01_General Drawings (1).pdf
PDF 8 MB Posted
- Attached to
- Project 570-19-107 | Improve Site Access and Physical Security Deficiencies Federal contract opportunity
- Solicitation number
- 36C26123R0110
About this file
This set of construction drawings and specifications is for Project 570-19-107 to improve site access and physical security deficiencies at the Department of Veterans Affairs Medical Center in Fresno, California. The project scope involves designing mitigation approaches for physical security issues such as fencing, bollards, security cameras including license plate readers, and additional lighting. It also includes providing a new, expanded location for the security monitoring room. The drawings cover site plans, demolition plans, architectural plans and details, structural, mechanical, plumbing and electrical drawings. Construction will be conducted in five phases for exterior lighting and security camera installation to minimize disruptions. The solicitation for this project is number 36C26123R0110 and was issued by the VA Veterans Health Administration VISN 21.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID SET RE-SUBMITTAL
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE SITE ACCESS AND
PHYSICAL SECURITY
DEFICIENCIES
VAMC, FRESNO, CA, 93703
570-19-107
Project Director
03-17-2023Revisions: Date: Dwg. of
3�� SCHEMATIC DESI*N
6�� DESI*N DEVELOPMENT
31� ARDEN AVE� S8ITE �23�
t� 888��00�3823 ZZZ�VFhZaEeQJ�FRP
*LENDALE� CA �1203
PRO-ECT NO�� S6020�180�00
11/12/2021 06/07/2021
��� CONSTR8CTION DOC8MENT 07/18/2022
100� CONSTR8CTION DOC8MENT 10/03/2022
%ID SET S8%MITTAL 10/31/2022
%ID SET RE�S8%MITTAL 03/17/2023
VA CENTRAL CALIFORNIA HEALTH CARE SYSTEM
DEPARTMENT OF VETERANS AFFAIRS
DESIGN FOR SITE ACCESS AND PHYSICAL SECURITY
VA PROJECT #570-19-107
VAMC FRESNO
N
N
PROJECT SCOPE
THE SCOPE FOR THIS PROJECT IS TO FOCUS ON THE REMEDIATION FOR THE SITE DEFICIENCIES IN VA CENTRAL CALIFORNIA HEALTH CARE CENTER, FRESNO REPORTED BY ROMANYK CONSULTING CORPORATION IN THEIR REPORT DATED SEPTEMBER, 25, 2017. THE AE SHALL DESIGN MITIGATION APPROACHES FOR THE PHYSICAL SECURITY DEFICIENCIES SUCH AS FENCING, BOLLARDS, SECURITY CAMERAS INCLUDING LICENSE PLATE READERS AND ADDITIONAL LIGHTING TO MEET IES LIGHTING STANDARDS. THE SCOPE ALSO INCLUDES TO PROVIDE NEW LOCATION FOR THE SECURITY MONITORING ROOM AS THE EXISTING ROOM (ALSO REFERRED AS POLICE DISPATCH ROOM) HAS NO CAPABILITY OF EXPANSION TO ACCOMMODATE NEW EQUIPMENT. COMPLETE MEP DESIGN IS PROVIDED FOR NEW SECURITY MONITORING ROOM WHICH INCLUDES LIGHTING, POWER, HVAC, PLUMBING AND LOW VOLTAGE PER VOLTAGE PER VA STANDARD GUIDELINES.
VICINITY MAP
STRUCTURAL
MECHANCIAL
SITE LOCATION
N
PROJECT DIRECTORY
ARCHITECT
KAL ARCHITECTS, INC.
12-J MAUCHLY,
IRVINE, CA 92618
CONTACT: RITA KALWANI
EMAIL: RKALWANI@KALARCHITECTS.COM
SHEGDE@KALARCHITECTS.COM
ENGINEER.
