This solicitation is seeking sealed bids from certified Small Business Concerns for the Temporary Bridge and Structural Repairs at 3 Bridges project located in St. Croix, U.S. Virgin Islands. The project consists of installing three temporary bridges and structural repairs, including embankment construction, aggregate base, structural repairs, approach work, riprap placement, guardrail installation, pavement marking, and other miscellaneous work. The project will be split into multiple work schedules and contract options, with the total cost expected to fall between $2,000,000 to $5,000,000. Interested vendors must register at www.sam.gov to receive email notifications and bid documents, which are anticipated to be issued on or about February 9, 2023. Completed bids are due on the date specified in Block 13a of the solicitation. The required annual representations and certifications must be completed online. Questions should be directed to eflhd.contracts@dot.gov and must include the solicitation number, project name and number, requester information, and point of contact.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE INSPECTION REPORT
STX702505
ROUTE 7025 OVER UNNAMED CREEK
USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS
LN
STRUCTURE NO. 2902-004P
INSPECTION TYPE: ROUTINE
INSPECTION DATE: 1/24/2022
EU
Report prepared by:
Federal Highway Administration Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov
STRUCTURE SUMMARY STRUCTURE NO. 2902-004P
STX702505 INSPECTION DATE: 01/24/2022
BRIDGE IDENTIFICATION AND DESCRIPTION
MAIN SPAN MATERIAL:
MAIN SPAN TYPE:
# OF BEAMS, MAIN SPAN: .
DECK TYPE:
WEARING SURFACE:
ABUT. FOUNDATIONS:
PIER FOUDNATION(S):
ABUTMENT / PIER MAT'L: ..
PROJ./PLAN REF. NO:
NPS ROAD CLASS:
STRUCTURE HISTORY:
1 - CONCRETE
02 - STRINGER/MULTI-BEAM OR
1 - CONCRETE CAST-IN-PLACE
6 - BITUMINOUS
0 - UNKNOWN
0 - UNKNOWN
1 - CONCRETE
NO. OF MAIN SPANS:
NO. OF APPR. SPANS:
STRUCT. TOTAL LENGTH: .
MAX. SPAN LENGTH:
DECK WIDTH:
CURB TO CURB WIDTH:
YEAR BUILT:
YEAR RECONSTRUCTED: .
SKEW ANGLE:
FRACTURE CRITICAL:
27.9 FT (8.5 M)
14.8 FT (4.5 M)
28.8 FT (8.8 M)
20.8 FT (6.3 M)
0 °
N
LOCATION
USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS
STATE: .............................. 781 - VIRGIN ISLANDS
FACILITY CARRIED: ......... ROUTE 7025
FEATURE INTERSECTED: UNNAMED CREEK
MILE POINT: .. 0 (KM PT 0)
LOCATION: .... 0.15 MILES FROM HIGHWAY 63
INSPECTION TEAM: M. Bostick, F. Fernandez, D. Martin
CONDITION ASSESSMENT:
Mark Bostick
REPORT REVIEW:
Marcus Miller
REPORT APPROVAL: Date: 04/22/2022
Jorgomai Ceesay
STRUCTURE EVALUATION SUMMARY
This two-span concrete tee beam bridge is in critically poor condition at this time. The bridge exhibits advanced and progressive deterioration of the structural concrete and steel reinforcement in most of the beams. The positive moment reinforcement for the concrete beams is exposed and no longer bonded to the concrete, thereby greatly reducing the load capacity of the structure. The exposed reinforcing steel in the exterior beams is 100% ineffective, as the bars have broken due to corrosion.
A letter from FHWA to VIDPW dated February 2, 2018 outlined specific safety measures to be taken immediately, including installing 5-ton weight limit signs at the bridge ends, and at the nearest intersections in advance of the bridge ends; reducing the number of traffic lanes on the structure from two lanes to one lane, using barrels and steel/aluminum fencing on both sides to narrow the traveled way to a single lane down the center of the bridge; installing appropriate warning signs, including “No Trucks” and “One Lane Bridge Ahead” signs, at both approaches; and installing “Stop” signs at both ends of the bridge to reduce vehicle impact on the structure. The letter further recommended that a temporary bridge be installed over the existing structure within 90 days, and that VIDPW continue to monitor the situation with interim inspections every three months.
