T2658 REVISED State-Supplied Price Sheet 4.24.24~1.xlsx

XLSX spreadsheet 40 KB Posted

Attached to
T2658 - Non-Emergency Remedial Action Services (NERAS)
Solicitation number
24DPP00939
Issued by
New Jersey

About this file

This document is a revised state-supplied price sheet for Bid Solicitation #24DPP00939 - T2658 Non-Emergency Remedial Action Services (NERAS) issued by the New Jersey Department of Environmental Protection (NJDEP). The contract will require the provision of services such as staging, sampling, loading, transporting, disposing, detecting, inspecting, and investigating discharges of petroleum fuel, crude oil, or hazardous materials. Professional services including surveying, structural engineering, and laboratory analysis are also required. The contract will be awarded to one Prime Contractor and one Alternate Contractor, with a contract term that is not specified. Bidders must submit the state-supplied price sheet, and the total quote price for all 3 years will be used to rank the quotes. An optional pre-quote conference is scheduled for February 23, 2024, and quotes are due by April 17, 2024.

The pricing sheet includes fixed rates for plans and reporting, labor rates, equipment and material rental rates, and miscellaneous supplies and services. Bidders must provide pricing for each line item, and a 10% markup is allowed for non-scheduled items. The procurement includes small business and disabled veteran-owned business set-aside evaluation preferences. The current incumbent vendor is Clean Venture, Inc., and the contract may involve integrating with existing infrastructure and technology related to environmental remediation services. The estimated contract value is not provided, but individual projects are generally estimated to cost less than $1 million.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Main Price Sch REVISED State-Supplied Price Sheet Bid Solicitation #24DPP00939 - T2658 Non- Emergency Remedial Action Services (NERAS), NJDEP

Bidder Name:
Instructions:Refer to Bid Solicitation Section 3.25 for Bidder Instructions. The Bidder must record its pricing in the YELLOW highlighted cells. The Total Price for each price line and the Total Quote Price will be automatically calculated.
Project Plans
Price lineDescription - Plans and Reporting - Fixed Price -(Bid Solicitation Section 4.2, Post Contract Award Work Plans)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
1Master Quality Assurance Project Plan (QAPP) *Not to exceed $5000.00each1$0.00N/AN/A$0.00
2Programmatic Health and Safety Plan, Spill Contingency Plan *Not to exceed $5000.00each1$0.00N/AN/A$0.00
3Site- Specific Quality Assurance Project Plan *Per engagement if requested. Not to exceed $500each12$0.00$0.00$0.00$0.00
4Site-Specific Health and Safety Plan *Per engagement if requested. Not to exceed $500each14$0.00$0.00$0.00$0.00
5Bi-Yearly Financial Reports- See Bid Solicitation, Section 4.22each2$0.00$0.00$0.00$0.00
Labor Rates
Price lineDescription - Labor Rates - All Inclusive Hourly Rates (Bid Solicitation Sections 4.10.1.1, Labor Requirements and 4.10.1.2, Personnel Requirements)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
6Project Managerhour0N/AN/AN/A$0.00
7Supervisor, Level D Protectionhour2,400$0.00$0.00$0.00$0.00
8Chemist, Level D Protectionhour160$0.00$0.00$0.00$0.00
9Health and Safety Officer, Level D Protectionhour800$0.00$0.00$0.00$0.00
10Licensed Site Remediation Professional (LSRP), Level D Protectionhour400$0.00$0.00$0.00$0.00
11Licensed Surveyor, Level D Protectionhour160$0.00$0.00$0.00$0.00
12Licensed Professional Engineer, Level D Protectionhour160$0.00$0.00$0.00$0.00
13Licensed Electrician/Licensed Electrical Contractor, Level D Protectionhour400$0.00$0.00$0.00$0.00