SCHWAB ENGINEERING
315 ARDEN AVE,SUITE #23
GLENDALE, CA 91203
CONTACT: VARINDER BAJAJ
EMAIL: VBAJAJ@SCHWABENG.COM
SPATEL@SCHWABENG.COM
AREA UNDER THE SCOPE OF WORK
FOR REFERENCE ONLY
TOPOGRAPHIC SURVEY MAP
TOPOGRAPHIC SURVEY MAP
TOPOGRAPHIC SURVEY MAP
TOPOGRAPHIC SURVEY MAP
TOPOGRAPHIC SURVEY MAP
SITE PLAN - LANDSCAPING
SITE PLAN - ELECTRICAL
SITE PLAN - GAS
DESIGN DRAWING SHEET INDEX
DWG. NO.SHEET NO. SHEET TITLE
GENERAL
ARCHITECTURAL
CIVIL
E-001 GENERAL NOTES, APPLICABLE CODES AND STANDARDS
E-002 ELECTRICAL SYMBOLS,LEGENDS AND ABBREVIATIONS
E-003 PANEL SCHEDULE
ES-100 ELECTRICAL SITE LIGHTING PLAN-EXISTING
ES-101 ELECTRICAL SITE SECURITY CAMERA PLAN-EXISTING
ES-200 ELECTRICAL SITE LIGHTING PLAN-NEW
ES-201 ELECTRICAL SITE SECURITY CAMERA PLAN-NEW
ES-202 ELECTRICAL SITE POWER PLAN-NEW
ES-203 ELECTRICAL CONDUIT ROUTING AND TRENCH PLAN
ED-401 PROPOSED SECURITY MONITORING ROOM DEMO PLAN
EP-501 PROPOSED SECURITY MONITORING ROOM NEW PLAN
EP-502 PROPOSED SECURITY MONITORING ROOM SIGNAL AND ROOF PLAN
E-601 PHOTOMETRIC CALCULATION-EXISTING
E-602 PHOTOMETRIC CALCULATION-NEW
E-603 SECURITY MONITORING ROOM PHOTOMETRIC CALCULATION
E-701 ELECTRICAL DETAILS
E-702 ELECTRICAL DETAILS
C-01 COVER AND GENERAL NOTES
C-02 INDEX MAP AND NOTES
CD-03 GATE #1 CONSTRUCTION DEMO
CD-04 GATE #2 CONSTRUCTION DEMO
CD-05 PARKING LOT H DEMO
CP-06 GATE #1 CONSTRUCTION DETAILS
CP-07 GATE #2 CONSTRUCTION DETAILS
CP-08 PARKING LOT H CONST. DETAILS
CI-09 FENCE PLAN :FENCE NO 1-2
CI-10 FENCE PLAN :FENCE NO 3-7
CI-11 FENCE PLAN :FENCE NO 8-12
CI-12 FENCE PLAN :FENCE NO 8-12
CI-13 CONSTRUCTION DETAIL #1
CI-14 CONSTRUCTION DETAIL #2
CG-15 EROSION CONTROL PLAN
CG-16 EROSION CONTROL PLAN
CG-17 EROSION CONTROL DETAILS
CT-18 TOPOGRAPHIC SURVEY
CT-19 TOPOGRAPHIC SURVEY
CT-20 TOPOGRAPHIC SURVEY
CT-21 TOPOGRAPHIC SURVEY
CT-22 TOPOGRAPHIC SURVEY
CT-23 TOPOGRAPHIC SURVEY
CT-24 TOPOGRAPHIC SURVEY
S-001 GENERAL NOTES
S-101 TYPICAL DETAILS
SS-201 FENCE SITE PLAN
SS-202 ENLARGE PLANS
S-301 SECTION AND DETAILS
S-302 SECTION AND DETAILS
M-001 MECHANICAL FRONT SHEET
M-002 MECHANICAL SCHEDULE AND CONTROLS
M-003 MECHANICAL DETAILS
M-004 MECHANICAL DETAILS
MD-100 MECHANICAL DEMOLITION FLOOR PLAN
MH-200 MECHANICAL FLOOR PLAN
MH-201 MECHANICAL ROOF PLAN
PLUMBING
P-001 PLUMBING FRONT SHEET
P-002 PLUMBING SCHEDULE
P-100 PLUMBING SITE PLAN
PD-101 PLUMBING PARTIAL 1ST FLOOR DEMO PLAN BUILDING B1
PL-101 PLUMBING PARTIAL 1ST FLOOR REMODEL PLAN BUILDING B1 ABOVE FLOOR
PL-102 PLUMBING PARTIAL 1ST FLOOR REMODEL PLAN BUILDING B1 BELOW FLOOR
P-201 PLUMBING DETAILS
ELECTRICAL
AS-001 SHEET INDEX,ABBREVIATIONS AND GENERAL NOTES
AS-002 ACCESSIBILITY STANDARD
AS-003 LIFE SAFETY AND EXISTING PLAN
AS-100 SITE DEMOLITION PLAN - CONCEPTUAL
AS-101 OVERALL SITE PLAN
AS-102 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-103 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-104 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-105 FENCE ELEVATIONS