STRUCTURE SUMMARY STRUCTURE NO. 2902-004P
STX702505 INSPECTION DATE: 01/24/2022
Since the previous inspection, temporary barriers were placed to narrow the traveled way to a single lane, along with new lane restriction and 5-ton weight limit signage installed at both approaches. However, numerous temporary barriers exhibit impact damage, and several barriers are displaced.
Due to the load rating performed of the structure based on the conditions observed during the inspection, it is recommended that posting for the structure be reduced to a 3-ton weight limit. Additionally, it is recommended that semi-permanent concrete barriers be placed on the structure to create a 10'-6" wide lane at the center of the bridge to limit the live loads to Beams 2 and 3 only.
It is recommended that VIDPW as soon as possible install a single lane Bailey-type temporary bridge to span over the existing structure. It is also strongly recommended that the "Stop" signs be installed at both ends of the bridge. Until the temporary bridge is in place, the weight limit posting should be reduced to 3-tons, concrete barriers be placed on the bridge, the weight limit be strictly enforced, and interim inspections be performed every three months.
As a permanent solution, it is recommended that the bridge be replaced with a new structure.
RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 2902-004P
STX702505 INSPECTION DATE : 01/24/2022
PRIORITY OF IMPROVEMENT226
A (Critical) - Structure is closed, in immediate damage of collapse, or presents a critical safety danger.
B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain open at reduced loads or with frequent inspections.
C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.
D (Minor) - Structure is generally in good condition. Preventive maintenance may be required.
E (Special) - Structure is under construction or reconstruction.
A
Item No.
Maintenance Recommendations
(GENERALLY NOT FLHP ELIGIBLE)
QTY. UNIT UNIT
COST
PRELIM.
COST
ESTIMATE
222.7 REMOVE EXISTING 5-TON WEIGHT LIMIT SIGNS AND
INSTALL 3-TON WEIGHT LIMIT SIGNS AT BOTH
APPROACHES. INSTALL "STOP" SIGNS TO HELP IMPROVE
MOTORIST SAFETY UNTIL TEMPORARY BRIDGE CAN BE
INSTALLED. INSTALL CONCRETE BARRIERS TO LIMIT
TRAFFIC TO SINGLE LANE OVER CENTER OF BRIDGE.
1 LS 10000 10000
PRELIM. MAINTENANCE TOTAL : 10000
Item No.
REHABILITATION/RECONSTRUCTION
(TYPICALLY NEEDED WITHIN 5 YEARS)
QTY. UNIT
UNIT
COST
PRELIM. COST ESTIMATES
REHAB RECONSTR
58,59,60 REPLACE EXISTING STRUCTURE.
1 LS 600000 600000
62.9,222.
REPAIR APPROACH GUARDRAIL SYSTEM.
INSTALL TEMPORARY BRIDGE TO SAFELY
CARRY TRAFFIC UNTIL NEW STRUCTURE CAN
BE BUILT.
1 LS 100000 100000
PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : 700000
COST ESTIMATE SUMMARY
PRELIM. MAINTENANCE TOTAL :
PRELIM. REHABILITATION TOTAL :
PRELIM. RECONSTRUCTION TOTAL : .. 0
TOTAL ITEMIZED COSTS:
PRELIMINARY ESTIMATE TOTAL * :
(*Includes typical contract costs for mobilization, traffic control and design/construction engineering: but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for planning purposes only; they should not be used as a complete or final engineers estimate.)
Remarks : See 2/2/18 letter from FHWA to VIDPW for recommended safety measures to be taken immediately.