14Foreman, Level D Protectionhour400$0.00$0.00$0.00$0.00
15Heavy Equipment Operator, Level D Protectionhour6,400$0.00$0.00$0.00$0.00
16Laborer, Level D Protectionhour8,000$0.00$0.00$0.00$0.00
17Truck Driver, Level D Protectionhour2,400$0.00$0.00$0.00$0.00
18Surveyor Assistant, Level D Protectionhour160$0.00$0.00$0.00$0.00
19Supervisor, Level C Protectionhour100$0.00$0.00$0.00$0.00
20Chemist, Level C Protectionhour40$0.00$0.00$0.00$0.00
21Foreman, Level C Protectionhour20$0.00$0.00$0.00$0.00
22Heavy Equipment Operator, Level C Protectionhour200$0.00$0.00$0.00$0.00
23Laborer, Level C Protectionhour300$0.00$0.00$0.00$0.00
24Health and Safety Officer, Level C Protectionhour20$0.00$0.00$0.00$0.00
*In the event that Contractor personnel are required to work in Level B personal protective gear, the State will pay one and a quarter (1.25) times the rate of the labor category of Level C personal protective gear. See Bid Solicitation Section 4.6, Health and Safety and Section 4.10.1.1, Labor Requirements
Turf Tractor and Equipment
Price lineDescription - Turf Tractor and Equipment Rates (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
25All-Purpose Tractor-50-60 HP 4 WD, 40 HP PTO 3 point hitch and Turf Tires with Front Bucketday10$0.00$0.00$0.00$0.00
26All-Purpose Tractor-50-60 HP 4 WD, 40 HP PTO 3 point hitch and Turf Tires with Front Bucket Mobilization/Demobilizationeach2$0.00$0.00$0.00$0.00
27Soil Pulvirizer- 60" wide 3 pt. linkage with spiked roller for use with All-Purpose tractorday10$0.00$0.00$0.00$0.00
28Soil Pulvirizer- 60" wide 3 pt. linkage with spiked roller for use with All-Purpose tractor Mobilization/Demobilizationeach2$0.00$0.00$0.00$0.00
29Landscape Rake- 6' wide, 3 pt. hitch manual angle for use with All-Purpose tractorday10$0.00$0.00$0.00$0.00
30Landscape Rake- 6' wide, 3 pt. hitch manual angle for use with All-Purpose tractor Mobilization/Demobilizationeach2$0.00$0.00$0.00$0.00
31Fertilizer Spreader- PTO driven, 3 point hitch, for use with All-Purpose tractorday10$0.00$0.00$0.00$0.00
32Fertilizer Spreader- PTO driven, 3 point hitch, for use with All-Purpose tractor Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
33Landscape Seeder- 8' wide, 3 pt hitch, 8 bushel capacity with rollers, for use with All-Purpose tractorday10$0.00$0.00$0.00$0.00
34Landscape Seeder- 8' wide, 3 pt hitch, 8 bushel capacity with rollers, for use with All-Purpose tractor Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
35Straw Crimper-8' wide, 12 blades for use with All-Purpose tractorday10$0.00$0.00$0.00$0.00
36Straw Crimper-8' wide, 12 blades for use with All-Purpose tractor Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
Heavy Equipment
Price lineDescription - Heavy Equipment (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
37Loader Backhoeday150$0.00$0.00$0.00$0.00
38Loader Backhoe, Mobilization / Demobilizationeach50$0.00$0.00$0.00$0.00
39Wheel Loader- Caterpillar 930G or Approved Equal w/2 cy bucketday75$0.00$0.00$0.00$0.00
40Wheel Loader- Caterpillar 930G or Approved Equal w/2 cy bucket, Mobilization / Demobilizationeach20$0.00$0.00$0.00$0.00
41Wheel Loader- Caterpillar 966G or equal w/5 cy bucketday75$0.00$0.00$0.00$0.00
42Wheel Loader- Caterpillar 966G or equal w/5 cy bucket, Mobilization / Demobilizationeach20$0.00$0.00$0.00$0.00
43Trackhoe- Caterpillar 315D L or Approved Equal w/1 cy bucketday300$0.00$0.00$0.00$0.00
44Trackhoe- Caterpillar 315D L or Approved Equal w/1 cy bucket, Mobilization / Demobilizationeach75$0.00$0.00$0.00$0.00
45Grapple Bucket Attachment for 315D or Approved Equalday50$0.00$0.00$0.00$0.00
46Grapple Bucket Attachment for 315D or Approved Equal, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
47Ditch Bucket Attachment-(no teeth) for 315D or Approved Equalday25$0.00$0.00$0.00$0.00