AS-106 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
E. CLINTON AVE.
N.
FR
ES
NO
S T.
E. HARVARD AVE.
E. MCKINELY AVE.
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
TITLE SHEET
VB RD/RS
G-001 1 110
N.
AN
GU
S
ST
N.
FR
ES
NO
S T.
E. HARVARD AVE.
N.
AN
GU
S
ST
E. CLINTON AVE.
VA CENTRAL CALIFORNIA
HEALTH CARE SYSTEM
LANDSCAPE
LC-100 LANDSCAPE COVER SHEET
LD-101 LANDSCAPE DEMOLITION PLAN
LD-102 LANDSCAPE DEMOLITION PLAN
LD-103 LANDSCAPE DEMOLITION PLAN
LD-104 LANDSCAPE DEMOLITION PLAN
LI-101 IRRIGATION PLAN
LI-102 IRRIGATION PLAN
LI-103 IRRIGATION PLAN
LI-104 IRRIGATION PLAN
LI-200 WATER MANAGEMENT INFORMATION
LI-300 IRRIGATION AND PLANTING DETAILS
LP-101 PLANTING PLAN
LP-102 PLANTING PLAN
LP-103 PLANTING PLAN
LP-104 PLANTING PLAN
AS-107 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-108 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-109 ENLARGED SITE PLANS, FENCE AND GATES ELEVATIONS
AS-110 SITE BOLLARDS PLAN
AS-601 GATE & FENCE TYPE ELEVATIONS &SCHEDULES
AD-101 DEMOLITION PLAN
AD-102 REFLECTED CEILING DEMOLITION PLAN
AE-101 SECURITY MONITORING ROOM FLOOR PLAN
AE-102 SECURITY MONITORING ROOM REFLECTED CEILING PLAN
AE-401 INTERIOR ELEVATIONS
AE-402 INTERIOR ELEVATIONS, ACCESSORIES & EQUIPMENT SCHEDULE
AE-501 CEILING DETAILS
AE-502 WALL DETAILS
AE-503 CASEWORK & MISCELLANEOUS DETAILS
AE-601 DOOR SCHEDULE
AF-101 FINISH FLOOR PLAN, SCHEDULE AND LEGEND
G-001 TITLE SHEET
G-002 INFECTION CONTROL
G-003 INFECTION CONTROL
G-004 ELECTRICAL PHASING LIGHTING & POWER
G-005 ELECTRICAL SITE SECURITY CAMERA PHASING PLAN-NEW
G-006 NOT USED
FP-100 FIRE PROTECTION SITE PLAN
FP-101 BUILDING 01 FIRST FLOOR FIRE PROTECTION PLAN
FIRE PROTECTION
AutoCAD SHX Text
EXP. 06-30-23
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
AutoCAD SHX Text N
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID SET RE-SUBMITTAL
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE SITE ACCESS AND
PHYSICAL SECURITY
DEFICIENCIES
VAMC, FRESNO, CA, 93703
570-19-107
Project Director
03-17-2023Revisions: Date: Dwg. of 3�� 6&+(0$7,& '(6,*1 6�� '(6,*1 '(9(/2P0(17
31� $5'(1 $9(� 68,7( �23� t� 888��00�3823 ZZZ�VFhZaEeQJ�FRP */(1'$/(� &$ �1203
P52-(&7 12�� 66020�180�00
11/12/2021 06/07/2021
��� &216758&7,21 '2&80(17 07/18/2022 100� &216758&7,21 '2&80(17 10/03/2022 %,' 6(7 68%0,77$/ 10/31/2022 %,' 6(7 5(�68%0,77$/ 03/17/2023