1 LS 10000 10000
1 LS 600000 600000
1 LS 100000 100000
700000
71000071000071000010000
700000
710000
10000
STRUCTURE NO. 2902-004P
STX702505 INSPECTION DATE: 01/23/2022
1. DECK SLAB
4. RIDEABILITY
5. CURBS, SIDEWALKS, AND MEDIAN
6. PARAPETS AND/OR RAILINGS
7. DRAINS AND DRAINAGE
8. UTILITIES
9. DEFLECTION AND/OR VIBRATION
10.OTHER:
1. BEARING DEVICES
2. GIRDERS OR BEAMS
3. ARCH(ES) OR SLAB(S)
4. FLOOR BEAMS AND STRINGERS
5. TRUSSES
6. DIAPHRAGMS AND BRACING
7. PAINT
8. FASCIA(E)
9. DEFLECTION AND/OR VIBRATION
10.ALIGNMENT
11.OTHER
1. ALIGNMENT
2. EROSION AND/OR SCOUR
3. CHANNEL PROTECTION
4. WATERWAY OBSTRUCTIONS
5. OTHER
6. ADEQUACY OF OPENING
7. NORMAL VELOCITY
8. AVERAGE CLEAR OPENING
9. STREAMBED COMPOSITION:
1. APPROACH SLABS
2. RELIEF JOINTS
3. APPROACH GUARDRAIL
4. SURFACING
5. EROSION
6. SETTLEMENT
7. SIGNS
8. ALIGNMENT
9. OTHER
1. WALL
2. WEEP HOLES
3. FOUNDATION
4. EROSION AND/OR SCOUR
5. SETTLEMENT OR DEFLECTION
6. OTHER
F
G
P
P
P
G
N
N
P
N
N
N
N
N
N
G
G
N
G
F
F
F
F
2 - INSUFF
3 - LOW
N
N
P
F
G
G
F
N
N
2. EXPANSION JOINTS N
3. WEARING SURFACE F
N
DRAINAGE
3 FT
G
NOT APPLICABLEN
EXCELLENT CONDITION9
VERY GOOD CONDITION - no problems noted.8
GOOD CONDITION - some minor problems.7
SATISFACTORY CONDITION - structural elements show some minor deterioration.6
FA R CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.
POOR CONDITION - advanced section loss, deterioration, spalling, or scour.4
SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible. Fatigue cracks in steel or shear cracks in concrete may be present.
CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.
MM NENT FA LURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability.
Structure is closed to
FA LED CONDITION - out of service; beyond corrective action. 0
CONCRETE
1. BREASTWALLS OR COLUMNS F
2. PILE BENTS N
3. CAPS AND/OR BEARING SEATS F
4. BACKWALLS AND/OR BULKHEADS N
5. FOUNDATIONS N
6. WINGWALLS F
7. WEEP HOLES N
8. EXPANSION JOINTS N
9. EROSION AND/OR SCOUR G
10.SETTLEMENT OR DEFLECTION G
11.SLOPE PROTECTION N
12.OTHER N
A. BRIDGE RAILINGS:
B. TRANSITIONS:
C. APPROACH GUARDRAILS:
D. APPROACH GUARDRAIL ENDS:
13. WALLS AND/OR COLUMNS G
N
G
N
G
G
N
0 - Does not meet standards or a safety features is 14.PILE BENTS required and none is provided.
15.CAPS AND/OR BEARING SEATS
1 - Meets currently acceptable standards.
16.FOUNDATIONS
17.EROSION AND/OR SCOUR N - Not applicable or a safety features is not required.
18.SETTLEMENT OR DEFLECTION
19.OTHER
58.1 SOUTH SPAN:
SPALL, 4'W X 2'L X 3"D, WITH EXPOSED REBAR IN BOTTOM OF DECK AT BAY #1 NEAR PIER. SPALL, 3'W X 2'L X UP TO 2"D, WITH
EXPOSED REBAR IN BOTTOM OF DECK AT BAY #2 AT SOUTH ABUTMENT.