48Ditch Bucket Attachment-(no teeth) for 315D or Approved Equal, Mobilization / Demobilizationeach3$0.00$0.00$0.00$0.00
49Trackhoe- Caterpillar 330DL or Approved Equal w/2.5 cy bucketday600$0.00$0.00$0.00$0.00
50Trackhoe- Caterpillar 330DL or Approved Equal w/2.5 cy bucket, Mobilization / Demobilizationeach100$0.00$0.00$0.00$0.00
51Tracked Dozer- Caterpillar D3C LGP or Approved Equalday25$0.00$0.00$0.00$0.00
52Tracked Dozer- Caterpillar D3C LGP or Approved Equal, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
53Tracked Dozer- Caterpillar D6H LGP or Approved Equalday50$0.00$0.00$0.00$0.00
54Tracked Dozer- Caterpillar D6H LGP or Approved Equal, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
55Roller Compactor - Caterpillar CB 224E or Approved Equalday50$0.00$0.00$0.00$0.00
56Roller Compactor - Caterpillar CB 224E or Approved Equal, Mobilization / Demobilizationeach10$0.00$0.00$0.00$0.00
57Roller Compactor - Caterpillar CS 434 or Approved Equalday20$0.00$0.00$0.00$0.00
58Roller Compactor - Caterpillar CS 434 or Approved Equal, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
59Mini Excavator - Caterpillar 303 or Approved Equalday150$0.00$0.00$0.00$0.00
60Mini Excavator - Caterpillar 303 or Approved Equal, Mobilization / Demobilizationeach50$0.00$0.00$0.00$0.00
Skid Steer Loader and Attachments
Price lineDescription - Skid Steer Loader and Attachments (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
61Skid Steer Loader-60-70 HP, w/ 68" front utility bucketday400$0.00$0.00$0.00$0.00
62Skid Steer Loader-60-70 HP, w/ 68" front utility bucket, Mobilization / Demobilizationeach50$0.00$0.00$0.00$0.00
63Grapple Bucket Attachment for Skid Steer or Approved Equalday50$0.00$0.00$0.00$0.00
64Grapple Bucket Attachment for Skid Steer or Approved Equal, Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
65Sweeper Attachement- for use with Skid Steer Loaderday50$0.00$0.00$0.00$0.00
66Sweeper Attachement- for use with Skid Steer Loader, Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
67Drop Hammer Attachment for use with Skid Steer Loaderday20$0.00$0.00$0.00$0.00
68Drop Hammer Attachment for use with Skid Steer Loader, Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
69Compact Track Loader-85-100 HP, w/ 68" Bucket Combination Loader/Telehandlerday50$0.00$0.00$0.00$0.00
70Compact Track Loader-85-100 HP, w/ 68" Bucket Combination Loader/Telehandler, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
Vacuum and Tank Trucks
Price lineDescription - Vacuum and Tank Trucks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
71Waste Hauling Vacuum Truck- 3,000 to 4,000 gallon capacityday100$0.00$0.00$0.00$0.00
72Waste Hauling Vacuum Truck- 3,000 to 4,000 gallon capacity, Mobilization / Demobilizationeach75$0.00$0.00$0.00$0.00
73Waste Hauling Tank Truck- 3,000 to 4,000 gallon capacityday50$0.00$0.00$0.00$0.00
74Waste Hauling Tank Truck- 3,000 to 4,000 gallon capacity, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
75Non- Waste Hauling Water Truck- 2,000-or greater gallon capacity with min. 3 valve spray system and hoses-for dust controlday50$0.00$0.00$0.00$0.00
76Non- Waste Hauling Water Truck- 2,000-or greater gallon capacity with min. 3 valve spray system and hoses-for dust control, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
Bulking Chambers and Tanks
Price lineDescription - Bulking Chambers and tanks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
77Horizontal Polyethylene Storage Tank - 500 gallon capacityday50$0.00$0.00$0.00$0.00
78Horizontal Polyethylene Storage Tank - 500 gallon capacity, Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
79Vertical Polyethylene Industrial Holding Tank - 4,000-6,000 gallon capacityday50$0.00$0.00$0.00$0.00
