
| 135 | Erosion Control Blanket -Straw Biodegradable Single Net Blanket, per sq. yd. | sq. yd | 20 | $0.00 | $0.00 | $0.00 | $0.00 |
| 136 | Silt Fence- woven polypropylene, 36” in width and fastened to hardwood posts, per linear ft. | lf | 1,000 | $0.00 | $0.00 | $0.00 | $0.00 |
| 137 | High Visibility Plastic Safety fence + posts- 4' high, per linear ft. | lf | 2,500 | $0.00 | $0.00 | $0.00 | $0.00 |
| 138 | Temporay metal Fence Panel -with metal stands 12' wide by 8' high - Weekly Rental | week | 500 | $0.00 | $0.00 | $0.00 | $0.00 |
| Non-Scheduled Item Mark-up | |||||||
| Price line | Description - Non-Scheduled Item Mark-up (Bid Solicitation Sections 4.10.3.2 Contract Modifications for Equipment, Materials, and Services and 4.10.3.3 Contract Modifications for Waste Disposal and Contaminated Materials Recycling) | Unit of Measurement | Estimated Quantity (a) | Year 1 Unit Pricing | Year 2 Unit Pricing | Year 3 Unit Pricing | Total Price |
| 139 | Non-Scheduled Item Mark-up - Not to Exceed 10% (b) | percent | $1,000,000.00 | 0.00% | 0.00% | 0.00% | $0.00 |
| 140 | Non-Scheduled Item Mark-up, Waste Disposal - Not to exceed 15% (c) | percent | $500,000.00 | 0.00% | 0.00% | 0.00% | $0.00 |
| Total Quote Price for All Three (3) Years: All Price Lines(d) | $0.00 | ||||||
| (a) The State makes no guarantee of work volume. | |||||||
| (b) Mark-up shall not exceed ten percent (10%). | |||||||
| (c) Mark-up shall not exceed fifteen percent (15%). | |||||||
| (d) Price used to rank Quotes. |