NORTH SPAN:
SPALL, FULL WIDTH X 2'L X 2"D, WITH EXPOSED REBAR AT BAY #1 NEAR PIER. DELAMINATION AND SPALL, FULL WIDTH X 1'L X 1"D (PREVIOUSLY 6"W X 6'L), WITH EXPOSED REBAR IN BOTTOM OF DECK AT BAY #2 NEAR NORTH ABUTMENT. SPALL, 5'W X 2'L X 2-
1/2"D, WITH EXPOSED REBAR IN BOTTOM OF DECK AT BAY #3 NEAR NORTH ABUTMENT.
HONEYCOMBED CONCRETE IN UPSTREAM OVERHANG OF NORTH SPAN
58.5
58.6
222.3
NEW RAILING INSTALLED ALONG WEST SIDE OF BRIDGE SINCE PREVIOUS INSPECTION. TEMPORARY PLASTIC BARRIERS PLACED ALONG EAST AND WEST RAILS SINCE PREVIOUS INSPECTION TO REDUCE TRAFFIC TO SINGLE LANE.
IMPACT DAMAGE TO SOUTH END OF WEST TEMPORARY BARRIERS, DESTROYING ONE AND SEVERELY DAMAGING ANOTHER;
FILL MATERIAL MOUNDED AT THIS LOCATION. SEVERAL BARRIERS ARE DISPLACED.
BROKEN BRIDGE RAIL ANCHORAGE ON UPSTREAM SIDE NEAR NORTH END. PEELING PAINT ON EAST BRIDGE RAIL. IMPACT DAMAGE TO EAST RAIL AT NORTH AND SOUTH ENDS. EAST CONCRETE CURB AT 2ND POST FROM NORTH END FAILED DUE TO
IMPACT. INCORRECT LAPPING OF WEST GUARDRAIL NEAR MID-LENGTH.
COLLISION DAMAGE AT NORTHEAST CORNER END TREATMENT.
58.5
58.7
HONEYCOMBED CONCRETE, SPALLS AND EXPOSED REBAR BENEATH SIDEWALK IN BOTH SPANS. MODERATE CRACKING, UP TO 1/8" W, THROUGHOUT SIDEWALK. MINOR CRACKING AND FAILED PAINT ON CURBS AND PEDESTRIAN BARRIER.
MODERATE VEGETATION AND GRAVEL ACCUMULATION ALONG EAST AND WEST CURBLINES.
4 CLOGGED DRAINS ALONG CURBS, WITH WEST DRAINS AT ABUTMENTS COMPLETELY CLOGGED.
MOUNDS OF DEBRIS AT NORTHWEST AND SOUTHEAST CORNERS, BUT NO TEMPORARY BARRIERS PRESENT.
59.2 STRUCTURE CONSISTS OF FOUR TEE BEAMS. SPALLING OF ENTIRE BOTTOM PORTION OF BEAMS WITH REBAR COMPLETELY DEBONDED AND MINOR TO MODERATE CRACKING THROUGHOUT. REBAR PARTIALLY MISSING ALONG BOTTOMS OF BEAMS #1 AND #4. SPALL, FULL HEIGHT X 3'L X UP TO 2"D, STARTING 1' FROM SOUTH ABUTMENT ON UPSTREAM SIDE OF BEAM #2 IN SOUTH
SPAN.
NO SHEAR STIRRUPS VISIBLE IN SPALLED SECTIONS OF CONCRETE.
60.1
60.3
60.6
60.9
60.13
MODERATE CRACKING AT BOTH ABUTMENTS, PARTICULARLY NEAR BEARING SEATS OF FASCIA BEAMS.
HEAVY ABRADING OF BOTH SOUTH ABUTMENT AND PIER WALL. MINOR POCKET OF UNDERMINING, UP TO 1'W X 1"H X UP TO 6"U, ALONG BOTTOM OF SOUTH ABUTMENT AT UPSTREAM END.
GAPS IN JOINTS OF MASONRY BREASTWALLS AND WINGWALLS OF NORTH AND SOUTH ABUTMENTS AT UPSTREAM END.
PIERS CONSIST OF STEM WALL WIDENED WITH TWO COLUMNS AND A BEAM UNDERNEATH SLAB SIDEWALK.