80Vertical Polyethylene Industrial Holding Tank - 4,000-6,000 gallon capacity, Mobilization / Demobilizationeach3$0.00$0.00$0.00$0.00
8120 CY Rolloff Container- without disposalday300$0.00$0.00$0.00$0.00
8220 CY Rolloff Container- without disposal, Mobilization / Demobilizationeach100$0.00$0.00$0.00$0.00
Trucks
Price lineDescription - Trucks (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
83Waste Hauling Dump Truck-10-20 cy capacityday200$0.00$0.00$0.00$0.00
84Waste Hauling Dump Truck-10-20 cy capacity, Mobilization / Demobilizationeach100$0.00$0.00$0.00$0.00
85Waste Hauling Tractor Truck w/ 40 cy dump trailerday50$0.00$0.00$0.00$0.00
86Waste Hauling Tractor Truck w/ 40 cy dump trailer, Mobilization / Demobilizationeach20$0.00$0.00$0.00$0.00
87Box Truck- , min. 600 cu.ft. capacity w/lift gateday50$0.00$0.00$0.00$0.00
88Flat Bed Stake Body truck- min. 1 ton cap. w/ 12 ft. bed & hydraulic rear gateday100$0.00$0.00$0.00$0.00
89Non- Waste Hauling Pickup Truck-3/4 ton capacity, 4wdday300$0.00$0.00$0.00$0.00
Floodlights ,Trailer and Accessories
Price lineDescription - Floodlights ,Trailer and Accessories (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
90Floodlights- towable light towers with diesel generator, 4 - 1000w Metal Halide Spring Mounted Floodlights per weekweek10$0.00$0.00$0.00$0.00
91Floodlights- towable light towers with diesel generator, 4 - 1000w Metal Halide Spring Mounted Floodlights per week , Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
92Generator Whisperwatt or Approved Equal - 36kW 60 Hz for powering Office Trailer per weekweek200$0.00$0.00$0.00$0.00
93Generator Whisperwatt or Approved Equal - 36kW 60 Hz for powering Office Trailer per week, Mobilization / Demobilizationeach15$0.00$0.00$0.00$0.00
94Office Trailer for NJDEP- 8' X 28' Double Office w/ restroom- per weekweek200$0.00$0.00$0.00$0.00
95Office Trailer for NJDEP- 8' X 28' Double Office w/ restroom- per week, Mobilization / Demobilizationeach15$0.00$0.00$0.00$0.00
96Portable Handicapped Sanitation Unit- ADA compliant h90" X w77" X d77" per weekweek300$0.00$0.00$0.00$0.00
97Portable Handicapped Sanitation Unit- ADA compliant h90" X w77" X d77" per week, Mobilization / Demobilizationeach50$0.00$0.00$0.00$0.00
Generators & Pressure Washers
Price lineDescription - Generators & Pressure Washers (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
98Generator Portable- 2.5 Kilowattsday50$0.00$0.00$0.00$0.00
99Generator, Portable- 6.5 Kilowattsday25$0.00$0.00$0.00$0.00
100Cold Pressure Washer- 2,000 psi. with wand, 100' hose and tipsday50$0.00$0.00$0.00$0.00
Compressors & Power Tools
Price lineDescription - Compressors & Power Tools (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
101Compressor- 185 cfm diesel with 80 lb. Air Hammerday10$0.00$0.00$0.00$0.00
102Compressor- 185 cfm diesel with 80 lb. Air Hammer, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
103Compressor with Air Driver Rivet Buster- Min 100 cfs compressorday20$0.00$0.00$0.00$0.00
104Compressor with Air Driver Rivet Buster- Min 100 cfs compressor, Mobilization / Demobilizationeach10$0.00$0.00$0.00$0.00
105Oxy-Acetylene Cutting Torch-with gas bottles includedday10$0.00$0.00$0.00$0.00
106Oxy-Acetylene Cutting Torch-with gas bottles included, Mobilization / Demobilizationeach2$0.00$0.00$0.00$0.00
107Nitrogen High Pressure Cylinder for UST work- Size 250day20$0.00$0.00$0.00$0.00
108Nitrogen High Pressure Cylinder for UST work- Size 250, Mobilization / Demobilizationeach10$0.00$0.00$0.00$0.00
109Gas Powered Cutoff Saw -60-70 cc with Abbrasive Bladesday35$0.00$0.00$0.00$0.00
110Gas Powered Chainsaw- 50-60 cc with 18"-20" bladeday50$0.00$0.00$0.00$0.00
111Sawsall- with metal cutting bladesday50$0.00$0.00$0.00$0.00
112Walk Behind Saw-with concrete or asphalt cutting bladesday20$0.00$0.00$0.00$0.00