INFECTION CONTROL
VB RD/RS
G-002 2 110
AutoCAD SHX Text
EXP. 06-30-23
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID SET RE-SUBMITTAL
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE SITE ACCESS AND
PHYSICAL SECURITY
DEFICIENCIES
VAMC, FRESNO, CA, 93703
570-19-107
Project Director
03-17-2023Revisions: Date: Dwg. of 3�� 6&+(0$7,& '(6,*1 6�� '(6,*1 '(9(/2P0(17
31� $5'(1 $9(� 68,7( �23� t� 888��00�3823 ZZZ�VFhZaEeQJ�FRP */(1'$/(� &$ �1203
P52-(&7 12�� 66020�180�00
11/12/2021 06/07/2021
��� &216758&7,21 '2&80(17 07/18/2022 100� &216758&7,21 '2&80(17 10/03/2022 %,' 6(7 68%0,77$/ 10/31/2022 %,' 6(7 5(�68%0,77$/ 03/17/2023
INFECTION CONTROL
VB RD/RS
G-003 3 110
AutoCAD SHX Text
EXP. 06-30-23
AutoCAD SHX Text E
AutoCAD SHX Text No. 29448
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text H
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text E
AutoCAD SHX Text F
AutoCAD SHX Text M
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text U
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text R
AutoCAD SHX Text P
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text L
AutoCAD SHX Text A
AutoCAD SHX Text P
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text G
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text O
YIELD
65 A B
74 A B
A B
PHASING POWER PLAN SEQUENCE-
PHASES - 1,2,3,4,5
A. CONTRACTOR TO PERFORM POWER WIRING AS PER DRAWING #ES-202 FOR EACH PHASE.
B. ANY TRENCHING WORK TO BE COORDINATED WITH VA BEFORE CONSTRUCTION.
C. EXTEND CIRCUIT FROM NEAREST CONNECTION POINT.
D. PROTECT ANY EXISTING UTILITY DURING THE CONSTRUCTION.
E. PROVIDE LABEL TAG FOR ANY TASK PERFORMED UNDER THE SCOPE.
CONSTRUCTION IN SECURITY MONITORING ROOM ( SMR) IS NOT INCLUDED
IN PHASING PLANS AS ALL WORK INCLUDED IN THIS PLAN IS EXTERIOR.
CONTRACTOR TO COORDINATE THE CONSTRUCTION SCHEDULE OF SMR
WITH FACILITY WITHIN THE TOTAL CONSTRUCTION PERIOD.
PHASE -1
N.I.C
PHASE -2
PHASE-3
PHASE -4
PHASE -5
PHASING SEQUENCE-
PHASE - 1
A. REMOVE THE EXISTING LIGHT FIXTURES AND REPLACE
WITH NEW LIGHT FIXTURES. THESE LIGHTS CONTINUE
TO GET POWER FROM THE EXISTING POWER SOURCE.
B. REPAIR COVER PLATE OF THE POLE COVERING
ANCHOR BOLTS AND PAINT THE POLE TO MATCH THE
EXISTING COLOR.
C. CONTRACTOR TO MAKE SURE THAT ALL THE LIGHT
FIXTURES ARE OPERATIONAL AND FUNCTIONING.