61.2 PAVED EMBANKMENT AT SOUTHWEST CORNER HAS SETTLED DUE TO EROSION.
61.4 DEAD VEGETATION LODGED AT UPSTREAM END. MUDDY CHANNEL WITH CONTAMINATED WATER. LARGE SECTIONS OF CONCRETE DEBRIS IN CHANNEL BELOW STRUCTURE. MULTIPLE DISPLACED TEMPORARY BARRIERS IN DOWNSTREAM
CHANNEL.
61.6 PER PREVIOUS INSPECTION REPORT, BRIDGE WAS SUBMERGED DURING FLOOD IN 2010.
222.4 MINOR TRANSVERSE CRACK, UP TO 1/4" W, IN ASPHALT OVER NORTH AND SOUTH ABUTMENTS IN SOUTHBOUND LANE. LIGHT WEAR, UP TO 1/8" D, IN APPROACH ROADWAY ASPHALT. MINOR TO MODERATE CRACKING, UP TO 1/4" W X 200 SF, IN SOUTH
APPROACH ROADWAY ASPHALT.
222.7 LANE RESTRICTION AND 5-TON WEIGHT LIMIT SIGNS INSTALLED AT NORTH AND SOUTH APPROACHES SINCE PREVIOUS
INSPECTION.
36.A RAILING DOES NOT MEET CURRENT SAFETY STANDARDS.
58.3 CRACKING, UP TO 1/4" W, IN ASPHALT WEARING SURFACE AT NORTH AND SOUTH ENDS IN SOUTHBOUND LANE. MODERATE
WEAR, UP TO 1/8" D, EXPOSING AGGREGATE IN ASPHALT WEARING SURFACE.
61.3 DETERIORATED MORTAR IN DOWNSTREAM CHANNEL PROTECTIVE MASONRY WALLS.
222.8 TRAFFIC SLOWS AT SOUTH APPROACH DUE TO ANGLED INTERSECTION.
H 3 3 6 5
HS 6 5 11 10
TYPE 3 5 5 9 8
TYPE 3S2 9 8 15 14
TYPE 3-3 11 10 19 17
0 - UNKNOWN
CAPACITY MEETS OR EXCEEDS DESIGN LOAD
X CAPACITY IS LESS THAN DESIGN LOAD
ORIGINAL LOAD RATING CALCULATION APPLICABLE
ORIGINAL LOAD RATING CALCULATION REVISED
02/01/2022
ENGINEERING JUDGMENT
STRUCTURE IS POSTED "NO TRUCKS OVER 10,000 LBS" AT BOTH APPROACHES. IT IS RECOMMENDED TO REDUCE WEIGHT LIMIT
POSTING TO 3-TONS.
(201) PARK: USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS
(202) STRUCTURE NAME:..............STX702505
(203) STRUCTURE KIND:............... 1 - BRIDGE
(204) STRUCTURE NUMBER:.........2902-004 P
(205) NPS REGION:
(206) ROUTE CODE NUMBER:
(207) ROAD SECTION NO:
(208) NPS ROAD CLASS:
(209) WITHIN NPS BNDRY?:.......... Yes
(210) OPERATING UNIT:
(211) PROJECT NO(S):
(212) DRAWING NUMBERS:
(21) MAINTAINED BY:......................01 - STATE HIGHWAY AGENCY
(22) OWNER:................................... 01 - STATE HIGHWAY AGENCY
(1) STATE:
(2) STATE HWY. AGENCY DIST:
(3) COUNTY CODE:
(4) CITY / PLACE CODE:
(5) INVENTORY ROUTE:
(6) FEATURES INTERSECTED:
(7) FACILITY CARRIED:
(8) STATE STRUCTURE NO:
(9) LOCATION:
(10) INV. RTE. - MIN. VERT. CLR:
(11) MILE POINT:
(27) YEAR BUILT:
(106) YEAR RECONSTRUCTED:
(20) TOLL:
(37) HISTORIC DESIGNATION:
781 - VIRGIN ISLANDS
