Plans - VI DPW STX(001).pdf

PDF 23 MB Posted

Attached to
Temporary Bridge and Structural Repairs at 3 Bridges in St. Croix, U. S. Virgin Islands
Solicitation number
693C73-23-B-000007
Issued by

About this file

This federal solicitation seeks sealed bids from certified small business concerns for the Temporary Bridge and Structural Repairs at 3 Bridges project in St. Croix, U.S. Virgin Islands. The project consists of installing three temporary bridges and conducting structural repairs, including embankment construction, aggregate base, approach work, riprap placement, guardrail installation, pavement marking, and other miscellaneous work. The cost of the entire project is expected to fall between $2,000,000 to $5,000,000. Bid documents were issued on or about February 9, 2023, with bid due date and location specified on the SF 1442 form in Block 13a of the solicitation. Interested vendors must register at www.sam.gov to receive email notifications when documents are added or updated. Annual Representations and Certifications must be completed at www.sam.gov and Form VETS-4212 at http://www.dol.gov/vets/vets4212.htm. The solicitation number is 693C73-23-B-000007 and was issued by the Department of Transportation Federal Highway Administration.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R01

/1

/2 fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

R

P R

O J

N A

M E

B

L A

N K

G

N .D

G N

A C

T U

A L

F

IL

E

GENERAL NOTES

INDEX OF BRIDGE PLAN SHEETS

Steel Girder Bridge Alternative Typical Section

Truss Bridge Alternative Typical Section

Plan and Elevation (Structure 2902-020P)

Site Plan (Structure 2902-020P)

Plan and Elevation (Structure 2902-014P)

Site Plan (Structure 2902-014P)

Plan and Elevation (Structure 2902-004P)

Site Plan (Structure 2902-004P)

General Notes and Index

SHEET NO. SHEET TITLE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

GENERAL NOTES:

N/A

Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects, FP-14.

Construction:

AASHTO LRFD Bridge Design Specifications, 9 Edition, 2020

Design:

SPECIFICATIONS:

th

2902-004P, 2902-014P, 2902-020P

SCOPE OF WORK

Provide 2-inch cover for reinforcing steel unless otherwise noted.

Furnish reinforcing steel conforming to AASHTO M 31, Grade 60 deformed.

Reinforcing Steel:

Concrete:

- inch unless otherwise noted.4 3Chamfer exposed edges of all concrete

Furnish Class A(AE) concrete with f'c = 4.5 ksi at 28 days.

MATERIALS:

Furnish all structural steel conforming to ASTM A572, grade 50 steel.

Structural Steel:

Dead Load:

Concrete: 150 pcf

DESIGN LOADS:

Vehicle live load: HL-93

Live Loads:

Verify subgrade bearing pressure prior to casting footing

Assume a subgrade bearing pressure of 4 ksf

Footings:

The Contractor is responsible for the stability of the structure during the construction phase.

and locate all utilities before proceeding work.

surrounding area, adjust dimensions of the work to fit existing conditions. Contact utility companies of the proposed work in this contract are dependent on the dimensions of configuration of the

Verify all controlling field dimensions before ordering or fabricating any material. Where dimensions

CONSTRUCTION:

over existing structure.

- Design and install a two-lane temporary bridge and foundation

- Partially demolish concrete parapet from existing structure.

Structure Number 2902-020P - Route 669 Culvert over existing structure.

- Design and install a two-lane temporary bridge and foundation

- Remove guardrail from existing structure.

Structure Number 2902-014P - Route 70 Bridge

Schedule B over existing structure.

- Design and install a one-lane temporary bridge and foundation

Structure Number 2902-004P - Route 7025 Bridge

Schedule A

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

R02 fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-004P)

SITE PLAN

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

" = 1'-0"8

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

2902-004P

C r e e k

N

C Structure

C Route 7025L

Existing sidewalk

Begin Bridge

Sta. 302+21.62 Sta. 302+71.78

End Bridge

Notes:

system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 1.