PHASE - 2
A. REMOVE THE EXISTING LIGHT FIXTURES AND REPLACE
WITH NEW LIGHT FIXTURES. THESE LIGHTS CONTINUE
TO GET POWER FROM THE EXISTING POWER SOURCE.
B. REPAIR THE COVER PLATE OF THE POLE COVERING
ANCHOR BOLTS AND PAINT THE POLE TO MATCH THE
EXISTING COLOR.
C. CONTRACTOR TO MAKE SURE THAT ALL THE LIGHT
FIXTURES ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 2 AFTER COMPLETION
OF PHASE 1. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE - 3
A. REMOVE THE EXISTING LIGHT FIXTURES AND REPLACE
WITH NEW LIGHT FIXTURES. THESE LIGHTS CONTINUE
TO GET POWER FROM THE EXISTING POWER SOURCE..
B. REPAIR THE COVER PLATE OF THE POLE COVERING
ANCHOR BOLTS AND PAINT THE POLE TO MATCH THE
EXISTING COLOR.
C. CONTRACTOR TO MAKE SURE THAT ALL THE LIGHT
FIXTURES ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 3 AFTER COMPLETION
OF PHASE 2. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE - 4
A. REMOVE THE EXISTING LIGHT FIXTURES AND REPLACE
WITH NEW LIGHT FIXTURES. THESE LIGHTS CONTINUE
TO GET POWER FROM THE EXISTING POWER SOURCE.
B. REPAIR THE COVER PLATE OF THE POLE COVERING
ANCHOR BOLTS AND PAINT THE POLE TO MATCH THE
EXISTING COLOR.
C. CONTRACTOR TO MAKE SURE THAT ALL THE LIGHT
FIXTURES ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 4 AFTER COMPLETION
OF PHASE 3. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE - 5
A. REMOVE THE EXISTING LIGHT FIXTURES AND REPLACE
WITH NEW LIGHT FIXTURES. THESE LIGHTS CONTINUE
TO GET POWER FROM THE EXISTING POWER SOURCE.
B. REPAIR THE COVER PLATE OF THE POLE COVERING
ANCHOR BOLTS AND PAINT THE POLE TO MATCH THE
EXISTING COLOR.
C. CONTRACTOR TO MAKE SURE THAT ALL THE LIGHT
FIXTURES ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 5 AFTER COMPLETION
OF PHASE 4. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
LEGENDS
PHASE - 1
PHASE - 2
PHASE - 3
PHASE - 4
PHASE - 5
SCALE: 1" = 40'-0"
ELECTRICAL SITE LIGHTING PHASING PLAN -NEW1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID SET RE-SUBMITTAL
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE SITE ACCESS AND
PHYSICAL SECURITY
DEFICIENCIES
VAMC, FRESNO, CA, 93703
570-19-107
Project Director
03-17-2023Revisions: Date: Dwg. of
35� 6&+E0A7I& DE6I*1
65� DE6I*1 DE9EL2P0E17
315 A5DE1 A9E� 68I7E �23�
t� 888��00�3823 ZZZ�VFhZaEeQJ�FRP
*LE1DALE� &A �1203
P52-E&7 12�� 660204180�00
11/12/2021 06/07/2021
�5� &216758&7I21 D2&80E17 07/18/2022 100� &216758&7I21 D2&80E17 10/03/2022
BID 6E7 68B0I77AL 10/31/2022
BID 6E7 5E�68B0I77AL 03/17/2023
200 40
PLAN
NORTH
ELECTRICAL SITE LIGHTING
PHASING PLAN-NEW
VB RD/RS
G-004 4 110
AutoCAD SHX Text
MOTORCYCLES
AutoCAD SHX Text B-31
AutoCAD SHX Text
COMMUNITY
AutoCAD SHX Text B-1
AutoCAD SHX Text
MAIN
AutoCAD SHX Text B-3
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
PUMPHOUSE
AutoCAD SHX Text B-7
AutoCAD SHX Text
GASOLINE PUMP
AutoCAD SHX Text B-4
AutoCAD SHX Text
MAIN
AutoCAD SHX Text B-19
AutoCAD SHX Text B-19A
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text B-2
AutoCAD SHX Text
BOILER PLANT
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
OPC