78010 ST CROIX
13933
1 4 1 00000 0
UNNAMED CREEK
ROUTE 7025
STX702505
0.15 MILES FROM HIGHWAY 63
99.99 FT ( 99.99 M)
0 (KM PT: 0 )
3 - ON FREE ROAD
5 - NOT ELIGIBLE
(43A) MAIN STR. MATERIAL:..........1 - CONCRETE (44A) APPR. STR. MATERIAL:............ 0 - Other
(43B) MAIN STR. TYPE:.................. 02 - STRINGER/MULTI-BEAM OR (44B) APPR. STR. TYPE:.................... 00 - OTHER
GIRDER
(45) NO. OF MAIN SPANS:..............002 (46) NO OF APPROACH SPANS:
(48) MAX. SPAN LENGTH:..............14.8 FT ( 4.5 M)
(49) STRUCTURE LENGTH:........... 27.9 FT ( 8.5 M) (108) WEAR SURFACE/PROTECT SYSTEM:
(216A) ABUTMENT #1 FDN:........... 0 - UNKNOWN A) TYPE WEARING SURFACE:.. 6 - BITUMINOUS
(216B) ABUTMENT #2 FDN:........... 0 - UNKNOWN B) TYPE MEMBRANE:................. 8 - UNKNOWN
(217A) PREDOM. PIER FDN:.......... 0 - UNKNOWN C) TYPE PROTECTION:.............. 8 - UNKNOWN
(217B) SECOND. PIER FDN:.......... 6 - N/A (218) IS SALT USED?.......................... NO
(107) DECK TYPE:.......................... 1 - CONCRETE CAST-IN-PLACE
(31) DESIGN LOAD:.........................0 - UNKNOWN (41) LOAD RESTRICTION:.................. B - OPEN, POSTING REQUIRED
(66) INVENTORY RATING:..............3 TONS ( 2.7 METRIC TONS) (70) BRIDGE POSTING:...................... 0 - MORE THAN 39.9% BELOW LEGAL
LOADS (0 TONS)
(64) OPERATING RATING:..............6 TONS ( 5.4 METRIC TONS)
(90) INSPECTION DATE: 01/24/2022 (91) FREQ. OF INSP: 3 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):
(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL:.......... N
(220) SPECIAL STUDY TYPE: INSP. EVERY MONTHS - LAST INSP:
(221) SPECIAL STUDY DATE: (B) UNDERWATER:..................... N
INSP. EVERY MONTHS - LAST INSP:
(C) SPECIAL INSPECTION:........ N
INSP. EVERY MONTHS - LAST INSP:
(16) LATITUDE:................................ 17 42'58 96" N (51) CURB TO CURB WIDTH:............ 20.8 FT ( 6.3 M)
(17) LONGITUDE:............................ 64 52 '59.45" W (52) DECK WIDTH:.......................... 28.8 FT ( 8.8 M)
(19) DETOUR LENGTH:.................. 1 MI ( 2 KM) (32) APPR. ROADWAY WIDTH:...... 22.5 FT ( 6.9 M)
(28A) LANES ON STRUCT:.............01 (213) APPR. PAVEMENT WIDTH:... FT ( 0 M)
(28B) LANES UNDER STRUCT:......00 LEFT SHOULDER:............... FT ( 0 M)
(42A) SERVICE ON:.........................1 - HIGHWAY RIGHT SHOULDER:.......... FT ( 0 M)