113Walk Behind Saw-with concrete or asphalt cutting blades, Mobilization / Demobilizationeach10$0.00$0.00$0.00$0.00
114Plate Tamper - Wacker Neuson WF1550 or Approved Equalday20$0.00$0.00$0.00$0.00
115Plate Tamper - Wacker Neuson WF1550 or Approved Equal Mobilization / Demobilizationeach10$0.00$0.00$0.00$0.00
Pumps
Price lineDescription - Pumps (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
116Trash-Sewage Pump- 2" gas powered trash pump 170 gpmday25$0.00$0.00$0.00$0.00
117Submersible Pump- 2" 70 gpmday20$0.00$0.00$0.00$0.00
Drums
Price lineDescription - Drums (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
11855 Gallon Drum- New, Open Head, UN 1A2/Y/1.5/150each200$0.00$0.00$0.00$0.00
11955 Gallon Drum-New, Closed Head, Rolled Steel UN 1A1/Y/1.4/300each20$0.00$0.00$0.00$0.00
12085 Gallon Salvage Overpack- New, Yellow Open Head, UN1A2/X440/Seach100$0.00$0.00$0.00$0.00
12195 Gallon Polythylene Overpack- UN 1H2/X345/Seach20$0.00$0.00$0.00$0.00
Revegetation/ Clearing
Price lineDescription - Revegetation/ Clearing (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
122Weed-Whacker Trimmer- with metal brush blades- (Min 33cc.)day10$0.00$0.00$0.00$0.00
123Wood/Brush Chipper-Engine driven 35-50 HP Trailer Unit with 12" capacityday10$0.00$0.00$0.00$0.00
124Wood/Brush Chipper-Engine driven 35-50 HP Trailer Unit with 12" capacity, Mobilization / Demobilizationeach5$0.00$0.00$0.00$0.00
Field Monitoring Instruments
Price lineDescription - Field Monitoring Instruments (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
125TVA 1000 or equal- combo FID/PIDday50$0.00$0.00$0.00$0.00
126Combustible Gas Meterday50$0.00$0.00$0.00$0.00
127MIE RAM-1 or DataRAM- Monitors or equivalentweek125$0.00$0.00$0.00$0.00
128Portable Mini-RAMday60$0.00$0.00$0.00$0.00
Material and Site Control
Price lineDescription - Material and Site Control (Bid Solicitation Section 4.10.2, On-Schedule Equipment and Materials)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
129Plastic Sheeting- 20' wide 6 mil.plastic, 200 sq.yd./ rolleach200$0.00$0.00$0.00$0.00
130Vermiculite- Environmentally safe, 50 lb bageach20$0.00$0.00$0.00$0.00
131Spill Pads, Polyproylene, Baleeach100$0.00$0.00$0.00$0.00
132Sorbent Booms, 5" Diameter Polyproylene, 4/per Baleeach100$0.00$0.00$0.00$0.00
133Caution Tape- 200 ft. rolleach100$0.00$0.00$0.00$0.00
134Flashing Barricades-Polyethylene frame,reflective tape w/lighteach30$0.00$0.00$0.00$0.00
135Spill Absorbent - Clay/Cellulose Mixture Speedy Dry or Bone Dri, per bageach50$0.00$0.00$0.00$0.00
136Geotextile Fabric- Woven non-biodegradable polypropylene, per sq. yd.sq. yd100$0.00$0.00$0.00$0.00
137Erosion Control Blanket -Straw Biodegradable Single Net Blanket, per sq. yd.sq. yd20$0.00$0.00$0.00$0.00
138Silt Fence- woven polypropylene, 36” in width and fastened to hardwood posts, per linear ft.lf1,000$0.00$0.00$0.00$0.00
139High Visibility Plastic Safety fence + posts- 4' high, per linear ft.lf2,500$0.00$0.00$0.00$0.00
Non-Scheduled Item Mark-up
Price lineDescription - Non-Scheduled Item Mark-up (Bid Solicitation Sections 4.10.3.2 Contract Modifications for Equipment, Materials, and Services and 4.10.3.3 Contract Modifications for Waste Disposal and Contaminated Materials Recycling)Unit of MeasurementEstimated Quantity (a)Year 1 Unit PricingYear 2 Unit PricingYear 3 Unit PricingTotal Price
140Non-Scheduled Item Mark-up - Not to Exceed 10% (b)percent$1,000,000.000.00%0.00%0.00%$0.00
141Non-Scheduled Item Mark-up, Waste Disposal - Not to exceed 15% (c)percent$500,000.000.00%0.00%0.00%$0.00
Total Quote Price for All Three (3) Years: All Price Lines(d)$0.00
(a) The State makes no guarantee of work volume.
(b) Mark-up shall not exceed ten percent (10%).
(c) Mark-up shall not exceed fifteen percent (15%).
(d) Price used to rank Quotes.