Bridge Length: 50'-2"

L

(Typ.)

Existing guardrail

302+00 303+00

50'-2"

SCHEDULE A

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R03

Bridge Length: 50'-2"

N fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-004P)

PLAN AND ELEVATION

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

Notes:

D01.

4. For additional information on the proposed ramp, see sheet system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

3. The bridge and foundation system shown on this sheet are for

BRIDGE ALTERNATIVE TYPICAL SECTION" sheets.

BRIDGE ALTERNATIVE TYPICAL SECTION" and "STEEL GIRDER

For details on temporary bridge alternatives, see "TRUSS 2.

bridge deck.

Set low chord of new temporary bridge 6" above existing 1.

3" = 1'-0"

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

-5

PLAN

ELEVATION

2902-004P

50'-2"

C Roadway

11'-6" east of

Existing ground

C Roadway

19'-3" west of

Existing ground to remain

Existing structure

(Typ.) (See Note 4)

Proposed ramp joint (Typ.)

±1" Expansion

C Structure

C Route 7025L

L

50'-2"

Begin Bridge

Elev. XX.XX (See Note 1)

Sta. 302+21.62 Elev. XX.XX (See Note 1)

Sta. 302+71.78

End Bridge profile

Existing

L

L

302+20 302+40 302+60 302+80

Abutment 1 Abutment 2

SCHEDULE A

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R04

Bridge Length: 60'-2" fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-014P)

SITE PLAN

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

2902-014P

5 6

0 5

N

Sta. 102+44.93

End BridgeBegin Bridge

Sta. 101+84.77 C Structure

C Route 70L

L

G u t

60'-2"

Notes:

system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 1.

101+00 102+00 103+00

SCHEDULE B

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R05

Bridge Length: 60'-2" fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-014P)

PLAN AND ELEVATION

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

Notes:

necessary for the installation of the new temporary bridge.

5. Remove existing guardrail system from existing bridge as

D03.

4. For additional information on the proposed ramp, see sheet system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

3. The bridge and foundation system shown on this sheet are for

BRIDGE ALTERNATIVE TYPICAL SECTION" sheets.

BRIDGE ALTERNATIVE TYPICAL SECTION" and "STEEL GIRDER

For details on temporary bridge alternatives, see "TRUSS 2.

bridge deck.

Set low chord of new temporary bridge 6" above existing 1.

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

PLAN

ELEVATION

2902-014P existing structure

Remove guardrail from

N

C Roadway

13'-8" north of

Existing ground

C Roadway

13'-2" south of

Existing ground

60'-2"

C Structure

C Route 70L

LElev.XX.XX (See Note 1)

Sta. 102+44.93

Elev.XX.XX (See Note 1)

Sta. 101+84.77

End BridgeBegin Bridge exsiting structure (Typ.)

Remove guardrail from

(Typ.) (See Note 4)

Proposed ramp

60'-2" to remain

Existing structure

L L joint (Typ.)

±1" Expansion

102+00101+80101+60 102+20 102+40 102+60

Abutment 1 Abutment 2

SCHEDULE B

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R06

Bridge Length: 70'-2" fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-020P)

SITE PLAN

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

2902-020P

Begin Bridge

Sta. 201+58.82

Sta. 202+28.99

End Bridge

Notes:

system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 1.

N

201+00 202+00

203+00

70'-2"

SCHEDULE B

C Structure

C Route 669L

L

C a s tle B u r k G u t

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R07

Bridge Length: 70'-2" fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

(STRUCTURE 2902-020P)

PLAN AND ELEVATION

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

Notes:

D02.

5. For additional information on the proposed ramp, see sheet limits of parapet demolition for approval.

temporary bridge according to Section 203. Submit to CO

4. Partially demolish existing concrete parapet to fit new system to the CO for approval.

illustration purposes only. Submit a bridge and foundation

The bridge and foundation system shown on this sheet are for 3.

BRIDGE ALTERNATIVE TYPICAL SECTION" sheets.

