Supplemental Price Breakdown.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Project 570-19-107 | Improve Site Access and Physical Security Deficiencies Federal contract opportunity
Solicitation number
36C26123R0110
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21

About this file

This document contains a supplemental price breakdown spreadsheet for a federal contract solicitation to improve site access and physical security at a Department of Veterans Affairs facility. The spreadsheet provides a line item budget for materials, labor, and total costs for general requirements, existing conditions demolition, earthwork, exterior improvements, and construction of a new security monitor room. Line items include project management, temporary facilities, security demolition, fencing, gates, landscaping, plumbing, HVAC and security equipment. The total proposed cost is $6,000 which includes overhead, profit and bonds/insurance. The related federal contract opportunity is solicitation number 36C26123R0110 to improve deficiencies in site access and physical security at the VA Veterans Integrated Service Network 21 facility. Pricing is due by the response date listed on the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Project 570-19-107 | Improve Site Access and Physical Security Deficiencies, newest first.
File Type Posted
SF30- Clarification on Due Date.pdf PDF
SF30- Amend 0003.pdf PDF
Atch. AS-101-Correct.pdf PDF
36C26123R0110 Amend 0002.pdf PDF
36C26123R0110 RFIs.pdf PDF
RFI Atch 1 Soils Report.pdf PDF
Site Visit Attendance Roster.pdf PDF
RFI Atch 2- AS 101.pdf PDF
SF30 Amend 0001- Clarify Site Visit Date.pdf PDF
CA Wage Determination 20230018 - 09292023.pdf PDF
VA Specifications- Final.pdf PDF
01_General Drawings (1).pdf PDF
03_Landscape Drawings (1).pdf PDF
07_FP Topo and Misc Drawings (1).pdf PDF
Appendix A Revised 10-6-23.pdf PDF
APPENDIX C.pdf PDF
04_Architectural Drawings (1).pdf PDF
05_Structural Drawings (1).pdf PDF
06_MEP Drawings (1).pdf PDF
02_Civil Drawings (1).pdf PDF
APPENDIX B.pdf PDF
Large Business Subcontracting Plan Template.docx DOCX document
CONTRACTOR CERTIFICATION REGARDING SAFETY AND ENVIRONMENTAL.docx DOCX document
001.RFP 36C26123R0110 Improve Site Access and Security Deficiencies.pdf PDF
Request for Information(RFI) Form.docx DOCX document
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT B - PRICING SCHEDULE
Improve Site Access and Physical Security
DESCRIPTIONMATERIALLABORTOTAL
General Requirements
Project Manager$$ - 0
Superintendent/Safety$$ - 0
Quality Control Manager$$ - 0
Temporary Facilities & Controls$$$ - 0
Laborer$$$ - 0
Mobilization$$$ - 0
$$$ - 0
General Requirements Total$ - 0$ - 0$ - 0
Existing Conditions (Demolition)
Security Monitor Room$$$ - 0
Site Demolition$$$ - 0
Main Gate Demolish$$$ - 0
Fresno Entry Demolition$$$ - 0
Parking H Demolition$$$ - 0
Bollards Demolition$$$ - 0
Landscaping/Irrigation Demolition$$$ - 0
Electrical Demolition$$$ - 0
Plumbing Demolition$$$ - 0
$$$ - 0
$$$ - 0
Existing Conditions Total$ - 0$ - 0$ - 0
Earthwork
Erosion Control$$$ - 0
$$$ - 0
$$$ - 0
$$$ - 0
Earthwork Total$ - 0$ - 0$ - 0
Exterior Improvements
Fence Material$$$ - 0
Fence/Gate/Bollard Foundations$$$ - 0
Gates$$$ - 0
Bollards$$$ - 0
Landscaping/Irrigation$$$ - 0
$$$ - 0
$$$ - 0
$$$ - 0
$$$ - 0
Exterior Improvements Total$ - 0$ - 0$ - 0
Security Monitor Room
Metal$$$ - 0
Thermal & Moisture Protection$$$ - 0
Wood & Plastic$$$ - 0
Openings$$$ - 0
Finishes$$$ - 0
Ceiling$$$ - 0
Wall Finishes$$$ - 0
Floors$$$ - 0
Specialties$$$ - 0
Equipment/Furnishings$$$ - 0
Fire Protection$$$ - 0
Plumbing$$$ - 0
HVAC$$$ - 0
Electrical$$$ - 0
Communications$$$ - 0
Electronic Safety and Security$$$ - 0
Surveillance$$$ - 0
$$$ - 0
$$$ - 0
$$$ - 0
Security Monitor Room Total$ - 0$ - 0$ - 0
Sub Total$ - 0$ - 0$ - 0
Overhead$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Profit$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Bonds and Insurance$ 1.00$ 1.00$ 2.00
TOTAL$ 3.00$ 3.00$ 6.00

File details come from the government source that posted it. Updated .