AutoCAD SHX Text
ANCILLARY
AutoCAD SHX Text
OPC
AutoCAD SHX Text B-5
AutoCAD SHX Text
PUMPHOUSE
AutoCAD SHX Text
MENTAL
AutoCAD SHX Text B-25
AutoCAD SHX Text B-34
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
FREEDOM
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
HOSPITAL
AutoCAD SHX Text B-24
AutoCAD SHX Text
LIBERTY
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
LIVING
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
VALOR BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text B-27
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
INDEPENDENCE BLDG
AutoCAD SHX Text
& TANKS
AutoCAD SHX Text B-8
AutoCAD SHX Text
STORAGE SHEDS
AutoCAD SHX Text B-36
AutoCAD SHX Text
BARN
AutoCAD SHX Text B-24
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text B-24
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text B-24
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
B-24 BREEZEWAY
AutoCAD SHX Text
& STAIRS
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text B-22
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text B-22A
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text T-5
AutoCAD SHX Text
ENGR. TRAILER
AutoCAD SHX Text
WALK OF HONOR
AutoCAD SHX Text
CLINTON AVENUE
AutoCAD SHX Text
HARVARD AVENUE
AutoCAD SHX Text
FRESNO STREET
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SPEED BUMP
AutoCAD SHX Text
SPEED BUMP
AutoCAD SHX Text
MAIN ENTRANCE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
VA MONUMENT SIGN
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STORAGE CANOPY
AutoCAD SHX Text
MONUMENT SIGN
AutoCAD SHX Text
NORTH ANGUS STREET
AutoCAD SHX Text
MODULAR 2
AutoCAD SHX Text
LOT C
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text B-18
AutoCAD SHX Text
LIQUID OXYGEN
AutoCAD SHX Text B-17
AutoCAD SHX Text
SHELTER
AutoCAD SHX Text
SMOKING
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BBQ
AutoCAD SHX Text
PARKING LOT H
AutoCAD SHX Text
PARKING LOT A
AutoCAD SHX Text
PARKING LOT B
AutoCAD SHX Text
PARKING LOT C
AutoCAD SHX Text
PARKING LOT E
AutoCAD SHX Text
PARKING LOT F
AutoCAD SHX Text
PARKING LOT G
AutoCAD SHX Text
PARKING LOT D
AutoCAD SHX Text
CLC
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
AutoCAD SHX Text E 22864
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text 9/30/23
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text H.
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
EL 308.5
EL 308.5
65 A B
74 A B
A B
F F
CONSTRUCTION IN SECURITY MONITORING ROOM ( SMR) IS NOT INCLUDED
IN PHASING PLANS AS ALL WORK INCLUDED IN THIS PLAN IS EXTERIOR.
CONTRACTOR TO COORDINATE THE CONSTRUCTION SCHEDULE OF SMR
WITH FACILITY WITHIN THE TOTAL CONSTRUCTION PERIOD.
PHASE -1
N.I.C
PHASE -2
PHASE-3
PHASE -4
PHASE -5
PHASING SEQUENCE-
PHASE - 1
A. REMOVE THE EXISTING CAMERA AND REPLACE WITH
NEW IN SAME PLACE.
B. RUN CAT 6 CABLE FROM COMMUNICATION ROOM TO
NEW CAMERA LOCATION.
C. CONTRACTOR TO MAKE SURE THAT ALL THE CAMERA
ARE OPERATIONAL AND FUNCTIONING.
PHASE - 2
A. REMOVE THE EXISTING CAMERA AND REPLACE WITH
NEW IN SAME PLACE.
