Amendment 0003 - VI DPW STX(001).pdf

PDF 206 KB Posted

Attached to
Temporary Bridge and Structural Repairs at 3 Bridges in St. Croix, U. S. Virgin Islands
Solicitation number
693C73-23-B-000007
Issued by

About this file

This document provides details on a federal contract solicitation for temporary bridge and structural repair work at three bridges in St. Croix, U.S. Virgin Islands. The solicitation is open only to certified small business concerns and seeks bids to install three temporary bridges and conduct structural repairs. The project consists of embankment construction, aggregate base, structural repairs, approach work, riprap placement, guardrail installation, pavement marking, and other miscellaneous work. It will be split into multiple work schedules or contract options with the total cost expected to fall between $2,000,000 to $5,000,000. The bid due date is extended to April 11, 2023 at 2:00 PM EST by Amendment 0003. The solicitation is issued by the U.S. Department of Transportation Federal Highway Administration Eastern Federal Lands Highway Division. Bidders must complete annual representations and certifications in the System for Award Management and represent themselves as a veteran-owned small business using form VETS-4212.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

693C7323B000007 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

ASHBURN VA 20147

ATTN: CONSTRUCTION

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

ASHBURN VA 20147

ATTN: ACQUISITIONS

693C73

SUITE E2-3-300

QUANTUM PARK, 22001 LOUDOUN COUNTY PKWY

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

See Block 1403/31/20230003

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

02/09/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Project VI DPW STX(001):

The purpose of this Amendment is to:

1) Provide additional clarification to bidder questions received in response to Amendment

0002.

2) Extend the Bid Opening date one week to Tuesday, April 11, 2023, at 2:00 p.m. EST.

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

Amendment No. 0003

U.S. DEPARTMENT OF TRANSPORTATION

FEDERAL HIGHWAY ADMINISTRATION

EASTERN FEDERAL LANDS HIGHWAY DIVISION

Amendment No. 0003 Project VI DPW STX (001)

Temporary Bridges and Structural Repairs Solicitation: 693C73-23-B-000007

The purpose of this Amendment is to

1) Provide additional clarification to bidder questions received in response to Amendment 0002.

2) Extend the Bid Opening date one week to Tuesday, April 11, 2023, at 2:00 p.m. EST.

Questions / Clarifications

The following questions and issues were submitted via email. The Government response for more clarification is provided.

What duration are the temporary bridges expected to be used?

Response: The temporary bridges are expected to remain in place for less than 5 years.

The Contractor needs to provide 1 year warranty after the completion of each bridge.

Has any hydraulic analysis been done for the proposed sites? If not will the contractor be required to provide a hydraulic analysis for each site?

Response: The temporary bridges are expected to remain in place for less than 5 years.

Hydraulics analysis will not be required per DPNR & DPW.

Has any Geotech analysis been completed for the proposed sites? If not will the contractor be required to provide a Geotech analysis for each site?

Response: No, Geotech analysis was not performed. Yes, as clearly stated under Footing Notes of Sheet R01, the contractor is responsible to confirm the assumed 4,000 psf allowable bearing capacity is achieved at the final foundation bottom elevation. The methodology used to confirm the assumed 4,000 psf allowable bearing capacity shall be provided as a submittal for approval.

Will the proposed temporary bridges and abutments/footings be required to meet the 10-year flood without overtopping per AASHTO?

Response: The temporary bridges do not need to be designed for overtopping if it isn’t needed for the temporary bridges.

Amendment 3 info.pdf
U.S. DEPARTMENT OF TRANSPORTATION
FEDERAL HIGHWAY ADMINISTRATION
EASTERN FEDERAL LANDS HIGHWAY DIVISION
Amendment No. 0003
Solicitation: 693C73-23-B-000007

File details come from the government source that posted it. Updated .