(42B) SERVICE UNDER:................. 5 - WATERWAY (33) BRIDGE MEDIAN:.................... 0 - NO MEDIAN
(29) AVG DAILY TRAFFIC:..............400 (34) SKEW ANGLE:
(30) YEAR OF ADT:......................... 2019 (35) STRUCTURE FLARED:............ 0 - NO FLARE
(114) FUTURE ADT:.........................480 (47) TOTAL HORIZ. CLEARANCE:.. 20.7 FT ( 6.3 M)
(115) YEAR OF FUTURE ADT:........2029 (50) SIDEWALKS
(101) PARALLEL STRUCTURE:......N - NO PARALLEL STRUCTURE LEFT:.................................... 0 0 FT ( 0 M)
(38) NAVIGATION CONTROL:.........N - NOT APPLICABLE, NO WATERWAY RIGHT:.................................. 5 3 FT ( 1.6 M)
(39) VERTICAL CLEARANCE:.........0 FT ( 0 M) (214) BRIDGE RAIL TYPE
(40) HORIZ. CLEARANCE:..............0 FT ( 0 M) RAIL CONFIGURATION:...... 1 - FULL HEIGHT (NO PARAPET)
(111) ABUT OR PIER PROT:...........1 - NAVIGATION PROTECTION NOT MATERIAL:........................... 4 - STEEL
REQUIRED
LATERAL UNDERCLEARANCE: DESIGN TYPE:..................... 1 - CONTINUOUS RAIL
(55) RIGHT:...............................00 FT ( 0 M) (215) BRIDGE RAIL HEIGHT:.......... 2 83 FT ( 0 86 M)
(56) LEFT:................................ 0 FT ( 0 M) (53) MIN. VRT. CLR. OVER DECK: 99.99 FT ( 99.99 M)
(54) MIN. VRT. UNDRCLRANCE:... .00 FT ( 0 M)
(58) DECK:....................................... 5 (67) STRUCTURAL EVALUATION:
(59) SUPERSTRUCTURE:...............2 (68) DECK GEOMETRY:......................N
(60) SUBSTRUCTURE:.......... 5 (69) UNDERCLEARANCES:................ N
(61) CHANNEL:................................6 (71) WATERWAY ADEQUACY:
(62) CULVERT:.................................N (72) APPROACH ALIGNMENT:
(222) APPROACHES:...................... 6 (113) SCOUR CRITICAL:.................... 8 - STABLE FOR SCOUR CONDITIONS
(223) RETAINING WALL:.................N (225) PURPOSE OF IMPROVEMENT: 2 - REHAB/RECONSTRUCTION
(36) TRAFFIC SAFETY FEAT: 0 0 0 0 (226) PRIORITY OF IMPROVEMENT: A - CRITICAL
(75A) TYPE OF WORK:................... 31 - REPLACEMENT - LOAD/GEOMETRY (227) MAINTENANCE COST:.............$ 10000
(75B) WORK DONE BY:.................. 1 - WORK TO BE DONE BY CONTRACT (228) REHAB / RECNSTR COST:..... $ 700000
(76) IMPROVEMENT LENGTH:....... FT ( 0 M) (229) CONSTRUCTION COST:.......... $ 0
(230) STRUCTURE HISTORY:
(231) ADDITIONAL CONSIDERATIONS:
IT IS RECOMMENDED TO PERFORM INTERIM INSPECTIONS EVERY THREE MONTHS IN ACCORDANCE WITH FHWA LETTER DATED 02/02/2018.