B. RUN CAT 6 CABLE FROM COMMUNICATION ROOM TO
NEW CAMERA LOCATION.
C. CONTRACTOR TO MAKE SURE THAT ALL THE CAMERA
ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 2 AFTER COMPLETION
OF PHASE 1. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE - 3
A. REMOVE THE EXISTING CAMERA AND REPLACE WITH
NEW IN SAME PLACE.
B. RUN CAT 6 CABLE FROM COMMUNICATION ROOM TO
NEW CAMERA LOCATION.
C. CONTRACTOR TO MAKE SURE THAT ALL THE CAMERA
ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 3 AFTER COMPLETION
OF PHASE 4. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE - 4
A. REMOVE THE EXISTING CAMERA AND REPLACE WITH
NEW IN SAME PLACE.
B. RUN CAT 6 CABLE FROM COMMUNICATION ROOM TO
NEW CAMERA LOCATION.
C. CONTRACTOR TO MAKE SURE THAT ALL THE CAMERA
ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 4 AFTER COMPLETION
OF PHASE 3. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
PHASE -5
A. REMOVE THE EXISTING CAMERA AND REPLACE WITH
NEW IN SAME PLACE.
B. RUN CAT 6 CABLE FROM COMMUNICATION ROOM TO
NEW CAMERA LOCATION.
C. CONTRACTOR TO MAKE SURE THAT ALL THE CAMERA
ARE OPERATIONAL AND FUNCTIONING.
D. CONTRACTOR TO START PHASE 5 AFTER COMPLETION
OF PHASE 4. CONTRACTOR SHALL COORDINATE WITH
FACILITY TO MINIMIZE THE DISTURBANCES DURING
CONSTRUCTION.
LEGENDS
PHASE - 1
PHASE - 2
PHASE - 3
PHASE - 4
PHASE - 5
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Fi le
P at h
BID SET RE-SUBMITTAL
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
IMPROVE SITE ACCESS AND
PHYSICAL SECURITY
DEFICIENCIES
VAMC, FRESNO, CA, 93703
570-19-107
Project Director
03-17-2023Revisions: Date: Dwg. of
35� 6&+E0A7I& DE6I*1
65� DE6I*1 DE9EL2P0E17
315 A5DE1 A9E� 68I7E �23�
t� 888��00�3823 ZZZ�VFhZaEeQJ�FRP
*LE1DALE� &A �1203
P52-E&7 12�� 660204180�00
11/12/2021 06/07/2021
�5� &216758&7I21 D2&80E17 07/18/2022 100� &216758&7I21 D2&80E17 10/03/2022
BID 6E7 68B0I77AL 10/31/2022
BID 6E7 5E�68B0I77AL 03/17/2023
SCALE: 1" = 40'-0"
ELECTRICAL SITE SECURITY CAMERA PHASING PLAN -NEW1
200 40
PLAN
NORTH
ELECTRICAL SITE SECURITY
CAMERA PHASING PLAN-NEW
VB RD/RS
G-005 5 110
AutoCAD SHX Text
MOTORCYCLES
AutoCAD SHX Text B-31
AutoCAD SHX Text
COMMUNITY
AutoCAD SHX Text B-1
AutoCAD SHX Text
MAIN
AutoCAD SHX Text B-3
AutoCAD SHX Text
ENGINEERING
AutoCAD SHX Text
PUMPHOUSE
AutoCAD SHX Text B-7
AutoCAD SHX Text
GASOLINE PUMP
AutoCAD SHX Text B-4
AutoCAD SHX Text
MAIN
AutoCAD SHX Text B-19
AutoCAD SHX Text B-19A
AutoCAD SHX Text
GENERATOR
AutoCAD SHX Text B-2
AutoCAD SHX Text
BOILER PLANT
AutoCAD SHX Text
WAREHOUSE
AutoCAD SHX Text B-32
AutoCAD SHX Text
OUTPATIENT
AutoCAD SHX Text
OPC
AutoCAD SHX Text
ANCILLARY
AutoCAD SHX Text
OPC
AutoCAD SHX Text B-5
AutoCAD SHX Text
PUMPHOUSE
AutoCAD SHX Text
MENTAL
AutoCAD SHX Text B-25
AutoCAD SHX Text B-34
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
HEALTH
AutoCAD SHX Text
FREEDOM
AutoCAD SHX Text
CLINIC
AutoCAD SHX Text
HOSPITAL
AutoCAD SHX Text B-24
AutoCAD SHX Text