BRIDGE ALTERNATIVE TYPICAL SECTION" and "STEEL GIRDER

For details on temporary bridge alternatives, see "TRUSS 2.

bridge deck.

Set low chord of new temporary bridge 6" above existing 1.

" = 1'-0"2

R

P R

O J

N A

M E

P

E

-0

P

.D G

N A

C T

U A

L F

IL

E

PLAN

ELEVATION

2902-020P

(See Note 4) concrete parapet

Partially demolish cave

Existing erosion to remain

Existing structure

Elev. XX.XX (See Note 1)

Sta. 202+28.99

End BridgeBegin Bridge

Elev. XX.XX (See Note 1)

Sta. 201+58.82

70'-2"

N joint (Typ.)

±1" Expansion

C Structure

C Route 669L

(See Note 4) concrete parapet

Partially demolish

C Roadway

15'-10" west of

Existing ground

C Roadway

14'-9" east of

Existing ground

(Typ.) (See Note 5)

Proposed ramp

L

L

L

Existing profile

202+00 202+20 202+40 202+60

201+40201+20 201+80201+60

Abutment 1 Abutment 2

SCHEDULE B

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R08 fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

TYPICAL SECTION

TRUSS BRIDGE ALTERNATIVE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

R

X P

R O

J N

A M

E B

L A

N K

S

H T

.D G

N A

C T

U A

L F

IL

E

Not to Scale

FOR INFORMATION ONLY

2902-004P, 2902-014P, 2902-020P

Notes:

purposes only.

2. The bridge cross section shown on this sheet is for illustration

Submit a TL-2 railing to CO for approval.1.

24'-0" Curb to curb (2902-014P & 2902-020P)

12'-0" Curb to curb (2902-004P)

SCHEDULES A&B

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

R09 fh fl fi le s e rv e .f lh d .f h w a .d o t.

g o v \d a ta

\P R

O J E

C T

S

S T

A T

E D

O T

\V I\

S t_

C ro ix \D

P W

S T

X

B ri d g e \M ic ro s ta ti o n \B ri d g e D e s ig n F il e s \0

P

R O

J E

C T

S .d g n

TYPICAL SECTION

STEEL GIRDER BRIDGE ALTERNATIVE

REVISIONSNO. DATE BYNO. DATE BY REVISIONS

/1

/2

R

X P

R O

J N

A M

E B

L A

N K

S

H T

.D G

N A

C T

U A

L F

IL

E

Not to Scale

TYPICAL SECTION

2902-004P, 2902-014P, 2902-020P

FOR INFORMATION ONLY

Notes:

purposes only.

2. The bridge cross section shown on this sheet is for illustration

Submit a TL-2 railing to CO for approval.1.

24'-0" Curb to curb (2902-014P & 2902-020P)

12'-0" Curb to curb (2902-004P)

C Roadway

C StructureL

L

(Typ.)

Steel beam

SCHEDULES A&B

NUMBER

AGREEMENT

STATE PROJECT

NUMBER

SHEET

VI VI DPW STX (001)693C73-21-K-500025

PROJECT TEAM LEADERSCALECHECKED BYDESIGNED BY

KDN KDN/JG CP

DRAWN BY

Christopher Negley of

DATE BRP NO.BRIDGE PLAN SHEET

November 2022 BRP-13249

USVI (ST CROIX) - DEPARTMENT OF PUBLIC WORKS

2902-020P, 2902-004P, 2902-014P

STRUCTURAL REPAIRS AT 3 BRIDGES,

TEMPORARY BRIDGE AND

Structure Number:

EASTERN FEDERAL LANDS HIGHWAY DIVISION

VI_DPW_STX(001)_plans_adv.pdf
VI DPW STX (001) - PLANS 100%.pdf
VI_DPW_STX(001)_plans_adv
VI_DPW_STX(001)_plans_adv
VI_DPW_STX(001)_plans_adv

File details come from the government source that posted it. Updated .