(330) ADDITIONAL CONFIGURATION INFORMATION:
$ 10000
$ 700000
(229) CONSTRUCTION COST:.......... $ 0
Inspector: Mark Bostick Structure Number: STX702505
Inspection Date: 01/24/2022 Facility Carried: ROUTE 7025
Bridge Inspection Report
Pictures
PHOTO 3
Description LOOKING SOUTH TOWARD MARKET STREET
PHOTO 4
Description WEST (DOWNSTREAM) SIDE
Bridge Inspection Report
Pictures
PHOTO 5
Description GENERAL TOPSIDE VIEW LOOKING NORTH
PHOTO 6
Description GENERAL UNDERSIDE VIEW LOOKING NORTH, SOUTH SPAN; NOTE SPALLING WITH
REBAR EXPOSURE ALONG BEAMS
Bridge Inspection Report
Pictures
PHOTO 7
Description CRACKING IN ASPHALT OVER SOUTH END OF BRIDGE
PHOTO 8
Description INCORRECT LAPPING OF WEST GUARDRAIL NEAR MID-LENGTH
Bridge Inspection Report
Pictures
PHOTO 9
Description DAMAGE TO 2ND RAIL POST FROM NORTH OF EAST RAIL
PHOTO 10
Description DEBRIS ACCUMULATION ALONG WEST CURBLINE
Bridge Inspection Report
Pictures
PHOTO 11
Description IMPACT DAMAGE AT NORTH END OF EAST RAIL
PHOTO 12
Description WEIGHT LIMIT SIGNS AT SOUTH APPROACH
Bridge Inspection Report
Pictures
PHOTO 13
Description DAMAGED TEMPORARY BARRIERS AT SOUTHWEST APPROACH
PHOTO 14
Description IMPACT DAMAGE TO SOUTHEAST APPROACH GUARDRAIL
Bridge Inspection Report
Pictures
PHOTO 15
Description SPALLED AND BROKEN CONCRETE DITCH AT SOUTHWEST CORNER
PHOTO 16
Description MAP CRACKING IN SOUTH APPROACH PAVEMENT
Bridge Inspection Report
Pictures
PHOTO 17
Description LANE RESTRICTION SIGN AT NORTH APPROACH
PHOTO 18
Description WEIGHT LIMIT SIGNS AT NORTH APPROACH
Bridge Inspection Report
Pictures
PHOTO 19
Description IMPACT DAMAGE TO NORTHEAST APPROACH GUARDRAIL; NOTE BENT POSTS AND
DAMAGE TO CURB
PHOTO 20
Description GENERAL VIEW OF SOUTH ABUTMENT
Bridge Inspection Report
Pictures
PHOTO 21
Description DEBONDED AND BROKEN LONGITUDINAL REINFORCEMENT ALONG WEST EXTERIOR OF
BEAM #1 ON SOUTH SPAN
PHOTO 22
Description SPALL WITH EXPOSED REBAR ON DECK UNDERSIDE AT BAY #1 ON SOUTH SPAN NEAR
PIER
Bridge Inspection Report
Pictures
PHOTO 23
Description CRACKING AND SPALLING WITH REBAR EXPOSURE ON BEAM #2 ON SOUTH SPAN NEAR
SOUTH ABUTMENT
PHOTO 24
Description CRACKING AND SPALLING WITH REBAR EXPOSURE AT DOWNSTREAM SIDE OF BEAM #2
ON SOUTH SPAN
Bridge Inspection Report
Pictures
PHOTO 25
Description GENERAL VIEW OF PIER, NORTH FACE
PHOTO 26
Description SPALL WITH EXPOSED REBAR ON DECK UNDERSIDE AT BAY #1 ON NORTH SPAN NEAR
PIER
Bridge Inspection Report
Pictures
PHOTO 27
Description CRACKING AND SPALLING WITH EXPOSED REBAR ON BEAM #3 ON NORTH SPAN
PHOTO 28
Description BROKEN LONGITUDINAL REINFORCEMENT ALONG EAST EXTERIOR BEAM #4 ON NORTH
SPAN
Bridge Inspection Report
Pictures
PHOTO 29
Description SPALL WITH EXPOSED REBAR ON UNDERSIDE OF SIDEWALK SLAB
PHOTO 30
Description GAPS IN MORTAR IN NORTH ABUTMENT BREASTWALL AT UPSTREAM END
Bridge Inspection Report
Pictures
PHOTO 31
Description UPSTREAM CHANNEL
PHOTO 32
Description DOWNSTREAM CHANNEL; NOTE DISPLACED TEMPORARY BARRIERS IN CHANNEL
Bridge Inspection Report
Pictures
PHOTO 33
Description DETERIORATION OF MORTAR ON MASONRY CHANNEL PROTECTION WALL AT SOUTH
CHANNEL WALL ON DOWNSTREAM SIDE
PHOTO 34
Description DETERIORATION OF MASONRY CHANNEL PROTECTION WALL AT NORTH CHANNEL WALL
ON DOWNSTREAM SIDE