LIBERTY
AutoCAD SHX Text
BLDG
AutoCAD SHX Text
LIVING
AutoCAD SHX Text
CENTER
AutoCAD SHX Text
VALOR BLDG
AutoCAD SHX Text
BLDG
AutoCAD SHX Text B-27
AutoCAD SHX Text
MENTAL HEALTH
AutoCAD SHX Text
INDEPENDENCE BLDG
AutoCAD SHX Text
& TANKS
AutoCAD SHX Text B-8
AutoCAD SHX Text
STORAGE SHEDS
AutoCAD SHX Text B-36
AutoCAD SHX Text
BARN
AutoCAD SHX Text B-24
AutoCAD SHX Text
AUDITORIUM
AutoCAD SHX Text B-24
AutoCAD SHX Text
TOILETS
AutoCAD SHX Text B-24
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text
B-24 BREEZEWAY
AutoCAD SHX Text
& STAIRS
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text
SWITCHGEAR
AutoCAD SHX Text B-22
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text B-22A
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text T-5
AutoCAD SHX Text
ENGR. TRAILER
AutoCAD SHX Text
WALK OF HONOR
AutoCAD SHX Text
CLINTON AVENUE
AutoCAD SHX Text
HARVARD AVENUE
AutoCAD SHX Text
FRESNO STREET
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SOLAR PANELS
AutoCAD SHX Text
SPEED BUMP
AutoCAD SHX Text
SPEED BUMP
AutoCAD SHX Text
MAIN ENTRANCE
AutoCAD SHX Text
SIGN
AutoCAD SHX Text
VA MONUMENT SIGN
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BUS
AutoCAD SHX Text
STORAGE CANOPY
AutoCAD SHX Text
MONUMENT SIGN
AutoCAD SHX Text
NORTH ANGUS STREET
AutoCAD SHX Text
MODULAR 2
AutoCAD SHX Text
LOT C
AutoCAD SHX Text
ELEVATOR
AutoCAD SHX Text B-18
AutoCAD SHX Text
LIQUID OXYGEN
AutoCAD SHX Text B-17
AutoCAD SHX Text
SHELTER
AutoCAD SHX Text
SMOKING
AutoCAD SHX Text
BUS
AutoCAD SHX Text
BBQ
AutoCAD SHX Text
PARKING LOT H
AutoCAD SHX Text
PARKING LOT A
AutoCAD SHX Text
PARKING LOT B
AutoCAD SHX Text
PARKING LOT C
AutoCAD SHX Text
PARKING LOT E
AutoCAD SHX Text
PARKING LOT F
AutoCAD SHX Text
PARKING LOT G
AutoCAD SHX Text
PARKING LOT D
AutoCAD SHX Text
CLC
AutoCAD SHX Text
BUILDING
AutoCAD SHX Text
AutoCAD SHX Text E 22864
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text R
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text S
AutoCAD SHX Text I
AutoCAD SHX Text O
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text G
AutoCAD SHX Text I
AutoCAD SHX Text N
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text L
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text T
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text A
AutoCAD SHX Text T
AutoCAD SHX Text E
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text C
AutoCAD SHX Text A
AutoCAD SHX Text L
AutoCAD SHX Text I
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text N
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text 9/30/23
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text A
AutoCAD SHX Text H.
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text I
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text I
AutoCAD SHX Text A
AutoCAD SHX Text N
AutoCAD SHX Text R
File details come from the government source that posted it. Updated .